a powerful foundation Zurich Construction Management Services consulting and planning

Size: px
Start display at page:

Download "a powerful foundation Zurich Construction Management Services consulting and planning"

Transcription

1 a powerful foundation consulting and planning

2 your project has suddenly, seriously gotten out of hand Engineering has turned in yet another set of plans Crews continue to accumulate overtime Materials are delivered late Delays are straining coordination to the breaking point Project costs are spiraling out of control Can the job be completed on time? Will profits be on target? What s your plan to resolve disputes? Isn t there a better way?

3 laying the groundwork Whether you re building a stadium or power plant, successful construction projects require solid planning. Yet rapid industry growth and unrelenting timetables can make such considerations challenging, even overwhelming. Now, Zurich Construction Management Services can help. We are a consulting group dedicated solely to the construction industry. Our consultants are experienced industry leaders who possess a unique vision and bottom-line perspective. They deliver superior business results results that help to improve project performance. We serve the following clients: owners and developers construction lenders construction attorneys design professionals construction managers construction general contractors trade subcontractors vendors and suppliers Regardless of sector, size or scope, we can help a project at any phase. Zurich Construction Management Services helping lay the groundwork for success! Using time, cost and quality control, our goal is to help ensure your construction projects are completed successfully, profitably and on time with minimum risk. Our consultants are available to complement and extend your staff at any phase of project development, design or construction.

4 constructing success from the ground up Experience An experienced team is essential to any successful construction project. Zurich Construction Management Services consultants share this philosophy, having worked in the very industry they now serve. All team members are degreed professionals who average 20 years of construction experience and have held positions such as project managers, project engineers, job site superintendents, project estimators and corporate managers. Project experience covers all market segments, including industrial, commercial, heavy and highway, public works and residential. Insight consultants combine this diverse background with their financial knowledge, observations of the world s best industry practices and lessons learned from years of problem solving. In addition, we are the industry leaders in training and educating our staff on cutting-edge trends and developments, as well as regulatory issues. Responsiveness Our deep and broad understanding of the construction industry is also evident in our approach to and array of services. Zurich Construction Management Services multidisciplinary team members bring their business and engineering perspective to bear when planning entire projects up front or identifying underlying construction problems. Our consultants then provide realistic and workable solutions that directly address your unique and complex construction-related challenges. As an added benefit, our experienced consultants are all full-time, permanent staff that provide you with the professional attention and consistency you require. Moreover, they are located throughout the world, so consultants are close to your projects and knowledgeable of local issues. An overview of our consulting services Organizational As a leader in your organization, there are issues you must continually address. Are you positioned for the future? Do you have the staff that will allow you to realize your goals? Are they adequately trained? Are their goals aligned with yours? Our consultants vast management experience, combined with ongoing research into how organizations work best, enables us to help you operate more efficiently and effectively on an ongoing basis. Services we provide include: seminars and training management consulting organizational reviews corporate X-Rays cultural assessments effective communications business planning Project feasibility When considering a new endeavor, construction participants have to ask themselves some challenging questions. What are the resource demands? Are resources available? Can you meet your required return on investment? How realistic is the schedule? With these and so many other considerations, Zurich C o n s t ruction Management Se rvices prov i d e s : project risk identification, assessment and reduction plans initial project budget and schedule reviews strategic planning schedule viability and resource availability analysis comprehensive business and financial services

5 Pre-construction Experience shows that the most successful projects are typically well planned and appropriately set up before construction. distinguishes itself from other consultants by providing pre-construction planning and evaluation services that include: project planning and setup project organizational reviews partnering facilitation proposed project management systems evaluations contract documents and contracting strategy reviews EEO, affirmative action and other employment requirements reviews prequalification assistance financial analysis of proposed participants constructability reviews value engineering analysis best practices recommendations Construction At the core of your project, solid construction management requires relentless attention to detail and job site conditions. Our consultants have expertise in scheduling, cost analysis, damage calculation, labor productivity and construction management, which translate into improved project control and rapid evaluation and resolution of disputes. consultants bring focus to your project by providing: Project controls project scheduling periodic schedule updates as-planned and as-built schedule preparations manpower and labor efficiency analysis productivity and contractor efficiency monitoring actual work status determinations job cost analysis design errors and omissions analysis proposed construction methods evaluations construction equipment utilization analysis quality assurance and control submittals, procurement and installation of major equipment analysis start-up and testing of equipment and controls analysis Change management change order preparations, reviews and negotiations time extension request evaluations delay evaluations indirect expense analysis and evaluations Safety safety and hazardous materials program formulations safety management plans accident investigations and expert testimony wall-to-wall safety evaluations Post-construction is committed to assisting our clients in the successful turnover of projects and in the avoidance and timely resolution of construction disputes. Our experts can provide: facility/systems turnover support project critiques and recommendations claims analysis, preparation and documentation negotiation and other alternative dispute resolution (ADR) forums construction defects evaluations forensic investigations and expert testimony

