PRODUCING A WORKFORCE DEVELOPMENT PROJECT PLAN

Size: px
Start display at page:

Download "PRODUCING A WORKFORCE DEVELOPMENT PROJECT PLAN"

Transcription

1 PRODUCING A WORKFORCE DEVELOPMENT PROJECT PLAN

2 1. WE ARE ALL PROJECT MANAGERS Project management is not difficult. People can be difficult. The art of being a good change manager is getting people to do what you want, when you want it and to the right standard. A Project Manager needs to be tenacious with task completion, and a good communicator. 2. INITIATING A PROJECT Producing a Workforce Development Project Plan is no different from any other project planning process. Whether large or small any project needs to: Have a clearly stated purpose so that the desired outcome is obvious. Be broken down into manageable chunks, each of which is an essential step towards a successful outcome. Measurable by milestones that will give an indication of progress. A well planned project will: Keep a focus on the project goal and prevent scope creep (drifting away from the project purpose). Enable lessons to be learned from each step of the plan to increase likelihood of success next time. A Project Initiation Document (PID) is a way of bringing together the plan to help define it; justify it; communicate its purpose and value; and fundamentally set out a contract of agreement between the Project Initiator, who requests the work to be done, and the Project Manager, who ensures delivery of the work. A Template is provided as Appendix A as guidance for structuring a PID. The day to day business of the project will be managed by the Project Lead, making sure it is delivered according to plan; the Project Team are the staff who actively work on the project; and the Project Board/Steering Group is responsible for overseeing the progress of the project and reacting to any strategic problems. Improve communications ensuring all involved are kept well informed. 2 Workforce Development Project Plan

3 3. HOW TO PLAN A PROJECT PLAN Use the PID Template to steer discussions with the Project Team and any other relevant individuals/ groups. As issues are raised, capture and categorise them under each heading (flip charts, post-its, Blu Tack and lots of wall space could prove useful at this stage). These initial sessions should get plenty of information out of everyone. If more details are needed the relevant people should be tasked to find out more and report back to the Project Lead as soon as possible. The Project Lead can now draft the first version of the PID, outlining the project plan s purpose, its outcome and the way to go about it. This first draft will now be reviewed by the Project Board/Steering Group and agreement reached on its content, objectives and timescales. The first stage of project planning is now underway. Helpful hints: Once the plan has been drafted and discussed with Team members, it could be shared with a critical friend for comments before officially sending it for final approval to the project Board. It can also be useful to look at plans produced for other projects, to give an idea of style and presentation. Pick out the best bits and use them to create your own masterpiece. 4. THE PROJECT INITIATION MEETING (PIM) By the end of the Planning Stage you will need to present your plan to the Project Board/Steering Group for formal sign off. Checklist for a Project Initiation Meeting 1. Identify/confirm Project Board/Steering Group attendees i.e. key stakeholders that have a specific interest in the work to be undertaken. 2. Ensure a suitable venue is arranged and that all attendees are available at that time. 3. Circulate an invitation letter with an agenda and a copy of the PID at least 5 working days in advance of the meeting or 7-10 days if it s a large document. Workforce Development Project Plan 3

4 An agenda could run like this: 5. CONTROLLING A PROJECT i. Presentation and agreement of PID - Project Lead ii. Presentation and approval of stage 1 plans - Project Lead / Board iii. Approval to proceed - Project Board iv. Date of end stage assessment for Stage As the Project Lead presenting the PID to the Board, be sure of what to say - pick out the salient points from the document page by page; be succinct and clear. 5. The Project Lead should make a note of any amendments requested by the Board. 6. Approval to proceed must be agreed by the Board, giving the authority to carry out the project and to call on the resources that have been identified. 7. If the initial Plan is not approved then the meeting will serve to begin to identify what is wrong with it and the alternatives to put it right. The PID should be revised accordingly and once again presented to the Project Board. Depending on the number of amendments needed, it may suffice to present the revised PID via rather than call another meeting this decision should be made at the PIM. This is not the end of the world; it s about getting the plan right! Arrange dates for checkpoint meetings with the Project Team on a weekly or fortnightly basis. It may be helpful to agree individual task plans that are then regularly reviewed so any slippage is quickly identified. Checkpoints should be short and to the point. The Project Lead should take notes and distribute these before the next meeting. Highlight Reports should be submitted to the Project Board/Steering Group at regular intervals to keep them informed of progress. A highlight report should be no more than 2 sides long and briefly summarise progress on the main tasks, identify any areas where there might be problems, and advise of any minor changes in resources or timescales. If any problems arise it is the Project Lead s responsibility to identify these as soon as possible and inform the management team the Risk Register (see PID) is useful here to keep an eye on potential concerns. Don t forget that quality assurance should not be swept under the carpet along the way. Any task which requires the production of something e.g. a set of procedures, a tool for gathering data, or a report, should meet certain criteria that have been agreed upon beforehand. 4 Workforce Development Project Plan

