1 Enclosure: M Agenda item: 17 GOVERNING BODY Title of paper: QIPP Delivery Update 2018/19 Date of meeting: 4 th July 2018 Presented by: Robert Shaw Prepared by: Kat Macann Title: Director of Commissioning & contact: Robert.shaw6@nhs.net Title: Head of QIPP PMO (Interim) & contact: kat.macann1@nhs.net Corporate Objective addressed by this paper (please select one or more with an X): 1. To commission safe, sustainable, efficient and affordable services to meet the health and wellbeing needs of the population of Greenwich and reduce x health inequalities; 2. To ensure the CCG s position recovers to meet its financial duties and x performance standards; 3. To nurture and support primary care to be resilient and thrive; x 4. To strengthen productive relationships with partners and the public to work as a health and care system; 5. To actively engage with our communities to improve their experience of healthcare; 6. To play an active and influential role in shaping SE London and London wide commissioning. Purpose of the report: The purpose of the report is to inform the Governing Body of the status of QIPP planning 2018/19. The report summarises the current QIPP plan position and sets out the approach to closing the planning gap through developing additional savings opportunities and mitigating delivery risks. Issues arising: The CCG has a QIPP target of 14.3m in 2018/19 Prior to June, QIPP schemes had been identified totalling 12.7m, leaving a gap of 1.6m in unidentified QIPP Additional areas of QIPP opportunity have now been identified and approved by the Financial Recovery Board for further development. These areas provide an agreed framework for closing the QIPP gap, bringing the total identified schemes to 14.4m. CCG leads are developing detailed plans for each area to set out how the savings can be realised. Revised risk assessments on the full QIPP plan show there is residual delivery risk totalling 4.3m within the plan this is expected to go down as the additional opportunities are worked up in full and mitigation work continues Collaborative work with Bexley and Lewisham CCGs is underway to strengthen delivery of planned and unplanned care schemes in relation to Lewisham and Greenwich NHS Trust, mitigate risks and progress additional opportunities.

2 Summary of actions, if any, following this meeting: The CCG will continue to progress planning and delivery of the QIPP programme with appropriate support from management to mitigate risks and enable the delivery of a balanced financial position for the new financial year. Previous committee involvement: Financial Recovery Board 13 June 2018 change proposals and additional opportunity areas approved Greenwich Executive Group 20 June 2018 for noting Finance, Performance & QIPP Committee 27 June 2018 for discussion Recommendations to the Governing Body: The Governing Board is asked to NOTE the QIPP planning position. (Please provide details below where Yes is indicated) Impact on Governing Body Assurance Framework (x) Yes x No N/A Impact on Environment (x) Yes No x N/A Legal Implications (x) Yes No x N/A Resource and or financial implications (x) Yes x No N/A Equality impact assessment (x) Yes No x N/A Privacy impact assessment (x) Yes No x N/A Impact on current NHS Outcomes Framework areas (x) Yes No x N/A Patient and Public Involvement (x) Yes No x N/A Communications and Engagement (x) Yes No x N/A Impact on CCG Constitution (x) Yes No x N/A Attachments: (i) QIPP Delivery Update 2018/19 2

3 QIPP Delivery 2018/19 Update to Governing Body July 2018 Robert Shaw, Director of Commissioning

4 Contents 1. Matters for Noting by the Governing Body 2. QIPP Plan Overview 3. High Level Risks to QIPP Delivery 4. Next Steps Page 2

5 1. Matters for noting by the Governing Body Governing body is asked to note the following: The draft Financial Recovery Plan presented to FRB in May 2018 showed a QIPP Plan requirement of 14.3m with 12.7m of schemes identified, 1.6m unidentified and 3.9m risk on identified schemes total risk of 5.5m High level areas have been identified and agreed by the CCG s SMT and Financial Recovery Board to close the QIPP planning gap and provide contingency for any shortfall from previously identified schemes The current position and additional opportunities are set out below, with further detail on work underway to mitigate delivery risks and stretch opportunities for savings from acute activity. Revised risk assessments on the total QIPP plan now show there is residual delivery risk totalling 4.3m this is expected to go down as the additional opportunities are worked up in full and mitigation work continues. The CCG is developing a collaborative approach to QIPP planning and delivery, working closely with Bexley and Lewisham CCGs to establish joint work programmes for planned and unplanned care. Page 3

6 2. QIPP Plan Overview Current position based on latest delivery and risk updates, includes additional areas of opportunity. QIPP 2018/19 Jun-18 Total ( 000s) Acute Community Mental Health Prescribing Continuing Care Other Total required 14,287 Identified Schemes - Total Identified Schemes - Risk Adjusted Over identified schemes 14,391 8,211 2, ,300 1,340 1,223 9,977 4,194 2, ,075 1, QIPP Risk Total 4,310 4, Page 4