6 building profits with a leader Responsiveness, industry expertise, expense containment and a unique, solutions-based approach are fundamental elements of every consulting assignment. As you consider your next project or find yourself needing counsel, Zurich Construction Management Services is prepared to help you build a powerful foundation. As a part of the Zurich Financial Services Group, we provide global reach, financial strength and stability and a tradition of commitment to excellence. Put our network of the industry s most experienced and qualified consultants to work for you from project conception to completion. is a part of Zurich Services Corporation, which is a member of the Zurich Financial Services Group ( a global leader of integrated financial services. Founded in 1872, Zurich Financial Services Group is headquartered in Zurich, Switzerland. It has offices in more than 60 countries employing 70,000 people.

7

8 3003 Summit Blvd., #1800 Atlanta, Georgia Zurich Services Corporation

jmt.com PROJECT CONTROLS Part of a diversified family of solutions

jmt.com PROJECT CONTROLS Part of a diversified family of solutions jmt.com PROJECT CONTROLS Part of a diversified family of solutions Services Program Management/Project Control CPM Scheduling Training e-construction Cost Engineering Cost Estimating Claims/Change Order

More information

(pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better

(pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better (pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better ABOUT US Kreisson is a construction, engineering and property law firm based in Sydney. We act

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

2016 Architecture & Engineering

2016 Architecture & Engineering 2016 Architecture & Engineering Market Outlook Survey The results are in... 1 Grassi & Co. and Zetlin & De Chiara LLP are pleased to announce the release of our 2016 Architecture & Engineering (A&E) Industry

More information

Health Advocate EAP+Work/Life offers complete support, full productivity and greater savings on healthcare costs.

Health Advocate EAP+Work/Life offers complete support, full productivity and greater savings on healthcare costs. EAP+Work/Life TM Real-life help Health Advocate EAP+Work/Life offers complete support, full productivity and greater savings on healthcare costs. It s not always possible for employees to leave their

More information

Middle East Delivering Expertise Since 1978

Middle East Delivering Expertise Since 1978 Middle East Delivering Expertise Since 1978 Global Construction Consultancy ABOUT US We have excelled at providing construction and engineering focused services since 1978. Our Project Management, Programming,

More information

Partnering In Construction: Improvementthrough. Integration And Collaboration

Partnering In Construction: Improvementthrough. Integration And Collaboration Partnering In Construction: Improvementthrough Downloaded from ascelibraryorg by 3744193189 on 01/24/18 Copyright ASCE For personal use only; all rights reserved Integration And Collaboration SEVDA BAYRAMOGLU

More information

Custodial Services Strategic Plan

Custodial Services Strategic Plan Hamilton College Custodial Services Strategic Plan 2005-2008 February 1, 2005 Table of Contents Context for planning..3 Vision.6 Mission.. 6 Core Values...6 Internal/External Assessment 7 Department Description..

More information

Level 7 NVQ Diploma in Strategic Management and Leadership. Qualification Specification

Level 7 NVQ Diploma in Strategic Management and Leadership. Qualification Specification Level 7 NVQ Diploma in Strategic Management and Leadership Qualification Specification ProQual 2014 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile 4

More information

PORTLAND PUBLIC SCHOOLS HUMAN RESOURCE SERVICES AND DELIVERY

PORTLAND PUBLIC SCHOOLS HUMAN RESOURCE SERVICES AND DELIVERY PORTLAND PUBLIC SCHOOLS HUMAN RESOURCE SERVICES AND DELIVERY January 2013 Overview Portland Public School District (the District or PPS) contracted with AKT to create a new vision and values for their

More information

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) 3.1 IV&V Methodology and Work Plan 3.1.1 NTT DATA IV&V Framework We believe that successful IV&V is more than just verification that the processes

More information

IPMA-CANADA INTERNATIONAL CERTIFICATION PROGRAM IPMA-CP (IN TRAINING) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE

IPMA-CANADA INTERNATIONAL CERTIFICATION PROGRAM IPMA-CP (IN TRAINING) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE IPMA- Canada INTERNATIONAL PROGRAM IPMA-CP (IN TRAINING) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE INTERNATIONAL PROGRAM is a national human resource management association whose mission is to promote excellence

More information

jackson lewis Preventive Strategies and Positive Solutions for the Workplace Corporate Diversity Counseling ALL WE DO IS WORK

jackson lewis Preventive Strategies and Positive Solutions for the Workplace Corporate Diversity Counseling ALL WE DO IS WORK Corporate Diversity Counseling jackson lewis Preventive Strategies and Positive Solutions for the Workplace ALL WE DO IS WORK Attorneys in our Corporate Diversity Counseling practice bring to bear over