5 Always agree detailed specifications before any resources are committed to a task. If the first stage of the project leads into a second, as the first nears successful completion, planning for the next stage should begin. The same processes for stage 2 will be followed as were for stage 1. It may be necessary to involve other people depending on the tasks to be carried out during the stage. If the tasks are specialised it may be more appropriate to appoint a Stage Lead to control this part of the project. Production of an End Stage Assessment (ESA) document is a useful control mechanism; this will contain a report on the progress of the last stage and the plans and narrative for the next stage. The ESA will also form the key element at the next Project Board/Steering Group meeting the date of which will have been agreed at the PIM. Remember to circulate the invitations and the ESA documents well in advance so that everyone gets a good chance to read it. The agenda for this meeting could be as follows:- i. Presentation of the report for Stage 1 - Project/Stage Lead ii. Presentation of the plans for Stage 2 -Project/Stage Lead iii. Approval to proceed into Stage 2 - Project Board iv. Date of ESA for Stage 2. This is the cycle of the project until it is completed. Then the last ESA could also be a Project Closure Meeting. Throughout the project it is the Project Lead s responsibility to: Keep in order, copies of all project documentation produced and associated reports etc. Note lessons learned for future projects. On completion of the project the Project Closure Document, presented to the Project Board, will assess the entire project and report on any of the benefits that are beginning to be realised as result of it. If something has been implemented as an outcome of the project e.g a change in working practice, introduction of a new role, the Project Closure should include a mechanism of audit and evaluation. It is beneficial to draw a line under the project so that everyone is aware of his or her roles and responsibilities in the future. Workforce Development Project Plan 5

6 1. INTRODUCTION PROJECT PLAN DEVELOPMENT TEMPLATE APPENDIX A What is the Project about, what is it designed to do, who wants it to happen and why. 2. BACKGROUND Set out the origin and context of the work. Include background material, (as Appendices if more appropriate), which supports the work and provides its rationale and evidence base, e.g. strategic drivers; report recommendations. State why and how the work is to be commissioned, and if applicable, what funding is available to support it? Identify how this work interfaces with any other. 3. SCOPE This is the big picture view of the Project that will also state the limitations of the work:- What are the end products? What solutions/answers will the project deliver? What is the timescale for delivering the project? If appropriate, state what is NOT to be included in the project? 4. PROJECT AIM & OBJECTIVES A succinct outline of what the Project will seek to achieve and when. Objectives should be SMART specific, measurable, achievable, results-focused, and timebound. 5. PRE-REQUISITES What are the things which MUST happen, or which MUST be produced either before the work starts or during its development? For example, all users must be trained. 6 Workforce Development Project Plan

7 6. RISKS Communicating potential risks and preparing for them, should they materialise is an integral part of project management. The unexpected can happen so it pays to think through and analyse the perceived risks to the work. Here are some areas to consider: Calibre of staff Knowledge of the subject matter Reliance on other s e.g internal departments/services Level of workforce/service change management experience Funding. State risks; identify ownership of the risk; evaluate their likely impact; and confirm what the project team is able to do to mitigate them. If there are a large number of risks - be sure to make these clear to those who have commissioned the work. It might be useful to set up a Register to capture risks as they arise and monitor them in Project meetings. The following Risk Register Template may be helpful: Risk Description Date Identified Likelihood Impact Response Risk Owner (High/Medium/ Low) 7. CONSTRAINTS Summary of any limitations that affect the scope of the project or how it is carried out, such as: Staff availability(lack of/ full diaries/ annual leave) Deadlines Accommodation Hardware (i.e. may be purchased already) Stakeholder/staff knowledge/competence. As with risks, it is not enough to list the constraints without attempting to evaluate the impact on the work and identify ways in which they may be overcome. 8. ASSUMPTIONS The initial project framework and plan are based on assumptions, for example, IT support, resource availability, working arrangements and flexibility, user expertise. Particular care should be taken in defining what is expected of people outside the project team. 9. ORGANISATION OF THE WORK PROGRAMME It is helpful to show the project structure as an organisational diagram with names and roles; and lines of accountability for the Project. Workforce Development Project Plan 7

8 10. PROJECT PLAN This is a detailed schedule of tasks to be performed alongside other relevant information such as leads, key milestones, and dates for achievement: Task Milestone Lead Deadline Progress/Date 11. MANAGEMENT CONTROLS State how the team intends to manage the work: What controls will be in place, such as assessments of Project progress; frequency of meetings and reports. 12. EVALUATION Any workforce change should be evaluated to determine what impact the change is having on the delivery of services or care to patients. The primary purpose of evaluation is to gain insight into prior or existing initiatives, and to enable reflection and assist in the identification of future change. The key aim of most evaluations is to provide useful feedback to a variety of audiences including sponsors, service users, staff, and other relevant stakeholders. 8 Workforce Development Project Plan

Project Management Handbook

Project Management Handbook Project Management Handbook Version 0.1 September 2011 1 CONTENTS Introduction 3 The Project Lifecycle 3 Aspyre 4 Project or Programme 5 Project Management 6 Phase 1 Prepare 7 Project Brief 7 Business

More information

Programme and Project Management

Programme and Project Management Programme and Project Management The words programme and project are, in most cases, interchangeable. In theory, a programme is large scale, and often consists of a number of projects. But a project can

More information

Project Management. From web projects through to major change projects

Project Management. From web projects through to major change projects S O L U T I O N S * I D E A S * S O L U T I O N S * I D E A S Project Management From web projects through to major change projects Project Agency S O L U T I O N S * I D E A S * S O L U T I O N S * I

More information

BREEAM Communities 2012 Bespoke International Process Guidance Note GN07 December 2013