7 3. High Level Risks to QIPP Delivery Risk Area Risk Description RAG Mitigation Approach Delivery Resource The CCG may have insufficient clinical and operational resources to deliver all transformational schemes on time. Recruitment to vacant commissioning and clinical posts Regular reviews of workload and prioritisation Collaborative workstreams with additional support Planning Quality & Patient Safety Communication & Engagement Procurement / Contracts Some schemes have been based on ambitious savings assumptions Some schemes are at an early stage of planning, so delivery risks/issues may not be fully understood Some schemes should be progressed at a collaborative level there is a risk that ownership and resources to progress these are not clear Schemes involving changes to services may negatively impact on quality or patient safety Engagement with primary care is critical to the delivery of demand management schemes Engagement with providers some schemes are reliant on providers adopting and adhering to pathways Current contractual arrangements may restrict opportunities to realise additional savings in year Further modelling / analysis underway to verify potential savings available Work up additional opportunities to meet any shortfall Complete detailed planning, early escalation of any significant risks or changes Development of Planned and Unplanned Care Boards to oversee joint work programmes Collaborative governance and reporting arrangements to be confirmed Completion of EIA, QIAs at planning stage Periodic reviews to be scheduled Quality / patient experience measures to be monitored alongside finance/activity reporting GP engagement strategy/plan being developed Involvement of GPs as Executive and Project Leads IT / forms work to improve compliance with pathways Engagement regarding specific schemes via appropriate contract management channels Collaborative work through Planned Care Board and Unplanned Care Board Target opportunities at PbR providers Early planning for QIPP pipeline to account for time constraints Page 5

8 4. Next Steps Delivery Assurance Finance / Activity Tracker to feed into highlight reports at scheme level Highlight reports to QIPP Planning, Delivery & Monitoring Group focusing on progress against milestones and managing risks Weekly programme updates to Senior Management Team July report with Month 1 data to Finance, Performance & QIPP Committee, followed by July Financial Recovery Board Scheme Development Undertake Deep Dive reviews with each budget holder Fast track proposals for new schemes business cases where applicable On-going pipeline development of local QIPP opportunities for 2019/20 Collaborative Work Bexley, Greenwich & Lewisham Planned Care and Unplanned Care programmes establish programme priorities and work streams; progress joint business cases South East London Treatment Access Policy alignment and opportunities Manage alignment with South East London work streams Develop 2019/20 QIPP plans at collaborative level Page 6

Corporate Objective addressed by this paper (please select one or more with an X):

Corporate Objective addressed by this paper (please select one or more with an X): Enclosure: I genda item: 13 GOVERNING BODY Title of paper: QIPP Delivery Update 2018/19 Date of meeting: 9 th January 2019 Presented by: Robert Shaw Prepared by: Kat Macann Title: Director of Commissioning

More information

Title of Meeting: Governing Body Agenda Item: 7.4

Title of Meeting: Governing Body Agenda Item: 7.4 Title of Meeting: Governing Body Agenda Item: 7.4 Date of Meeting: 6 April 2017 Paper Title: HaRD CCG Draft Governing Body Assurance Framework Refresh Responsible Governing Body Member Lead Joanne Crewe,

More information

NHS BOLTON CLINICAL COMMISSIONING GROUP Public Board Meeting AGENDA ITEM NO: 8. Date of Meeting:.27 th April 2018

NHS BOLTON CLINICAL COMMISSIONING GROUP Public Board Meeting AGENDA ITEM NO: 8. Date of Meeting:.27 th April 2018 NHS BOLTON CLINICAL COMMISSIONING GROUP Public Board Meeting AGENDA ITEM NO: 8 Date of Meeting:.27 th April 2018 TITLE OF REPORT: AUTHOR: PRESENTED BY: PURPOSE OF PAPER: (Linking to Strategic Objectives)

More information

SWL STP Governance Arrangements proposals for refresh to support delivery

SWL STP Governance Arrangements proposals for refresh to support delivery SWL STP Governance Arrangements proposals for refresh to support delivery Contents 1. Context for refreshing our STP governance arrangements... 2 2. Relationship with statutory local governance arrangements...

More information

Our Healthier South East London (OHSEL) The SEL STP. Programme Director: Community Based Care

Our Healthier South East London (OHSEL) The SEL STP. Programme Director: Community Based Care Our Healthier South East London (OHSEL) The SEL STP Programme Director: Community Based Care Job Title: Programme Director: Community Based Care Band: 9 Responsible to: Accountable to: Responsible for:

More information

GOVERNING BODY. x improvement along the pathway 2. To ensure the CCG s position recovers to meet its financial duties and performance standards

GOVERNING BODY. x improvement along the pathway 2. To ensure the CCG s position recovers to meet its financial duties and performance standards Enclosure: G Agenda item: 10 GOVERNING BODY Title of paper: and Action Plan 2018-19 Date of meeting: 28 March 2018 Presented by: Yvonne Leese Prepared by: Yvonne Leese Title: Director of Quality and Integrated

More information

Integrated Planning Checklist 2014/15: Quality Innovation Productivity and Prevention (QIPP)

Integrated Planning Checklist 2014/15: Quality Innovation Productivity and Prevention (QIPP) Integrated Planning Checklist 2014/15: Quality Innovation Productivity and Prevention (QIPP) BACKGROUND INFORMATION: Enter Your Name: Enter Your Email Address: Mary Bytheway mary.bytheway@dwmh.nhs.uk Select

More information

NHS Central London CCG QIPP Development 2014/15

NHS Central London CCG QIPP Development 2014/15 NHS Central London CCG QIPP Development 2014/15 Contents Section 1: Context Section 2: Our Commitment System Wide Change Section 3: Key Activities Section 4: Benchmarking Tools Examples of Benchmarking

More information

REPORT TO MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY

REPORT TO MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY REPORT TO MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY Date of Meeting: 24 th March 216 Agenda No: 8.2 Attachment: 15 Title of Document: Board Assurance Framework Report Author: Terri Burns, Corporate

More information

Enclosure: F Agenda item: 9 GOVERNING BODY. Title of paper: Recovery Plan (Financial Recovery Board) Date of meeting: Wednesday 23 March 2016

