1 WORLD JOURNAL OF PHARMACY AND PHARMACEUTICAL SCIENCES P.Ramasubramaniyan et al. Volume 2, Issue 6, Review Article ISSN EQUIPMENT QUALIFICATION ON BLISTER PACKING MACHINE Ramasubramaniyan.P*, Palanichamy.S, Srinag.T,Sharanya.N,Lakshmi.M, Solairaj.P Department of Pharmaceutics, Sankaralingam Bhuvaneswari College of Pharmacy, Sivakasi, Tamil Nadu, India. Article Received on 16 August 2013, Revised on 15 Sept 2013, Accepted on 12 November 2013 *Correspondence for Author: * Dr. P. Ramasubramaniyan, Professor, Department of Pharmaceutics, Sankaralingam Bhuvaneswari College of Pharmacy, Sivakasi, Tamil Nadu, INDIA. ramskit@yahoo.com ABSTRACT This article discusses about the equipment qualification on blister packing machine which covers different types of qualification like design, installation, operational and performance qualification and requalification. It also includes the process involved in the blister packing machine and detail description of equipment parts like unwinding station, forming station, sealing station, heating station, cooling station, feeder, lidding material and labeling through packaging. It also covers the details of packaging importance and its types. Keywords: Equipment, Qualification, Blister Packing Machine, Packaging. INTRODUCTION Equipment The collective analytical measurement instruments, in conjunction with firmware, assembled to perform a mechanical process. In a computerized system, the equipment is controlled by the computer system. The computer collects measurement data from the equipment. A device or collection of components that perform a process to produce the result. ([1]) Qualification 1. Action of proving that any premises, systems and items of equipment work correctly and actually lead to the expected results. The meaning of the word validation is sometimes

2 extended to incorporate the concept of qualification. 2. The action of providing that any equipment or process works correctly & consistently and produces the expected results. Qualification is part of, but not limited to, a validation process. Types of Qualification 1. Design Qualification (D.Q) 2. Installation Qualification (I.Q) 3. Operational Qualification (O.Q) 4. Performance Qualification (P.Q) 5. Re-Qualification. ([2]) History of Validation The concept of validation was first proposed by two Food and Drug Administration (FDA) officials, Ted Byers and Bud Loftus, in the mid 1970s in order to improve the quality of pharmaceuticals. ([3]) It was proposed in direct response to several problems in the sterility of large volume parenteral market. The first validation activities were focused on the processes involved in making these products, but quickly spread to associated processes including environmental control, media fill, equipment sanitization and purified water production. The concept of validation was first developed for equipment and processes and derived from the engineering practices used in delivery of large pieces of equipment that would be manufactured, tested, delivered and accepted according to a contract. ([4] The use of validation spread to other areas of industry after several large-scale problems highlighted the potential risks in the design of products. ([5]) Reason for Validation Validation is "Establishing documented evidence that provides a high degree of assurance that a specific process will consistently produce a product meeting its pre-determined specifications and quality attributes. A properly designed system will provide a high degree of assurance that every step, process, and change has been properly evaluated before its implementation. Testing a sample of a final product is not considered sufficient evidence that every product within a batch meets the required specification FDA (1987). ([6]) Design Qualification (DQ) It is the documented verification that the proposed design of the facilities, systems and equipment is suitable for the intended purpose

3 Installation Qualification (IQ) It is the documented verification that the equipment or systems, as installed or modified, comply with the approved design, the manufacturer s recommendations and/or user requirements. Operational Qualification (OQ) It is the documented verification that the equipment or systems, as installed or modified, perform as intended throughout the anticipated operating ranges. Performance Qualification (PQ) It is the documented verification that the equipment and ancillary systems, as connected together, can perform effectively and reproducibly based on the approved process method and specifications. User Requirements Specification The User Requirements Specification should be treated as a contractual document avoiding conflicts with other technical specification documents. The URS should not be considered a mere part of the validation documentation but rather the main and possibly only specification document for the equipment. The URS should as a minimum, cover all mandatory parts including those necessary to guarantee the final product quality and achieve compliance with the rules. Ideally, the requirements should be independent from the supplier s product and express the customer needs without addressing specific design solutions. ([7]) URS Scope User Requirement Specifications (URS) Scope includes but is not limited to; Level-1, full details of end user operability. Level-2, full details of functionality. Level-3, software functionality interface. A full description of the required system performance. Performance criteria, critical parameters and operating range. Cleaning and maintenance requirements. Appropriate regulatory requirements. Documentation requirements

4 Training requirements. All none industry standard testing that may be required. ([8]) Design Qualification (DQ) Design qualification is the documentation of the planning phase, including the decision making for the equipment. Design qualification takes place before the equipment is constructed. With the design qualification, the conformity of the equipment or facility planning with certain requirements is reviewed. To this end, the requirements laid out in the user requirements are compared with the specifications compiled by the supplier (technical specifications) and confirmed in writing. ([9]) Installation Qualification (IQ) The (IQ) execution; verifies that the equipment, and its ancillary systems or sub-systems have been installed in accordance with installation drawings and or specifications. It further details a list of all the GMP requirements that are applicable to this particular installation qualification. These requirements must all be satisfied before the IQ can be completed and the qualification process is allowed to progress to the execution of the Operational Qualification. Installation Qualification Scope (IQ) The scope of the IQ testing/inspections will cover the under listed subjects, but is not restricted to them alone. Verify all components parts. Verify installation is as specified. Insert a brief description of the validated product process. Insert a brief description of the operational function. Verify supplied voltages. Verify whether the electrical installation qualification (IQ) complies. Verify all alarms and visual displays. Confirm the issue level of software. Identify and verify the serial & model numbers. Review all calibration certificates. Verify signal continuity. Verify the ambient conditions. Verify the documentation provided for the maintenance of the system. ([10])

5 Before installation Obtain manufacturer's recommendations for installation site requirements. Check the site for the fulfillment of the manufacturer's recommendations (utilities such as electricity, water and gases plus environmental conditions such as humidity, temperature, vibration level and dust). Allow sufficient shelf space for the equipment itself, related SOP's, operating manuals, logbooks and software. ([11]) The most important aspects to consider during IQ Provide as-built documentation. Check training reports. Check that documentation is complete. Check calibration reports. Identify piping and instrumentation. ([12]) Operational Qualification (OQ) Operational qualification is defined as Documented verification that the system or subsystem performs as intended throughout all anticipated operating ranges. ([13]) OQ demonstrates that an instrument will function according to its operational specification in the selected environment. Operational Qualification (OQ) is the process of demonstrating that a instrument will function according to its operational specification in the selected environment. Before OQ testing is done, one should always consider what the instrument will be used for. Testing may be quite extensive if the instrument is to be used for all types of applications and where some of these place great demands on the performance of the system. ([14]) OQ should include, but not be limited to the following (a) Tests that have been developed from knowledge of processes, systems and equipment; (b) Tests to include a condition or a set of conditions encompassing upper and lower operating limits, sometimes referred to as worst case conditions. The completion of a successful Operational qualification should allow the finalization of calibration, operating and cleaning procedures, operator training and preventative

6 maintenance requirements. It should permit a formal "release" of the facilities, systems and equipment. ([15]) Typical tests in the OQ include the following: Alarm tests Behavior of the system after energy breakdown Accuracy of filling lines Transportation speed in a sterilization tunnel Temperature distribution in an autoclave Performance of a washing machine, accuracy of a weighing system ([16]) Performance Qualification PQ demonstrates that a balance or instrument consistently performs according to a specification appropriate to its routine use. Performance Qualification (PQ) is the process of demonstrating that an instrument consistently performs according to a specification appropriate to its routine use. The test frequency is much higher than for OQ. Another difference is that PQ should always be performed under conditions that are similar to routine sample analysis PQ should be performed on a daily (or at least a weekly) basis, or whenever the instrument is used. The test frequency depends not only on the stability of the equipment but also on everything in the system that may contribute to the analysis results. 1. Define the performance criteria and test procedures. 2. Select critical parameters. 3. Define the test intervals PQ should include, but not be limited to the following: (a) Tests, using production materials, qualified substitutes or simulated product, that have been developed from knowledge of the process and the facilities, systems or equipment; (b) Tests to include a condition or set of conditions encompassing upper and lower operating limits. ([17]) The following technical systems need to be performance-tested and qualified: High purity water systems (monitoring of the quality parameters: ph, Total Organic Carbon, conductivity, Central processor unit, temperature) Heating, ventilation and air conditioning systems (temperature, pressure, humidity)