BREEAM Communities 2012 Bespoke International Process Guidance Note GN07 December 2013 Introduction This document contains information and guidance for BREEAM Communities Assessors who are seeking to assess a project outside of the UK. The guidance provides an outline of the bespoke criteria

More information

Quality Assurance and Improvement Framework

Quality Assurance and Improvement Framework Quality Assurance and Improvement Framework For Modern Apprenticeships and Employability Quality Standards and Assessment Guidance April 2018 Index Page Introduction 3 Principles and purpose of the Quality

More information

Chartered Institute of Internal Auditors. The above areas are addressed by the sections identified below:

Chartered Institute of Internal Auditors. The above areas are addressed by the sections identified below: 22 March 2018 Projects Chartered Institute of Internal Auditors Internal audit can play a significant role in helping an organisation achieve its strategic objectives in relation to project management.

More information

GRIP for Programmes Release 1 (DRAFT) April Network Rail GRIP for Programmes Page 1 of 104

GRIP for Programmes Release 1 (DRAFT) April Network Rail GRIP for Programmes Page 1 of 104 GRIP for Programmes Release 1 (DRAFT) April 2015 Network Rail GRIP for Programmes Page 1 of 104 Network Rail GRIP for Programmes Page 2 of 104 Forward Purpose This document provides an overview and guidance

More information

Pario Sample 360 Report

Pario Sample 360 Report Pario Sample 360 Report Pario 360 Feedback Personal Development Feedback Report Chris Case-Study Report Compiled 16th May 2011 Note: This report does not include the table that compares mean ratings of

More information

Certificate IV in Project Management Student Assessment Guide

Certificate IV in Project Management Student Assessment Guide Overview The assessment for the Certificate IV in Project Management comprises Team Assignment Development of a detailed Project Management Plan for chosen case study - 30% for blended classes Individual

More information

Project Office - Project Management Handbook April 2011: v 5.0

Project Office - Project Management Handbook April 2011: v 5.0 VERSION HISTORY Version Print Date Modification 1.0 October 2005 Created 2.0 November 2006 Updated to incorporate feedback from project community; template formats updated. 3.0 March 2008 Updated; template

More information

UCS PRE-AWARD PROCESS PROJECT DEVELOPMENT CHECKLIST

UCS PRE-AWARD PROCESS PROJECT DEVELOPMENT CHECKLIST UCS PRE-AWARD PROCESS PROJECT DEVELOPMENT CHECKLIST You may find it helpful to consider the prompts below when you are developing your project proposal. Please remember that further support is available

More information

PRINCE2 walkthrough and Roadmap. Dave Litten

PRINCE2 walkthrough and Roadmap. Dave Litten PRINCE2 walkthrough and Roadmap Dave Litten Step www.projex.com By Step Guide Copyright Copyright 2018 Projex Academy Cover and internal design Dave Litten https://www.projex.com/prince2-masterclass/ All

More information

Action to date: Recommendation 2: Response: Action to date:

Action to date: Recommendation 2: Response: Action to date: ANNEX C 360 Assurance Report Urgent and Emergency Care Centre Project 3rd Project Governance Assurance Report Response to recommendations Background: 360 Assurance were appointed by the CCG to provide

More information

Appendix Project Management Templates

Appendix Project Management Templates Appendix Project Management Templates This book contains a bonus CD-ROM with 25 project management templates, described in the following table, that cover various project management steps from the TenStep

More information

Project Charter/Mandate Template

Project Charter/Mandate Template Project Charter/Mandate Template Document Control: Role Name Date Signature (Author) Amendment History: Issue Status Version Date Actioned by Discussed / Reviewed Approvals: This document must be approved

More information

Knowing what to Communicate...2. Knowing when to Communicate...3. Communicating with Workers...4. Communicating with Managers...

Knowing what to Communicate...2. Knowing when to Communicate...3. Communicating with Workers...4. Communicating with Managers... Topic 7 Section 2 Interpersonal Communication Contents Knowing what to Communicate...2 Knowing when to Communicate...3 Communicating with Workers...4 Communicating with Managers.....5 Communicating with

More information

5 C s Project Management. By Vivek Dixit

5 C s Project Management. By Vivek Dixit 5 C s Project Management By Vivek Dixit Agenda What is Project Management? 5 C s of Project Management Processes required Essentials of a process Importance of Project Management Essentials of Project

More information

A Guide for Standard Setting Organisations

A Guide for Standard Setting Organisations Developing Scottish Qualification Products for Approval: A Guide for Standard Setting Organisations March 2016 Publication date: March 2016 Publication code: AA5955 Published by the Scottish Qualifications

More information

MONITORING & EVALUATION MONITOR AND MANAGE PERFORMANCE ESCALATION PROCESS ASSESS AND EVALUATE

MONITORING & EVALUATION MONITOR AND MANAGE PERFORMANCE ESCALATION PROCESS ASSESS AND EVALUATE MONITORING AND E V A L U AT I O N M A N U A L D E FI N I N G T H E PR O C E SS F O R CO N T R AC T M O N I TO R I N G A N D M A N AG E M E N T A N D T H E E VA LUAT I O N O F PR O G R A M PE R F O R M

More information

Quality Management System Guidance. ISO 9001:2015 Clause-by-clause Interpretation

Quality Management System Guidance. ISO 9001:2015 Clause-by-clause Interpretation Quality Management System Guidance ISO 9001:2015 Clause-by-clause Interpretation Table of Contents 1 INTRODUCTION... 4 1.1 IMPLEMENTATION & DEVELOPMENT... 5 1.2 MANAGING THE CHANGE... 5 1.3 TOP MANAGEMENT

More information

Project Execution Approach

Project Execution Approach Project Execution Approach July 2016 2016 Affinity Digital (Technology) Ltd 1 Project Execution Approach Affinity Project Management Affinity is in an excellent position with its multiple methodology offerings.

