Terms of Reference for a final Evaluation for the project:

Size: px
Start display at page:

Download "Terms of Reference for a final Evaluation for the project:"

Transcription

1 Terms of Reference for a final Evaluation for the project: Integrated River Basin Management at Koshi River Safeguarding the lives of millions 1. BACKGROUND TO THE FINAL EVALUATION 1.1. Programme background The project was initiated due to the recognition that Koshi basin is major water system providing well-being and development for millions of people in the region. At the same time primary water users are exhibiting stress signals (mainly local communities), as a result of environmental catastrophes (flooding of 2008, which displaced tens of thousands of people), large scale infrastructure development plans (mainly hydropower), and climate change (melting of glaciers and climatic variation). At the same time, the Government of Nepal (GoN) has developed National Water Plan (NWP) in 2005, which stresses strongly the need for Integrated River Basin Management, in order to decrease the increasing amount of inter-sectoral, inter-regional and riparian conflicts related to river systems (NWP Nepal, 2005). National development priorities for the GoN as outlined in the current planning documents (e.g. included in the draft National Development Strategy Paper, NDSP 2009; Trade, Private Sector Development and Investment Opportunities discussion paper, 2009, and Transformation of Nepal s Economy Agenda for Growth and Social Equity discussion paper, 2009) are economic growth and dramatic increased investments in energy, agriculture and rural development sectors. These are very typical priorities for any developing country, but the government s emphasis on ensuring social equity and the role of civil society envisioned to achieve these ambitious plans single out Nepal from other developing countries. It is often contested that economic growth and social equity are difficult to match, while the fact is that they shouldn t be mutually exclusive. This project was initiated based on the ground realities (rampant poverty, unsustainable land use practices and lack of capacity at the local level) combined with national priorities. During the scoping exercise WWF found that even though there were necessary plans and policy framework in place, their implementation is limited, partly due to the political instability, partly because of government s limited resources and capacity (financial and human) to deliver services. WWF Nepal initiated a stakeholder engagement process, reaching from local communities to the highest level of government, which was culminated in February 2009 with an inauguration of pilot IRBM initiative, jointly implemented by WWF Nepal and Water and Energy Commission Secretariat (WECS), the GON and financially supported by the Ministry for Foreign Affairs of Finland (MFA). From a long-term perspective, this project is designed to act as a showcase to demonstrate integrated river basin management approach and help replicating successes in other parts of the country. However, since the basin and the water systems it contributes to are of trans-boundary nature, the objective is to develop a multicountry basin initiative, as practiced in other parts of the world as well. This is one of the ways to implement the 1

2 approach in the appropriate scale, which is required by freshwater systems like the one in question. While this project focused on one of the major sub basins of Koshi basin, Indrawati sub-basin, the long term plan is to upscale this IRBM project to cross-border basin wide initiative. The strategy is focused on stepwise approach and demonstration, which are the main characteristics of this project Integrated River Basin Management at Koshi River Project Objectives The trans-boundary Koshi basin provides freshwater for livelihoods and ecosystem services for millions of people in China, Nepal and India. Due to pressure originating from anthropogenic sources and climate change, Koshi is under threats that compromise the stability of the system. The overall development objective of the project is By 2020, water and related resources of Koshi basin are best managed (in the face of climate change and development scenario) to promote socioeconomic development for the benefit of all the local people, especially the poorest and marginalized while maintaining the ecological balance. The immediate objectives include: 1) By 2016, institutional structures are functional having broad-based partner support to implement democratic IWRM approach, which empowers local communities and marginalized groups to participate in decision-making, planning and implementation 2) By 2016, local communities in target areas are empowered and capacitated to manage natural resources sustainably and to reduce their vulnerability against the impact of climate change through rights-based approach, complemented by optimized economic benefits from water and other natural resources As in the first phase, the project followed the same approach that uses three E-pillars of IWRM as the foundations: Social Equity Economic Efficiency Environmental Sustainability At the catchment level, the project has been implemented through the 9 Integrated Resource Management Committees (IRMCs), the legally registered institutions that were established and institutionalized during the first phase. The IRMCs are responsible for planning and implementation of the IWRM activities at catchment levels with the technical and financial support from project office. The project proposed to benefit directly at least 4,000 households and 20,000 individuals across the project intervention areas in Indrawati. Indigenous people (IPs), Marginalized Janajatis and disadvantaged groups, primarily women will be project's prime focus. IRMCs, local water users, Eco-clubs, water smart communities, are the direct beneficiaries. The indirect beneficiaries were identified to be primarily the stakeholders indirectly associated with IRMCs and different user groups (water, irrigation, farmers, forest and agriculture). 2

3 The Koshi project is implemented by Water and Energy Commission Secretariat (WECS), Government of Nepal and WWF Nepal. The project has had two phases: phase I and phase II with extension to 2016 because of earthquake in Nepal in Both phases are funded by the MFA (85 %) and WWF Finland (15 %). Budget for phase I was and for phase II RATIONALE, PURPOSE AND OBJECTIVES OF THE EVALUATION The project has been running now for six years with one year extension due to the earthquake. This evaluation should analyze if project has achieved the goals and results that were determined before the start of the project. Therefore this evaluation will analyze the success of the project by reflecting on the objectives and results of the project, originally set in the project logframe and document. Furthermore thorough analysis is needed to be able to plan the future steps for WWF on water sector. The Koshi project was included in a wider audit of MFA funded projects in Nepal which was conducted by KPMG in May This audit was focused on the administration and management of the project, and therefore it didn t capture the content and achievements of the project. Therefore it was decided that a full final evaluation on the project should be conducted. The purpose of this evaluation is to: Analyze the performance of the project to date by reflecting on the objectives and results of the project, set in the project logframe and document. Analyze to what extent the project supports the cross-cutting objectives that are outlined in the Development Policy Program of Finland (see section 4.1) Analyze how well the project supports and is linked and incorporated to the wider conservation programmes of WWF Nepal or projects and programmes by other development partners Present the lessons learned from the project Analyze the partnership and cooperation between the partners Reflect achievements and performance of this project on similar water sector initiatives in Nepal Reflect the role of WWF Nepal in water sector in Nepal and possible added value of WWF implementing such projects Provide recommendations for future role of WWF Nepal on water sector Provide recommendations on up scaling IRBM approach in Nepal with potential funding opportunities for WWF Provide recommendation on how WWF water sector support could cooperate and strengthen Finnish bilateral cooperation in Nepal on water sector Provide summary status of the IRMCs and recommend strategies for their long term sustainability 3

4 3. SCOPE OF THE FINAL EVALUATION: STAKEHOLDERS AND GEOGRAPHICAL AREA The evaluation will cover the project operating time span of: to The evaluation is expected to be future oriented strategic evaluation but the past performance and especially the lessons learned shall be assessed to the extent it is necessary to achieve the project objectives. The evaluation team is expected to concentrate especially on issues of impact/influence and sustainability, coherence, compatibility and their interlinkages. Crosscutting issues shall be paid due attention where considered of particular importance (for example. gender etc.). The same concerns the issues of Finnish value added in supporting the forestry and water sector and WWF s role as implementing entity. The evaluation team shall pay attention to compliance and coherence and complementarity of the policies and practices among the partners and with the policies of the partner countries or other donors in the sector. Certain aspects of water will be reviewed through representative examples. For example watershed management in forestry, biodiversity, conservation and agriculture interventions. The existing material i.e. project documents, appraisals, mid-term reviews, progress reports, steering committee decisions, completion and other evaluations shall be utilized to the extent possible. An in-depth study of documentation is an important aspect of the evaluation and an adequate time shall be reserved for it. The supporting field visits and interviews shall be arranged so that maximum benefit can be achieved from the time allocation for them. The central findings and conclusions shall be synthesized in the main report. Stakeholders that will be included in the evaluation are: WWF Nepal WWF Finland (in Finland) WECS Embassy of Finland, Nepal Integrated Resource Management Committees (IRMCs) Sample of beneficiary communities District Soil, Forest, Agriculture offices The geographical area of the evaluation will cover whole project area from where the evaluation team can propose suitable sample size for consultations. Due to time and resources restrictions, the evaluation team is not expected to cover all the projects but to take a representative sample to ensure proper analysis. 4. ISSUES TO BE ADDRESSED AND EVALUATION QUESTIONS 4.1. Evaluation questions 4