Enclosure: F Agenda item: 9 GOVERNING BODY. Title of paper: Recovery Plan (Financial Recovery Board) Date of meeting: Wednesday 23 March 2016 Enclosure: F genda item: 9 OVERNIN BODY Title of paper: Recovery Plan (Financial Recovery Board) Date of meeting: Wednesday 23 March 2016 Presented by: Prepared by: Title: Turnaround Director & Interim

More information

Quarter /19 Diane Sankey, Governance, Risk & Complaints Manager

Quarter /19 Diane Sankey, Governance, Risk & Complaints Manager NHS BOLTON CLINICAL COMMISSIONING GROUP Public Board Meeting AGENDA ITEM NO: 12 Date of Meeting: 27 July 2018 TITLE OF REPORT: AUTHOR: PRESENTED BY: PURPOSE OF PAPER: (Linking to Strategic Objectives)

More information

Appendix 1. Draft. Organisational Development Strategy November 2015 March 2017

Appendix 1. Draft. Organisational Development Strategy November 2015 March 2017 Appendix 1 Draft Organisational Development Strategy November 2015 March 2017 1 Introduction Castle Point and Rochford CCG is a Clinical Commissioning Group (CCG) in south Essex. A CCG is a group of GPs

More information

Job description and person specification

Job description and person specification Job description and person specification Position Job title Delivery Field Work Support Directorate Operations & Information Pay band AFC Band 8a Responsible to Delivery Partner(s) in local geography Salary

More information

Key issues for Clinical Commissioning Groups

Key issues for Clinical Commissioning Groups Key issues for Clinical Commissioning Groups Issue 1 Grant Thornton is appointed external auditor for around 40% of CCGs, giving us excellent insight into the key issues facing CCGs and the solutions being

More information

Job description and person specification

Job description and person specification Job description and person specification Job title Business Process Lead - NHS RightCare System Programme Management& Governance Position Directorate Midlands & East Region Pay band AFC Band 8c Responsible

More information

Template GP Integration Agreement for accountable models overview

Template GP Integration Agreement for accountable models overview New care models Template GP Integration Agreement for accountable models overview Accountable Care Organisation (ACO) Contract package - supporting document Our values: clinical engagement, patient involvement,

More information

2 Year Operating Plan Summary

2 Year Operating Plan Summary 2 Year Operating Plan 2017 2019 Summary December 2016 Introduction This document presents a summary of the Kingston Hospital NHS Foundation Trust s 2 year Operating Plan for 2017/19 which was submitted

More information

Supporting all NHS Trusts to achieve NHS Foundation Trust status by April 2014

Supporting all NHS Trusts to achieve NHS Foundation Trust status by April 2014 Supporting all NHS Trusts to achieve NHS Foundation Trust status by April 2014 Tripartite Formal Agreement between: Coventry and Warwickshire Partnership NHS Trust NHS West Midlands Department of Health

More information

Business Case Process

Business Case Process Reference Number: GuCG005 Version: 1.0 Name of Originator / Author & Organisation: Responsible LECCG Committee: LECCG Executive Lead: Date Approved by LECCG Authorising Committee: Matthew Broughton & Ben

More information

STRATEGIC PLANNING AND STRATEGIC CHANGE REPORT. Director of Planning and Performance. Director of Planning and Performance

STRATEGIC PLANNING AND STRATEGIC CHANGE REPORT. Director of Planning and Performance. Director of Planning and Performance BOARD 9 DECEMBER 2015 AGENDA ITEM 3.3 STRATEGIC PLANNING AND STRATEGIC CHANGE REPORT of Director of Planning and Performance Paper prepared by Director of Planning and Performance Purpose of Paper Action/Decision

More information

Sustainability and transformation partnerships

Sustainability and transformation partnerships HFMA briefing Sustainability and transformation partnerships Developing robust governance arrangements Introduction The issue of governance in relation to sustainability and transformation partnerships

More information

Pay Band Agenda for Change Band 8a / Grade 7

Pay Band Agenda for Change Band 8a / Grade 7 Job Description Job Title Reference Number Directorate Patient and Public Voice Manager (fixed term / secondment opportunity) 990-NHSE888NSC Patients and Information Pay Band Agenda for Change Band 8a

More information

Leeds Health Commissioning and System Integration Board. Terms of Reference

Leeds Health Commissioning and System Integration Board. Terms of Reference APPENDIX A Leeds Health Commissioning and System Integration Board Terms of Reference Version: 15.0 DRAFT Approved by: Date approved: Date issued: Responsible Director: Review date: [+6 months from approval]

More information

Case Study: Developing a Comprehensive Procurement Strategy to Ensure Financial Stability for the NHS

Case Study: Developing a Comprehensive Procurement Strategy to Ensure Financial Stability for the NHS Case Study: Developing a Comprehensive Procurement Strategy to Ensure Financial Stability for the NHS Warren Simms Associate Director Clinical Procurement and Market Management Context. NHS Procurement

More information

Job description and person specification

Job description and person specification Job description and person specification Position Job title Head of Genomics Unit Directorate Finance, Commercial and Specialised Commissioning Pay band AFC Band 9 Responsible to Director of Strategy and

More information

CCG CO 22 Project Management Policy

CCG CO 22 Project Management Policy Corporate CCG CO 22 Project Management Policy Version Number Date Issued Review Date V2.0 20/05/2016 20/05/2018 Prepared By: Head of Programme Management Office (PMO), NTCCG Consultation Process: Transformation

More information

3.2 To ensure effective governance process in the arrangements for public health transition 4.1 To achieve authorisation

3.2 To ensure effective governance process in the arrangements for public health transition 4.1 To achieve authorisation All Directors All Directors Director of Governance and Chief Finance Officer Appendix 1: Croydon Clinical Commissioning Group 2012/13 CCG CCG Sub Clinical Lead 1. Achieving financial sustainability in

More information

JOB DESCRIPTION. Department: Hertfordshire and West Essex Sustainability and Transformation Partnership.