More information

Marketing and Social Media Executive Summary

Marketing and Social Media Executive Summary Appendix D CODA Audit Reports Completed and Presented to CODA Assurance, Audit and Risk Committee Marketing and Social Media Executive Summary 1 Introduction Internal Audit has recently completed an audit

More information

Greater London South Scout County registered charity no gls-scouts.org.uk glscountyscouts.org.uk

Greater London South Scout County registered charity no gls-scouts.org.uk glscountyscouts.org.uk For further information, advice and support contact: Matt Butterfield County Development Officer E: matt.butterfield@gls-scouts.org.uk T: 07766 540 057 Greater London South Scout County registered charity

More information

BSB51415 Diploma of Project Management. The Project Life Cycle. Version 1.1 Produced 27 May 2016

BSB51415 Diploma of Project Management. The Project Life Cycle. Version 1.1 Produced 27 May 2016 BSB51415 Diploma of Project Management The Project Life Cycle Version 1.1 Produced 27 May 2016 Copyright 2016 Compliant Learning Resources. All rights reserved. No part of this publication may be reproduced

More information

RESEARCH SUPPORT SERVICES FRAMEWORK. Streamlining the management and governance of R&D studies in the NHS

RESEARCH SUPPORT SERVICES FRAMEWORK. Streamlining the management and governance of R&D studies in the NHS RESEARCH SUPPORT SERVICES FRAMEWORK Streamlining the management and governance of R&D studies in the NHS Page 1 of 22 Contents 1. INTRODUCTION... 3 How to use this document... 3 Background... 4 Purpose

More information

Environmental management systems in plastics processing

Environmental management systems in plastics processing Environmental management systems in plastics processing TANGRAM TECHNOLOGY Environmental management systems in plastics processing Practical worksheets for industry CONTENTS Part 1 - Clean business = good

More information

Introduction to PM². Laurent Kummer COEPM² Team

Introduction to PM². Laurent Kummer COEPM² Team Introduction to PM² laurent.kummer@ext.ec.europa.eu Laurent Kummer COEPM² Team Course Agenda Introduction & context Governance model Project lifecycle Processes & Artefacts Mindsets 2 Laurent Kummer PM²

More information

7. Facilitated development session: Organisational planning

7. Facilitated development session: Organisational planning 7. Facilitated development session: Organisational planning Introduction This governance development session is in two parts: 1. a short working session to briefly review the role of the board or management

More information

Annex II: Evaluation Procedure

Annex II: Evaluation Procedure Making the railway system work better for society. NSA Monitoring 1 / 22 Procedure Evaluation procedure for the NSA monitoring activity Document Type: Procedure Origin: ERA Document ID: Activity Based

More information

S3. Step 3 Develop Roadmap

S3. Step 3 Develop Roadmap S3. Step 3 Develop Roadmap PART OF IT STRATEGY TOOLIKIT VERSION 0.5 MAY 2007 1 TABLE OF CONTENTS S3-1. DETERMINE PRIORITIES... 3 S3-1.1 ASSESS DEPENDENCIES... 3 S3-1.2 PRIORITISE BUILDING BLOCKS... 3 S3-1.3

More information

Chapter 8 THE STAGES OF AN AUDIT AFTER APPOINTMENT

Chapter 8 THE STAGES OF AN AUDIT AFTER APPOINTMENT Chapter 8 THE STAGES OF AN AUDIT AFTER APPOINTMENT 45 1. Overview Appointment Plan the audit Understand entity Assess risk of material misstatement Respond to risk Expect effective controls Expect ineffective

More information

POLICY DEVELOPMENT FRAMEWORK

POLICY DEVELOPMENT FRAMEWORK POLICY DEVELOPMENT FRAMEWORK This framework explains the process for developing a policy at Cafcass. The framework includes a section on how to develop a policy, an explanation of the relationship between

More information

ISO 9001:2015 Expectations

ISO 9001:2015 Expectations The ISO 9001:2015 Standard was published September 15, 2015. The Standard is written such that it may be used by any organization type for the purpose of implementing and maintaining a Quality Management

More information

Project Management (BPM1313) Project Charter

Project Management (BPM1313) Project Charter Project Management (BPM1313) by Dr. Adekunle Qudus Adeleke Faculty of Industrial Management adekunle@ump.edu.my Aims To further broaden the students knowledge on project charter and elements Expected Outcomes

More information

The Integrated Support and Assurance Process (ISAP): detailed guidance on assuring novel and complex contracts

The Integrated Support and Assurance Process (ISAP): detailed guidance on assuring novel and complex contracts The Integrated Support and Assurance Process (ISAP): detailed guidance on assuring novel and complex contracts Part C: Guidance for NHS trusts and NHS foundation trusts Published by NHS England and NHS