5 The evaluation team is expected to draft the specific evaluation questions which should cover the following aspects. The evaluation team should, however, use their professional experience and knowledge by adding questions deemed necessary. Analyze the performance of the project to date by reflecting on the objectives and results of the project, originally set in the project logframe and document. Analyze WWF s role on water sector Analyze the performance of the project compared to the other similar initiatives. Identify the added value and possible challenges on WWF on IRBM approach implementer in Nepal and region 4.2. Alignment with the Finland s Development Policy Program objectives The project will be evaluated based on the Evaluation Manual published by MFA Finland in 2014 ( The evaluation should reflect on how the project has promoted the priority areas of the Finland s Development Policy Programme, which are: o a democratic and accountable society that promotes human rights, o an inclusive green economy that promotes employment, o sustainable management of natural resources and environmental protection, o human development. In addition the evaluation should clearly present how the cross-cutting objectives have been incorporated to the project design and implementation and how the project has promoted these objectives which are: o gender equality, o reduction of inequality and o climate sustainability Evaluation criteria The evaluation team should incorporate aspects related to the following criteria in the evaluation (specific question examples can be found in the evaluation manual): Relevance Are the results, purpose and overall objectives of the project in line with the needs and aspirations of the beneficiaries, and with the policy environment of the intervention? Is the project consistent with the needs and priorities of its target group and the policies of the partner country and donor agencies? Has the situation changed since the approval of the intervention (e.g. programme/project) document? To what extent the approach of Finland to support the sector has been/is relevant from the point of view of the most urgent needs of the partner country s water sector challenges? Lessons learned? And role of WWF as implementing entity? Efficiency 5

6 How well the various activities have transformed the available resources in to the intended outputs. Can the cost of the intervention be justified by the results? What lessons can be learned from transforming the available resources into results? Effectiveness How well the results achieved have promoted the purpose of the project. Has the project achieved its objectives or will it do so in the future? What are the particular points of interest for lessons learned? Impact Has there been a change towards the achievement of the overall objective(s) as a consequence of the project? Both intended and the unintended impacts are reviewed. What are the overall effects of the intervention, intended and unintended, long term and short term, positive and negative? Sustainability The degree to which the benefits produced by the project continue after the external support has come to an end. Will the benefits produced by the project be maintained after the termination of external support? What kind of positive features of or limitations for sustainability can be identified? To what extent the cross-cutting issues have played a role in promotion of sustainability in a positive or negative sense? What are the most important lessons to be learned for future? Coherence Whether and how the goals that are central to Finland s development cooperation policy or the partner country s development policy are taken into account in the planning and implementation. How have they affected the intervention? 5. METHODOLOGY Multiple methodologies should be used, both quantitative and qualitative (for instance meeting documents and participant lists and personal interviews). Validation of results must be done through multiple sources. No single statements should be taken as a general outcome. However, the detailed methodology will be proposed by the team conducting the evaluation. A careful review of existing documentation is of particular importance and should be given a due attention to in the first preparatory phase. A well formulated approach and methodology combined with a realistic time schedule and evaluation matrix form a solid basis for the field visits. During the field visit all modern interactive methods shall be taken into use to extract the information needed to complement and countercheck the evidence found in the documentation. Debriefing sessions with relevant stakeholders shall be arranged and also the WWF consulted on the observations and to identify the possible gaps and errors in information. Complementary interviews and e-questionnaires can be organized in the final stages of report drafting. Possible methods that can be used for data collection and analysis are: o Desk study covering project work plans, project reports, project documents, Finnish Development Policy program and other materials o Identify sample sites and catchments and conduct direct field observation o Personal and group interviews with relevant stakeholders and key informants 6

7 o Other data/information collection tools such as surveys and questionnaires o The methodology should ensure that the evaluation process: o is participatory and inclusive involving different stakeholders including the final beneficiaries o takes into consideration gender and human rights aspects o respects local traditional and cultural norms 6. THE EVALUATION PROCESS, SCHEDULE and REPORTING The time period of the evaluation will be 3 months, effective from the day the contract is signed. The evaluation should start in September It is expected that the evaluation team will Finalize the evaluation methodology and prepare an inception report which will be commented by WWF before starting the evaluation activities Evaluate relevant sources of information through desk reviews and literature studies Carry out field visits, observations and surveys Interact/discuss with relevant stakeholders Prepare draft report with evaluation findings and recommendations Receive and incorporate feedbacks from stakeholders before finalizing reports Organize a feedback session for WWF Finland and WWF Nepal, including WECS and Embassy of Finland to receive comments and test the results (skype meeting or similar) Prepare final report of the evaluation in English and submit it to WWF Nepal. Consultant should submit 2 copies each (hard and soft copies) of the final report Inception report and the final workplan should be submitted to WWF Nepal after 3 weeks the contract has been signed and the final report by final report by 15 of December The final report should be: o maximum of 50 pages + annexes o compact and include only relevant information o answer to the main evaluation questions o reflect on the cross-cutting objectives o include pictures o include findings and clear table of recommendation o List of interviewed stakeholders Publication of the report shall be responsibility of WWF Nepal and WWF Finland. WWF Nepal will hold copy right of the report and the consultant cannot publish part or full report without prior approval from WWF Nepal. 7. EXPERTISE REQUIRED The evaluation team should comprise of experts (1-3 members) that have understanding of Nepal as the operational environment and/or expertise on the region and at least one of the experts should be from Nepal and at least one of the team members should be a woman. One of the consultant should act as a team leader and WWF Nepal will sign the contract with the one company or lead consultant only. 7

8 The team should have strong expertise in conducting evaluations. In addition the team should have expertise in the following thematic concepts: Evaluation experience preferably on MFA funded projects IRBM and water sector in general Environment and livelihoods o socio-economic aspects o governance/institutional aspect o climate change and adaptation o Sustainable livelihoods The cross-cutting themes: Human rights, gender equality and climate sustainability. In addition: o The evaluation team should have knowledge on Finnish Development Policy Programme and its objectives o The evaluation team should use the Evaluation Manual (MFA Finland 2014) as the guidelines for the evaluation o The evaluation team should have ability to speak and understand Nepali language. 8. PAYMENT AND TAXES Consultant will take care of all relevant taxes, travel arrangements etc. 50% of contract amount will be paid after receiving inception report and detailed workplan. The consultant will be contracted by WWF Nepal. 9. MANDATE The evaluation team is entitled and expected to discuss matters relevant to this evaluation with pertinent persons and organizations. However, it is not authorized to make any commitments on the behalf of WWF Nepal or WWF Finland. 10. SELECTION PROCESS WWF Nepal with other stakeholders will select the evaluation team based on the proposals from the interested consultants. The expression of the interest, detail workplan and the CVs of the evaluation team should be submitted to WWF Nepal by Friday, 19 August 2016 by 17: ANNEXES. 1. Link to the evaluation manual. 2. Link to the OECD/DAC and EU quality standards for evaluations 3. Annual report of the project, year 2015 (separate document) 4. Project document of Phase II (separate document) 8

9 Evaluation Manual: OECD/DAC and EU quality standards for evaluations: CROSS-CUTTING OBJECTIVES Has adequate and appropriately disaggregated baseline been data available on the cross-cutting objectives for planning, implementation, monitoring and evaluation? Have clear objectives and indicators been defined for the cross-cutting objectives? Have cross-cutting objectives been integrated into programme activities and/or are specific targeted measures been planned? Have adequate resources and expertise been allocated for implementation that promoted cross-cutting objectives? Have potential negative effects on cross-cutting objectives been identified? Have measures been planned to minimize them? Are cross-cutting objectives systematically and explicitly integrated into programme monitoring, reporting and evaluation? Does the programme planning, implementation and decision-making directly involve people, representatives and expertise related / relevant to cross-cutting objectives? If cross-cutting objectives have not been addressed in the programme, has this been explicitly justified? ENVIRONMENT, CLIMATE CHANGE, DISASTER RISKS Relevance Does the programme address the environmental issues identified in the problem analysis? If not, are there good reasons for giving priority to other problems? Does the programme incorporate environmental objectives addressing its potential environmental impacts? Effectiveness Does the programme comply with its environmental requirements and objectives? Does the environmental protection measures produce the expected results? Efficiency Is the programme making efficient use of environmentally damaging means? Are adequate resources or efforts invested in mitigating/optimising environmental impacts? Is the programme handicapped by under-estimated environmental constraints? Sustainability Are programme outcomes threatened by environmental degradation (or resource impoverishment) or disasters? Impact What are the programme s contributions to sustainable development? Can these be improved? What are the social and environmental effects external to programme objectives? What are the impacts compared to those predicted by the EIA? 9