More information

Background Verification. Request for Proposal Guide

Background Verification. Request for Proposal Guide Background Verification Request for Proposal Guide A Guide for Organizations to submit a Request for Proposal for Background Screening. This Guide was developed for employers and other organizations, such

More information

East Bay Community Energy

East Bay Community Energy East Bay Community Energy is seeking experienced, well-qualified applicants for the position of Chief Executive Officer Boargfkljgfl;jfkl;agency BACKGROUND Alameda County and 11 of its cities have agreed

More information

BIM Pilot Getting Started Guide. next

BIM Pilot Getting Started Guide. next BIM Pilot Getting Started Guide What is BIM? Framework for implementing a BIM pilot project Driven BIM leadership Getting started with your BIM pilot project Moving to BIM can seem like a daunting task.

More information

A Summary of the Construction Industry Institute (CII)

A Summary of the Construction Industry Institute (CII) A Summary of the Construction Industry Institute (CII) RS-272 Studies on Work Packaging Increased Safety, Productivity, and Predictability by Rusty Haggard, Industry Author and Former CII Staff (1985 2009)

More information

DAVID A. SCOTTI

DAVID A. SCOTTI DAVID A. SCOTTI dascotti@scottilaw.net David A. Scotti focuses his practice in the areas of construction law, complex commercial litigation and real estate with an emphasis in construction litigation,

More information

Internal Construction Management at Michigan State University

Internal Construction Management at Michigan State University Internal Construction Management at Michigan State University MSU Construction Industry Research and Education Center Sp Funding Provided by MSU office of Vice President of Finance and Operations Grant

More information

WHO WE ARE. Development / Build-to-Suit. Acquisitions. Sale-Leaseback Program

WHO WE ARE. Development / Build-to-Suit. Acquisitions. Sale-Leaseback Program WHO WE ARE Paragon is an experienced commercial real estate firm that actively develops, acquires and manages retail, industrial and healthcare properties nationwide. As a well-capitalized, privately held

More information

Midpeninsula Regional Open Space District

Midpeninsula Regional Open Space District Midpeninsula Regional Open Space District HUMAN RESOURCES MANAGER DEFINITION Under general direction, plans, manages, develops, implements and directs the District s human resources services and functions,

More information

DISPUTE RESOLUTION LEADER

DISPUTE RESOLUTION LEADER DISPUTE RESOLUTION LEADER Preferred destination for administered and ad hoc resolution of disputes An independent non-profit organization that helps global businesses and their counsel prevent and resolve

More information

CONSTRUCTION MANAGEMENT

CONSTRUCTION MANAGEMENT CONSTRUCTION MANAGEMENT Construction Management is not a new idea. The function of the Construction Manager is to work on behalf of the owner to complete a project within the plans and specifications provided.

More information

Management Manual of the Muhr und Bender Group

Management Manual of the Muhr und Bender Group Management Manual of the Muhr und Bender Group Property of Mubea - Copyright Page 1 of 14 Foreword from the management Mubea Management Manual Our story starts in the year 1916 it all begins with a spring.

More information

As part of the tasks and responsibilities of project control, the aspect of (time) control during the course of a project can be applied in many ways.

As part of the tasks and responsibilities of project control, the aspect of (time) control during the course of a project can be applied in many ways. Introduction As part of the tasks and responsibilities of project control, the aspect of (time) control during the course of a project can be applied in many ways. The main elements which can influence

More information

NW Region Tribal Transportation Symposium March 6-9, PROJECT DOCUMENTATION for Tribes Administering Construction Projects

NW Region Tribal Transportation Symposium March 6-9, PROJECT DOCUMENTATION for Tribes Administering Construction Projects NW Region Tribal Transportation Symposium March 6-9, 2017 PROJECT DOCUMENTATION for Tribes Administering Construction Projects Slides adopted from Karl Gleason, FHWA - Senior Tribal Coordinator, presentation

More information

DEVELOPING KEY PERFORMANCE INDICATORS. - The Balanced Scorecard Framework -

DEVELOPING KEY PERFORMANCE INDICATORS. - The Balanced Scorecard Framework - DEVELOPING KEY PERFORMANCE INDICATORS - The Balanced Scorecard Framework - The purpose of this presentation is to identify and address the key questions necessary to design an effective framework for performance

More information

Occupational Health and Safety Specialist (New Position)

Occupational Health and Safety Specialist (New Position) Edmonton Catholic Schools is now accepting applications for the position of Health and Safety Specialist (New Position) Edmonton Catholic Schools is a large urban school district whose mission is to provide