More information

Introduction... 1 Management... 2 Activities... 3 Schedules... 5 Resources... 6

Introduction... 1 Management... 2 Activities... 3 Schedules... 5 Resources... 6 Successful Projects don t Happen by Chance. Project XYZ Configuration and Change Control Plan Introduction... 1 Management... 2 Activities... 3 Schedules... 5 Resources... 6 Introduction This configuration

More information

Establishing a Medical Licensing Assessment Programme Board

Establishing a Medical Licensing Assessment Programme Board Agenda item: 8 Report title: Report by: Action: Establishing a Medical Licensing Assessment Programme Board John Carr, Programme Manager, MLA john.carr@gmc-uk.org, 0161 240 8308 To consider Executive summary

More information

7.11b: Quality in Project Management: A Comparison of PRINCE2 Against PMBOK

7.11b: Quality in Project Management: A Comparison of PRINCE2 Against PMBOK by Peter Whitelaw, Rational Management Pty Ltd, Melbourne Introduction This comparison takes each part of the PMBOK and provides comments on what match there is with elements of the PRINCE2 method. It's

More information

Audit Planning and risk assessment. Presentation by Richard Maggs to the PEMPAL Seminar in St Petersburg September 2013

Audit Planning and risk assessment. Presentation by Richard Maggs to the PEMPAL Seminar in St Petersburg September 2013 Audit Planning and risk assessment Presentation by Richard Maggs to the PEMPAL Seminar in St Petersburg September 2013 Presentations Background and purpose of the planning and risk assessment guide Identification

More information

Business Planning for 2014/15

Business Planning for 2014/15 Business Planning for 2014/15 Proposed approach and timeframe Authors: John Willshere and Steve Bruggenwirth Date: 14/10/13 1 Copyright 2013, Health and Social Care Information Centre. Contents Contents

More information

3.1 GETTING KEY INTERNAL STAKEHOLDERS INVOLVED

3.1 GETTING KEY INTERNAL STAKEHOLDERS INVOLVED EXCELLENCE THROUGH PATIENT AND FAMILY CENTRED CARE BAY OF PLENTY DISTRI CT HEALTH BOARD 3.1 GETTING KEY INTERNAL STAKEHOLDERS INVOLVED 3.1 GETTING KEY INTERNAL STAKEHOLDERS INVOLVED Averil Boon RN, Grad

More information

NHSScotland Procurement Review

NHSScotland Procurement Review NHSScotland Procurement Review Project Initiation Document QuEST Portfolio Office Contents 1. Document Control 3 1.1 Programme Details 3 1.2 Version Control 3 2. Purpose of the Document 4 3. Context and

More information

POLICY DEVELOPMENT FRAMEWORK

POLICY DEVELOPMENT FRAMEWORK POLICY DEVELOPMENT FRAMEWORK Lead Manager: Head of Policy Responsible Director: Director of Corporate Planning and Policy Approved by: Policy Planning and Performance Group Date approved: 17 January 2008

More information

NHSmail Project Initiation Document Template

NHSmail Project Initiation Document Template NHSmail Project Initiation Document Template Version 2 February 2018 Copyright 2017Health and Social Care Information Centre. The Health and Social Care Information Centre is a non-departmental body created

More information

Role of the QP Assessor

Role of the QP Assessor Role of the QP Assessor Gillian Jordan QP assessor for the Institute of Biology 1 Contents Overview of the Assessment Process Profile of the Assessors Application Form Sponsor Form Assessors Review Form

More information

HSE INDICATOR TOOL USER MANUAL

HSE INDICATOR TOOL USER MANUAL HSE INDICATOR TOOL USER MANUAL 1 Background The Indicator Tool is a 35-item questionnaire relating to the six primary stressors identified in the Management Standards on Work Related Stress. The items

More information

PROJECT MANAGEMENT PLAN

PROJECT MANAGEMENT PLAN PROJECT MANAGEMENT PLAN AS A TOOL TO DEVELOP EFFECTIVE COMMUNICATION TO MANAGE STAKEHOLDERS AND THE DESIGN TEAM Adelaide Airport plaza Event: Design and Development of Stations and Terminals Conference

More information

TOOL 3.3 WHO SHOULD USE THIS TOOL EMPLOYER ENGAGEMENT TOOLKIT TOOL 3.3 CO-HOST AN EMPLOYER-FOCUSED NETWORKING EVENT

TOOL 3.3 WHO SHOULD USE THIS TOOL EMPLOYER ENGAGEMENT TOOLKIT TOOL 3.3 CO-HOST AN EMPLOYER-FOCUSED NETWORKING EVENT EMPLOYER ENGAGEMENT TOOLKIT TOOL 3.3 CO-HOST AN EMPLOYER-FOCUSED NETWORKING EVENT TOOL 3.3 Education and training providers often host networking events such as career fairs for their students, but you

More information

Leadership 300: Enhancing Leadership Skills

Leadership 300: Enhancing Leadership Skills Leadership 300: Enhancing Leadership Skills Pre-course Materials In preparation for attending the upcoming session, you are asked to complete the following pre-course reading. Your time spent completing

More information

CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS

CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS Objectives Introduction The objectives are: Describe the purpose of the phase planning activity, preconditions, and deliverables in the implementation methodology.