JOB DESCRIPTION. Department: Hertfordshire and West Essex Sustainability and Transformation Partnership. JOB DESCRIPTION Job Title: STP Programme Manager Department: Hertfordshire and West Essex Sustainability and Transformation Partnership. Location: Base Hatfield, Hertfordshire, but required to work agilely.

More information

Technical guidance for NHS planning 2017/18 and 2018/19. Annex F: NHS Improvement guidance for operational and activity plans September 2016

Technical guidance for NHS planning 2017/18 and 2018/19. Annex F: NHS Improvement guidance for operational and activity plans September 2016 Technical guidance for NHS planning 2017/18 and 2018/19 Annex F: NHS Improvement guidance for operational and activity plans September 2016 About NHS Improvement NHS Improvement is responsible for overseeing

More information

Business Continuity Management Policy

Business Continuity Management Policy Business Continuity Management Policy Version FINAL 1.0 Ratified by Dudley CCG Audit Committee Date ratified 17/03/16 Name of originator(s) / author(s) David Morris, Midlands and Lancashire CSU/ Sue Johnson,

More information

STAFFORD & SURROUNDS DECOMMISSIONING & DISINVESTMENT OF SERVICES

STAFFORD & SURROUNDS DECOMMISSIONING & DISINVESTMENT OF SERVICES Stafford & Surrounds Clinical Commissioning Group STAFFORD & SURROUNDS DECOMMISSIONING & DISINVESTMENT OF SERVICES Agreed at Governing Body 09 December 2013 Date:.. Signature:. Chair Stafford & Surrounds

More information

Regional Genomics Service Improvement Lead Job Description and Person Specification

Regional Genomics Service Improvement Lead Job Description and Person Specification Regional Genomics Service Improvement Lead Job Description and Person Specification Position Job title Regional Genomics Service Improvement Lead Directorate Medical Directorate Pay band AFC Band 8d Responsible

More information

Job Description. Head of Contracting. Deputy Head of Contracting. Senior Contracts Manager. Assistant Contracts Manager

Job Description. Head of Contracting. Deputy Head of Contracting. Senior Contracts Manager. Assistant Contracts Manager Job Description Job Title: Senior Contract Manager (Primary Care) Reference No: Organisation: NHS Vale of York Clinical Commissioning Group Department: System Resources and Performance Team: Contracting

More information

Equality Delivery System (EDS2) and Workforce Race Equality Standard (WRES) Strategy

Equality Delivery System (EDS2) and Workforce Race Equality Standard (WRES) Strategy Equality Delivery System (EDS2) and Workforce Race Equality Standard (WRES) Strategy 2014-2018 EXECUTIVE SUMMARY: Welcome to our EDS2/WRES Strategy. This document contains our plans to meet and continuously

More information

Re-defining the Strategic Change Programme

Re-defining the Strategic Change Programme Re-defining the Strategic Change Programme i Table of Contents 1. Purpose of Document... 3 2. Overview of the Portfolio... 4 3. Case for Change... 5 4. Where are we now?... 9 5. Priorities - Programme

More information

NHS Dorset Clinical commissioning Group Transformation Programme Dashboard - March 2016

NHS Dorset Clinical commissioning Group Transformation Programme Dashboard - March 2016 NHS Dorset Clinical commissioning Group Transformation Programme Dashboard - March 2016 Produced by: Kelly Spiller Data source: Highlight Reports and Heads of Service Date published: 02 March 2016 Transformation

More information

CCG CO 22 Project Management Policy

CCG CO 22 Project Management Policy Corporate CCG CO 22 Project Management Policy Version Number Date Issued Review Date V1.1 25/02/2016 25/02/2018 Prepared By: Head of Programme Management Office (PMO), NTCCG Consultation Process: Transformation

More information

Plymouth Hospitals NHS Trust Business Case for replacement Managed Equipment Service

Plymouth Hospitals NHS Trust Business Case for replacement Managed Equipment Service Plymouth Hospitals NHS Trust Business Case for replacement Managed Equipment Service Purpose The Business Case describes and seeks approval to award the contract for the replacement of the existing Pathology

More information

TITLE OF REPORT: Board Assurance Framework Quarter /18. Diane Sankey, Governance, Risk & Complaints Manager

TITLE OF REPORT: Board Assurance Framework Quarter /18. Diane Sankey, Governance, Risk & Complaints Manager NHS BOLTON CLINICAL COMMISSIONING GROUP Public Board Meeting AGENDA ITEM NO: 10 of Meeting: 27 April 2018 TITLE OF REPORT: Board Assurance Framework Quarter 2017/18 AUTHOR: PRESENTED BY: PURPOSE OF PAPER:

More information

HFMA AWARDS 2018 HFMA AWARDS 2018

HFMA AWARDS 2018 HFMA AWARDS 2018 HFMA AWARDS 2018 HFMA AWARDS 2018 Case studies from the finance team of the year award 2017 Introduction The National Healthcare Finance Awards attract entries from across the NHS, showcasing good practice

More information

Item Number: 8.3. Governing Body Meeting: 5 February Report Sponsor Amanda Bloor Chief Officer. Report Author Amanda Bloor Chief Officer

Item Number: 8.3. Governing Body Meeting: 5 February Report Sponsor Amanda Bloor Chief Officer. Report Author Amanda Bloor Chief Officer Item Number: 8.3 Governing Body Meeting: 5 February 2015 Report Sponsor Amanda Bloor Chief Officer Report Author Amanda Bloor Chief Officer 1. Title of Paper: Harrogate Public Sector Leadership Board 2.