More information

RISK REDUCTION IN DESIGN-BUILD

RISK REDUCTION IN DESIGN-BUILD WHITE PAPER RISK REDUCTION IN DESIGN-BUILD The Design-Build Process Can Dramatically Reduce The Risk Involved In New Facility There is no such thing as a business venture without risk. Expansion, merger,

More information

Delivering Value Across the Supply Chain

Delivering Value Across the Supply Chain Delivering Value Across the Supply Chain DISTRIBUTION 3PL 4PL REPAIR SERVICE Your Total Solution for Parts and Product Supply Chain Management W ith decades of industry experience, Encompass is a market

More information

Managing Schedule Change

Managing Schedule Change Managing Schedule Change Ted Douglas, CCP, PSP, FAACE CPM Construction Conference Orlando, Florida January 11, 2017 Managing Schedule Change Outline Change Drivers Contract Changes Clause Schedule Change

More information

Common Myths and Best Practices. By Gr e g o r y A. Ga r r e t t

Common Myths and Best Practices. By Gr e g o r y A. Ga r r e t t Common Myths and Best Practices By Gr e g o r y A. Ga r r e t t 16 Contract Management October 2009 Examining 10 common myths and several best practices of risk management can help you apply an effective

More information

Facilities Planning and Construction (FP&C)

Facilities Planning and Construction (FP&C) Appendix 8.4a Facilities Planning and Construction (FP&C) UAA FP&C Quality Assessment Checklist (A) Project: PM: Project ID: Updated:

More information

INFORMATION TECHNOLOGY SERVICES. KEY PRIORITIES for CSU Information Technology In support of Graduation Initiative 2025

INFORMATION TECHNOLOGY SERVICES. KEY PRIORITIES for CSU Information Technology In support of Graduation Initiative 2025 INFORMATION TECHNOLOGY SERVICES KEY PRIORITIES for CSU Information Technology In support of Graduation Initiative 2025 September 2017 INTRODUCTION The California State University recently embarked on the

More information

Compliance Program Effectiveness Guide

Compliance Program Effectiveness Guide Compliance Program Effectiveness Guide June 2017 This Guide is a comparison of: Compliance Program Elements New York State, Social Services Law 363-D Office of Inspector General (OIG) Compliance Program

More information

Request for Proposal For: 2018 American Bar Association Temporary Services

Request for Proposal For: 2018 American Bar Association Temporary Services Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet

More information

International Projects Safety and Quality Assured. Industrial inspection services for international projects.

International Projects Safety and Quality Assured. Industrial inspection services for international projects. International Projects Safety and Quality Assured. Industrial inspection services for international projects. www.tuv.com 2 INDUSTRIAL INSPECTION SERVICES Successful international projects When quality

More information

EBRD Performance Requirement 1

EBRD Performance Requirement 1 EBRD Performance Requirement 1 Assessment and Management of Environmental and Social Impacts and Issues Introduction 1. This Performance Requirement (PR) establishes the importance of integrated assessment

More information

Performance Information Procurement System. Developed By: Performance Based Studies Research Group

Performance Information Procurement System. Developed By: Performance Based Studies Research Group Performance Information Procurement System Developed By: Performance Based Studies Research Group www.pbsrg.com 1 High Vendor Performance III. Negotiated-Bid Owner selects vendor Negotiates with vendor

More information

Why Do I Need A Project Manager / Owner s Representative For My New Library Project?

Why Do I Need A Project Manager / Owner s Representative For My New Library Project? Why Do I Need A Project Manager / Owner s Representative For My New Library Project? 111 SW Columbia Street Suite 830 Portland, OR 97201 Tel: 503-225-1120 Fax: 503-224-3226 www.hillintl.com A Project Manager/Owner

More information

Level 6 NVQ Diploma in Construction Site Management (Construction)

Level 6 NVQ Diploma in Construction Site Management (Construction) Level 6 NVQ Diploma in Construction Site Management (Construction) Qualification Specification ProQual 2014 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile

More information

WINDFARM DEVELOPMENT. FM 1847, Pharr District, Cameron County. Date. Footer Text

WINDFARM DEVELOPMENT. FM 1847, Pharr District, Cameron County. Date. Footer Text WINDFARM DEVELOPMENT FM 1847, Pharr District, Cameron County Table of Contents 1 2 3 4 Location Map Windfarm Planning Activities Windfarm Construction Closeout/Negotiations 5 Lessons Learned 2 Location

More information

Management. Construction. Development. WE PROVIDE A complete roster of building services to streamline the construction process

Management. Construction. Development. WE PROVIDE A complete roster of building services to streamline the construction process WE ARE: We are a family-owned construction company providing construction services to general contractors and real estate owners throughout the San Francisco Bay Area. Founded in 2001, Argo Construction