More information

Thinking about competence (this is you)

Thinking about competence (this is you) CPD In today s working environment, anyone who values their career must be prepared to continually add to their skills, whether it be formally through a learning programme, or informally through experience

More information

SENG 380:Software Process and Management. Software Project planning

SENG 380:Software Process and Management. Software Project planning SENG 380:Software Process and Management Software Project planning 1 Step Wise Planning Activities Step 0: Select project Step 1: Identify project scope and objectives Step 2: Identify project infrastructure

More information

Project Origination: Item Description (Origination) Comments (or reasons for NOT completing)

Project Origination: Item Description (Origination) Comments (or reasons for NOT completing) Project Origination: (Origination) Develop Project Proposal: 24 Formulate business need/problem and 24 anticipated benefits to all parties Review project s fit with organization s mission 24 Identify project

More information

Measuring the Impact of Volunteering

Measuring the Impact of Volunteering Measuring the Impact of Volunteering Why is measuring the impact of volunteering important? It is increasingly important for organisations or groups to describe the difference that volunteering makes to,

More information

HOW TO WRITE A WINNING PROPOSAL

HOW TO WRITE A WINNING PROPOSAL HOW TO WRITE A WINNING PROPOSAL WHAT IS A PROPOSAL? A proposal is a picture of a project, it is NOT the project. In that sense, it is based on your project plan but may be quite different from the Project

More information

Risk Management Strategy

Risk Management Strategy NHS Greater Glasgow & Clyde Strategy Strategy NHS GREATER GLASGOW & CLYDE Issue date: April 2007 Version: 1. Custodian: Head of Clinical Governance Status: Approved Review Interval: Two years 1 of 11 NHS

More information

Knowing what to Communicate...2. Knowing when to Communicate...3. Communicating with Workers...4. Communicating with Managers...

Knowing what to Communicate...2. Knowing when to Communicate...3. Communicating with Workers...4. Communicating with Managers... Topic 7 Section 2 Interpersonal Communication Contents Knowing what to Communicate...2 Knowing when to Communicate...3 Communicating with Workers...4 Communicating with Managers.....5 Communicating with

More information

Project Management GUIDANCE OCTOBER 2018

Project Management GUIDANCE OCTOBER 2018 Project Management GUIDANCE OCTOBER 2018 A GUIDE TO DEVELOPING YOUR PROJECT IDEAS This pack has been produced to provide details of the Trust s process and templates that are in place for the development

More information

WRMP19 Programme Quality Assurance Plan dwrmp19 Supporting Appendix 10A 1 December 2017

WRMP19 Programme Quality Assurance Plan dwrmp19 Supporting Appendix 10A 1 December 2017 WRMP19 Programme Quality Assurance Plan dwrmp19 Supporting Appendix 10A 1 December 2017 WRMP19 Programme Quality Assurance Plan Originated by: Checked by: Approved by: Accepted by: Name / Position Signature

More information

Local Sport & Recreation Strategy Support Guidance for Implementation

Local Sport & Recreation Strategy Support Guidance for Implementation Local Sport & Recreation Strategy Support Guidance for Implementation The following provides a guide to the deliverables required from the service and should be read in conjunction with the Process of

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 4 NVQ Diploma in Spectator Safety Management (6852-04) October 2011 Version 1.0 Qualification at a glance Subject area City & Guilds number 6852 Spectator Safety Age group

More information

1 P a g e Contents About this Workbook...3 Project Management Ethics and Professional Responsibility...4 Organizational Project Management Maturity...5 The Project Management Office...7 Choosing the Right

More information

Business Case Process

Business Case Process Reference Number: GuCG005 Version: 1.0 Name of Originator / Author & Organisation: Responsible LECCG Committee: LECCG Executive Lead: Date Approved by LECCG Authorising Committee: Matthew Broughton & Ben

More information

A Primer for the Project Management Process by David W. Larsen 1. Table of Contents

A Primer for the Project Management Process by David W. Larsen 1. Table of Contents A Primer for the Project Management Process by David W. Larsen 1 Table of Contents Description... 2 STAGE/STEP/TASK SUMMARY LIST... 3 Project Initiation 3 Project Control 4 Project Closure 6 Project Initiation...

More information

RISK STRATEGY & REGISTER

RISK STRATEGY & REGISTER RISK STRATEGY & REGISTER Lacrosse Scotland Updated by on: 10/02/ Page 1 of 19 Updated by on 10/02/ CONTENTS Section 1: Section 2: Section 3: Introduction The Risk Management Process The Types of Risks

More information

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) OSHAD-SF Technical Guideline

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) OSHAD-SF Technical Guideline Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) OSHAD-SF Technical Guideline Communication and Consultation Version 3.0 July 2016 Table of Contents 1. Introduction... 3 2. Definitions...

