CORRECTIVE AND PREVENTIVE ACTION

Size: px
Start display at page:

Download "CORRECTIVE AND PREVENTIVE ACTION"

Transcription

1 1 of 7 uncontrolled. This copy is only valid only at the time of printing. Unauthorized reproduction of this document is prohibited.

2 2 of 7 CONTENTS 1.0 PURPOSE SCOPE RESPONSIBILITY CROSS REFERENCE DEFINITIONS PROCEDURE S CUSTOMER COMPLAINTS RECORDS... 7

3 3 of PURPOSE The purpose of this procedure is to ensure that a system is implemented for correcting nonconformances, preventing potential non-conformances and pursuing improvement initiatives. 2.0 SCOPE The scope of this procedure shall cover all non-conformance, potential non-conformances, improvement initiatives and customer complaints affecting the Health, Safety, Environment and Quality of organizational and operational activities. All corrective and preventive actions and their associated non-conformances shall be documented using an appropriate report as defined in this procedure. 3.0 RESPONSIBILITY It shall be the responsibility of all ALMANSOORI personnel to make the management aware of any areas of non-conformance, potential non-conformances or improvement initiatives that may require corrective action or preventive action. It shall be the responsibility of management to control and implement all corrective or preventive actions. 4.0 CROSS REFERENCE This procedure may cross-reference with the following procedures: IMSP 01 Management Review of Quality System IMSP Control of Non-Conforming Product IMSP 06 Internal Audits 5.0 DEFINITIONS 5.1 Non-Conformance: Non fulfillment of a need or expectation that is stated, generally implied or obligatory. 5.2 Corrective Action: Action taken to eliminate the cause of a detected nonconformity or other undesirable situation. Corrective action is taken to prevent recurrence.

4 4 of Preventive Action: Action taken to eliminate the cause of a potential nonconformity or other potential undesirable situation. Preventive action is taken to prevent recurrence. 5.4 Customer Complaint: Shall mean any communication from the customer, whether written or verbal, in which he expresses his dissatisfaction with the product or services supplied by AlMansoori 6.0 PROCEDURE 6.1 S Conditions that may require corrective or preventive actioning may be detected and documented in the following areas, processes or operations, but not limited to: a) Customer complaints b) Identification of potential problem(s) through various sources c) An audit finding d) Third party audits e) Equipment breakdown or failure f) Inspection and testing operations g) Suppliers performance records All Corrective Action Reports raised shall be categorized as being Major or Minor as follows: MAJOR: Where procedure contradicts working practices and / or working practices do not reflect standard requirements. Customer complaints which require additional corrective action or equipment breakdown / failures which require operations to be halted. MINOR: Where system procedure / process is not being fully adhered to. Equipment breakdown / failures which do not affect operational activities. Any non-conformance which does not have an immediate effect on the Integrated Management System.

5 5 of Once corrective actions or preventive actions has been raised and logged by the HSEQ Department, the Division Manager shall be issued with the original The Division Manager shall document cause of non-conformance or potential non-conformance, proposed corrective action, action to prevent recurrence or occurrence and a proposed implementation date On completion of and the original shall be issued to the HSE & Quality Manager who will, in consultation with the Division Manager determine if the proposed corrective or preventive action and the implementation date are satisfactory to preclude recurrence or occurrence of nonconformance, condition or potential nonconformance If the proposed corrective or preventive action is agreed by the HSE & Quality Manager he shall sign as acceptance and hand a copy back to the Division Manager who shall process action until implementation date If the proposed corrective action is rejected by the HSE & Quality Manager after consultation with the Division Manager he shall reject the report giving the reason and reissue report to the Division Manager for action and reply as per the procedure for the original Once signatory approval of corrective action or preventive action is given by the HSE & Quality Manager he shall hold the original report until the corrective action has been fully implemented by the implementation date Once the implementation date has been reached the HSE & Quality Manager in conjunction with the Division Manager shall ensure all actions have been completed and finally closed out by signing final section of the report. The HSEQ Department shall file original report and supply a copy to the respective Division for their records.