10 RELEVANCE Relevance refers to the extent to which the objectives of the programme are consistent with beneficiaries' requirements, country needs, global priorities and partners' and Finland's policies. Problems, needs Are the objectives and achievements of the programme still consistent with the needs and priorities of the stakeholders, including the final beneficiaries? Whose poverty and inequality is the programme focused to reduce? Whose sustainable development is it promoting? Policy priorities Are the objectives and achievements of the programme consistent with the policies of the partner country? Are the objectives and achievements of the programme consistent with global goals, commitments and principles? Are the objectives of the programme consistent with Finland s development policy (incl. regional and country-specific priorities, sectoral and thematic priorities)? Are the objectives consistent with poverty reduction and promotion of sustainable development achieving the cross-cutting objectives, ie. human rights based equality and vulnerability reduction objectives environmental sustainability, climate change mitigation and adaptation, disaster risk reduction Has the situation changed since the approval of the programme?] EFFICIENCY The efficiency of a programme is defined by how well the various activities transformed the available resources into the intended results in terms of quantity, quality and timeliness. Comparison should be made against what was planned. Value for money How well have the activities transformed the available resources into the intended outputs/results, in terms of quantity, quality and time? Can the costs of the programme be justified by the results? Have the contributions by the partner country and the donor(s) been provided as planned? Quality of technical assistance? DEVELOPMENT EFFECTIVENESS Effectiveness describes if the results have furthered the achievement of the purpose of the programme, or are expected to do so in the future. The evaluation will be made against the related indicators. Achievement of immediate benefits Is the quality and quantity of the produced results and outputs in accordance with the plans, how are the results/outputs applied by the beneficiaries and other intended stakeholders? 10

11 To what extent has the programme achieved its purpose or will it do so in the future? Have behavioral patterns changed as planned in the stakeholder institutions or groups at various levels? How far have the changed institutional arrangements and characteristics produced the planned services and improvements? Have the planned benefits been delivered and received, as perceived by all key stakeholders? Are the results/outputs and the programme purpose making a contribution towards reducing poverty and inequality, and promoting sustainable development? DEVELOPMENT IMPACT Impact describes how the programme has succeeded in the attainment of its overall objective, i.e. targeted impact for its beneficiaries. The evaluation will be made against the related indicators. Achievement of wider benefits Has progress been made towards achieving the overall objective(s) of the programme? How is the programme intended to reduce the poverty of the intended primary beneficiaries? Through which transmission channels (prices, employment, transfers, access, authority, and assets) are the programme impacts supposed to be transmitted to the lives of the poor women and men? What is the overall poverty, inequality and sustainability impact of the programme, intended and unintended, long term and short term, positive and negative? Do the indicators for the overall objective show that the intended changes are starting to take place? In whose lives are the poverty, inequality and sustainability impacts starting to make a difference? SUSTAINABILITY Sustainability can be described as the degree to which the benefits produced by the programme continue after the external support has come to an end. Likely continuation of the achieved benefits What are the possible factors that enhance or inhibit sustainability, including ownership/commitment, economic/financial, institutional, technical, socio-cultural and environmental sustainability aspects? Will the benefits produced by the programme be maintained after the termination of external support? Who will take over the responsibility of financing the activities, or have they become self-sustaining? Is there an exit strategy and gradual handing over plan in place and will it ensure sustainability? PROGRAMME MANAGEMENT AND ADMINISTRATIVE ARRANGEMENTS Sound management Quality of the day-to-day management? Are possible problems in implementation adequately addressed? What is the quality of work planning, monitoring and reporting incl. use of indicators, resource and personnel management, financial management, cooperation and communication between stakeholders? Is adequate baseline data available and utilised in monitoring and reporting, disaggregated by gender, age group and other relevant categories? Is the balance of power and responsibilities between the various stakeholders appropriate? Have important assumptions been identified? Are risks appropriately managed, including flexible adaptation to unforeseen situations? 11

12 AID EFFECTIVENESS = EFFECTIVENESS OF AID MANAGEMENT AND DELIVERY Ownership Does the partner institution have a development strategy? Is it operational, results-oriented, and with clear strategic priorities? Has the strategy been developed through a broad consultative process involving relevant stakeholders, such as parliaments, local governments, civil society organizations, private sector? Is the programme finance included in the partner institution s medium term expenditure framework and reflected in the annual budget? Does the partner institution exercise leadership in coordinating aid? Does it have an active and leading role in decision making concerning planning and implementation and in joint decision making structures? Alignment with partner strategies and priorities Is the programme based on the partner s development strategies and periodic reviews of progress? Is conditionality drawn from the partner s development strategy? Is there a limited set of conditions that are mutually agreed, jointly assessed, made public, and results-based? Use of country s own institutions and systems This includes public financial management (i) budget execution procedures eg. funds included in budget, deposited and disbursed through country treasury system, ii) financial reporting procedures and iii) national audit procedures), monitoring, reporting and evaluation, social and environmental assessments Does the partner institution provide reliable assessments of performance, transparency and accountability of country systems, and undertake necessary reforms? Have the country systems been jointly assessed by using mutually agreed diagnostic tools? Does the programme use country systems fully or partially? How have risks of using country systems been identified and mitigated? If country systems are not used partially or at all, is the rationale transparently stated? Is the position regularly reviewed? Is capacity development provided to strengthen country systems? Is staff guidance and internal incentives provided in the MFA to encourage the use of country systems? Is the programme day-to-day management accountable to the partner s implementing agency (rather than to the donor)? Are Terms of Reference of externally appointed staff determined by the country implementing agency (rather than by the donor)? Is most of the professional staff appointed by the implementing agency? Is the salary structure of national staff similar to that of the civil service personnel? Capacity development Does the partner institution have a capacity development strategy? Is the capacity development support provided by the programme based on the partner s capacity development strategy? Is technical assistance jointly selected and managed? Does the programme promote use of local and regional resources, including through South-South cooperation? 12

13 Use of common arrangements Does the programme use common donor arrangements for planning, budgeting and financial management (e.g. joint financial arrangements), procurement, monitoring, evaluating and/or reporting? Are the field missions of the programme conducted as joint missions? Predictability of aid Does Finland provide full and timely information on annual commitments and actual disbursements? In which format / through which mechanism? Has the partner institution integrated this information into its own planning, ie. budget estimates and accounting systems? Have disbursements been made according to the jointly agreed schedule? If not, what are the reasons for this? Does Finland provide regular and timely information on three- to five-year forward expenditure? In which format / through which mechanism? Has the partner institution integrated this information into its own medium-term planning and macroeconomic frameworks? Complementarity Does the programme improve complementarity and division of labour among donors? How has donor coordination been carried out in initial identification and planning? How have comparative advantages between donors been assessed? Harmonized approach to environmental assessments and cross-cutting objectives Are common approaches and procedures been applied for environmental assessments and promotion of cross-cutting objectives? Managing for results Has the partner institution established results-oriented reporting and assessment frameworks with a manageable number of indicators? Does the programme rely on these frameworks? Have the monitoring and reporting requirements of the programme been harmonized with other donors, e.g. by using joint formats for periodic reporting? Does the programme develop capacity and demand for results-based management? Mutual accountability Does the partner institution reinforce participatory approaches in formulation, implementation and assessing progress of its development strategies? Does Finland provide timely, transparent and comprehensive information on aid flows? Are both Finland and the partner institution held accountable for commitments in the programme? Are the risks for corruption/possible instances of corruption addressed in the programme implementation and monitoring framework? COHERENCE Do contradictions with other policies prevent implementation and the achievement of the programme s overall objectives? 13