7 Complex connected systems (e.g., filling line, BPI production line; performance parameters) ([18]) Requalification Requalification is the repetition of the qualification effort or a selected portion of it. ([19]) Packing Packaging is defined as the collection of different components which surround the pharmaceutical product from the time of production until its use. Background Two basic types of pharmaceutical blister packages exist. In one variety the cavity is constructed of clear, thermoformed plastic, and the lid is formed of clear plastic or a combination of plastic, paper, and/or foil. The other type of package contains foil as an essential component of both webs and its cavity is created by cold stretching. ([20]) Types of Packaging 1. Thermoforming 2. Cold forming Importance of Packaging Protects against all adverse external influences that can alter the properties of the product. Protects against biological contamination. Protects against physical damage. Carries the correct information and identification of the product. Tamper evident / Child resistance/ Anti counterfeiting. Functions of Packaging 1. Containment -Not to leak, nor allow diffusion and permeation -Strong enough to hold the contents during handling 2. Protection -Light -Moisture -Oxygen -Biological contamination

8 -Mechanical damage -Counterfeiting General properties of blister packaging material: - Tensile strength - Tear strength - Impact resistance - Stiffness - Temperature resistance - Moisture resistance Factors Affecting Blister Thickness A. Material: The nature of material e.g. softening temperature, hardening time, elasticity etc. B. Process: Pressure and plug system usually produce forming produces thicker top section while in vacuum forming, it is thicker near the base and thinner at the top. C. Essential machine operation: 1. Heating and thermoforming. 2. Cold forming. 3. Feeding and filling. 4. Heat sealing of the bidding material. 5. Punching out or guillotining the tray from the web. 6. Printing of the lidding web. 7. Batch marking. Advantages of Blister Packaging 1. Blisters are very inexpensive to produce. 2. Can be used for promoting products. 3. Protects and holds the product securely. 4. Many sizes available, from small unit-dose. 5. Allows products to be seen, but not touched. 6. Product is very visible. Disadvantages of Blister Packaging 1. Blisters require some type of a card to seal the blister. 2. Requires heat sealing the blister to the card

9 Blister Packaging Components The four basic components of pharmaceutical blister packages are the forming film, the lidding material, the heat-seal coating, and the printing ink. Forming films account for approximately 80 85% of the blister package, and lidding materials make up 15 20% of the total weight of the package. Since the forming film and the lidding material form an integrated package, they must match precisely. Forming film The forming film is the packaging component that receives the product in deep drawn pockets. One key to package success is selecting the right plastic film for the blisters in terms of its property type, grade, and thickness. Consideration must be given to the height and weight of the product, sharp or pointed edges of the final package, and the impact resistance, aging, migration, and cost of the film. The plastic also must be compatible with the product. Factors influencing package production and speed of assembly must be taken into account, including heat sealing properties and the ease of cutting and trimming formed blisters. Lidding materials The lidding material provides the base or main structural component upon which the final blister package is built. It must be selected according to the size, shape, and weight of the product as well as the style of the package to be produced. Lidding materials range in caliper or thickness from 0.36 to 0.76 mm, but mm is the most popular range. The surface of the lidding material must be compatible with heat-seal coating process. Clay coatings are added to the lidding material to enhance printing. Heat-sealing and printability are both important considerations in blister packaging, and the lidding material must offer the best workable compromise. Printing inks Printing inks provide graphics and aesthetic appeal. They can be applied to the lidding material by letterpress, gravure, offset, flexographic, or silk-screen printing processes. Printing inks must resist heat sealing temperatures as high as 300 ºC without showing any discoloration or tackiness (blocking). In addition, they must sufficiently resist abrasion, bending, and fading and must be safe for use with the intended product. Printing inks should not contain excessive amounts of hydrocarbon lubricants, greases, oils, or release agents

10 Qualification tests should always precede production runs. Finally, printing inks must comply with FDA recommendations. Cold-formed foil/foil Best known to Americans is the blister package made of a foil, film, paper, or multimaterial backing that is adhered to a sheet of thermoformed plastic blisters. However, a less common type of blister is the foil/foil lamination used for products that are particularly susceptible to moisture and/or light. Unlike all-plastic blisters, these are not thermoformed but instead are cold-pressed into shape. Products that require the highest degree of protection are packed in an all-foil package. Cold-formable foil is finding favor because it is the only material that provides a 100% barrier to moisture, oxygen, and light. Machinery and assembly Blister packaging machinery Modern thermoform fill seal machines can operate at speeds <800 packages/min. Today, much of the emphasis in improving production is placed on applying microprocessor controls that electronically connect the filling and forming equipment with other downstream machinery for cartooning and wrapping. These controls also feed tablets or liquids into the unit-dose blisters, ensuring that an exact volume is put into each. Modern machinery also uses integrated vision systems to help ensure the accuracy of the fill and the integrity of the product in the blister. These machines have become quite versatile and can readily accommodate several types of lid stocks and base stocks, allowing the manufacturer to obtain better compatibility between the medicine and its packaging material as well as better patient compliance. Detailed assembly Blister packaging machines typically operate with intermittent motion. The seal is made during the dwell time required for thermoforming. The essential parts and functions of an intermittently operating packaging machine include the following: The unwinding station The unwinding station supplies the forming films and the lidding material at a rate corresponding to the speed of the packaging machine

11 The heating station The heating station raises the temperature of the plastic forming films to a level suitable for deep drawing. Forming films containing the polyvinyl chloride (PVC) support material are heated to C. Polypropylene (PP) forming films are heated to C. Forming films containing aluminum are not heated before the forming process. The forming station The forming station forms the plastic blister cavities via compressed air or die plates. Films containing aluminum are formed with mechanical forming tools only. The cooling station The cooling station cools PP films after the forming process. Laminates containing PVC or aluminum do not need to be cooled. The feeding machine The loading area fills the blister cavities with product. The feeding machine can be linked, or the product to be packaged can simply be swept into the blisters. The sealing station The sealing station heat seals the lidding material to the forming film that contains the product. All heat-sealing methods mate the blister and lid under constant pressure for a specified time, during which heat is supplied. The mating surfaces fuse and bond, setting almost instantaneously when heat input stops. Depending on the type of machine, the sealing temperature typically ranges between 140 and 340ºC. The cooling station The cooling station is necessary with all forming films. PP forming films must be cooled longer than other types of film. Labeling through packaging Packages are labeled, notched, and then marked with a batch number at the coding station. The perforating device makes a cross-shaped perforation along the sealing seams. At the punching station, the packages are then separated into sheets that typically contain from 10 to 20 individual blisters. The vision system checks the filled packages for defects. Finally, a multipacking machine packs the individual packages into bigger cartons. ([21])

12 METHODOLOGY The execution of equipment qualifications involved the following: Development of IQ, OQ and PQ protocols. Approval of IQ, OQ and PQ protocols. Executing the IQ, OQ and PQ. Workout of IQ, OQ and PQ report. Approval of IQ, OQ and PQ report. Design Qualification (DQ) The Blister packing machine was to be checked whether the user requirements are fulfilled. Installation Qualification (IQ) Instrument specifications during installation: Table No. 1: Equipment details 1 Equipment to be installed as per drawing(s)/ manufacturer s recommendation. 2. Equipment identification nameplate is to be visible. 3. Major components are to be securely assembled. 4. Any physical damage is to be checked. 5. Required electric connections are to be tight and grounded. Earthing connection is to be done properly. 6. Sufficient space is to be provided around the equipment/ system for servicing. 7. All moving parts are to be covered with suitable guard. 8. All utilities related to equipment are to be connected. 9. Parts are to be accessible for easy cleaning. While installing the machine, the following parameters were observed and confirmed Identification of Execution Team members. Purchase order verification

13 Verification of Manual, Drawing and Related documents. Installation Verification. Verification of Material of construction. Verification of Utilities. Major component verification. Operational Qualification The machine was run as per the operating instructions for 30minutes with empty load and observed the operation and recorded. While machine was in operation, switch off the mains power supply. After few minutes, the machine was restarted and the operation performance was observed and the result was recorded. During the operation of equipment, the temperature was controlled or adjusted to c to c to form the blister cavities and then adjusted to c to c for sealing the lidding material. Then the operation was observed. The result of operational qualification was noted. While operating the machine, the following tests are to be carried out: Safety features; Alarm tests; Behavior of the system after energy breakdown; Accuracy of filling lines; Continuity of Operation; Power Failure Recovery Study; Functionality of Push buttons/switches provided on Electrical /Control panel; Temperature Controller performance verification; Operational Performance of ACG Pampac Blister Packing Machine and Performance Verification of ACG Inspection system Performance Qualification During PQ, the temperature was adjusted from C to C for optimal forming temperature study and finally the temperature was fixed