6 6 of CUSTOMER COMPLAINTS Any member of staff receiving a complaint from a customer either verbally or in writing must report it to the relevant divisional manager, Operations Manager or Corporate HSE & Quality Manager within 24 hours. That individual should in turn request a Customer Complaint Form, held and controlled by the HSEQ Department and available from the HSE Coordinator in order to document details of the complaint All details of the complaint must be detailed and documented on a Customer Complaint Form or attached with the form A copy of the Customer Complaint Form shall be submitted on completion to the Corporate HSE & Quality Manager who in conjunction with the respective Manager shall determine what action shall be taken to resolve the complaint The Corporate HSE & Quality Manager and respective Division Manager shall approve the result of investigations made and the actions taken to resolve the complaint The Corporate HSE & Quality Manager or Division Manager shall, from the information obtained from the investigation into the complaint, ensure that the customer complaint form along with all relevant information is sent or taken to the customer If the customer is in acceptance with all actions to solve the complaint, they are requested to sign Customer Complaint Form and return it to the Division Manager. If they cannot accept all suggested resolution they should contact the Division Manager. The Division Manager shall ensure that all customer complaint forms are returned by the customer for final close out Final close out of all customer complaint forms shall be by the Chief Executive Officer, Division Manager and Corporate HSE & Quality Manager The Corporate HSE & Quality Manager shall review the customer complaint file on a frequent basis and follow up outstanding actions.

7 7 of RECORDS In the situation where the complaint is associated with returned equipment that is subsequently found to be non-conforming, such complaint shall be documented and processed in accordance with procedure IMSP Control of non-conforming Product. Positive and Dangerous Feedback F Customer Complaint Form F. 441 Customer Complaint Register F. 442

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

Quality management systems

Quality management systems L E C T U R E 9 Quality management systems LECTURE 9 - OVERVIEW Quality management system based on ISO 9000 WHAT IS QMS (QUALITY MANAGEMENT SYSTEM) Goal: Meet customer needs Quality management system includes

More information

Quality Assurance Policy and Procedures

Quality Assurance Policy and Procedures 650 Montana Ave, Suite A Las Cruces, NM 88001 (575) 522-0430 www.rmgovernmentservices.com Quality Assurance Policy and Procedures PURPOSE. The purpose of this policy is to outline the quality assurance

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

QUALITY SYSTEM MANUAL

QUALITY SYSTEM MANUAL QUALITY SYSTEM MANUAL This Manual is a Proprietary Document and any Unauthorized Reproduction is prohibited. ISSUE DATE July 26, 2012 AUTHORIZED BY: Quality Management Representative Eric Hoff Managing

More information

FDA 21 CFR Part 820 vs. ISO 13485:2016 Comparison Table created by greenlight.guru

FDA 21 CFR Part 820 vs. ISO 13485:2016 Comparison Table created by greenlight.guru FDA 21 CFR Part 820 vs. ISO 13485:2016 Comparison Table created by greenlight.guru FDA QSR (21 CFR Part 820) ISO 13485:2016 820.1 Scope 1 Scope 2 Normative References 820.3 Definitions 3 Terms and Definitions

More information

BS EN ISO 9001 QUALITY ASSURANCE MANUAL

BS EN ISO 9001 QUALITY ASSURANCE MANUAL PAC PRICE ARTHUR CONSULTANCY BS EN ISO 9001 QUALITY ASSURANCE MANUAL COPY NO: 025 ISSUE: 4 QUALITY ASSURANCE MANUAL BS EN ISO 9001 CONTENTS PAC Price Arthur Consultancy - Building Services Consulting Engineers

More information

Quality Manual ISSUED JANUARY Approved By: January 12, 2004 (President & Chief Executive Officer)

Quality Manual ISSUED JANUARY Approved By: January 12, 2004 (President & Chief Executive Officer) Quality Manual ISSUED JANUARY 2004 Approved By: January 12, 2004 (President & Chief Executive Officer) (Date) Quality Policy To be the industrial control industry's most preferred supplier of sensor integration

More information

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Table of Contents Contents 1. Introduction... 3 1.1. Process Approach...