Terms of Reference. Final Project Evaluation: Integrated River Basin Management at Koshi River Safeguarding the lives of millions

Terms of Reference. Final Project Evaluation: Integrated River Basin Management at Koshi River Safeguarding the lives of millions Terms of Reference Final Project Evaluation: Integrated River Basin Management at Koshi River Safeguarding the lives of millions 1. BACKGROUND TO THE FINAL EVALUATION 1.1. Programme background The project

More information

Terms of Reference For Project Evaluation REDD for reducing poverty in Nepal Phase I and II

Terms of Reference For Project Evaluation REDD for reducing poverty in Nepal Phase I and II Terms of Reference For Project Evaluation REDD for reducing poverty in Nepal Phase I and II Background REDD phase I (2009-2010) and REDD phase II project (2011-2013) are projects supported by Ministry

More information

Evaluation Policy for GEF Funded Projects

Evaluation Policy for GEF Funded Projects Evaluation Policy for GEF Funded Projects Context Conservation International helps society adopt the conservation of nature as the foundation of development. We do this to measurably improve and sustain

More information

Terms of Reference (ToR) End-of-the Programme Evaluation UNDP Support to Inclusive Participation in Governance May 2013

Terms of Reference (ToR) End-of-the Programme Evaluation UNDP Support to Inclusive Participation in Governance May 2013 Terms of Reference (ToR) End-of-the Programme Evaluation UNDP Support to Inclusive Participation in Governance May 2013 1. Introduction In April 2007, the United Kingdom, Department for International Development

More information

Terms of Reference (ToR) End-of-the Project Evaluation UNDP Support to the Strategic Capacity Building Initiative

Terms of Reference (ToR) End-of-the Project Evaluation UNDP Support to the Strategic Capacity Building Initiative Terms of Reference (ToR) End-of-the Project Evaluation UNDP Support to the Strategic Capacity Building Initiative Introduction In 2011, The Government of Rwanda and the United Nations Development Programme

More information

Terms of Reference: Project Final Evaluation

Terms of Reference: Project Final Evaluation Terms of Reference: Project Final Evaluation 1. Background Project: Implementing agency and partner(s): Project funding sources: Creating a space for the participation of Myanmar s civil society in policy

More information

Terms of Reference for a Gender Analysis

Terms of Reference for a Gender Analysis Terms of Reference for a Gender Analysis 1. BACKGROUND The European Commission defines a gender analysis as the study of differences in the conditions, needs, participation rates, access to resources and

More information

Terms of Reference (TOR) Evaluation of UN Volunteers intervention ( ) in the Tonle Sap Conservation Project

Terms of Reference (TOR) Evaluation of UN Volunteers intervention ( ) in the Tonle Sap Conservation Project Terms of Reference (TOR) Evaluation of UN Volunteers intervention (2007-2009) in the Tonle Sap Conservation Project 1.1. Background to the UNV Programme The United Nations Volunteer (UNV) programme is

More information

CONSULTANCY SERVICES FOR EVALUATION OF THE ECOWAS PROGRAMME ON GENDER MAINSTREAMING IN ENERGY ACCESS (ECOW-GEN) IN ECOWAS COUNTRIES

CONSULTANCY SERVICES FOR EVALUATION OF THE ECOWAS PROGRAMME ON GENDER MAINSTREAMING IN ENERGY ACCESS (ECOW-GEN) IN ECOWAS COUNTRIES 1 P a g e REQUEST FOR PROPOSALS (RFP) AND TERMS OF REFERENCE CONSULTANCY SERVICES FOR EVALUATION OF THE ECOWAS PROGRAMME ON GENDER MAINSTREAMING IN ENERGY ACCESS (ECOW-GEN) IN ECOWAS COUNTRIES Expertise:

More information

APPENDIX III LOGICAL FRAMEWORK ANALYSIS

APPENDIX III LOGICAL FRAMEWORK ANALYSIS APPENDIX III LOGICAL FRAMEWORK ANALYSIS Project Goal: Project Purpose (target): Outputs (results) Intervention Logic Objectively Verifiable Indicators Sources of Verification Assumptions Ensure good quality

More information

TERMS OF REFERENCE FOR THE FINAL EVALUATION OF THE REFORM, MODERNIZATION AND DECENTRALIZATION OF PUBLIC ADMINISTRATION PROJECT IN GUINEA-BISSAU

TERMS OF REFERENCE FOR THE FINAL EVALUATION OF THE REFORM, MODERNIZATION AND DECENTRALIZATION OF PUBLIC ADMINISTRATION PROJECT IN GUINEA-BISSAU TERMS OF REFERENCE FOR THE FINAL EVALUATION OF THE REFORM, MODERNIZATION AND DECENTRALIZATION OF PUBLIC ADMINISTRATION PROJECT IN GUINEA-BISSAU 1. INTRODUCTION INDIVIDUAL CONSULTANT Chronic political and

More information

TERMS OF REFERENCE Review of the Joint UNDP and UN Women programme Inclusive development and empowerment of Women in Rakhine State

TERMS OF REFERENCE Review of the Joint UNDP and UN Women programme Inclusive development and empowerment of Women in Rakhine State TERMS OF REFERENCE Review of the Joint UNDP and UN Women programme Inclusive development and empowerment of Women in Assignment Title Rakhine State International Consultant for Conflict Sensitivity National

More information

Terms of Reference. Final Evaluation ALERT Project

Terms of Reference. Final Evaluation ALERT Project Terms of Reference Final Evaluation ALERT Project The ALERT consortium has designed technology for improving the way humanitarian agencies prepare for and respond to disasters. ALERT is a three-year initiative

More information

UNDP-Spain MDG Achievement Fund. Terms of Reference for Thematic Window on Environment and Climate Change

UNDP-Spain MDG Achievement Fund. Terms of Reference for Thematic Window on Environment and Climate Change UNDP-Spain MDG Achievement Fund Terms of Reference for Thematic Window on Environment and Climate Change This document provides policy guidance to UN Country Teams applying for funding under the UNDP-Spain

More information

Terms of reference Evaluator for mid-term review of 4.5-year EuropeAid Grant Agreement

Terms of reference Evaluator for mid-term review of 4.5-year EuropeAid Grant Agreement Terms of reference Evaluator for mid-term review of 4.5-year EuropeAid Grant Agreement Forus (previously known as International Forum of National NGO Platforms or IFP) is seeking an external evaluator

More information

Terms of Reference. Projects Outputs Evaluation

Terms of Reference. Projects Outputs Evaluation Terms of Reference Projects Outputs Evaluation Strengthening Participatory and Accountable Governance and Protection of Human Rights. Empowering Civil Society in A. BACKGROUND UNDP s corporate policy is

More information

REDD+ Social & Environmental Standards

REDD+ Social & Environmental Standards REDD+ Social & Environmental Standards CI/Photo by John Martin Version 1 June 2010 GGCA/Photo by Eric Hidalgo Standards to support the design and implementation of government-led REDD+ programs that respect

More information

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Terms of Reference(ToR) for the Strategic Environmental and Social Assessment (SESA) and Environmental Social Management

More information

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Terms of Reference(ToR) for the Strategic Environmental and Social Assessment (SESA) and Environmental Social Management

More information

EAST AFRICAN COMMUNITY DEVELOPING EAC FORESTRY POLICY AND STRATEGY TERMS OF REFERENCE

EAST AFRICAN COMMUNITY DEVELOPING EAC FORESTRY POLICY AND STRATEGY TERMS OF REFERENCE EAST AFRICAN COMMUNITY DEVELOPING EAC FORESTRY POLICY AND STRATEGY TERMS OF REFERENCE EAC SECRETARIAT ARUSHA FEBRUARY, 2018 1 1. INTRODUCTION The East African Community (EAC) is an inter-governmental organization

More information

Building on the recently adopted CEB Common Principles, the 2030 Agenda requires the UN Development System (UNDS) to:

Building on the recently adopted CEB Common Principles, the 2030 Agenda requires the UN Development System (UNDS) to: 23 June 2016 Summary of Key UNDG Proposals for a More Strategic and Dynamic QCPR Policy Response to an Ambitious and Transformative 2030 Sustainable Development Agenda The 2030 Agenda for Sustainable Development

More information

Executive Board of the United Nations Development Programme and of the United Nations Population Fund

Executive Board of the United Nations Development Programme and of the United Nations Population Fund United Nations DP/2011/3 Executive Board of the United Nations Development Programme and of the United Nations Population Fund Distr.: General 15 November 2010 Original: English First regular session 2011

More information

Core Humanitarian Standard

Core Humanitarian Standard Core Humanitarian Standard on Quality and Accountability Version 3 - Final Draft 01.10.2014 www.corehumanitarianstandard.org 1 Table of Contents i.introduction... 3 ii. Structure of the Standard... 4 iii.