14 Later the temperature was adjusted to C C to study the optimal sealing temperature study and finally the temperature was fixed. During performance of the machine, the following parameters were observed: Defective tablets; Missed tablets; Black spots; Machine speed; Optimal forming temperature; Optimal sealing temperature. RESULTS AND DISCUSSION The equipment qualification of Blister packing machine was conducted by four types namely, Design qualification, Installation qualification, Operation qualification and Performance qualification. Design Qualification For qualifying the Blister packing machine, the vendor manufactured and supplied the machine as per the requirements of the user. The design qualification was satisfied. Installation Qualification i. Instrument specifications: 1. Equipment was installed as per drawing(s)/ manufacturer s recommendation. 2. Equipment identification nameplate was visible. 3. Major components are securely assembled. 4. There was no physical damage. 5. Required electric connections and earthing connections are tightly grounded and done properly. 6. Sufficient space was provided around the equipment/ system for servicing. 7. All moving parts were covered with suitable guard. 8. All utilities related to equipment are connected. 9. Parts were accessible for easy cleaning

15 The following parameters are within the limits and it was observed that the installation of the equipment was in proper manner. Identified the Execution Team members. Verified the Purchase order. Verified the Manual, Drawing and Related documents. Installation was verified. Material of construction was verified. Utilities were verified. Verified the Lubricants. Procedures were identified. Installation checks specific to equipment were identified and carried out as per individual test procedures. Verified the Major component. The details of each component were recorded and the supplied component was checked and installed as per the User Requirement Specification / Manufacturer s recommendations. All are found correct. (Table No. 10). Table No. 2: Basic Unit Description Specified Supplied Make ACG Pampac ACG Pampac Model B45 R B45 R Sr. No. BR BR Inspection System Shall be provided Provided Temperature control and Indication Servo drivers Machine Dimension Forming Area Shall be provided on MMI Shall be provided for various access operations of Pulling & perforation stations with other 4400(L) x 2170(W) x 2350 (H) mm. Maximum 240 mm (Width) x 210mm (Advance) provided on MMI provided for various access operations of Pulling & perforation stations with other 4400(L) x 2170(W) x 2350 (H) mm. Maximum 240 mm (Width) x 210 mm (Advance) Forming Depth Upto 12mm Up to 12mm

16 Forming cycles Forming Speed Upto 45 cycles per minute for PVC Upto 35 cycles per minute For ALUMINIUM Upto 9.5 meters per minute Up to 45 cycles per minute for PVC Up to 35 cycles per minute For ALUMINIUM Up to 9.5 meters per minute Operational Qualification Operational qualification was carried out by the vendor under the supervision of machine operator, validation person and the engineering person. The following parameters are within the limits: Alarm tests were good. System after energy breakdown works properly. Accuracy of filling lines was good. Continuity of Operation was good. Power Failure Recovery Study was good. Functionality of Push buttons/switches provided on Electrical /Control panel works properly. Temperature Controller performance verification was within the limit. The safety feature testing was carried out by operating the equipment. The exercise was repeated for 2 more times. All the safety features were tested and found in compliance with the URS. Table No. 3: Safety Features Sr. No Description of safety features Base Foil end sensor Lidding end Foil Method of Testing Foil Consumed / take out the base foil manually during machine is in operation Lidding Foil Consumed / take out the Lidding foil manually during machine is in operation Acceptance Criteria Machine Stops at Zero Position Machine Stops at Zero Position Buzzer will made ON Sensor for If the foil roll level reaches to indicate the operator 3. base foil Low low after completion of set level time machine will stop 4. Loop sensor Manually Operate the sensor Base foil unwinding

17 for base foil unwinding motor shall be ON 5. Sensor for Base foil Joint When sensor detects the joint in the base foil The joint blister will get rejected at Sensor Lidding Joint for foil When sensor detects the joint in the Lidding foil The joint blister will get rejected at 45 0 Critical Parameters Some important critical parameters such as Continuity of Operation, Power Failure Recovery Study, Functionality of Push buttons/switches provided on Electrical/Control panel, Temperature Controller performance verification, Operational Performance of ACG Pampac Blister Packing Machine Model: B45 R and Performance Verification of ACG Inspection System were performed and the results are presented. Continuity of Operation Machine ran for 30 minutes and found no abnormal noise or vibrations. Motor ran continuously without tripping, motor/machine parts were not excessively heated up. Hence continuity of operation with empty load for 30 minutes was found within the limits. Power Failure Recovery Study Power failure alarm was in good condition. When power supply was stopped, machine also got stopped at zero position. When power resumes, machine started with the existing set parameters. Performance Qualification The following parameters are within the limits Machine speed was verified. Optimal forming temperature was good. Optimal sealing temperature was good. Black spots were identified and rejected. Missed tablets were identified and rejected. Defective tablets were identified and rejected. Machine Speed Verification: The machine speed was maintained at three different ranges such as minimum (10 cycles / min), optimum (25 cycles / min) and maximum (43 cycles / min) in order to evaluate the

18 forming and sealing of the blister as specified in protocols. The forming and sealing of the blister was found satisfactory. Optimal Forming Temperature Study This study was carried out using the dummy product with PVC as forming foil at different machine speeds (10, 15, 20, 25, 30, 35, 40, 43 cycles / min) under various temperatures such as 110ºC, 120ºC, 130ºC and 140ºC. The parameters like pocket shape, deformations, pin holes, cracks and dents were evaluated at top and bottom of the heating plate. The results showed that all the parameters were found within the limits. Optimal Sealing Temperature This study was carried out using the dummy product foiled with PVC as forming foil and aluminium as lidding foil at different machine speeds (10, 15, 20, 25, 30, 35, 40, 43 cycles / min) under various temperatures such as 180ºC, 195ºC, 220ºC, 235ºC and 250ºC. The parameters like knurling quality, pin holes, cracks, dents and leak test were evaluated. The results proved that all the parameters were found within the limits. Performance of ACG inspection system This study was performed at 10, 20 and 30 cycles / min to evaluate or identify the defects such as missed tablets, black spots and defective tablets. From the results it was found that the evaluated parameters were within the limits. After completion of performance qualification we observed that the obtained results were within the limits and found satisfactory. SUMMARY The design, installation, operational and performance qualification of ACG-PAMPAC BLISTER PACKING MACHINE, Model: B45 R was performed as per the approved qualification protocol. During installation qualification, the material of construction of all product contact parts were verified and certified as SS316L and its equivalent and the non contact parts were certified for SS304 and its equivalent. All the utilities are connected and found to be adequate. All the major components i.e. Basic Unit, Base foil unwinding station, Heating station, Forming station, Linear indexing station, Feeding station, Lidding foil unwinding station, Sealing station, Cooling station,

19 Punching & Perforation station, Rotary pickup station, Web support assembly, Electrical controls and other were identified, installed, checked and mounted properly during installation qualification. During operation qualification, all the accessories provided to the equipments were calibrated and the results were found satisfactory. Control panel components and function of each key/component of the panel against its specified function was checked as per the operational instructions and the results were found satisfactory. Safety feature testing has been tested as per the procedure mentioned in the protocol and all the results are within the limits. The critical operating parameters such as Verification of continuity of operation, Power failure recovery study, Verification temperature controllers, Operation performance of Blister packing machine and Verification of security, Recipe management functionalities were verified and found correct. All the observations during operational qualification were found satisfactory and were within the limits. As part of performance qualification, the machine was run with dummy tablets at 10 cycles/min, 20 cycles / min and 30 cycles / min and the quality of blisters were found satisfactory. CONCLUSION All the results observed for individual qualification steps are found within the limits as per the proposed protocols and the equipment was successfully qualified in compliance with the URS, cgmp and FDA requirements. The installation, operational and performance qualification of ACG-PAMPAC BLISTER PACKING MACHINE, Model: B45 R was performed as per the approved protocol No.GITPRIOP307 and GITPRPQP307 respectively. Hence the ACG-PAMPAC BLISTER PACKING MACHINE, Model: B45 R can be released for routine use