More information

Quality Manual ISO 9001:2000

Quality Manual ISO 9001:2000 Quality Manual ISO 9001:2000 Page 2 of 23 TABLE OF CONTENTS COVER PAGE...1 TABLE OF CONTENTS...2 SIGNATURES...3 QUALITY POLICY...4 INTRODUCTION...5 CORPORATE PROFILE...9 4.O QUALITY MANAGEMENT SYSTEM...10

More information

Reliance Aerospace Solutions

Reliance Aerospace Solutions Reliance Aerospace Solutions Quality Manual The information contained in this document is the property of Reliance Aerospace Solutions, a division of Reliance Steel & Aluminum Company This manual is a

More information

25 D.L. Martin Drive Mercersburg, PA (717)

25 D.L. Martin Drive Mercersburg, PA (717) QUALITY MANUAL D. L. MARTIN CO. 25 D.L. Martin Drive Mercersburg, PA 17236 (717) 328-2141 Revision 14 August 2012 Michael A. White Manager, QA & Engineering D.L. Martin Co. Quality Manual UNCONTROLLED

More information

ISO 9001:2015 Quality Management System. New/Revised Requirements

ISO 9001:2015 Quality Management System. New/Revised Requirements ISO 9001:2015 New/Revised The Quality System Checklist is intended to only identify the new/revised requirements. ISO 9001:2015 requires the adoption of the process approach which extends to internal quality

More information

Plastics and Concepts of Connecticut Inc. Quality Manual

Plastics and Concepts of Connecticut Inc. Quality Manual Plastics and Concepts of Connecticut Inc. Quality Manual Nature of Changes For This Issue: 1. Initial Release 8/14/2000 2. Reformatted and grammatical errors corrected 6/11/02 3. Minor grammatical errors

More information

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

14620 Henry Road Houston, Texas PH: FX: WEB:  QUALITY MANUAL 14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic

More information

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

MANUAL QUALITY CONTROL & QUALITY ASSURANCE MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE

More information

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 2 of 18 REVISION HISTORY DATE CHANGE DESCRIPTION 10/11/06 Original release 10/21/09 Revised to ISO9001:2008

More information

Stanley Industries, Inc. ISO 9001:2008 Quality Policy Manual

Stanley Industries, Inc. ISO 9001:2008 Quality Policy Manual Stanley ISO 9001:2008 Table of Contents and STANLEY Document Reference Related STANLEY Section Page Procedure(s) 1. Introduction 1 None 2. Scope 1 None 3. Organizational Structure & 1 STANLEY Company History

More information

ISO 9001:2008 Clause P023 Corrective Action Procedure

ISO 9001:2008 Clause P023 Corrective Action Procedure ISO 9001:2008 Clause 8.5.2 P023 Corrective Action Procedure Document No P023 Corrective Action Procedure.docx Rev 2 Uncontrolled Copy Controlled Copy x Date 01-Jul-2012 COMPANY PROPRIETARY INFORMATION

More information

EN39 TUBE ASSESSMENT REPORT. Assessment Summary

EN39 TUBE ASSESSMENT REPORT. Assessment Summary EN39 TUBE ASSESSMENT REPORT : Category: Manufacturer Manufacturer Manufacturer Manufacturer Location: Name: Location Location Location Location Previous Assessment Category: N/A Meeting With: Assessment

More information

CSA Group Products, Processes and Services Scheme

CSA Group Products, Processes and Services Scheme 1. CONTACT CSA CSA Group Products, Processes and Services Scheme 1.1 Getting started is easy. There are three ways to contact us: Call 866 797 4272 Email client.services@csagroup.org Complete a request