More information

Terms of Reference (ToR) Mid-term review of the East Africa Regional Sustainable Investments/Finance programme in Kenya, Tanzania and Mozambique

Terms of Reference (ToR) Mid-term review of the East Africa Regional Sustainable Investments/Finance programme in Kenya, Tanzania and Mozambique Terms of Reference (ToR) Mid-term review of the East Africa Regional Sustainable Investments/Finance programme in Kenya, Tanzania and Mozambique 1. background The East Africa Regional Sustainable Investments

More information

KINGDOM OF CAMBODIA NATION KING RELIGION

KINGDOM OF CAMBODIA NATION KING RELIGION KINGDOM OF CAMBODIA NATION KING RELIGION ROYAL GOVERNMENT OF CAMBODIA STRATEGIC FRAMEWORK FOR DECENTRALIZATION AND DE-CONCENTRATION REFORMS 17 June 2005 Unofficial translation from the original text in

More information

Core Humanitarian Standard

Core Humanitarian Standard Core Humanitarian Standard on Quality and Accountability Draft 2 for consultation & testing 17.06.2014 www.corehumanitarianstandard.org 1 Table of Contents i. Introduction... 3 Structure... 4 ii. The Eight

More information

GLOBAL ALLIANCE FOR CLIMATE-SMART AGRICULTURE (GACSA) FRAMEWORK DOCUMENT. Version 01 :: 1 September 2014

GLOBAL ALLIANCE FOR CLIMATE-SMART AGRICULTURE (GACSA) FRAMEWORK DOCUMENT. Version 01 :: 1 September 2014 GLOBAL ALLIANCE FOR CLIMATE-SMART AGRICULTURE (GACSA) FRAMEWORK DOCUMENT Version 01 :: 1 September 2014 I Vision 1. In today s world there is enough food produced for all to be well-fed, but one person

More information

NGO Group Statement to the Global Platform for Disaster Risk Reduction. Cancun, Mexico, May 2017

NGO Group Statement to the Global Platform for Disaster Risk Reduction. Cancun, Mexico, May 2017 NGO Group Statement to the Global Platform for Disaster Risk Reduction Cancun, Mexico, 22-26 May 2017 It is 12 years since the first framework for Disaster Risk Reduction (DRR) was agreed. And after all

More information

FAO REGIONAL CONFERENCE FOR AFRICA

FAO REGIONAL CONFERENCE FOR AFRICA 1 ARC/18/7/Web Annex 2 Rev. 1 FAO REGIONAL CONFERENCE FOR AFRICA Thirtieth Session Khartoum, the Sudan, 19-23 February 2018 the Africa to FAO Strategic Objectives in the Biennium 1. The FAO results framework

More information

EVALUATION MANUAL MINISTRY FOR FOREIGN AFFAIRS

EVALUATION MANUAL MINISTRY FOR FOREIGN AFFAIRS EVALUATION MANUAL MINISTRY FOR FOREIGN AFFAIRS Layout: Innocorp Oy Cover photo: Marja-Leena Kultanen ISBN: 978-952-281-160-8 EVALUATION MANUAL PREFACE Development evaluation is about facts on progress

More information

A Common Gender Equality and Social Inclusion (GESI) Framework. GESI Working Group, IDPG 2017

A Common Gender Equality and Social Inclusion (GESI) Framework. GESI Working Group, IDPG 2017 A Common Gender Equality and Social Inclusion (GESI) Framework GESI Working Group, IDPG 2017 Outline PART I: Basic understanding on GESI o Mandates on GESI (Government of Nepal and Development Partners)

More information

FAO REGIONAL CONFERENCE FOR LATIN AMERICA AND THE CARIBBEAN

FAO REGIONAL CONFERENCE FOR LATIN AMERICA AND THE CARIBBEAN LARC/18/5/Web Annex 2 FAO REGIONAL CONFERENCE FOR LATIN AMERICA AND THE CARIBBEAN Thirty-fifth Session Montego Bay, Jamaica, 5-8 March 2018 the Latin America and Caribbean to FAO Strategic Objectives in

More information

Terms of Reference for the Outcome Evaluation of Achieving the MDGs and Reducing Human Poverty Programme

Terms of Reference for the Outcome Evaluation of Achieving the MDGs and Reducing Human Poverty Programme Terms of Reference for the Outcome Evaluation of Achieving the MDGs and Reducing Human Poverty Programme Introduction The United Nations Development Programme (UNDP) will undertake outcome evaluation to

More information

FSC SOCIAL STRATEGY: BUILDING AND IMPLEMENTING A SOCIAL AGENDA VERSION 2.1. Section C: FSC Social Strategy

FSC SOCIAL STRATEGY: BUILDING AND IMPLEMENTING A SOCIAL AGENDA VERSION 2.1. Section C: FSC Social Strategy FSC SOCIAL STRATEGY: BUILDING AND IMPLEMENTING A SOCIAL AGENDA VERSION 2.1 Section C: FSC Social Strategy This is not a complete document. This summary does not contain Section A (Background and Rationale),

More information

TERMS OF REFERENCE (TOR) Title: Voices from the Underground: End-of-Project Evaluation Mozambique and South Africa

TERMS OF REFERENCE (TOR) Title: Voices from the Underground: End-of-Project Evaluation Mozambique and South Africa TERMS OF REFERENCE (TOR) Title: Voices from the Underground: End-of-Project Evaluation 201-2016 Period: May June 2017 Duration: Sites: Duty Station: 20 days Mozambique and South Africa IOM Maputo Background

More information

High level political forum on sustainable development

High level political forum on sustainable development High level political forum on sustainable development Irena Zubcevic Division for Sustainable Development UN Department of Economic and Social Affairs Credit: Bill Bly High-level political forum on sustainable

More information

Annex VI Action Fiche for West Bank and Gaza Strip/ Jordan/ Israel. Project approach - centralised (direct) management

Annex VI Action Fiche for West Bank and Gaza Strip/ Jordan/ Israel. Project approach - centralised (direct) management Annex VI Action Fiche for West Bank and Gaza Strip/ Jordan/ Israel 1. IDENTIFICATION Title/Number Total cost 1,500,000 Aid method / Method of implementation Fostering co-operation on water management between

More information

Mid-term Evaluation for the Gender and Generational Empowerment project in Tanzania.