20 REFERENCE 1. P.A. Cloud, Validating a Laboratory Incubator, BioPharm 1997, 10(11), P. Bedson, The Development and Application of Guidance on Equipment Qualification of Analytical Instruments, Accred. Qual. Assur. 1996, 1(6), Agalloco,J."Validation: an unconventional review and reinvention". Validation: an unconventional review and reinvention, 1995, 49 (4), pp Hoffmann, A., Kahny-Simonius, J., Plattner, M., Schmidli-Vckovski, V., & Kronseder, C. 'Computer system validation: An overview of official requirements and standards'. Pharmaceutica Acta Helvetiae, 1998, vol. 72 (6), pp Leveson, N. G. & Turner, C. S. 'An investigation of the Therac-25 accidents', Computer, 1993, 26 (7), pp FDA, Guidelines on General Principles of Process Validation, Sandro De Caris, Marco Bellentani, Beny Fricano, Carlo Bestetti, Marco Silvestri and Barbara Testoni. Risk-Based Equipment Qualification: A User/Supplier Cooperative Approach, the official magazine of ISPE, 2007, 27 (3) Maas & Peither AG GMP Publishing LOGFILE No. 8, 2011, pp Satyabrata Jena, K.Sravya, Arjun Goje, D. Narendra Prasad and Syed Sameer. Equipment Qualification For RMG, FBD, Blender & Compression Machines- An Overview, International Journal of Novel Drug Delivery Technology; 2011, 1 (3), pp Robert A. Nash, Alfred H. Wachter., Pharmaceutical Process Validation. 3rd Ed., 2003, volume 129, Marcel Dekker, Inc, pp Robert A. Nash, Alfred H. Wachter., Pharmaceutical Process Validation. 3rd Ed., 2003, volume 129, Marcel Dekker, Inc, pp Satyabrata Jena, K.Sravya, Arjun Goje, D. Narendra Prasad and Syed Sameer. Equipment Qualification for RMG, FBD, Blender & Compression Machines- An Overview, International Journal of Novel Drug Delivery Technology; 2011, 1 (3), pp PDA, Validation of Computer-Related Systems, Technical Report No. 18, PDA J. Sci. Technol. 1995, 49 (1), pp. S1 S Robert A. Nash, Alfred H. Wachter., Pharmaceutical Process Validation. 3rd Ed.,

21 2003, volume 129, Marcel Dekker, Inc, pp Robert A. Nash, Alfred H. Wachter., Pharmaceutical Process Validation. 3rd Ed., 2003, volume 129, Marcel Dekker, Inc, pp J.Agalloco, Master Planning of Validation, PDA Training and Research Institute, 1998, pp R. Pilchik, Pharmaceutical Blister Packaging, Part I: Rationale and Materials, Pharm. Technol. 2000, 24 (11), pp R. Pilchik, Pharmaceutical Blister Packaging, Part I: Rationale and Materials, Pharm. Technol. 2000, 24 (11), pp

World Journal of Pharmaceutical Research SJIF Impact Factor 5.990

World Journal of Pharmaceutical Research SJIF Impact Factor 5.990 SJIF Impact Factor 5.990 Volume 4, Issue 9, 444-454. Review Article ISSN 2277 7105 COMPUTER SYSTEM VALIDATION: A REVIEW Patil Yogesh* Mali Kamlesh, Bodhane Mohini, Ram Phad, Shaikh Ismail, Lale Shivam

More information

PROCESS VALIDATION: AN ESSENTIAL PROCESS IN PHARMACEUTICAL INDUSTRY

PROCESS VALIDATION: AN ESSENTIAL PROCESS IN PHARMACEUTICAL INDUSTRY WORLD JOURNAL OF PHARMACY AND PHARMACEUTICAL SCIENCES Vijayasree et al. SJIF Impact Factor 6.647 Volume 6, Issue 3, 367-874 Review Article ISSN 2278 4357 PROCESS VALIDATION: AN ESSENTIAL PROCESS IN PHARMACEUTICAL

More information

GUIDE TO GOOD MANUFACTURING PRACTICE FOR MEDICINAL PRODUCTS

GUIDE TO GOOD MANUFACTURING PRACTICE FOR MEDICINAL PRODUCTS PHARMACEUTICAL INSPECTION CONVENTION PHARMACEUTICAL INSPECTION CO-OPERATION SCHEME GUIDE TO GOOD MANUFACTURING PRACTICE FOR MEDICINAL PRODUCTS PH 1/97 (Rev. 3), 15 January 2002 ANNEX 15 QUALIFICATION AND

More information

INTERNATIONAL JOURNAL OF PHARMACEUTICAL RESEARCH AND BIO-SCIENCE

INTERNATIONAL JOURNAL OF PHARMACEUTICAL RESEARCH AND BIO-SCIENCE INTERNATIONAL JOURNAL OF PHARMACEUTICAL RESEARCH AND BIO-SCIENCE PROCESS VALIDATION: AN ESSENTIAL PROCESS IN PHARMACEUTICAL INDUSTRY D. VIJAY KUMAR, KAMESWARA RAO S., P. BHARGAVA BHUSHAN RAO, T. V. V.

More information

Dr. Sheelpriya walde Professor Gurunanak college of pharmacy, Nagpur

Dr. Sheelpriya walde Professor Gurunanak college of pharmacy, Nagpur Dr. Sheelpriya walde Professor Gurunanak college of pharmacy, Nagpur GMP ( Adopted in 1975 ) In India Good manufacturing practices are the practices required in order to conform to guidelines recommended

More information

ISO Part 1 and Part 2 Compliance Requirements. Cathriona O Neill

ISO Part 1 and Part 2 Compliance Requirements. Cathriona O Neill ISO 11607 Part 1 and Part 2 Compliance Requirements Cathriona O Neill I.S. EN 11607 Introduction ISO 11607 is the principal guidance document. Packaging for terminally sterilised medical devices - Part

More information

The procurement, qualification and calibration of lab instruments: An Overview

The procurement, qualification and calibration of lab instruments: An Overview The procurement, qualification and calibration of lab instruments: An Overview The reliability of analytical data generated from chemical and physical analyses is critically dependent on three factors:

More information

Process development and basic GMP

Process development and basic GMP Process development and basic GMP Aulton Chapter 45, handouts Specification, stability, inprocess controls and validation Product development Process development Critical Product Qualities issues Critical

More information

Managing Validation. Paperless Recorders

Managing Validation. Paperless Recorders Managing Validation Paperless Recorders Multitrend Plus Validation Background The past five years has seen an increase in the use of computerized systems and products in the pharmaceutical and bio-pharmaceutical

More information

INDUSTRIAL PROCESS VALIDATION OF TABLET DOSAGE FORM: A REVIEW

INDUSTRIAL PROCESS VALIDATION OF TABLET DOSAGE FORM: A REVIEW International Journal of Pharmacy Review & Research www.ijprr.com INDUSTRIAL PROCESS VALIDATION OF TABLET DOSAGE FORM: A REVIEW Vishal Sharma* and Nimrata Seth 1 Department of Pharmaceutics, Rayat Institute

More information

INTERNATIONAL RESEARCH JOURNAL OF PHARMACY ISSN Review Article

INTERNATIONAL RESEARCH JOURNAL OF PHARMACY  ISSN Review Article INTERNATIONAL RESEARCH JOURNAL OF PHARMACY www.irjponline.com ISSN 2230 8407 Review Article INTRODUCTION AND GENERAL OVERVIEW OF PHARMACEUTICAL PROCESS VALIDATION: A REVIEW Pandita Rachna* 1, Rana A C

More information

Contents. Contents (13) 1 Production (23)

Contents. Contents (13) 1 Production (23) 1 Production (23) 1.A Sanitation (27) 1.A.1 Organisational prerequisites (27) 1.A.2 Sources of contamination (28) 1.A.3 Responsibilities and implementation (29) 1.B Personnel hygiene (31) 1.B.1 Clothing

More information

á1058ñ ANALYTICAL INSTRUMENT QUALIFICATION

á1058ñ ANALYTICAL INSTRUMENT QUALIFICATION USP 41 General Information / á1058ñ 1 á1058ñ ANALYTICAL INSTRUMENT QUALIFICATION INTRODUCTION A large variety of analytical instruments, ranging from a simple apparatus to complex computerized systems,

More information

[Rakesh, 6(2): February 2019] ISSN DOI /zenodo Impact Factor

[Rakesh, 6(2): February 2019] ISSN DOI /zenodo Impact Factor GLOBAL JOURNAL OF ENGINEERING SCIENCE AND RESEARCHES FEATURES, FUNCTIONS AND SELECTION OF BLISTERPACKAGING MATERIALS: A REVIEW Rakesh* 1, Pankaj 2 & Dhirender 3 *1 M.Tech. Scholar, Guru Jambheshwar University

More information

PROCESS VALIDATION: AN OVERVIEW

PROCESS VALIDATION: AN OVERVIEW PROCESS VALIDATION: AN OVERVIEW Chandra Kant 1 *, Ujjwal Nautiyal 1, M. Senthil Kumar 1, Vikas Verma 1, Rupinder Singh 1 1 Department of Pharmacy, Himachal institute of Pharmacy, Paonta Sahib, (H.P), India.