More information

The Integrated Support and Assurance Process (ISAP): detailed guidance on assuring novel and complex contracts

The Integrated Support and Assurance Process (ISAP): detailed guidance on assuring novel and complex contracts The Integrated Support and Assurance Process (ISAP): detailed guidance on assuring novel and complex contracts Part C: Guidance for NHS trusts and NHS foundation trusts Published by NHS England and NHS

More information

GOVERNING BODY MEETING

GOVERNING BODY MEETING Enclosure: F genda item: 8 OVERNIN BODY MEETIN Title of paper: reenwich CC Recovery Plan Date of meeting: January 27 th 2016 Presented by: nnabel Burn Prepared by: nnabel Burn Title: Chief Officer & email

More information

Quality Impact Assessment Procedure. July 2012

Quality Impact Assessment Procedure. July 2012 Quality Impact Assessment Procedure July 2012 1 Document name Quality Impact Assessment Procedure Version 3.0 Document author (name/title) Karen Warner Compliance lead (name/title) Mark Turner, Assurance

More information

Financial Recovery Programme. John Turner Senior Service Improvement Manager

Financial Recovery Programme. John Turner Senior Service Improvement Manager Financial Recovery Programme John Turner Senior Service Improvement Manager Introduction 5 year York and Scarborough system finance plan drafted Aim to reach break even position by start of 2022 We deliver

More information

Feedback from consultation on mandating patient-level costing

Feedback from consultation on mandating patient-level costing Feedback from consultation on mandating patient-level costing February 2018 We support providers to give patients safe, high quality, compassionate care within local health systems that are financially

More information

Item 9 Appendix 1. Introduction

Item 9 Appendix 1. Introduction Item 9 Appendix 1 Introduction Each of the three CCGs, Hambleton, Richmondshire and Whitby, Harrogate and Rural District and Scarborough and Ryedale, have recently completed a Capacity and Capability Review

More information

CCG Organisation Improvement Plan November 2017 Exceptions Report

CCG Organisation Improvement Plan November 2017 Exceptions Report CC Organisation Improvement Plan November 2017 Exceptions Report Sheila Bremner Chief Officer November 2017 Improvement Plan QIPP Delivery Key: Blue rating = change complete and embedded Pg 2 The CC needs

More information

BOARD PAPER - NHS COMMISSIONING BOARD

BOARD PAPER - NHS COMMISSIONING BOARD NHSCB28028 BOARD PAPER - NHS COMMISSIONING BOARD Title: Recruitment update Clearance: Jo-Anne Wass, National Director: HR Purpose of Paper: This paper provides an update for the Board on the implementation

More information

TRUST BOARD MEETING. 27 September Memorandum of Understanding for the West Yorkshire and Harrogate Health and Care Partnership

TRUST BOARD MEETING. 27 September Memorandum of Understanding for the West Yorkshire and Harrogate Health and Care Partnership TRUST BOARD MEETING 27 September 2018 Paper Title: Section: Lead Director: Paper Author: Agenda Item: Presented For: Paper Category: Memorandum of Understanding for the West Yorkshire and Harrogate Health

More information

Cancer Programme Manager. Full time (37.5 hours per week)

Cancer Programme Manager. Full time (37.5 hours per week) Job title Salary Hours Base Accountable to Cancer Programme Manager 33,222 to 59,964 (dependent on experience) Full time (37.5 hours per week) Cambridge Director of Transformation ABOUT EASTERN AHSN The

More information

Job Description & Person Specification. Age UK Kensington & Chelsea Values

Job Description & Person Specification. Age UK Kensington & Chelsea Values Job Description & Person Specification Job Title Hours Contract Salary HSCA Service Delivery Manager 35 hours per week Permanent 35,353 per annum Age UK Kensington & Chelsea Values We promote the well-being

More information

NHS DORSET CCG CLINICAL SERVICES REVIEW SPECIFICATION

NHS DORSET CCG CLINICAL SERVICES REVIEW SPECIFICATION NHS DORSET CCG CLINICAL SERVICES REVIEW SPECIFICATION 1. REQUIREMENTS OVERVIEW 1.1 NHS Dorset Clinical Commissioning Group (CCG) is seeking a provider partner to better understand the enduring care needs

More information

Operational Plan Refresh

Operational Plan Refresh Operational Plan Refresh 2018-19 30 April 2018 2 Introduction 1. Introduction The Trust submitted a two year Operational Plan for 2017-19 on 23 December 2016. This was based on the NHS Operational Planning

More information

E-rostering the clinical workforce: levels of attainment and meaningful use standards

E-rostering the clinical workforce: levels of attainment and meaningful use standards E-rostering the clinical workforce: levels of attainment and meaningful use standards November 2018 We support providers to give patients safe, high quality, compassionate care within local health systems

More information

Appendix 1 GPFV Plan Stage 2 Review CCG(s) Cambridgeshire and Peterborough CCG Rating Comments/recommendations Green Green Green Green Amber/green