More information

Job Posting Director, Monitoring, Evaluation and Learning - HQ

Job Posting Director, Monitoring, Evaluation and Learning - HQ Job Posting Director, Monitoring, Evaluation and Learning - HQ Closing Date: Friday, July 17 th 2015 Organization: Department/Division: Work location: Authorized to Work in: Right To Play International

More information

Computer Systems Analysts, Database Administrators, and Computer Scientists

Computer Systems Analysts, Database Administrators, and Computer Scientists Computer Systems Analysts, Database Administrators, and Computer Scientists (0*NET 15-1011.00, 15-1051.00, 15-1061.00, 15-1081.00, 15-1099.99) Significant Points Education requirements range from a 2-year

More information

The Value of Integrated Legal, Tax, Accounting and Business Advisory Services

The Value of Integrated Legal, Tax, Accounting and Business Advisory Services The Value of Integrated Legal, Tax, Accounting and Business Advisory Services By Janathan L. Allen PUBLICATION VOLUME 4.0 TAX LEGAL ADVISORY ACCOUNTING Competing and Succeeding in Today s Fast Paced and

More information

An Epicor White Paper. Best Practices for ERP Implementation Success

An Epicor White Paper. Best Practices for ERP Implementation Success An Epicor White Paper Best Practices for ERP Implementation Success Table of Contents Introduction...1 Best Practices for ERP Implementation...3 Understand business processes and key requirements...3 Build

More information

Result 14 Definition of new Learning Outcomes

Result 14 Definition of new Learning Outcomes Result 14 Definition of new Learning Outcomes Elaborated by ANQEP and nowa Based on the defined Functional Areas and Units of Competence of Spain Portugal Austria 1 December 2016 1. Functional Areas and

More information

EXECUTIVE SUMMARY OVERVIEW

EXECUTIVE SUMMARY OVERVIEW EXECUTIVE SUMMARY OVERVIEW Hunter Industries, Ltd. and Anderson Columbia Co., Inc. formed the Hunter Anderson Joint Venture (HAJV) and as the Proposer, desires to design and construct the Energy Sector

More information

ISO 9001 Auditing Practices Group. Aligning the QMS with the achievement of organizational and business success

ISO 9001 Auditing Practices Group. Aligning the QMS with the achievement of organizational and business success Slide 1 ISO 9001 Auditing Practices Group Guidance on: Effectiveness Aligning the QMS with the achievement of organizational and business success Slide 2 Business, Quality and Excellence Models and Tools

More information

NAPBS Background Verification Request for Proposal Guide

NAPBS Background Verification Request for Proposal Guide NAPBS Background Verification Request for Proposal Guide A Guide for Organizations to submit a Request for Proposal for Background Screening This Guide was developed for employers and other organizations,

More information

BEST PRACTICES IN FACILITIES MANAGEMENT: AN ADC & JLL ROUNDTABLE

BEST PRACTICES IN FACILITIES MANAGEMENT: AN ADC & JLL ROUNDTABLE BEST PRACTICES IN FACILITIES MANAGEMENT: AN ADC & JLL ROUNDTABLE INTRODUCTION With the need to streamline the management of its installations while it addresses aging infrastructure, severe budget constraints

More information

construction solutions asia pacific

construction solutions asia pacific construction solutions asia pacific The outlook of the construction industry within the Asia Pacific region remains strong, however pressures to successfully deliver projects against a backdrop of finite

More information

Working with roof consultants can be beneficial, but there are

Working with roof consultants can be beneficial, but there are 30 www.professionalroofing.net JULY 2013 During the 2013 International Roofing Expo, I moderated an NRCA panel that explored the relationships between roofing contractors and roof consultants. Although

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

HUMAN RESOURCES DIRECTOR

HUMAN RESOURCES DIRECTOR HUMAN RESOURCES DIRECTOR SALARY RANGE: Based on experience FLSA: Exempt LOCATION: Boston, MA CONTACT: jobs@naca.com BENEFITS: Excellent single/family health, vision and dental PPO, 70% employer contribution

More information

The Senior Manager s Role in SMS

The Senior Manager s Role in SMS The Senior Manager s Role in SMS Introduction This document has been developed by the SMS International Collaboration Group which the CAA is a key participant in. The introduction of SMS is one of the

More information

CONTACT INFORMATION. Corporate Headquarters 1801 S.W. 3rd Avenue Suite 500 Miami, FL Tel: (305) Fax: (305)

CONTACT INFORMATION. Corporate Headquarters 1801 S.W. 3rd Avenue Suite 500 Miami, FL Tel: (305) Fax: (305) CONTACT INFORMATION Corporate Headquarters 1801 S.W. 3rd Avenue Suite 500 Miami, FL 33129 Tel: (305) 692-9992 Fax: (305) 692-3032 Mid-Atlantic Office 12 Juniper Trail Suite 205 Kitty Hawk, NC 27949 Tel:

More information

...becoming a builder when a man s handshake was more important than a written contract, it was only natural to name his company...