Mid-term Evaluation for the Gender and Generational Empowerment project in Tanzania. Mid-term Evaluation for the Gender and Generational Empowerment project in Tanzania. Twin is a non-profit organization which owns a trading company. This structure allows us to combine trade, marketing,

More information

ECOWAS AGRICULTURAL POLICY (ECOWAP)/COMPREHENSIVE AFRICAN AGRICULTURE DEVELOPMENT PROGRAMME (CAADP) COMPACT

ECOWAS AGRICULTURAL POLICY (ECOWAP)/COMPREHENSIVE AFRICAN AGRICULTURE DEVELOPMENT PROGRAMME (CAADP) COMPACT REPUBLIC OF GHANA REPUBLIC OF GHANA ECOWAS AGRICULTURAL POLICY (ECOWAP)/COMPREHENSIVE AFRICAN AGRICULTURE DEVELOPMENT PROGRAMME (CAADP) COMPACT TO SUPPORT THE SUCCESSFUL IMPLEMENTATION OF THE GHANA FOOD

More information

Call for Expression of Interest

Call for Expression of Interest Call for Expression of Interest Mid term Evaluation Project: Empowerment of Vulnerable Women in Sri Lanka Deadline for submission of Expression of Interest: October 17 th 2014 1. Introduction Empowerment

More information

BURKINA FASO FOREST INVESTMENT PROGRAMME. GENERAL PRESENTATION FIP/REDD+ Ministry of Environment and Sustainable Development of Burkina Faso

BURKINA FASO FOREST INVESTMENT PROGRAMME. GENERAL PRESENTATION FIP/REDD+ Ministry of Environment and Sustainable Development of Burkina Faso BURKINA FASO FOREST INVESTMENT PROGRAMME GENERAL PRESENTATION FIP/REDD+ Ministry of Environment and Sustainable Development of Burkina Faso CUIABA, 20-25 October 2014 BRAZIL PRESENTATION PLAN RATIONAL

More information

Technical Note Integrating Gender in WFP Evaluations

Technical Note Integrating Gender in WFP Evaluations Technical Note Integrating Gender in WFP Evaluations Version September 2017 1. Purpose of this Technical Note 1. This technical note shows how gender equality and empowerment of women (GEEW), hereafter

More information

ACCRA AGENDA FOR ACTION

ACCRA AGENDA FOR ACTION ACCRA AGENDA FOR ACTION Ministers of developing and donor countries responsible for promoting development and Heads of multilateral and bilateral development institutions endorsed the following statement

More information

Government of Uganda, United Nations Development Programme (UNDP) And World Bank

Government of Uganda, United Nations Development Programme (UNDP) And World Bank Government of Uganda, United Nations Development Programme (UNDP) And World Bank Brief description Project title: The Poverty and Social Impact Analysis (PSIA) of the Proposed National Land Use Policy

More information

A Framework For Socio-Cultural Impacts and Safeguards Assessment

A Framework For Socio-Cultural Impacts and Safeguards Assessment A Framework For Socio-Cultural Impacts and Safeguards Assessment BirdLife 2018 1 P a g e Introduction Conservation, by its very nature, affects the distribution and abundance, rights of access to, governance

More information

Terms of Reference (TOR)

Terms of Reference (TOR) Annex 4 Terms of Reference (TOR) Conducting Simplified Economic Appraisals for proposed labour intensive public infrastructure projects contributing to local economic development. 1. Project title: Simplified

More information

FOREST INVESTMENT PROGRAM DESIGN DOCUMENT. (Prepared by the Forest Investment Program Working Group)

FOREST INVESTMENT PROGRAM DESIGN DOCUMENT. (Prepared by the Forest Investment Program Working Group) CIF/DMFIP.2/2 February 24, 2009 Second Design Meeting on the Forest Investment Program Washington, D.C. March 5-6, 2009 FOREST INVESTMENT PROGRAM DESIGN DOCUMENT (Prepared by the Forest Investment Program

More information

Terms of Reference (TOR)

Terms of Reference (TOR) CONFÉRENCE DES NATIONS UNIES SUR LE COMMERCE ET LE DÉVELOPPEMENT UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT Terms of Reference (TOR) External Evaluation of UNCTAD's Development Account 7 th Tranche

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE National Consultant To support UNDAF Evaluation for Nepal

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE National Consultant To support UNDAF Evaluation for Nepal INDIVIDUAL CONSULTANT PROCUREMENT NOTICE National Consultant To support UNDAF Evaluation for Nepal Date: 31 May 2016 Reference No.: UNDP/PN/23/2016 Country: Nepal Description of the assignment: The national

More information

Review of the Terms of Reference: "Evaluation of EKN supported interventions in ASAL" Operationalisation of institutional sustainability.

Review of the Terms of Reference: Evaluation of EKN supported interventions in ASAL Operationalisation of institutional sustainability. Review of the Terms of Reference: "Evaluation of EKN supported interventions in ASAL" Operationalisation of institutional sustainability Kenya 11 December 2012 Advisory Report by the Dutch Sustainability

More information

Aligning international cooperation. with national noncommunicable diseases plans: information note on

Aligning international cooperation. with national noncommunicable diseases plans: information note on WHO Global Coordination Mechanism on the Prevention and Control of Noncommunicable Diseases Aligning international cooperation with national noncommunicable diseases plans: information note on landmarks

More information

CI-GEF PROJECT AGENCY MONITORING AND EVALUATION POLICY FOR GEF-FUNDED PROJECTS

CI-GEF PROJECT AGENCY MONITORING AND EVALUATION POLICY FOR GEF-FUNDED PROJECTS CI-GEF PROJECT AGENCY MONITORING AND EVALUATION POLICY FOR GEF-FUNDED PROJECTS Version 02 March 2016 1 DOCUMENT LOG AND CHANGE RECORD Version Date Changes/Comments Author(s) 01 Oct 2013 Version submitted

More information

HARIYO BAN PROGRAM OVERVIEW

HARIYO BAN PROGRAM OVERVIEW HARIYO BAN PROGRAM OVERVIEW 1. INTRODUCTION The USAID-funded Hariyo Ban Program is a five-year program that started in August 2011. Hariyo Ban s overall goal is to reduce adverse impacts of climate change

More information

REQUEST FOR PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: LARGE SIZED PROJECT

REQUEST FOR PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: LARGE SIZED PROJECT REQUEST FOR PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: LARGE SIZED PROJECT THE LEAST DEVELOPED COUNTRIES FUND FOR CLIMATE CHANGE (L (LDCF) 1 Submission date: 30 June 2010 Resubmission date: 28 July

More information

Terms of Reference Independent Final Evaluation of Zambia Green Jobs Programme March 2018

Terms of Reference Independent Final Evaluation of Zambia Green Jobs Programme March 2018 1. Introduction & rationale for evaluation Terms of Reference Independent Final Evaluation of Zambia Green Jobs Programme March 2018 The Green Jobs Programme of the Government of Zambia implemented with

More information

Terms of Reference (ToR)

Terms of Reference (ToR) Terms of Reference (ToR) Mid -Term Evaluations of the Two Programmes: UNDP Support to Deepening Democracy and Accountable Governance in Rwanda (DDAG) and Promoting Access to Justice, Human Rights and Peace

More information

Management response to the evaluation of UNDP contribution to environmental management for poverty reduction: the povertyenvironment

Management response to the evaluation of UNDP contribution to environmental management for poverty reduction: the povertyenvironment United Nations DP/2011/9 Executive Board of the United Nations Development Programme and of the United Nations Population Fund Distr.: General 17 December 2010 Original: English First regular session 2011

More information

Reducing Vulnerability and Managing Risk. Pre-Consultation Briefing Note for the Europe and Others Group Consultation

Reducing Vulnerability and Managing Risk. Pre-Consultation Briefing Note for the Europe and Others Group Consultation Photo credit: UNOCHA / Eduardo Diaz The purpose of this preconsultation briefing paper is to stimulate discussions at the World Humanitarian Summit Regional Consultation for the Europe and Others group

More information

Executive Board of the United Nations Development Programme and of the United Nations Population Fund

Executive Board of the United Nations Development Programme and of the United Nations Population Fund United Nations Executive Board of the United Nations Development Programme and of the United Nations Population Fund Distr.: General xx April 2009 Original: English DP/DCP/TKM/1 Annual session 2009 26

More information

THE VIETNAM PARTNERSHIP GROUP ON AID EFFECTIVENESS

THE VIETNAM PARTNERSHIP GROUP ON AID EFFECTIVENESS THE VIETNAM PARTNERSHIP GROUP ON AID EFFECTIVENESS ACTION PLAN 2008 Introduction 1. This Action Plan is based on the vision that Vietnam will achieve the objectives and targets in the Hanoi Core Statement

More information

POVERTY REDUCTION ACTION PLAN (PRAP) DEVELOPMENT GUIDANCE 1

POVERTY REDUCTION ACTION PLAN (PRAP) DEVELOPMENT GUIDANCE 1 Introduction POVERTY REDUCTION ACTION PLAN (PRAP) DEVELOPMENT GUIDANCE 1 BNTF Participating Countries (PCs) are required to develop their PRAPs as a condition for the allocation of BNTF funding. It is

More information

Trade-Related Assistance: What Do Recent Evaluations Tell Us?