More information

Corrective Action(s) System Procedure

Corrective Action(s) System Procedure Page: 1 of 7 Corrective Action(s) System Procedure Page: 2 of 7 1.0 PURPOSE AND SCOPE 1.1 Purpose 1.1.1 To define the methods for preventive action, nonconformance trend identification, customer complaints/concerns

More information

Metal Powder Products Company

Metal Powder Products Company Metal Powder Products Company Supplier Quality Manual Revision 1 Page 1 of 10 Introduction 1. Purpose: This manual has been created for Metal Powder Product s (MPP) Production, Prototype and Service Suppliers.

More information

Quality and Medical Devices: ISO 13485:2003

Quality and Medical Devices: ISO 13485:2003 Quality and Medical Devices: ISO 13485:2003 Quality Management System requirements for Medical Devices manufacturers O3 Enterprise s.r.l. ISO 13485 Quality Management Systems Medical Device O3 Enterprise

More information

ISO 9001 QUALITY MANUAL

ISO 9001 QUALITY MANUAL ISO 9001 QUALITY MANUAL Origination Date: 10/01/14 Document Identifier: AIF quality control manual Date: 10/01/14 Project: Customer review Document Status: Released Document Link: www.aeroindfast.com Abstract:

More information

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C 1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100

More information

SAMM POLICY 10 (SP 10) GRADING OF NON- CONFORMITIES Issue 2, 28 February 2007 (Amd.1, 11 August 2014)

SAMM POLICY 10 (SP 10) GRADING OF NON- CONFORMITIES Issue 2, 28 February 2007 (Amd.1, 11 August 2014) SKIM AKREDITASI MAKMAL MALAYSIA (SAMM) LABORATORY ACCREDITATION SCHEME OF MALAYSIA SAMM POLICY 10 (SP 10) GRADING OF NON- CONFORMITIES Issue 2, 28 February 2007 (Amd.1, 11 August 2014) JABATAN STANDARD

More information

Management System Manual International Compliance Group

Management System Manual International Compliance Group Granting, refusing, maintaining, renewing, suspending, restoring or withdrawing certification. Page 1-1 Initial certification audit General - ICG s auditing work is conducted in two stages: Stage 1 and

More information

BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL

BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL Page 1 of 33 TABLE OF CONTENTS SECTION TITLE PAGE 0 Company Introduction... 4 0 Organizational Chart.. 5 1 Scope.. 6 2 Related Documents... 6 3 Terminology...

More information

ILAC-G20:2002. Guidelines on Grading of Non-conformities

ILAC-G20:2002. Guidelines on Grading of Non-conformities Guidelines on Grading of Non-conformities Copyright ILAC 2002 ILAC encourages the authorised reproduction of its publications, or parts thereof, by organisations wishing to use such material for areas

More information

Quality Manual Revision: C Effective: 03/01/10

Quality Manual Revision: C Effective: 03/01/10 TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL

More information

MENTAL HEALTH CONSUMER GRIEVANCE PROCEDURES

MENTAL HEALTH CONSUMER GRIEVANCE PROCEDURES Date Reviewed/Revised: September 9, 2016 Next Review Date: September 9,2019 By ~.tew CYl~SW J Be avioral Health Director I. PURPOSE: The purpose of this Consumer Grievance Policy is to: A. Promote consumers'

More information

YOUR CERTIFICATION PROCESS EXPLAINED

YOUR CERTIFICATION PROCESS EXPLAINED ISO 22000 FOOD SAFETY MANAGEMENT SYSTEMS FSSC 22000 FOOD SAFETY SYSTEM CERTIFICATION This document outlines the audit process for the above referenced standard. It outlines the stages to audit and gives