Appendix 1 GPFV Plan Stage 2 Review CCG(s) Cambridgeshire and Peterborough CCG Rating Comments/recommendations Green Green Green Green Amber/green Appendix 1 GPFV Plan Stage 2 Review CCG(s) Cambridgeshire and Peterborough CCG Rating Comments/recommendations Model of care Green The plan illustrates clearly how the different models of care will be

More information

Workforce Race Equality Standard (WRES) Implementation Plan 2015/17

Workforce Race Equality Standard (WRES) Implementation Plan 2015/17 Workforce Race Equality Standard (WRES) Implementation Plan 2015/17 Solent NHS Trust Headquarters, Adelaide Health Centre, William Macleod Way, Millbrook, Southampton SO16 4XE Telephone: 023 8060 8900

More information

Capital regime, investment and property business case approval guidance for NHS trusts and foundation trusts

Capital regime, investment and property business case approval guidance for NHS trusts and foundation trusts Capital regime, investment and property business case approval guidance for NHS trusts and foundation trusts Annex 4: Strategic outline case technical requirements November 2016 NHS Improvement publication

More information

JOB DESCRIPTION - CHIEF OPERATING OFFICER

JOB DESCRIPTION - CHIEF OPERATING OFFICER JOB DESCRIPTION - CHIEF OPERATING OFFICER JOB TITLE: RESPONSIBLE TO: KEY RELATIONSHIPS: Chief Operating Officer Chief Executive Chief Executive and Chair Board members Executive Team Senior clinicians,

More information

Theatre Transformation Programme. Programme Brief

Theatre Transformation Programme. Programme Brief Theatre Transformation Programme Programme Brief Document Status: Version 1 Date: 30 th June 2011 Authors: A Bennett Head of Transformation Patsy Spence Head of Operational Performance Senior Reporting

More information

Report by Lesley Anne Smith, Head of Quality on behalf of Elaine Mead, Chief Executive

Report by Lesley Anne Smith, Head of Quality on behalf of Elaine Mead, Chief Executive Highland NHS Board 3 April Item 4.4 NHS HIGHLAND STRATEGIC RISK REGISTER Report by Lesley Anne Smith, Head of Quality on behalf of Elaine Mead, The Board is asked to: Approve the NHS Highland Strategic

More information

Knowledge Management Strategy

Knowledge Management Strategy Knowledge Management Strategy 2013-2017 Promoting the management & use of knowledge for the best patient care Margaret Rowley April 2013 WAHT-code Page 1 of 13 Version 1.3 DOCUMENT CONTROL Originator:

More information

Page 1 of 52. NHS Midlands and East of England Region CCG Resilience Handbook 11 th May 2017 VERSION 1.0

Page 1 of 52. NHS Midlands and East of England Region CCG Resilience Handbook 11 th May 2017 VERSION 1.0 Page 1 of 52 NHS Midlands and East of England Region CCG Resilience Handbook 11 th May 2017 VERSION 1.0 Page 2 of 52 Contents Scope and purpose of the handbook... 3 Introduction: what does good look like?...

More information

Job description and person specification

Job description and person specification Job description and person specification Position Job title Knowledge Management Facilitator Directorate Operations and Information Pay band AFC Band 8a Responsible to NHS RightCare Knowledge Management

More information

National Quality Board (NQB) Workplan

National Quality Board (NQB) Workplan National Quality Board (NQB) Workplan Background 1. Following agreement at the July 2015 meeting of the Five Year Forward View (5YFV) Board that the ALB CEO s should work with the DH to ensure that delivery

More information

Commissioning Capability Programme

Commissioning Capability Programme Name of Author: Sponsoring Director and/or Clinician: Locality Affected: Practices Affected: Caroline Gregory, Chief Financial Officer Nicki Millin All All 1. 1.1 1.2 1.3 1.4 Purpose and Reasons To achieve

More information

JOB DESCRIPTION. 1. JOB TITLE: Director of Research & Innovation. 5a. RESPONSIBLE TO: Deputy Medical Director (Clinical Standards and Governance)

JOB DESCRIPTION. 1. JOB TITLE: Director of Research & Innovation. 5a. RESPONSIBLE TO: Deputy Medical Director (Clinical Standards and Governance) JOB DESCRIPTION 1. JOB TITLE: Director of Research & Innovation 2. LOCATION: Trust-wide 3. NOMINAL BASE: Trust-wide 4. SALARY: 3 PAs 5a. RESPONSIBLE TO: Deputy Medical Director (Clinical Standards and

More information

Ayrshire and Arran NHS Board

Ayrshire and Arran NHS Board Paper No 26 Ayrshire and Arran NHS Board Monday 29 August 2016 Transformational Change Governance Arrangements Author: Vicki Campbell, Corporate Business Manager Sponsoring Director: John Burns, Chief

More information

TRUST BOARD 26 MAY 2011 ANNUAL REVIEW OF BOARD COMMITTEES 2010/2011

TRUST BOARD 26 MAY 2011 ANNUAL REVIEW OF BOARD COMMITTEES 2010/2011 TRUST BOARD 26 MAY 2011 ANNUAL REVIEW OF BOARD COMMITTEES 2010/2011 D Summary The annual reviews of the Board s sub committees took place during April and May 2011. The Trust s standard terms of reference

More information

Issues Management Policy and process

Issues Management Policy and process Issues Management Policy and process Version: V1.0 Ratified: Lewisham Risk Management Group Name of originator/author: Name of responsible committee/individual; Victoria Medhurst Senior Management Team