Trade-Related Assistance: What Do Recent Evaluations Tell Us? 3-4 NOVEMBER 2008 CONFERENCE CENTRE, PARIS Background Document for Session III Trade-Related Assistance: What Do Recent Evaluations Tell Us? MAIN FINDINGS AND KEY RECOMMENDATIONS 1 Identify the most adequate

More information

The future strategic framework of the Convention. Draft decision submitted by the Chair of the Committee of the Whole

The future strategic framework of the Convention. Draft decision submitted by the Chair of the Committee of the Whole United Nations Convention to Combat Desertification ICCD/COP(13)/L.18 Distr.: Limited 14 September 2017 Original: English Conference of the Parties Thirteenth session Ordos, China, 6 16 September 2017

More information

Terms of Reference. Nairobi-based Global Policy Centre. Development of Programme Document ( )

Terms of Reference. Nairobi-based Global Policy Centre. Development of Programme Document ( ) United Nations Development Programme Terms of Reference Nairobi-based Global Policy Centre Development of Programme Document (2015-2017) Location: Home-based with missions to Nairobi, Kenya and New York,

More information

Guidelines for the Diagnostic Trade Integration Study (DTIS) and DTIS Update (DTISU) under EIF Phase Two

Guidelines for the Diagnostic Trade Integration Study (DTIS) and DTIS Update (DTISU) under EIF Phase Two DOC06.A Guidelines for the Diagnostic Trade Integration Study (DTIS) and DTIS Update (DTISU) under EIF Phase Two November 2016 The Diagnostic Trade Integration Study (DTIS)/DTIS Update (DTISU) work is

More information

I. BACKGROUND: Call for Resumes:

I. BACKGROUND: Call for Resumes: GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES STRATEGIC COUNSEL FOR ORGANIZATIONAL DEVELOPMENT AND MANAGEMENT FOR RESULTS DEPARTMENT OF PLANNING AND EVALUATION Call for Resumes: Midterm Evaluation

More information

HEALTH AND POPULATION b) Water Supply and Sanitation

HEALTH AND POPULATION b) Water Supply and Sanitation HEALTH AND POPULATION b) Water Supply and Sanitation Demand driven approaches Project quality and sustainability are improved by including men and women Water Supply and Sanitation projects are increasingly

More information

TERMS OF REFERENCE (TOR) UN-REDD Sri Lanka National Programme

TERMS OF REFERENCE (TOR) UN-REDD Sri Lanka National Programme TERMS OF REFERENCE (TOR) UN-REDD Sri Lanka National Programme Assignment: Addressing Gender Considerations and Inclusion of Women in REDD+ Policy Processes Job title: National Expert Gender and Natural

More information

Joint Assessment of National Health Strategies and Plans

Joint Assessment of National Health Strategies and Plans Joint Assessment of National Health Strategies and Plans Version 2: September 2011 Joint Assessment of National Health Strategies and Plans Joint Assessment Tool: the attributes of a sound national strategy

More information

IMPROVING WATERSHED MANAGEMENT PRACTICES IN NORTHERN INDIA AN ECONOMIC WIN WIN FOR SUSTAINABLE AGRICULTURE AND RAINWATER HARVESTING

IMPROVING WATERSHED MANAGEMENT PRACTICES IN NORTHERN INDIA AN ECONOMIC WIN WIN FOR SUSTAINABLE AGRICULTURE AND RAINWATER HARVESTING IMPROVING WATERSHED MANAGEMENT PRACTICES IN NORTHERN INDIA AN ECONOMIC WIN WIN FOR SUSTAINABLE AGRICULTURE AND RAINWATER HARVESTING ACCESS TO WATER AND INCREASED BIOMASS PRODUCTIVITY IS A KEY ECONOMIC

More information

Final draft for final comments - 13 November 2015 VIENTIANE DECLARATION ON PARTNERSHIP FOR EFFECTIVE DEVELOPMENT COOPERATION ( )

Final draft for final comments - 13 November 2015 VIENTIANE DECLARATION ON PARTNERSHIP FOR EFFECTIVE DEVELOPMENT COOPERATION ( ) ! Final draft for final comments - 13 November 2015 VIENTIANE DECLARATION ON PARTNERSHIP FOR EFFECTIVE DEVELOPMENT COOPERATION (2016-2025) I. Introduction 1. We, the Government of the Lao People s Democratic

More information

Terms of Reference (TOR)

Terms of Reference (TOR) CONFÉRENCE DES NATIONS UNIES SUR LE COMMERCE ET LE DÉVELOPPEMENT UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT Terms of Reference (TOR) External Evaluation of Development Account Project 1415 AX Support

More information

Pangani River Basin Management Project. Terms of Reference for Project Internal Review

Pangani River Basin Management Project. Terms of Reference for Project Internal Review Pangani River Basin Management Project Terms of Reference for Project Internal Review 1. Background The World Conservation Union (IUCN) implements a programme of conservation and natural resource management

More information

Plenary Session 1: Issue Brief- Final DRAFT

Plenary Session 1: Issue Brief- Final DRAFT Plenary Session 1: National and Local Disaster Risk Reduction Strategies Paving the Way for Action by All Issue Brief- Final DRAFT 1 1. Rationale The Sendai Framework for Disaster Risk Reduction 2015 2030

More information

Gender Mainstreaming Plan

Gender Mainstreaming Plan Gender Mainstreaming Plan Ensuring that both men and women have equal opportunities to participate in and benefit from the GEF project can be achieved through progressive and efficient mainstreaming of

More information

COMMUNITY REVITALIZATION PROGRAM

COMMUNITY REVITALIZATION PROGRAM Mid-Term Review (MTR) Terms of Reference for COMMUNITY REVITALIZATION PROGRAM Phase VI Commissioned by: IOM Mission in Iraq Terms of Reference Established in 1951, the UN Migration Agency (IOM) is the

More information

CARIBBEAN DEVELOPMENT BANK TERMS OF REFERENCE DISASTER RISK MANAGEMENT STRATEGY AND OPERATIONAL GUIDELINES OF THE CARIBBEAN DEVELOPMENT BANK

CARIBBEAN DEVELOPMENT BANK TERMS OF REFERENCE DISASTER RISK MANAGEMENT STRATEGY AND OPERATIONAL GUIDELINES OF THE CARIBBEAN DEVELOPMENT BANK CARIBBEAN DEVELOPMENT BANK TERMS OF REFERENCE DISASTER RISK MANAGEMENT STRATEGY AND OPERATIONAL GUIDELINES OF THE CARIBBEAN DEVELOPMENT BANK DECEMBER 2018 1. Background Natural hazards have become more

More information

PROCEDURE AND TOOLS FOR EVALUABILITY REVIEW OF ILO PROJECTS OVER US$5 MILLION

PROCEDURE AND TOOLS FOR EVALUABILITY REVIEW OF ILO PROJECTS OVER US$5 MILLION PROCEDURE AND TOOLS FOR EVALUABILITY REVIEW OF ILO PROJECTS OVER US$5 MILLION August 2014 (containing forms to fill in at end of document) BACKGROUND Over two-thirds of independent evaluations flag poor

More information

Canadian International Development Agency 200 Promenade du Portage Gatineau, Quebec K1A 0G4 Tel: (819) Toll free: Fax: (819)

Canadian International Development Agency 200 Promenade du Portage Gatineau, Quebec K1A 0G4 Tel: (819) Toll free: Fax: (819) Canadian International Development Agency 200 Promenade du Portage Gatineau, Quebec K1A 0G4 Tel: (819) 997-5006 Toll free: 1-800-230-6349 Fax: (819) 953-6088 (For the hearing and speech impaired only (TDD/TTY):

More information

Republic of Malawi ANNEX 1: PUBLIC SECTOR MANAGEMENT POLICY IMPLEMENTATION PLAN

Republic of Malawi ANNEX 1: PUBLIC SECTOR MANAGEMENT POLICY IMPLEMENTATION PLAN Republic of Malawi ANNEX 1: PUBLIC SECTOR MANAGEMENT POLICY IMPLEMENTATION PLAN Policy Priority Area 1: Shared understanding of the vision, mission and functions of the public service Policy Statement

More information

seek input from national Governments in preparation for the Secretary-General 's initial input to the Open Working Group

seek input from national Governments in preparation for the Secretary-General 's initial input to the Open Working Group Response to Questionnaire related to the development of the Sustainable Development Goals by the National Planning Commission (NPC), Govt. of Nepal (Focal point for UNDESA and UNCSD). seek input from national

More information

St. Petersburg Declaration

St. Petersburg Declaration DRAFT 20 October 2005 Elements of St. Petersburg Declaration We, the representatives of the Governments from Europe and North Asia, countries from other continents and the European Commission, participating

More information

EVALUATION PLAN. Cooperation Programme Interreg V-A Slovenia-Austria for the programme period

EVALUATION PLAN. Cooperation Programme Interreg V-A Slovenia-Austria for the programme period EVALUATION PLAN Cooperation Programme Interreg V-A Slovenia-Austria for the programme period 2014-2020 2 June 2016 CONTENT: INTRODUCTION... 1 OBJECTIVES AND COVERAGE... 2 Evaluation objectives... 2 Coverage...