More information

QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008

QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008 QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008 Revision: 9 Issue Date: 28 April 2014 CONTROLLED COPY Number: Issued to: UNCONTROLLED COPY A.M.S. Electronics, Inc. 113 Pillow Street, Butler, PA 16001 (724)

More information

Sections of the Standard. Evidence / Comments. (Y) / Nonconforming (NC)

Sections of the Standard. Evidence / Comments. (Y) / Nonconforming (NC) Date: Sections of the Standard 4 Context of the Organization 4.1 Understanding the organization and its context 4.2 Understanding the needs and expectations of interested parties 4.3 Determining the scope

More information

BS2482 TIMBER BOARDS ASSESSMENT REPORT. Assessment Summary

BS2482 TIMBER BOARDS ASSESSMENT REPORT. Assessment Summary BS2482 TIMBER BOARDS ASSESSMENT REPORT : Category: Manufacturer Manufacturer Manufacturer Manufacturer Location: Name: Location Location Location Location Previous Assessment Category: N/A Meeting With:

More information

Protocol for Consultation with Trade Union Safety representatives.

Protocol for Consultation with Trade Union Safety representatives. Protocol for Consultation with Trade Union Safety representatives. Introduction The purpose of this protocol is to outline the arrangements within the School for consulting and cooperating with Trade Union

More information

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT Desk Audit of Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT-90-5001-02.1 Reviewed by: Element Requirements Applicable 1. Is a quality policy defined

More information

Fitting ISO 9001:2000 into a 20 Element Quality System

Fitting ISO 9001:2000 into a 20 Element Quality System Fitting ISO 9001:2000 into a 20 Element Quality System ASQ Washington DC Section 0509 Rockville Maryland Presented by Norman P. Moreau, P.E., CSQE, CQA President Theseus Professional Services 410-857-0023

More information

SPECIAL AUDITS WHAT, WHY AND HOW?

SPECIAL AUDITS WHAT, WHY AND HOW? SPECIAL AUDITS WHAT, WHY AND HOW? Mike McRandall and Don McFarland (NSF-ISR) Introductions: Mike McRandall NSF-ISR Business Unit Manager, Aerospace mmcrandall@nsf.org Don McFarland NSF-ISR Technical Scheme

More information

ADVANCED INTERNAL AUDIT WORKSHOP

ADVANCED INTERNAL AUDIT WORKSHOP ADVANCED INTERNAL AUDIT WORKSHOP By Paul J. Kunder RABQSA QMS Lead Auditor/Aerospace Industry Experienced Auditor RABQSA Approved Aerospace Auditor Transition Training (AATT) Trainer Vice Chair U.S. Z1A

More information

Management System Policy and Procedure Manual. Based on the requirements of ISO17021, AS9104 and Associated ANAB Accreditation Rules

Management System Policy and Procedure Manual. Based on the requirements of ISO17021, AS9104 and Associated ANAB Accreditation Rules 1 Great Western Registrar LLC Management System Policy and Procedure Manual Based on the requirements of ISO17021, AS9104 and Associated ANAB Accreditation Rules 08/01/2017 Created and Approved by: Karey

More information

Certificate of Recognition (COR ) COR Program Guidelines. Infrastructure Health & Safety Association (IHSA) 05/17 1

Certificate of Recognition (COR ) COR Program Guidelines. Infrastructure Health & Safety Association (IHSA) 05/17 1 Certificate of Recognition (COR ) COR Program Guidelines Infrastructure Health & Safety Association (IHSA) 05/17 1 Table of Contents Contents Page 1. Program Guideline Overview... 4 1.1 Scope... 4 1.2

More information

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA Page 1 of 42 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 10051 OLD GROVE RD. SAN DIEGO, CA 92131 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza

More information

Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19

Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19 SRI Quality System Registrar Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19 Booklet Version 171122 Revision Date QP 4.0 Pre-Audit Registration Procedures 15 11/07/15 QP 5.0 On-Site Audit Procedure