More information

Thermoforming packaging machine R 145 with MULTIVAC Clean Design. Maximum process reliability and cleanroom suitability

Thermoforming packaging machine R 145 with MULTIVAC Clean Design. Maximum process reliability and cleanroom suitability Thermoforming packaging machine R 145 with MULTIVAC Clean Design Maximum process reliability and cleanroom suitability MULTIVAC R 145 Clean Design Thermoforming packaging machine R 145 with MULTIVAC Clean

More information

MASTER PLANNING FOR VALIDATION

MASTER PLANNING FOR VALIDATION MASTER PLANNING FOR VALIDATION By: Gamal Amer, Ph.D. Principal, Premier Compliance Services, Inc. 1 Process Validation: General Principles and Practices Guidance to industry issued by the FDA in January

More information

DETAILED PROCEDURE AND GUIDELINES TEMPERATURE MAPPING STUDY & QUALIFICATION OF COLD ROOMS, WAREHOUSES, VANS, TRUCKS, REEFERS, REFRIGERATORS & BOXES

DETAILED PROCEDURE AND GUIDELINES TEMPERATURE MAPPING STUDY & QUALIFICATION OF COLD ROOMS, WAREHOUSES, VANS, TRUCKS, REEFERS, REFRIGERATORS & BOXES DETAILED PROCEDURE AND GUIDELINES ON TEMPERATURE MAPPING STUDY & QUALIFICATION OF COLD ROOMS, WAREHOUSES, VANS, TRUCKS, REEFERS, REFRIGERATORS & BOXES FOR PHARMACEUTICAL INDUSTRY Revision History: Revision

More information

EUROPEAN COMMISSION HEALTH AND CONSUMERS DIRECTORATE-GENERAL

EUROPEAN COMMISSION HEALTH AND CONSUMERS DIRECTORATE-GENERAL EUROPEAN COMMISSION HEALTH AND CONSUMERS DIRECTORATE-GENERAL Medicinal Products Quality, Safety and Efficacy Brussels, 6 February 2014 SANCO/TSE/ The received contributions together with the identity of

More information

35 STATION DOUBLE ROTORY COMPRESSION MACHINE

35 STATION DOUBLE ROTORY COMPRESSION MACHINE Page 1 of 16 User Requirement Specifications 35 STATION DOUBLE ROTORY Equipment ID: T-35COMP 01 Page 2 of 16 Table of Contents 1.0 APPROVAL SIGNATURES 2.0 OVERVIEW 3.0 PROCESS DESCRIPTION 4.0 PRODUCTIVITY

More information

Manual 069 The validation of facilities and system

Manual 069 The validation of facilities and system 1. Purpose The purpose of this guideline is to provide requirements for the Validation of Facilities and Systems and to outline recommendations on how to achieve compliance. 2. Scope This guideline can

More information

International Journal of Pharmaceutical and Medicinal Research

International Journal of Pharmaceutical and Medicinal Research Review article A review on process validation Int. J. Pharm. Med. Res. 2014; 2(3):100-104 ISSN: 2347-7008 International Journal of Pharmaceutical and Medicinal Research Journal homepage: www.ijpmr.org

More information

MOTHER DAIRY A UNIT OF GUJARAT CO-OPERATIVE MILK MARKETING FEDERATION LIMITED PURCHASE ENQUIRY

MOTHER DAIRY A UNIT OF GUJARAT CO-OPERATIVE MILK MARKETING FEDERATION LIMITED PURCHASE ENQUIRY PURCHASE ENQUIRY Inquiry No : MDG/PUR/PKS/ENQ/BT, Dated: April 17, 2014 Description Qty : Purchase Inquiry for Supply, Installation and commissioning and testing of fully automatic Butter Thermoforming,

More information

Good practices in quality control in pharmaceutical industry - Overview of regulatory guidelines

Good practices in quality control in pharmaceutical industry - Overview of regulatory guidelines Review Article Good practices in quality control in pharmaceutical industry - Overview of regulatory guidelines Chagi Venkatesh*, S. B. Puranik ABSTRACT Good practices in quality control (QC) department

More information

User Requirement Specifications

User Requirement Specifications Page 1 of 15 User Requirement Specifications Tablet Inspection Belt Equipment ID: T-INSB01 Page 2 of 15 Table of Contents 1.0 APPROVAL SIGNATURES 2.0 OVERVIEW 3.0 PROCESS DESCRIPTION 4.0 PRODUCTIVITY REQUIREMENT

More information

BLISTER PACKING MACHINES AND SERVICES THAT OFFER FLEXIBILITY AND HIGH QUALITY BLISTER PACKS FROM A WIDE VARIETY OF PACKAGING MATERIALS.

BLISTER PACKING MACHINES AND SERVICES THAT OFFER FLEXIBILITY AND HIGH QUALITY BLISTER PACKS FROM A WIDE VARIETY OF PACKAGING MATERIALS. BLISTER PACKING MACHINES AND SERVICES THAT OFFER FLEXIBILITY AND HIGH QUALITY BLISTER PACKS FROM A WIDE VARIETY OF PACKAGING MATERIALS. 06 1. PACKAGING SOLUTIONS 07 1. PACKAGING SOLUTIONS SMALL SCALE,

More information

CALIBRATION AND QUALIFICATION OF EQUIPMENTS IN THE PHARMACEUTICAL INDUSTRY: EMPHASIS ON RADIOPHARMACEUTICALS PRODUCTION

CALIBRATION AND QUALIFICATION OF EQUIPMENTS IN THE PHARMACEUTICAL INDUSTRY: EMPHASIS ON RADIOPHARMACEUTICALS PRODUCTION 2011 International Nuclear Atlantic Conference - INAC 2011 Belo Horizonte, MG, Brazil, October 24-28, 2011 ASSOCIAÇÃO BRASILEIRA DE ENERGIA NUCLEAR - ABEN ISBN: 978-85-99141-04-5 CALIBRATION AND QUALIFICATION

More information

Equipment Qualification Ensure Fit for Intended Use. IVT Amsterdam Conference Mary Sexton. 19 Mar 2015

Equipment Qualification Ensure Fit for Intended Use. IVT Amsterdam Conference Mary Sexton. 19 Mar 2015 Equipment Qualification Ensure Fit for Intended Use IVT Amsterdam Conference Mary Sexton 19 Mar 2015 Equipment Qualification Ensure Fit for Intended Use 1. Types of Qualification 2. Validating Equipment

More information

AQUALAB 4TE, 4TEV, 4TE DUO, 4TEV DUO BENCHTOP WATER ACTIVITY

AQUALAB 4TE, 4TEV, 4TE DUO, 4TEV DUO BENCHTOP WATER ACTIVITY AQUALAB 4TE, 4TEV, 4TE DUO, 4TEV DUO BENCHTOP WATER ACTIVITY Installation Qualification + Operational Qualification Protocols and Instructions TABLE OF CONTENTS 1. Introduction.. 3 2. Installation Qualification

More information

Guidelines for Process Validation of Pharmaceutical Dosage Forms

Guidelines for Process Validation of Pharmaceutical Dosage Forms Guidelines for Process Validation of Pharmaceutical Dosage Forms Version 2.1 Date issued 21/02/2010 Date of implementation 21/05/2010 31 August 2010 Page 1 of 20 Guidelines for Process Validation of Pharmaceutical

More information

Supplementary Training Modules on Good Manufacturing Practice. Validation. WHO Technical Report Series, No. 937, Annex 4.