...becoming a builder when a man s handshake was more important than a written contract, it was only natural to name his company... ...becoming a builder when a man s handshake was more important than a written contract, it was only natural to name his company... JOE E. WOODS, INC. GENERAL CONTRACTING The tradition of fairness, reliability,

More information

EXPERIENCE + EXPERTISE = RESULTS

EXPERIENCE + EXPERTISE = RESULTS INFO@FDRSAFETY.COM 360 COOL SPRINGS BOULEVARD, SUITE 101 FRANKLIN, TN 37067 WWW.FDRSAFETY.COM About FDRsafety Our Mission FDRsafety s mission is simple: To assist our clients with planning, provide qualified

More information

A Model for CAS Self Assessment

A Model for CAS Self Assessment Introduction An effective Contractor Assurance System integrates contractor management, supports corporate parent governance and facilitates government oversight systems. The purpose of a CAS is threefold:

More information

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS Professional Construction Management Services Harrisburg International Airport Rehabilitate Runway 13-31 Susquehanna Area Regional

More information

Replacing Risk with Knowledge to Deliver Better Acquisition Outcomes

Replacing Risk with Knowledge to Deliver Better Acquisition Outcomes 36 Replacing Risk with Knowledge to Deliver Better Acquisition Outcomes William S. Kaplan The acquisition workforce isn t what it used to be. Challenges in program execution remain and likely always will,

More information

Repetitive Bidding of Duplicative Material Costs. Next Slide

Repetitive Bidding of Duplicative Material Costs. Next Slide Repetitive Bidding of Duplicative Material Costs Table of Contents Risk Assessment Research and Planning Risk Assessment Initial Review of Subcontract Proposal Preliminary Analytical Procedures Entrance

More information

Human Resource Management (HRM)

Human Resource Management (HRM) Human Resource Management (HRM) 1 Human Resource Management (HRM) Courses HRM 5051. Human Resources Management Strategies. 3 Credit Hours. The effective management of HR practices has an enormous effect

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)

More information

CII Performance Assessment Report Industrial Projects Construction Phase

CII Performance Assessment Report Industrial Projects Construction Phase Company Name Project Name Project ID Project General Information CII Refining Company Eagle Ford Expansion A TENO52831 Project Location Victoria, Texas Project Type Oil/Gas Exploration/Production Project

More information

CONSTRUCTION INDUSTRY COUNCIL Technical Seminar on Construction Procurement Selection of Consultants 27 November 2015

CONSTRUCTION INDUSTRY COUNCIL Technical Seminar on Construction Procurement Selection of Consultants 27 November 2015 CONSTRUCTION INDUSTRY COUNCIL Technical Seminar on Construction Procurement Selection of Consultants 27 November 2015 Background A Task Force established by CIC Comprising Government, Clients, Consultants,

More information

MERGER & ACQUISITION INTEGRATION SERVICES EXPERTS WITH IMPACT

MERGER & ACQUISITION INTEGRATION SERVICES EXPERTS WITH IMPACT MERGER & ACQUISITION INTEGRATION SERVICES EXPERTS WITH IMPACT Table of Contents 2 DEFINITIVE EXPERTISE: ACROSS THE DEAL LIFECYCLE 4 POINT OF VIEW MERGER INTEGRATION FAILURES 6 MERGER & ACQUISITION INTEGRATION

More information

MSP : The Basics. Kenn Dolan, Consultant, FPMS. AXELOS.com. APMG International 2010

MSP : The Basics. Kenn Dolan, Consultant, FPMS. AXELOS.com. APMG International 2010 Kenn Dolan, Consultant, FPMS AXELOS.com White Paper May 2010 Contents Background/history 3 Why would an organization use MSP? 3 Who uses MSP? 3 What are the benefits of using MSP? 3 An overview of the

More information

Work Plan and IV&V Methodology

Work Plan and IV&V Methodology Work Plan and IV&V Methodology ISG Public Sector has been helping public sector organizations acquire and implement (from a project oversight and organizational change management perspective) new, enterprise-wide

More information

SECTION QUALITY REQUIREMENTS

SECTION QUALITY REQUIREMENTS SECTION 014000 - PART 1 - GENERAL 1.1 SUMMARY A. Defines SRP requirements for Contractor Quality Control and Owner Quality Assurance. As an Electric and Water Utility, SRP has many critical facilities.