More information

ISO/IEC 27001:2005 BASED INFORMATION SECURITY MANAGEMENT SYSTEM INFORMATION SECURITY MANAGEMENT SYSTEM MANUAL

ISO/IEC 27001:2005 BASED INFORMATION SECURITY MANAGEMENT SYSTEM INFORMATION SECURITY MANAGEMENT SYSTEM MANUAL ISO/IEC 27001:2005 BASED INFORMATION SECURITY MANAGEMENT SYSTEM INFORMATION SECURITY MANAGEMENT SYSTEM MANUAL Date of Release of current version: Oct 25, 2010 Mynd Solutions Pvt. Ltd. 280, Udyog Vihar,

More information

Objective Evidence Record (OER)

Objective Evidence Record (OER) This material is derived from SAE AS9101D, which is copyrighted intellectual property of SAE international. SAE is not responsible for outcomes resulting from use of this material. APPENDIX A OBJECTIVE

More information

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard.

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard. Quality Manual This manual complies with the requirements of the ISO 9001:2015 International Standard. Northeast Power Systems, Inc. 66 Carey Road Queensbury, New York 12804 Quality Manual Rev 0 Printed

More information

ISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS

ISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS ISO 22000:2005 Standard Food Safety Management System INTERNATIONAL STANDARDS REGISTRATIONS 3.1 FOOD SAFETY concept that food will not cause harm to the consumer when it is prepared and/or eaten according

More information

Quality Manual QM-9001 Revision 25 May 2013

Quality Manual QM-9001 Revision 25 May 2013 Lion Precision 563 Shoreview Park Road Shoreview, MN 55126 Phone: (651) 484-6544 Fax: (651) 484-6824 info@lionprecision.com Quality Manual QM-9001 Revision 25 May 2013 Approved by: Don Martin, President

More information

A S D T R A N S L A T E D I N T O P L A I N E N G L I S H 8. O P E R A T I O N S

A S D T R A N S L A T E D I N T O P L A I N E N G L I S H 8. O P E R A T I O N S 8.1 DEVELOP, IMPLEMENT, AND CONTROL YOUR OPERATIOL PROCESSES 1 Plan the implementation and control of your operational processes. Black identifies ISO 9001 task. 2 Consider how you're going to implement

More information

Important Information on Maintaining. SQF Certification December 2016

Important Information on Maintaining. SQF Certification December 2016 Important Information on Maintaining SQF Certification December 2016 Mérieux NutriSciences Certification LLC 111 E. Wacker Dr., Ste 2300, Chicago, IL 60601 USA TEL. +1 312 938 5151 FAX. +1 312 729 1320

More information

Beaver Machine. Quality Manual

Beaver Machine. Quality Manual Beaver Machine Quality Manual This manual has been written to the ISO 9001:2000 International Quality Standard Beaver Machine Inc. 5273 Hanson Court Minneapolis, MN 55429 763-535-2204 www.beavermachine.com

More information

Vendor Qualification Survey

Vendor Qualification Survey 1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service

More information

Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) MDD-013 Supplier Business Reviews

Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) MDD-013 Supplier Business Reviews Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) MDD-013 Supplier Business Reviews Purpose of the Supplier Business Review SOP Establishes a consistent

More information

Agreement. Between. Cooper Standard. (Hereafter referred to as the CS ) And. (Hereafter referred to as the Supplier )

Agreement. Between. Cooper Standard. (Hereafter referred to as the CS ) And. (Hereafter referred to as the Supplier ) Global Supplier Quality Manual Revision 1 Agreement Between Cooper Standard (Hereafter referred to as the CS ) And (Hereafter referred to as the Supplier ) This agreement is made between the above named

More information

QUALITY ASSURANCE MANUAL

QUALITY ASSURANCE MANUAL QUALITY ASSURANCE MANUAL REVISION 1.0 JANUARY 12, 2014 DYESS AVIATION, INC. 2000 W. BEND DR. GEORGETOWN, TX 78626 Dyess Aviation, Inc. Quality Assurance Manual Policy & Procedures Quality Management Introduction:

More information

Approved Supplier Guidance

Approved Supplier Guidance Approved Supplier Guidance Administrative Office: 2420 W. R. Larson Rd. San Antonio, Texas 78261 (210) 384-3484 FAX (830) 438-2309 D&D Machinery and Sales Inc. Approval by: Original copy retained in D&D

More information

Analysis of ISO 9001:2015 against the ICoCA Certification Assessment Framework

Analysis of ISO 9001:2015 against the ICoCA Certification Assessment Framework Analysis of ISO 9001:2015 against the ICoCA Certification Assessment Framework As detailed in the ICoCA Certification Procedure, the Board of Directors assesses and recognizes standards for potential recognition

More information

Mantor Aviation Company

Mantor Aviation Company Mantor Aviation Company QUALITY ASSURANCE MANUAL QA Manual 2013 Revision 8 Uncontrolled Copy Ph: 507-553-5053 Fax: 612-395-5267 Introduction Mantor Aviation Company is a supplier of aircraft parts, components,

More information

Comments, Complaints & Compliments policy

Comments, Complaints & Compliments policy Comments, Complaints & Compliments policy Version EKH#2 Last reviewed July 2013 Responsible officer Jonathan Hicks Approved by Board 12 Sept 2011 Next review date May 2015 Related documents Mission Statement

More information

REQUIREMENTS FOR ACCREDITATION OF INSPECTION BODIES

REQUIREMENTS FOR ACCREDITATION OF INSPECTION BODIES NATIONAL CENTRE FOR ACCREDITATION REQUIREMENTS FOR ACCREDITATION OF INSPECTION BODIES according to SM SR EN ISO/IEC 17020:2013 Code DR-OI-07 Edition 2 Page 1/15 Approved by Technical Certification Committee

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 11.12.2010 Official Journal of the European Union L 327/13 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 1169/2010 of 10 December 2010 on a common safety method for assessing conformity

More information

Quality Management System

Quality Management System Quality Management System ZYQ Testing Laboratory 11111 Testing Avenue Testing Town, Alaska 22222 (555) 555-5555 Date Prepared: January 19, 2009 1 Please note that this Quality Management System (QM) was

More information

ISO 9001:2008 Clause PR017 Customer Satisfaction Procedure

ISO 9001:2008 Clause PR017 Customer Satisfaction Procedure ISO 9001:2008 Clause 8.2.1 PR017 Customer Satisfaction Procedure Strode Park Foundation for People with Disabilities Page 1 of 7 Approvals The signatures below certify that this procedure has been reviewed

More information

EFR CERTIFICATION Standard Operating Procedure Management and Auditor Competency

EFR CERTIFICATION Standard Operating Procedure Management and Auditor Competency Page 1 of 21 1. OBJECTIVES 1.1 This document details the EFRC policy and procedure to select, evaluate and maintain auditor competency. 1.2 This procedure also outline the competency criteria in the logical

More information

BIM CERTIFIED QUALITY AQUACULTURE (CQA) SCHEME DOCUMENT CONTROL

BIM CERTIFIED QUALITY AQUACULTURE (CQA) SCHEME DOCUMENT CONTROL BIM CERTIFIED QUALITY AQUACULTURE (CQA) SCHEME DOCUMENT CONTROL PURPOSE This procedure describes the method by which the controlled copies of the BIM CQA Quality System Documents are issued and maintained

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 9001 Quality management systems Requirements Systèmes de management de la qualité Exigences Fourth edition 2008-11-15 Reference number ISO 9001:2008(E) ISO 2008 PDF disclaimer

More information

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution

More information

0. 0 TABLE OF CONTENTS

0. 0 TABLE OF CONTENTS QUALITY MANUAL Conforming to ISO 9001:2008 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2