More information

Board Assurance Framework

Board Assurance Framework Board Assurance Framework 2018 19 First draft May 2018 Version 5 Board Development Meeting 22.02.2018 Trust Management Group 04.04.2018 02.05.2018 Audit Committee 10.04.2018 Trust Board 24.05.2018 Quality

More information

APPENDIX 6a Risk Register

APPENDIX 6a Risk Register APPENDIX 6a Risk Register Sustainable Services Programme Final Draft Strategic Outline Case for submission to SaTH Trust Board 22 March 2016 APPENDIX 6a Risk Register 19/02/2016 SaTH Sustainable Services

More information

Oxfordshire Clinical Commissioning Group Board Meeting. Date of Meeting: 26 May 2016 Paper No: 16/37

Oxfordshire Clinical Commissioning Group Board Meeting. Date of Meeting: 26 May 2016 Paper No: 16/37 Oxfordshire Clinical Commissioning Group Board Meeting Oxfordshire Clinical Commissioning Group Date of Meeting: 26 May 2016 Paper No: 16/37 Title of Presentation: Oxfordshire CCG s RightCare Approach

More information

JOB DESCRIPTION. Director of Primary and Out of Hospital Care

JOB DESCRIPTION. Director of Primary and Out of Hospital Care JOB DESCRIPTION JOB TITLE: BAND: ACCOUNTABLE TO: RESPONSIBLE TO: BASE: Head of Transformation 8c Director of Primary and Out of Hospital Care Director of Primary and Out of Hospital Care Bernard Weatherill

More information

The purpose of this paper is to present the outcome of recent PR19 assurance activities for note by the Water Forum.

The purpose of this paper is to present the outcome of recent PR19 assurance activities for note by the Water Forum. BUSINESS PLAN UPDATE ASSURANCE DASHBOARD PAGE 1 OF 1 1. PURPOSE OF PAPER The purpose of this paper is to present the outcome of recent PR19 assurance activities for note by the Water Forum. 2. QUALITY

More information

Commissioning Strategy Directorate Secondment Programme

Commissioning Strategy Directorate Secondment Programme Commissioning Strategy Directorate 2017-18 Secondment Programme 1 1 What we are looking for We are looking for dynamic and ambitious individuals who passionate about delivering transformational improvements

More information

Working with local authority scrutiny. {Smart Guides} to ENGAGEMENT. For better commissioning

Working with local authority scrutiny. {Smart Guides} to ENGAGEMENT. For better commissioning Working with local authority scrutiny {Smart Guides} to ENGAGEMENT For better commissioning Working with local authority scrutiny Part of the Smart Guides to Engagement series, this guide helps clinical

More information

1. Introduction. 2. Update. Towards a Local Integrated Care Partnership (LICP) in Rushcliffe

1. Introduction. 2. Update. Towards a Local Integrated Care Partnership (LICP) in Rushcliffe RCCG/GB//056 Towards a Local Integrated Care Partnership (LICP) in Rushcliffe 1. Introduction The MCP Governance Group considered and endorsed a paper in October 2017 seeking support for developing an

More information

Emergency Preparedness, Resilience and Response (EPRR) Core Standard Assessment and Assurance

Emergency Preparedness, Resilience and Response (EPRR) Core Standard Assessment and Assurance Agenda Item: 13 Date of Meeting: 3 January 2017 Author: Clinical Lead: CCG Director/Manager: Jeanette George, Chief Operating Officer Mary Backhouse, Chief Clinical Officer Jeanette George, Chief Operating

More information

Structured Assessment 2017 Betsi Cadwaladr University Health Board

Structured Assessment 2017 Betsi Cadwaladr University Health Board Structured Assessment 2017 Betsi Cadwaladr University Health Board Audit year: 2017 Date issued: January 2018 Document reference: 285A2017-18 This document has been prepared as part of work performed in

More information

JOB DESCRIPTION. Senior Fundraising Engagement Manager

JOB DESCRIPTION. Senior Fundraising Engagement Manager JOB DESCRIPTION Fundraising Engagement Manager Reporting to: Direct Reports: Location: Salary: Senior Fundraising Engagement Manager None Various/ home-based Outside London c. 26,000 / Inside London c.

More information

Trust Board Meeting. 2 July 2015

Trust Board Meeting. 2 July 2015 Trust Board Meeting 2 July Paper Reference: TB(15-16) 99 Report Title: Executive Summary: Action Required: Link to Strategic Objectives: Risks: Quality Impact: Resource Implications: Legal/Regulatory Implications:

More information

CCG Lay member with a Lead Role in Finance. Job Description and Person Specification

CCG Lay member with a Lead Role in Finance. Job Description and Person Specification CCG Lay member with a Lead Role in Finance CCG Organisation Summary Job Description and Person Specification NHS Hammersmith and Fulham Clinical Commissioning Group (CCG) were set up and became a statutory

More information

Head of HR Process Improvement. Pay Band. Duration of job

Head of HR Process Improvement. Pay Band. Duration of job Role Profile Job Description Job Title Ref no: Head of HR Process Improvement Directorate or Region UK Department/Country HR Location of post Reports to UK, Europe or Wider Europe Head of Global HR Operations

More information

RISK MANAGEMENT STRATEGY

RISK MANAGEMENT STRATEGY RISK MANAGEMENT STRATEGY Version 2.0 Page 1 of 9 OCTOBER 2013 POLICY DOCUMENT VERSION CONTROL CERTIFICATE TITLE Title: Risk Management Strategy Version: 2.0 SUPERSEDES Supersedes: Risk Management Strategy