More information

GUIDELINES AND PROCEDURES FOR PERIODIC REVIEW OF ADMINISTRATIVE AND EDUCATIONAL SUPPORT UNITS

GUIDELINES AND PROCEDURES FOR PERIODIC REVIEW OF ADMINISTRATIVE AND EDUCATIONAL SUPPORT UNITS GUIDELINES AND PROCEDURES FOR PERIODIC REVIEW OF ADMINISTRATIVE AND EDUCATIONAL SUPPORT UNITS Clark Atlanta University Office of Planning, Assessment and Research Revised 2009 GUIDELINES AND PROCEDURES

More information

PPPS IN THE SOCIAL SECTORS: EDUCATION AND HEALTH

PPPS IN THE SOCIAL SECTORS: EDUCATION AND HEALTH PPPS IN THE SOCIAL SECTORS: EDUCATION AND HEALTH JACQUES COOK PUBLIC-PRIVATE PARTNERSHIP WHITE PAPER SERIES Introduction Public-Private Partnerships (PPPs) have been successfully applied in many countries

More information

Responsible Procurement Policy

Responsible Procurement Policy Responsible Procurement Policy 2015 Corporate Procurement Unit Corporate Social Responsibility Bank Hapoalim At Bank Hapoalim, responsible procurement is not a task or an objective; it is a way of life

More information

Red River College. Point Factor Rating Classification System

Red River College. Point Factor Rating Classification System Red River College Point Factor Rating Classification System Guide to the Application of Point Factor Ratings as developed by the Joint Evaluation Committee Knowledge: measures the minimum level of job

More information

Development of expertise: Road maintenance Future competence requirements Summary

Development of expertise: Road maintenance Future competence requirements Summary Development of expertise: Road maintenance Future competence requirements Summary ViaNova Plan og Trafikk AS December 2009 Task Report Development of expertise: Road maintenance Future competence requirements

More information

IT PROJECT ANALYST/MANAGER

IT PROJECT ANALYST/MANAGER IT PROJECT ANALYST/MANAGER I. DESCRIPTION OF WORK Positions in this banded class are responsible for project management work involving planning and coordination of information technology projects. To ensure

More information

Elements of a Successful Compliance Management System and Vendor Management Rules of the Road

Elements of a Successful Compliance Management System and Vendor Management Rules of the Road Elements of a Successful Compliance Management System and Vendor Management Rules of the Road Jonathan L. Pompan Partner, Venable LLP jlpompan@venable.com 202.344.4383 Katherine M. Lamberth Associate,

More information

The Evolution of the HR Business Partner

The Evolution of the HR Business Partner The Evolution of the HR Business Partner A Discussion of the Changing Role of the HR Business Partner in a Shared Services Model June 2015 Copyright 2015 ScottMadden, Inc. All rights reserved. Agenda About

More information

BID AND PURCHASING LAWS/BEST PRACTICES

BID AND PURCHASING LAWS/BEST PRACTICES BID AND PURCHASING LAWS/BEST PRACTICES BEFORE YOU DO ANYTHING, ASK YOURSELF THIS QUESTION. Is this purchase or contract for goods or services exempt from the bid laws? Exemptions: Piggy back off a contract

More information

Operational Excellence Methodology Continuous Improvement

Operational Excellence Methodology Continuous Improvement Operational Excellence Methodology Continuous Improvement Duvan Luong, Ph.D. Operational Excellence Networks In our everyday life, we all have objectives. Usually, the objectives are associated with obligations

More information

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction 9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE 9.1.1 Introduction This chapter is the provisional Environmental Management Plan (EMP) for the Jubilee Phase 1 Development project. The elements of

More information

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO. Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions

More information

Project Management Context Outline

Project Management Context Outline Project Management Context Outline Project Phases and the Project Life Cycle Product Life Cycles Project Stakeholders Understanding Organizational Influences Suggested Skills for a Project Manager 1 Project

More information

Deloitte s High-Impact HR Operating Model: Business HR. Deloitte Consulting LLP

Deloitte s High-Impact HR Operating Model: Business HR. Deloitte Consulting LLP Deloitte s High-Impact HR Operating Model: Business HR Deloitte s High-Impact HR Operating Model: Business HR The business of Human Resources (HR) is the business HR has a mission: High impact. A new Operating

More information

3Z0Z 0? W7? TOTAL QUALITY MANAGEMENT MASTER PLAN* (S)l\f> v^n. 0 Department of Defense. AUG 2 ego, August O/ A./ \o V* TECHNICAL LIBRARY