More information

Terms of Reference to conduct a socio-economic study and energy access baseline in Arua and Masindi Districts

Terms of Reference to conduct a socio-economic study and energy access baseline in Arua and Masindi Districts Terms of Reference to conduct a socio-economic study and energy access baseline in Arua and Masindi Districts Background The World Wide Fund for Nature (WWF), the global conservation organization, has

More information

Call for Concept notes Climate Resilient Food Security

Call for Concept notes Climate Resilient Food Security Call for Concept notes Climate Resilient Food Security Introduction The Results strategy for Sweden s international development cooperation with Mozambique (2015-2020) emphasizes the need for increased

More information

Monitoring and Evaluation Policy

Monitoring and Evaluation Policy Monitoring and Evaluation Policy 1 M&E Policy Last Updated October 2017 1. Introduction The Monitoring and Evaluation (M&E) policy will apply to the global C&A Foundation including Fundación C&A in Mexico

More information

COMMITTEE ON AGRICULTURE

COMMITTEE ON AGRICULTURE July 2016 COAG/2016/4 E COMMITTEE ON AGRICULTURE Twenty-fifth Session Rome, 26-30 September 2016 Agriculture and the 2030 Agenda for Sustainable Development Executive Summary The 2030 Agenda for Sustainable

More information

Monitoring and Evaluation in the GEF: How Country Stakeholders Get Involved. GEF Expanded Constituency Workshops Group Work

Monitoring and Evaluation in the GEF: How Country Stakeholders Get Involved. GEF Expanded Constituency Workshops Group Work Monitoring and Evaluation in the GEF: How Country Stakeholders Get Involved GEF Expanded Constituency Workshops Group Work Group Exercise Work with the group at your table as a team to provide input to

More information

Monitoring and Evaluation in the GEF: How Country Stakeholders Get Involved. GEF Expanded Constituency Workshops Group Work

Monitoring and Evaluation in the GEF: How Country Stakeholders Get Involved. GEF Expanded Constituency Workshops Group Work Monitoring and Evaluation in the GEF: How Country Stakeholders Get Involved GEF Expanded Constituency Workshops Group Work Group Exercise Work with the group at your table as a team to provide input to

More information

Executing Organisations: SOCADIDO - Soroti Catholic Diocese Integrated Development Organisation Hoffnungszeichen Sign of Hope e.v.

Executing Organisations: SOCADIDO - Soroti Catholic Diocese Integrated Development Organisation Hoffnungszeichen Sign of Hope e.v. Terms of Reference for a Feasibility Study Project Title: CONSERVING AND RESTORING FRAGILE ECOSYSTEMS AND NATURAL RE- SOURCES IN THE TESO REGION, EASTERN UGANDA, THROUGH COMMUNITY ACTION SUP- PORT Country:

More information

Suriname. Terms of Reference UNDAF Mid Term Review Consultant. Consultant, UNDAF Mid Term Review

Suriname. Terms of Reference UNDAF Mid Term Review Consultant. Consultant, UNDAF Mid Term Review Terms of Reference UNDAF Mid Term Review Consultant I. Position Information Job code title: Consultant, UNDAF Mid Term Review Duration: 26 working days Location: Paramaribo Expected start date October

More information

Compass for partners

Compass for partners Compass for partners towards quality in development through partnership Introduction This is a partnership check-list. It is a tool developed to support KEPA s member organizations and their Southern partners

More information

GUIDELINES FOR INCEPTION REPORTS

GUIDELINES FOR INCEPTION REPORTS GUIDELINES FOR INCEPTION REPORTS Please consult the IEU Handbook: https://www.unodc.org/unodc/en/evaluation/evaluation-handbook.html or contact IEU directly for more guidance. An Inception Report summarizes

More information

Further Development of the Initial Investment Framework

Further Development of the Initial Investment Framework Further Development of the Initial Investment Framework GCF/B.08/20 4 October 2014 Meeting of the Board 14-17 October 2014 Bridgetown, Barbados Agenda item 16 Page b Recommended action by the Board It

More information

A ROAD MAP TO MAINSTREAMING GENDER CONSIDERATIONS INTO GHANA S REDD+ PROCESS

A ROAD MAP TO MAINSTREAMING GENDER CONSIDERATIONS INTO GHANA S REDD+ PROCESS A ROAD MAP TO MAINSTREAMING GENDER CONSIDERATIONS INTO GHANA S REDD+ PROCESS BACKGROUND considerations are essential to REDD+ as they have the potential to enhance the effectiveness and efficiency of conservation,

More information

MINISTRY OF LANDS AND NATURAL RESOURCES NATURAL RESOURCES AND ENVIRONMENTAL GOVERNANCE PROGRAMME (TECHNICAL ASSISTANCE- TA) DRAFT

MINISTRY OF LANDS AND NATURAL RESOURCES NATURAL RESOURCES AND ENVIRONMENTAL GOVERNANCE PROGRAMME (TECHNICAL ASSISTANCE- TA) DRAFT MINISTRY OF LANDS AND NATURAL RESOURCES NATURAL RESOURCES AND ENVIRONMENTAL GOVERNANCE PROGRAMME (TECHNICAL ASSISTANCE- TA) DRAFT TERMS OF REFERENCE (TOR) FOR THE REVISION OF THE FORESTRY DEVELOPMENT MASTER

More information

Coordination and Harmonisation of Government and Partner Practices for Enhanced Effectiveness of Foreign Assistance to the Republic of Moldova

Coordination and Harmonisation of Government and Partner Practices for Enhanced Effectiveness of Foreign Assistance to the Republic of Moldova Development Partnership Principles Coordination and Harmonisation of Government and Partner Practices for Enhanced Effectiveness of Foreign Assistance to the Republic of Moldova Chisinau 2010 Government

More information

PLAN INTERNATIONAL - RESA. Terms of References. End of Project Evaluation CSO strengthening Project Region of Eastern and Southern Africa - RESA

PLAN INTERNATIONAL - RESA. Terms of References. End of Project Evaluation CSO strengthening Project Region of Eastern and Southern Africa - RESA PLAN INTERNATIONAL - RESA Terms of References End of Project Evaluation CSO strengthening Project Region of Eastern and Southern Africa - RESA Plan International - RESA 2018 Terms of reference to conduct

More information

DIAKONIA TERMS OF REFERENCE FOR BASELINE SURVEY CONSULTANCY PROCUREMENT REFERENCE NUMBER: DK/CONS/09/001/2015

DIAKONIA TERMS OF REFERENCE FOR BASELINE SURVEY CONSULTANCY PROCUREMENT REFERENCE NUMBER: DK/CONS/09/001/2015 1. Over View of Diakonia Work in Uganda Diakonia is a Christian development organization working together with local partners for sustainable change for the most vulnerable people of the world. Diakonia

More information

Annex 2. DAC-code Sector Government administration

Annex 2. DAC-code Sector Government administration Annex 2 ACTION FICHE FOR EGYPT 1. IDENTIFICATION Title Support to political development and good governance Total cost EC Contribution : EUR 3 000 000 Aid method / Management mode Project approach / Decentralised

More information