More information

Corporate Risk Register Q1 DRAFT

Corporate Risk Register Q1 DRAFT Corporate Register Q1 DRAFT The following risk register represents those risks in place at the time of reporting at quarter 1, the mitigation strategies in place for each risk and the proposed treatment

More information

TRUST BOARD. Date of Meeting: 10/5/2011 Enclosure: 7

TRUST BOARD. Date of Meeting: 10/5/2011 Enclosure: 7 TRUST BOARD Date of Meeting: 10/5/2011 Enclosure: 7 Title of Report: Merger and Acquisition Update Agenda Item No: 8.3 Aims: This report informs and updates the Board on the development of the process

More information

The Whittington Hospital NHS Trust. Modernising Clinical Services. Project Initiation Document

The Whittington Hospital NHS Trust. Modernising Clinical Services. Project Initiation Document The Whittington Hospital NHS Trust Modernising Clinical Services Project Initiation Document March 2008 Contents Contents...2 Appendices...2 1.0 Introduction...3 1.1 Overview...3 1.2 Background...3 1.3

More information

Policy:E7. Escalation Policy N/A. Appended below at Appendix B. Version: E7/01

Policy:E7. Escalation Policy N/A. Appended below at Appendix B. Version: E7/01 Policy:E7 Escalation Policy Version: E7/01 Ratified by: Trust Management Team Date ratified: 11 th September 2013 Title of Author: Board Secretary & Head of Governance Title of responsible Director Medical

More information

NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING ORGANISATIONAL DEVELOPMENT FRAMEWORK UPDATE 2018/2019

NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING ORGANISATIONAL DEVELOPMENT FRAMEWORK UPDATE 2018/2019 NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING ORGANISATIONAL DEVELOPMENT FRAMEWORK UPDATE 2018/2019 Date of the meeting 14/11/2018 Author Sponsoring Board member Purpose of Report Recommendation

More information

Lance McCarthy, Deputy Chief Executive, North Middlesex University Hospital NHS Trust CONTACT DETAILS:

Lance McCarthy, Deputy Chief Executive, North Middlesex University Hospital NHS Trust CONTACT DETAILS: MEETING: Haringey Clinical Commissioning Group Governing Body meeting DATE: Wednesday, 4 June 2014 TITLE: North Middlesex University Hospital NHS Trust s Foundation Trust application update LEAD DIRECTOR

More information

JOB DESCRIPTION. Head of Secondary Care Hospital Commissioning. CCG HQ, St Cross Business Park, Newport, IW

JOB DESCRIPTION. Head of Secondary Care Hospital Commissioning. CCG HQ, St Cross Business Park, Newport, IW JOB DESCRIPTION Job Title: Reports to: Accountable to: Type of Contract: Hours: Grade: Employer: Base: Deputy Head of Secondary Care Hospital Commissioning Head of Secondary Care Hospital Commissioning

More information

Kingston Hospital NHS Foundation Trust Recovery Plan Update. Trust Board Meeting 29 th July 2015

Kingston Hospital NHS Foundation Trust Recovery Plan Update. Trust Board Meeting 29 th July 2015 Kingston Hospital NHS Foundation Trust Recovery Plan Update Trust Board Meeting 29 th July 2015 Summary We have been through a robust process to set the plan and have subsequently focused on further actions

More information

Business Continuity Policy

Business Continuity Policy Putting Barnsley People First Business Continuity Policy Version:.0 Approved By: Governing Body Date Approved: August 015 Reviewed October 016 Name of originator / author: Jamie Wike, Head of Planning,

More information

Risk Management Strategy

Risk Management Strategy Risk Management Strategy Risk Management Strategy 2016-2018 Janet Young Governance & Risk Manager June 2016 Executive Lead Jane Meggitt, Director of Communications & Corporate Affairs Index Foreword...............

More information

Integration of Health and Social Care. Integration Joint Board. Performance Management Framework

Integration of Health and Social Care. Integration Joint Board. Performance Management Framework Integration of Health and Social Care Integration Joint Boards Performance Management Framework Date of First Issue: 31 March 2016 Approved by : Clackmannanshire & Stirling On: 30 March 2016 Integration

More information

Supporting local public services through change. Integrating health and social care services

Supporting local public services through change. Integrating health and social care services Supporting local public services through change Integrating health and social care services Health and social care services should be viewed as a single, interdependent system. Services designed from this

More information

Chief Executive Directors of Planning x 2 National Boards, with input from all National Boards. Lead Director Author

Chief Executive Directors of Planning x 2 National Boards, with input from all National Boards. Lead Director Author NOT PROTECTIVELY MARKED Public Board Meeting March 2018 Item No 07.1 THIS PAPER IS FOR ENDORSEMENT NATIONAL BOARD COLLABORATIVE DELIVERY PLAN 2018-23 SUMMARY Lead Director Author Action required Key points

More information

Care.data Programme Board Terms of Reference

Care.data Programme Board Terms of Reference Document filename: care.data Programme Board Terms of Reference Directorate / Programme Document Reference Care.data Programme Project Programme Director Eve Roodhouse Status Final Owner Eve Roodhouse

More information

St George s Healthcare NHS Trust: the next decade. Workforce Strategy

St George s Healthcare NHS Trust: the next decade. Workforce Strategy the next decade Workforce Strategy 2012 2022 January 2013 Contents Contents Introduction St George s mission, vision and values St George s in 2022 what this means for the workforce The workforce in 2012

More information