Supplementary Training Modules on Good Manufacturing Practice. Validation. WHO Technical Report Series, No. 937, Annex 4. Supplementary Training Modules on Good Manufacturing Practice Validation WHO Technical Report Series, No. 937, 2006. Annex 4. Validation Slide 1 of 48 August 2006 Validation! Part 1. General overview on

More information

SECTION PANEL SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION PANEL SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 101423 - PANEL SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

hm 780 DC / DC-V THE INTELLIGENT GENERATION EASY ROTARY SEALERS WITH INTEGRATED PRINTER

hm 780 DC / DC-V THE INTELLIGENT GENERATION EASY ROTARY SEALERS WITH INTEGRATED PRINTER hm 780 DC / DC-V THE INTELLIGENT GENERATION EASY ROTARY SEALERS WITH INTEGRATED PRINTER GENERATION EASY THE HM 780 DC AND HM 780 DC-V (V = VALIDATABLE) ROTARY SEALERS WITH INTEGRATED PRINTER ARE THE ANSWER

More information

Annex Draft Annex

Annex Draft Annex Anmerkung 1: Dieses Vergleichsdokument wurde nach bestem Wissen und Gewissen erstellt und ist rechtlich nicht bindend. Es gelten die von der EMA veröffentlichten Dokumente in der jeweiligen Form. Anmerkung

More information

C40 BLISTER PACKAGING MACHINE

C40 BLISTER PACKAGING MACHINE C40 BLISTER PACKAGING MACHINE C40 A VALUE MACHINE Combined with the latest control systems and quality controls, the C40 machine is the answer for those customers who demand high production efficiency

More information

Credence Management Corporation. Best-in-class total program management

Credence Management Corporation. Best-in-class total program management Credence Management Corporation Best-in-class total program management About us Credence Management corporation is a Plastics Technical Project Management and execution firm, backed by qualified and experienced

More information

Current Features of USFDA and EMA Process Validation Guidance

Current Features of USFDA and EMA Process Validation Guidance Human Journals Review Article April 2016 Vol.:6, Issue:1 All rights are reserved by Patwekar S.L et al. Current Features of USFDA and EMA Process Validation Guidance Keywords: Pharmaceutical validation,

More information

Downstream handling and Secondary Packging for BFS containers some considerations

Downstream handling and Secondary Packging for BFS containers some considerations Downstream handling and Secondary Packging for BFS containers some considerations Peter Åkerman Senior Advisor AstraZeneca, Sweden Operations Content Regulatory requirements Examples of downstream handling

More information

Blister line. ebl350. Best performance. Best value.

Blister line. ebl350. Best performance. Best value. Blister line ebl350 Best performance. Best value. Blister machine Best performance and best value: With the new blister machine you can package with the greatest flexibility, security, and efficiency.

More information

Drug Quality Assurance: Systems at ChemCon Author: Dr. Peter Gockel

Drug Quality Assurance: Systems at ChemCon Author: Dr. Peter Gockel Drug Quality Assurance: Systems at ChemCon Author: Dr. Peter Gockel On February 13th, 2006, the FOOD AND DRUG ADMINISTRATION (FDA) implemented a revision to the Compliance Program Guidance Manual for active

More information

Packaging Performance Qualification A Risk-Based Approach

Packaging Performance Qualification A Risk-Based Approach PEER-REVIEWED Packaging Performance Qualification A Risk-Based Approach Steen Howaldt Christiansen and Jesper Bønnelycke Torp Jensen ABSTRACT This paper describes a risk-based performance qualification

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ABP SERIES OF AUTOMATIC BLISTER PACKAGING MACHINERY Ridat ABP series of machines are some of the most advanced models in the comprehensive range of Ridat blister packaging equipment.

More information

10 Things You Should Do Before You Validate Your Next Package

10 Things You Should Do Before You Validate Your Next Package sponsored by 10 Things You Should Do Before You Validate Your Next Package Before you set out to validate a medical device package design or process, you ve got to do your homework. You need to understand

More information

GAMP5 Validation for Dynamics 365

GAMP5 Validation for Dynamics 365 GAMP5 Validation for Dynamics 365 Prepared by: Michael Webster, Business Development Director, RSM US LLP michael.webster@rsmus.com, +1 617 241 1544 Dynamics 365 is an ideal enterprise resource planning

More information

Symposium: Latest developments in packaging equipment and automation solutions

Symposium: Latest developments in packaging equipment and automation solutions Symposium: Latest developments in packaging equipment and automation solutions Target How some ongoing trends are having an impact on packaging equipment. Medical packaging possibilities. Update on different

More information

Heating, ventilation, and air system encompasses heating, ventilation, and air conditioning, which is integral component of

Heating, ventilation, and air system encompasses heating, ventilation, and air conditioning, which is integral component of REVIEW ARTICLE Demand of pharmaceutical facility functionality: Validation and qualification of HVAC system Anamika Singh, Sapna Malviya, Anil Kharia Department of Quality Assurance of Modern Institute

More information

Subpart B Organization and Personnel, 21 CFR Responsibilities of the quality control unit.

Subpart B Organization and Personnel, 21 CFR Responsibilities of the quality control unit. FDA inspections continue to focus on CGMP violations related to basic GMP controls. A survey of Warning Letters issued in 2013 on CMC (Chemistry / Manufacturing / Controls) violations reveals an emphasis

More information

Installation Qualification/Operational Qualification Protocols and Instructions

Installation Qualification/Operational Qualification Protocols and Instructions Installation Qualification/Operational Qualification Protocols and Instructions AquaLab PRE Decagon Devices, Inc July 20, 2016 4:05 PM 1 Table of Contents Section 1 Section 2 Section 2.1 Section 2.2 Section

More information

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and

More information

hm 780 DC / DC-V THE INTELLIGENT GENERATION EASY ROTARY SEALERS WITH INTEGRATED PRINTER

hm 780 DC / DC-V THE INTELLIGENT GENERATION EASY ROTARY SEALERS WITH INTEGRATED PRINTER hm 780 DC / DC-V THE INTELLIGENT GENERATION EASY ROTARY SEALERS WITH INTEGRATED PRINTER GENERATION EASY THE HM 780 DC AND HM 780 DC-V (V = VALIDATABLE) ROTARY SEALERS WITH INTEGRATED PRINTER ARE THE ANSWER

More information

GAMP 4/5 Prospective / retrospective Qualification of water treatment plants) P. Dony

GAMP 4/5 Prospective / retrospective Qualification of water treatment plants) P. Dony GAMP 4/5 Prospective / retrospective Qualification of water treatment plants) P. Dony 31.03.2008 Table of contents Slide 2 1. GAMP 4 and GAMP 5 differences 2. CHRIST prospective Qualification strategy

More information

A COMPREHENSIVE RANGE OF PRESS-OUT DEBLISTERING MACHINES THAT OFFER SPEED, EFFICIENCY AND SAFETY IN THE RECOVERY OF VALUABLE PRODUCT.

A COMPREHENSIVE RANGE OF PRESS-OUT DEBLISTERING MACHINES THAT OFFER SPEED, EFFICIENCY AND SAFETY IN THE RECOVERY OF VALUABLE PRODUCT. A COMPREHENSIVE RANGE OF PRESS-OUT DEBLISTERING MACHINES THAT OFFER SPEED, EFFICIENCY AND SAFETY IN THE RECOVERY OF VALUABLE PRODUCT. 24 3. PRODUCT RECOVERY 25 3. PRODUCT RECOVERY A COMPREHENSIVE RANGE

More information

Packaging Solutions Quick Finder. Pharma and Home & Personal Care.

Packaging Solutions Quick Finder. Pharma and Home & Personal Care. Packaging Solutions Quick Finder Pharma and Home & Personal Care. 04_2017 Pharma Packaging solutions The following gives a brief overview of our standard structures. In addition our R&D specialists will

More information

BFS IOA BFS Training 2018 Kunming Qualification and Validation of a BFS-Installation including CIP/SIP

BFS IOA BFS Training 2018 Kunming Qualification and Validation of a BFS-Installation including CIP/SIP Qualification and Validation of a BFS-Installation including CIP/SIP Presented by Christoph Bohn and Stefan Kiesel Director Rommelag Pharma Service Senior Manager Rommelag Pharma Service Coyright BFS IOA

More information

Design and Construction of Biocontainment Laboratories

Design and Construction of Biocontainment Laboratories Design and Construction of Biocontainment Laboratories Commissioning and Validation Benjamin MABILE Director Global Validation, GSK Biologicals GSK Biologicals Context - Vaccines Key elements of the Validation

More information

Installation Qualification/Operational Qualification Protocols and Instructions

Installation Qualification/Operational Qualification Protocols and Instructions Installation Qualification/Operational Qualification Protocols and Instructions AquaLab VSA Vapor Sorption Analyzer Decagon Devices, Inc June 28, 2016 11:03 AM 1 Table of Contents Section 1 Section 2 Section

More information

Application This structure is the internationally accepted PVC/PE/PVdC film suitable for sensitive medicines. WHO recommends these blister films for p

Application This structure is the internationally accepted PVC/PE/PVdC film suitable for sensitive medicines. WHO recommends these blister films for p Pharmaceuticals PVdc Coated Blister RMCL manufactures a range of multilayered, high quality and high performance structures for a variety of applications. These structures are created from an optimized

More information

The appropriate solution for every requirement.