More information

It s 10pm Do You Know Where Your Institution's PII Is? Reducing Risk by Understanding the How, Where, and Why of your PII

It s 10pm Do You Know Where Your Institution's PII Is? Reducing Risk by Understanding the How, Where, and Why of your PII It s 10pm Do You Know Where Your Institution's PII Is? Reducing Risk by Understanding the How, Where, and Why of your PII Chris Oswald, Assistant Director, IT Audit Jerome Park, Director, IT Audit Princeton

More information

Writing a business case

Writing a business case Writing a business case A how to guide for Heads/Directors/Leaders/Mangers of Midwifery Birthrate Plus Associates 1.0 Introduction Congratulations on the completion of your Birthrate Plus assessment. If

More information

A CHECKLIST FOR PREPARING INITIAL AGREEMENT DOCUMENTS

A CHECKLIST FOR PREPARING INITIAL AGREEMENT DOCUMENTS Finance, ehealth & Pharmaceuticals Directorate Capital and Facilities Division Enquiries to: Steven Hanlon T: 0131-244 2139 E: steven.hanlon@scotland.gsi.gov.uk Chief Executives, NHS Boards and Special

More information

Policies, Procedures, Guidelines and Protocols

Policies, Procedures, Guidelines and Protocols Policies, Procedures, Guidelines and Protocols Document Details Title Policy on the Development and Management of Procedural Documents (Strategies, Policies, Protocols and Guidelines) Trust Ref No 1361-28127

More information

Loch Lomond & The Trossachs National Park Authority and Cairngorms National Park Authority

Loch Lomond & The Trossachs National Park Authority and Cairngorms National Park Authority Loch Lomond & The Trossachs National Park Authority and Cairngorms National Park Authority Internal audit report 2014-15 Project Management 15 January 2015 Contents This report is for: Action David Cameron

More information

Mentoring Toolkit Additional Resources

Mentoring Toolkit Additional Resources Mentoring Toolkit Additional Resources University of Edinburgh Mentoring Connections Programme Table of Contents Mentoring Connections at the University of Edinburgh... 4 General information on the mentoring

More information

ADAPTING ONE OF THE TWELVE COMPETENCY MODELS TO SIMILAR UTILITY JOBS

ADAPTING ONE OF THE TWELVE COMPETENCY MODELS TO SIMILAR UTILITY JOBS ADAPTING ONE OF THE TWELVE COMPETENCY MODELS TO SIMILAR UTILITY JOBS Utilities can adapt the models developed in this project for positions that are somewhat different in their organizations. This chapter

More information

www.adaptaconsulting.co.uk Adapta Consulting is a CFG Corporate Subscriber Published by Adapta Consulting First published 2013 Copyright Adapta Consulting All rights reserved No part of this book may be

More information

How to build a Quality & Safety System

How to build a Quality & Safety System How to build a Quality & Safety System 29 November 2011 How to build a Quality & Safety System Helpful stuff for operators who have not previously run a formal management system In many cases organisations

More information

Decision Discussion Assurance Information X

Decision Discussion Assurance Information X Title of Meeting: Primary Care Commissioning Committee Date of Meeting: 1 March 2018 Paper Title: Data Quality Service Responsible PCCC Member Lead Dr Rick Sweeney Governing Body Member Purpose (this paper

More information

Certificate IV in Project Management Student Assessment Guide

Certificate IV in Project Management Student Assessment Guide Overview The assessment for the Certificate IV in Project Management comprises Assessment Task Description Percentage Individual Assignment Unit Tests Development of a detailed Project Management Plan

More information

SYDNEY TRAINS SAFETY MANAGEMENT SYSTEM SYSTEM PROCEDURE 07: HUMAN FACTORS

SYDNEY TRAINS SAFETY MANAGEMENT SYSTEM SYSTEM PROCEDURE 07: HUMAN FACTORS SYDNEY TRAINS SAFETY MANAGEMENT SYSTEM SYSTEM PROCEDURE 07: HUMAN FACTORS Purpose Scope Out of scope The purpose of this document is to describe the process for managing Human Factors (HF) to support the

More information

Planning an Effective Self-Assessment. The first step in your business improvement Journey

Planning an Effective Self-Assessment. The first step in your business improvement Journey Planning an Effective Self-Assessment The first step in your business improvement Journey Contents Introduction What is Self-Assessment? The Self-Assessment Process On the Day of the Self-Assessment Prioritising

More information

HSE Assurance Overview

HSE Assurance Overview HSE Assurance Overview Agenda 1 2 3 4 5 Assurance Framework Three Lines of Defense Model Interview Techniques Lessons Learned Documenting findings BHP Risk and Assurance Hierarchy 3 Assurance Model Life

More information

Workplace Travel Planning Guide

Workplace Travel Planning Guide Workplace Travel Planning Guide Welcome to the Get Healthy at Work Workplace Travel Planning Guide. We hope you find this guide practical and easy to follow. It will help your organisation to develop and

More information

Building trust and confidence in our reporting Data Assurance Summary 2017/18

Building trust and confidence in our reporting Data Assurance Summary 2017/18 Building trust and confidence in our reporting 1 Contents 1 About this document Statement of risks, strengths and weaknesses Assurance plans Data summary Our 2020-25 business plan reporting risks and 2

More information

PROCESS TRAINING. DIR PM Lite 2.0 Process Training v2.0 1

PROCESS TRAINING. DIR PM Lite 2.0 Process Training v2.0 1 PROCESS TRAINING 1 PM Lite (Project Management Lite) is a project management process made up of tools, templates, and best practices that empowers its users to be more efficient and effective in project

More information

HU801B Project Management Lecture 7 - Project Planning

HU801B Project Management Lecture 7 - Project Planning HU801B Project Management Lecture 7 - Project Planning Material extracted from Software Engineering 9 th Edition, Sommerville http://softwareengineering-9.com Agenda Project planning and the planning process