3Z0Z 0? W7? TOTAL QUALITY MANAGEMENT MASTER PLAN* (S)l\f> v^n. 0 Department of Defense. AUG 2 ego, August O/ A./ \o V* TECHNICAL LIBRARY 3Z0Z O/ A./ \o V* ^V TIME y>- v^n 0? W7? TOTAL QUALITY MANAGEMENT MASTER PLAN* 0 Department of Defense August 1988 (S)l\f> TECHNICAL LIBRARY AUG 2 ego, u i ACCESSION NO AD DoD TOTAL QUALITY MANAGEMENT

More information

Inside Outsourcing. Jo-Ann Mendles. CEO & President Thirty-four Park, LLC. October 2013

Inside Outsourcing. Jo-Ann Mendles. CEO & President Thirty-four Park, LLC. October 2013 October 2013 Inside Outsourcing CEO & President Thirty-four Park, LLC INTERVIEWED BY LARRY JANIS Thirty-four Park complements its clients' in-place executive teams and expert resources to accelerate break-through

More information

FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT

FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT FSC36 Safe Feed/Safe Food (www.safefeedsafefood.org) is a facility certification program for the American Feed Industry Association (www.afia.org) Version 7.0

More information

This resource is associated with the following paper: Assessing the maturity of software testing services using CMMI-SVC: an industrial case study

This resource is associated with the following paper: Assessing the maturity of software testing services using CMMI-SVC: an industrial case study RESOURCE: MATURITY LEVELS OF THE CUSTOMIZED CMMI-SVC FOR TESTING SERVICES AND THEIR PROCESS AREAS This resource is associated with the following paper: Assessing the maturity of software testing services

More information

Highwire Snowboards Inc. Increasing Leads Through Online Marketing

Highwire Snowboards Inc. Increasing Leads Through Online Marketing Highwire Snowboards Inc. Increasing Leads Through Online Marketing December 05, 2014 Prepared by: Ruben Gamez Prepared for: Tim Jones Marketing Challenges With skeptical buyers saturated by media like

More information

City of Olivette Request for Qualifications Furniture Procurement and Installation April 26, 2016

City of Olivette Request for Qualifications Furniture Procurement and Installation April 26, 2016 General Information The City of Olivette (City) is seeking a qualified firm to provide procurement, installation, and warranty service related to furnishings and furniture at the City s new Municipal Center.

More information

ASPIRE Guideline. ASPIRE Guideline Achieving Greatness. Together

ASPIRE Guideline. ASPIRE Guideline Achieving Greatness. Together ASPIRE Guideline Achieving Greatness. Together 2 Together, we strive for performance excellence. Welcome AGCO has committed itself to provide high-tech solutions for professional farmers feeding the world

More information

Strategic Risk Management Key Enabler for Business Transformation Success

Strategic Risk Management Key Enabler for Business Transformation Success Strategic Risk Management Key Enabler for Business Transformation Success Satish P. Subramanian, PgMP, PMP, ProSci Principal Consulting Manager, M Squared Consulting / SolomonEdwards October 3, 2016 Speaker

More information

Richard J. Long, P.E.

Richard J. Long, P.E. Richard J. Long, P.E. LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com Construction Contract

More information

ConsensusDocs. Catalog. Updated Docs Inside

ConsensusDocs. Catalog. Updated Docs Inside ConsensusDocs ConsensusDocs Contracts Catalog Updated Docs Inside ConsensusDocs Keeping You Ahead of the Cur ve ConsensusDocs... Building A Better Way! Whether working at the office, from the road or even

More information

Demographics and reach 2 Advertising opportunities 3 Art specifications 10 Special rates and contacts 14 Terms and conditions 15

Demographics and reach 2 Advertising opportunities 3 Art specifications 10 Special rates and contacts 14 Terms and conditions 15 2018 Demographics and reach 2 Advertising opportunities 3 Art specifications 10 Special rates and contacts 14 Terms and conditions 15 DEMOGRAPHICS AND REACH The Bar Association of San Francisco (BASF)

More information

The Starting Your Business Checklist ebook

The Starting Your Business Checklist ebook THE STARTING YOUR BUSINESS CHECKLIST Legal Disclaimer: While all attempts have been made to verify information provided in this publication, neither the Author nor the Publisher assumes any responsibility

More information

Building Services Engineer (mechanical) model career pathway Version 1.0

Building Services Engineer (mechanical) model career pathway Version 1.0 April 2013 Building Services Engineer (mechanical) model career pathway Version 1.0 AIRAH Strategic aim #2 - Closing the skills gap Prepared by: The Australian Institute of Refrigeration Air Conditioning

More information

Eralis Job and DCAA Compliance. January 2017

Eralis Job and DCAA Compliance. January 2017 Eralis Job and DCAA Compliance January 2017 2017 Eralis Software Inc. All rights reserved. No parts of this work may be reproduced in any form or by any means graphic, electronic, or mechanical, including

More information