The appropriate solution for every requirement. The appropriate solution for every requirement. Our LA160, LA300 LA400 and LA500 Sachet Packaging Machines www.mediseal.de Contents 04 Able to provide solutions Professional product development. 06 Rich

More information

Audit Validation Programs Like a Champ (When your time is limited!!) Cathelene Compton 12 October 2017

Audit Validation Programs Like a Champ (When your time is limited!!) Cathelene Compton 12 October 2017 Audit Validation Programs Like a Champ (When your time is limited!!) Cathelene Compton 12 October 2017 FDA 483 Observations 2 FDA 483 Observations 3 FDA 483 Observations 4 Auditing Validation How to cover

More information

Contents. Contents (13) 1 Qualification (21)

Contents. Contents (13) 1 Qualification (21) 1 Qualification (21) 1.A Official requirements (23) 1.A.1 Legal aspects of qualification (23) 1.A.2 Documentation of the qualification (26) 1.A.3 Design Qualification (DQ) (27) 1.A.4 Installation Qualification

More information

COMPLIANCE WITH EU ANNEX 15: VALIDATION AND QUALIFICATION

COMPLIANCE WITH EU ANNEX 15: VALIDATION AND QUALIFICATION COMPLIANCE WITH EU ANNEX 15: VALIDATION AND QUALIFICATION Paul L. Pluta, PhD Journal of Validation Technology Journal of GXP Compliance University of Illinois at Chicago (UIC) College of Pharmacy, Chicago,

More information

Section PANEL SIGNAGE

Section PANEL SIGNAGE Section 10 14 23 PANEL SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including FDOT DIVISION I GENERAL REQUIREMENTS & COVENANTS Specification Sections,

More information

SUPPLEMENTARY GUIDELINES ON GOOD MANUFACTURING PRACTICES (GMP): VALIDATION

SUPPLEMENTARY GUIDELINES ON GOOD MANUFACTURING PRACTICES (GMP): VALIDATION Pharmapathway.com SUPPLEMENTARY GUIDELINES ON GOOD MANUFACTURING PRACTICES (GMP): VALIDATION Page 1 of 43 1. INTRODUCTION Validation is an essential and integral part of Good Manufacturing Practice (GMP).

More information

User Requirement Specifications

User Requirement Specifications Page 1 of 13 ANNEXURE III User Requirement Specifications MACHINE :Linear Bottle Washing CAPACITY: 120 Bottles/ minute Page 2 of 13 Table of Contents 1.0 APPROVAL SIGNATURES....03 2.0 INTRODUCTION...04

More information

GMP & Quality Assurance. Mayur Sushir Dept of Microbiology MJC

GMP & Quality Assurance. Mayur Sushir Dept of Microbiology MJC GMP & Quality Assurance Mayur Sushir Dept of Microbiology MJC Introduction GMP ensures that quality is built into the organization & processes involved in manufacture GMP covers all aspects of manufacture

More information

Documenta tion and Records

Documenta tion and Records Documenta tion and Records Page 1 of 30 Training Outcome of the Module: After completing this module, you will be able to: Recognize the importance of procedures Recognize the importance of record keeping

More information

Validation. An Easy to Understand Guide Validating Purified Water Systems

Validation. An Easy to Understand Guide Validating Purified Water Systems Validation Overview Validation Documentation Validation Activities Validation Mistakes Validation Protocols Test Selection Common Verifications When to test Test Layout and Content Validation Protocol

More information

SERIES FC 600/780/1000 SPEEDMASTER plus STEEL RULE CUTTING MACHINES ENGLISH

SERIES FC 600/780/1000 SPEEDMASTER plus STEEL RULE CUTTING MACHINES ENGLISH ENGLISH SERIES FC 600/780/1000 SPEEDMASTER plus STEEL RULE CUTTING MACHINES FC SPEEDMASTER plus The FC SPEEDMASTER plus is an automatic vacum pressure forming machine with servo plugs and with steel rule

More information

HISTORY AND MILESTONES

HISTORY AND MILESTONES HISTORY AND MILESTONES HISTORY AND MILESTONES DOC S.r.l., Documentation Organization & Consultancy, was established in 1997 by MASCO group C.E.O. Eng. Alberto Borella and Eng. Paolo Curtò who became Managing

More information

«Company» «Address1» «Address2» «City» Sub.: Purchase of Capsule Polishing Machine. 01 No. Detailed Specifications as given below.

«Company» «Address1» «Address2» «City» Sub.: Purchase of Capsule Polishing Machine. 01 No. Detailed Specifications as given below. INDIAN INSTITUTE OF INTEGRATIVE MEDICINE (Formerly known as RRL) (Council of Scientific & Industrial Research CANAL ROAD, JAMMU Phones: 0191-2569000, 2569001, to 10 (11 Lines) Telefax: 2569023, 2569019,

More information

High Reliability Optoelectronic Devices

High Reliability Optoelectronic Devices High Reliability Optoelectronic Devices Sensors and Specialist Components BI Technologies and OPTEK Technology Hi-Rel products, Hi-Rel service from OPTEK Technology TT Electronics OPTEK Technology solves

More information

Your benefit is our incentive

Your benefit is our incentive MULTIVAC product overview Packaging solutions with method. 2 Your benefit is our incentive MULTIVAC stands for Better Packaging. But what lies behind these two words? As a benefactor of packaging solutions

More information

ASTM D10-F02 Workshop FDA Regulatory Perspective. Patrick Weixel FDA Center for Devices and Radiological Health

ASTM D10-F02 Workshop FDA Regulatory Perspective. Patrick Weixel FDA Center for Devices and Radiological Health ASTM D10-F02 Workshop FDA Regulatory Perspective Patrick Weixel FDA Center for Devices and Radiological Health 1 FDA Regulatory Perspective Focus of talk: Use of Standards Auditing Packaging Process Deficiencies

More information

A Compilation of WHO GMP Audit Points

A Compilation of WHO GMP Audit Points A Compilation of WHO GMP Audit Points Collected from WHOPIR of 28 companies Part III of VIII Current article Part III Production Prepared and Submitted By: Edited by : A. Jwalakanth B.Pharm, MBA (Aus)

More information

INTEGRA 520V. Integrated Robotized Blister Line. Liquids Solids Creams Packaging. English

INTEGRA 520V. Integrated Robotized Blister Line. Liquids Solids Creams Packaging. English INTEGRA 520V Integrated Robotized Blister Line Liquids Solids Creams Packaging English INTEGRA 520V Integrated Robotized Blister Line Integra 520V is a robotized blister line, integrating the two operations

More information

Int. J. Pharm. Sci. Rev. Res., 34(1), September October 2015; Article No. 23, Pages: Process Validation of Tablet Dosage Form in Industries

Int. J. Pharm. Sci. Rev. Res., 34(1), September October 2015; Article No. 23, Pages: Process Validation of Tablet Dosage Form in Industries Review Article Process Validation of Tablet Dosage Form in Industries Ram Mohan S.R, N. Vishal Gupta* Pharmaceutical Quality Assurance group, Dept of Pharmaceutics, JSS University, Sri ShivarathreeshwaraNagara,

More information

TECHNICAL SPECIFICATION FOR CURED-IN-PLACE MANHOLE REHABILITATION LINER SYSTEM

TECHNICAL SPECIFICATION FOR CURED-IN-PLACE MANHOLE REHABILITATION LINER SYSTEM TECHNICAL SPECIFICATION FOR CURED-IN-PLACE SYSTEM PART 1 GENERAL 1.01 SCOPE OF WORK Furnish all materials, labor, equipment, tools and required incidentals for providing and installing a resin impregnated