More information

Project Management Initiation Document

Project Management Initiation Document Project Management Initiation Document This document provides an ideal project management plan template which can be used by anyone at any level who is undertaking a project and is looking for a plan structure

More information

Corporate Aviation Safety Management System

Corporate Aviation Safety Management System Corporate Aviation Safety Management System Prelude Dear aviation colleague, This guide was developed to facilitate the implementation of an effective, yet practical, safety management system (SMS). Although

More information

Overview COSCSMO14. Manage project processes in construction management. Manage project processes in construction management

Overview COSCSMO14. Manage project processes in construction management. Manage project processes in construction management Overview This standard is about preparing a strategy for the project using the most appropriate team. The needs of the stakeholders will need to be identified along with the requirements of the brief and

More information

UK Link Shipper Engagement Day Agenda

UK Link Shipper Engagement Day Agenda UK Link Shipper Engagement Day Agenda Date: Thursday 2 nd October Venue: The Studios, Birmingham (capacity 120 cabaret style) Purpose: Share file formats overlaid on To-be processes following formal release

More information

OE Project Charter Template

OE Project Charter Template Project Charter EMI Outreach April 12, 2011 OE Project Charter Template Project Name: Energy Management Office Prepared by: Sara Shirazi Date (MM/DD/YYYY): August 1, 2011 Project Charter Version History:

More information

PROJECT BOARD TERMS OF REFERENCE. Roles and Responsibilities

PROJECT BOARD TERMS OF REFERENCE. Roles and Responsibilities PROJECT BOARD TERMS OF REFERENCE Roles and Responsibilities 1 DOCUMENT CONTROL Change Control Table Version Amendment Description Release Date Updated by 0.1 First draft Alignment with new governance framework

More information

Controlled Document Number: Version Number: 7 Controlled Document Sponsor: Controlled Document Lead:

Controlled Document Number: Version Number: 7 Controlled Document Sponsor: Controlled Document Lead: Policy for the Development and Management of Controlled Documents CONTROLLED DOCUMENT CATEGORY: CLASSIFICATION: PURPOSE: Controlled Document Number: Version Number: 7 Controlled Document Sponsor: Controlled

More information

working with partnerships

working with partnerships A practical guide to: working with partnerships Practical step-by-step building blocks for establishing an effective partnership in the not-for-profit sector N 2 (squared) Consulting with Nottingham Council

More information

Student Lifecycle Support and Development Engagement Plan. Contents. Appendices. Objectives. Version 2.0 Published February 2015

Student Lifecycle Support and Development Engagement Plan. Contents. Appendices. Objectives. Version 2.0 Published February 2015 Student Lifecycle Support and Development Engagement Plan Contents Objectives 1. Engagement and Collaboration 2. Development & Change Management 3. Training Provision 4. Communications 5. User Support

More information

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General 1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General The organization s management with executive The commitment and involvement of the responsibility shall define, document

More information

BIIAB Unit Pack. BIIAB Level 3 NVQ Diploma in Sales (QCF) 601/6785/3

BIIAB Unit Pack. BIIAB Level 3 NVQ Diploma in Sales (QCF) 601/6785/3 BIIAB Unit Pack BIIAB NVQ Diploma in Sales (QCF) 601/6785/3 Version 1 BIIAB September 2015 www.biiab.org Contents CFAQ5 R/502/8601 Meeting customers after sales needs CFAQ11 R/502/8615 Obtaining and analysing

More information

Project Governance IT Services: Projects and Change Queen Mary University of London Protect 1

Project Governance IT Services: Projects and Change Queen Mary University of London Protect 1 Project Governance 1 DOCUMENT CONTROL Change Control Table Version Amendment Description Release Date Updated by 0.1 First Draft 15/10/215 Helen 0.2 Feedback Review feedback 21/10/2015 Shelim 0.3 Updated

More information

Meeting Date 15 March 2018 Agenda Item 2b

Meeting Date 15 March 2018 Agenda Item 2b Meeting Date 15 March 2018 Agenda Item 2b Report Title Stocktake Report Author Pam Wenger, Report Sponsor Pam Wenger, Presented by Pam Wenger, Freedom of Open Information Purpose of the Report The purpose

More information

ISC17D029. Project Manager Rob Bloomer, FPG, Centrum 1.01,

ISC17D029. Project Manager Rob Bloomer, FPG, Centrum 1.01, ISC17D029 Title: Managed Print Review Update to ISSC Group Author: Rob Bloomer (FPG) Procurement Officer Date: 17/01/2018 Circulation: ISSC Group 30 January 2018 Agenda: ISC17A002 Issue At this stage the

More information

Who Should be on Your Project Team: The Importance of Project Roles and Responsibilities

Who Should be on Your Project Team: The Importance of Project Roles and Responsibilities Who Should be on Your Project Team: The Importance of Project s and One significant factor contributing to the success of projects is having the right people engaged in the process. Who are the right stakeholders

More information

Project Management Knowledge Areas SECTION III

Project Management Knowledge Areas SECTION III Project Management Knowledge Areas SECTION III 1 Project Integration Management CHAPTER 4 2 The Key to Overall Project Success: Good Project Integration Management Project managers must coordinate all

More information