More information

Pharmaceutical Solutions

Pharmaceutical Solutions Pharmaceutical Solutions HI-SPEED Checkweighing SAFELINE Metal Detection & X-ray Inspection Product Inspection For The Pharmaceutical Industry Industry Challenges We understand that product quality and

More information

VALIDATION AS A KEY TOOL IN SUCCESSFUL TRANSFER OR ESTABLISHMENT OF A MEDICAL DEVICE COMPANY IN A NEW FACILITY

VALIDATION AS A KEY TOOL IN SUCCESSFUL TRANSFER OR ESTABLISHMENT OF A MEDICAL DEVICE COMPANY IN A NEW FACILITY VALIDATION AS A KEY TOOL IN SUCCESSFUL TRANSFER OR ESTABLISHMENT OF A MEDICAL DEVICE COMPANY IN A NEW FACILITY Oren Levin, Diane Gordon VisionCare Ophthalmic Technologies, POB 3879, Petah Tikva 49130,

More information

Good Manufacturing Practices Purpose and Principles of GMP. Tony Gould

Good Manufacturing Practices Purpose and Principles of GMP. Tony Gould Good Manufacturing Practices Purpose and Principles of GMP Tony Gould Why GMP? Provides a high level assurance that medicines are manufactured in a way that ensures their safety, efficacy and quality Medicines

More information

Troubleshooting Thermoformable Packaging

Troubleshooting Thermoformable Packaging Troubleshooting Thermoformable Packaging Optimizing the thermoforming process with differing materials. TEKNI-FILMS A A Division of Company Defining the Manufacturing Process All processes contain variables

More information

Istanbul May 31, 2001

Istanbul May 31, 2001 Pürifiye Su Sistemleri Validasyonu Istanbul, Turkey May 31, 2001 Peter Drechsler Aventis Pharm- Frankfurt, Germany Aventis Pharma Exubera Inhaled Insulin Table of content for Presentation: * Validation

More information

Bulk Inspection of Tablets: Assuring Product Quality at Manufacturing and Packaging

Bulk Inspection of Tablets: Assuring Product Quality at Manufacturing and Packaging Bulk Inspection of Tablets: Assuring Product Quality at Manufacturing and Packaging With the consolidation of tablet manufacturing plants, with the expansion of tablet packaging operations and with the

More information

FlexAct BT (Bag Tester) Flexboy 2D November, 2015

FlexAct BT (Bag Tester) Flexboy 2D November, 2015 FlexAct BT (Bag Tester) Flexboy 2D November, 2015 Agenda 1 2 3 4 Container Closure Integrity for SUS FlexAct BT Value Proposition FlexAct BT Instruments FlexAct BT SU Flexboy 2D 5 FlexAct BT Validation

More information

GAMP Guideline & Validation Documentation

GAMP Guideline & Validation Documentation GAMP Guideline & Validation Documentation Danilo Maruccia Milano, 21 Marzo 2006 GAMP Guideline & Validation Documentation GAMP Guideline Planning documents Specification Documents Testing Documents Acceptance

More information

The Pharmaceutical and Chemical Journal, 2017, 4(4):9-19. Review Article

The Pharmaceutical and Chemical Journal, 2017, 4(4):9-19. Review Article , 2017, 4(4):9-19 Available online www.tpcj.org Review Article ISSN: 2349-7092 CODEN(USA): PCJHBA Pharmaceutical Process Validation Approach for Extended Release Tablets: An Overview Shaziya Y Sayeed*,

More information

FLARING MACHINE MAINTENANCE & INSTRUCTIONS MANUAL. Allswage UK. Roebuck Street, West Bromwich, B70 6RB

FLARING MACHINE MAINTENANCE & INSTRUCTIONS MANUAL. Allswage UK. Roebuck Street, West Bromwich, B70 6RB FLARING MACHINE MAINTENANCE & INSTRUCTIONS MANUAL A. WARRANTY AND RESPONSIBILITY Warranty: It's the supplier's responsibility to guarantee the conformity of the product, assuring that it's manufactured

More information

GLOBAL QUALITY SOLUTIONS PACKAGE INTEGRITY SEAL INTEGRITY LEAK DETECTION

GLOBAL QUALITY SOLUTIONS PACKAGE INTEGRITY SEAL INTEGRITY LEAK DETECTION GLOBAL QUALITY SOLUTIONS PACKAGE INTEGRITY SEAL INTEGRITY LEAK DETECTION Redefining the standards for accuracy and reliability. About PTI PTI Packaging Technologies & Inspection is headquartered in Tuckahoe,

More information

Meeting the challenges of medical device packaging

Meeting the challenges of medical device packaging Meeting the challenges of medical device packaging Gisela Cristina Mendes Bastos Viegas, S.A. October 14, 2011 Agenda Evaluation and selection Validation Test methods Sterile Barrier Systems EN 868 Parts

More information

18.H Questionnaire for preparing GMP-inspections

18.H Questionnaire for preparing GMP-inspections Questionnaire for preparing -inspections Questionnaire for preparing -inspections Here you will find answers to the following questions: What questions are typically asked during inspections based on current

More information

cation odifi o m ubject t ata s cal d echni aco t Rom _0 atic PRO_EN_PC4 Prom Promatic PC 4000 Continuous Motion Cartoning

cation odifi o m ubject t ata s cal d echni aco t Rom _0 atic PRO_EN_PC4 Prom Promatic PC 4000 Continuous Motion Cartoning Promatic Promatic PC 4000 Continuous Motion Cartoning PC 4000 The innovation in continuous motion cartoning Tube feeding unit The Promatic PC 4000 series is a flexible high speed cartoner range designed

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

The Benefits of Integrating Metal Detection into Your Product Inspection Program for Consumer Safety. Antoine Dodier & Hitesh Hirani

The Benefits of Integrating Metal Detection into Your Product Inspection Program for Consumer Safety. Antoine Dodier & Hitesh Hirani The Benefits of Integrating Metal Detection into Your Product Inspection Program for Consumer Safety Antoine Dodier & Hitesh Hirani Agenda 1 2 Loma Systems Consumer Safety 3 4 5 6 Metal Contamination Prevention

More information

FYPON, LLC. February 2014

FYPON, LLC. February 2014 Section 06 66 30 EXTERIOR PVC RAILINGS AND GUARDS PART 1 - GENERAL 1.1 RELATED SECTIONS: A. All contract documents apply to work of this section; this includes but is not limited to: Agreement; Drawings;

More information

CATALOG & TOOLING BOOK. Go Blister!

CATALOG & TOOLING BOOK. Go Blister! CATALOG & TOOLING BOOK Go Blister! INTRODUCTION Dear Customer, I appreciate the opportunity to introduce EW Packaging and would like to thank you in advance for your time and consideration in viewing our

More information

SECTION VISUAL DISPLAY BOARDS

SECTION VISUAL DISPLAY BOARDS SECTION 101000 VISUAL DISPLAY BOARDS THIS SECTION IS WRITTEN IN CSI 3-PART FORMAT AND IN CSI PAGE FORMAT; NOTES TO THE SPECIFIER (IN BLUE), SHOULD BE DELETED PRIOR TO PUBLICATION. PART 1 GENERAL 1.01 SUMMARY

More information

C80 SERIES BLISTER PACKAGING MACHINES

C80 SERIES BLISTER PACKAGING MACHINES C80 SERIES BLISTER PACKAGING MACHINES C80R / C80-A81 NEW DIMENSION OF FLEXIBILITY LEADERS IN THE MEDIUM SPEED MARKET RANGE, C80R AND C80-A81 REACH THE HIGHEST RETURN LEVELS ON YOUR INVESTMENT DUE TO A

More information

PERFORMANCE QUALIFICATION PROTOCOL HVAC SYSTEM

PERFORMANCE QUALIFICATION PROTOCOL HVAC SYSTEM Page 1 of 24 PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC SYSTEM Signing of this Performance Qualification Protocol indicates agreement with the Validation Master Plan approach of the equipment. Further

More information

CP 1200 P Ahead of the times with intelligent blister line technology. MediSeal

CP 1200 P Ahead of the times with intelligent blister line technology. MediSeal CP 1200 P 3000 Ahead of the times with intelligent blister line technology MediSeal Tomorrow s thermoforming lines are based on servo-technology. Give your products the packages they deserve! The innovative

More information