More information

Quality Systems Manual

Quality Systems Manual Quality Systems Manual This manual was developed to support ISO 9001 elements 1445 Oakland Drive, San Jose, CA 95112-2702 - Tel: (408) 294-9897 - Fax: (408) 297-1540 http://www.gorillacircuits.com Reference

More information

METUCHEN CAPACITORS INCORPORATED. Quality Manual P.O. BOX HIGHWAY 35, SUITE 2 HOLMDEL NJ USA

METUCHEN CAPACITORS INCORPORATED. Quality Manual P.O. BOX HIGHWAY 35, SUITE 2 HOLMDEL NJ USA METUCHEN CAPACITORS INCORPORATED Quality Manual P.O. BOX 399 2139 HIGHWAY 35, SUITE 2 HOLMDEL NJ 07733 USA Copy Holder Copy Number : 1 This Quality Manual Covers the activities and functions performed

More information

CHAPTER 11 PERSONNEL MANAGEMENT EVALUATION SECTION 1 - GENERAL

CHAPTER 11 PERSONNEL MANAGEMENT EVALUATION SECTION 1 - GENERAL CHAPTER 11 PERSONNEL MANAGEMENT EVALUATION SECTION 1 - GENERAL 11-1. Purpose of Personnel Management Evaluation. Evaluation is an essential component in the personnel management process. Its purpose is

More information

FSC Forest Management Group System Procedures

FSC Forest Management Group System Procedures SCOPE Mid Carolina Timber Company is a forestry consultant organization committed to the mission of promoting long-term responsible forest management strategies that improve the health of forest and freshwater

More information

For Use By Certification Bodies Performing SAAS Accredited SA8000:2014 Certification Audits

For Use By Certification Bodies Performing SAAS Accredited SA8000:2014 Certification Audits 1 2 3 4 5 6 SAAS Procedure 201A Accreditation Requirements 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 For Use By Certification Bodies Performing SAAS Accredited SA8000:2014 Certification Audits October

More information

AS9003A QUALITY MANUAL

AS9003A QUALITY MANUAL AS9003A QUALITY MANUAL Origination Date: (month/year) Document Identifier: Date: Document Status: Document Link: AS9003A Latest Revision Date Draft, Redline, Released, Obsolete Location on Server (if used)

More information

Quality Assurance Procedure Issued: 15NOV2017 Page 1 of 11

Quality Assurance Procedure Issued: 15NOV2017 Page 1 of 11 Quality Assurance Procedure Issued: 15NOV2017 Page 1 of 11 1.0 Purpose To ensure that Fleet Canada states applicable requirements for purchased products on purchase orders and applicable documents. Requirements

More information

CIVIL AVIATION REQUIREMENTS SECTION 6 DESIGN STANDARDS & TYPE CERTIFICATION SERIES 'B', PART II

CIVIL AVIATION REQUIREMENTS SECTION 6 DESIGN STANDARDS & TYPE CERTIFICATION SERIES 'B', PART II GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPPOSITE SAFDRJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 6 DESIGN STANDARDS & TYPE CERTIFICATION

More information

Nonconforming Material System Procedure

Nonconforming Material System Procedure Page: 1 of 13 Nonconforming Material System Procedure Page: 2 of 13 1.0 PURPOSE AND SCOPE 1.1 Purpose a. To define the system for identifying, segregating and controlling, and disposing of material, identified

More information

Supplier Quality Manual

Supplier Quality Manual including subsidiaries of Mexico and Canada Supplier Quality Manual Issue date: March 1, 2010 Revised: April 7, 2011 Page 1 of 14 Corporate Quality Statement Quality plays a vital role in SCHOTT Gemtron

More information

Clause Map IATF 16949:2016 to ISO/TS 16949:2009

Clause Map IATF 16949:2016 to ISO/TS 16949:2009 Table of Contents Table of Contents Foreword Foreword + Foreword Automotive QMS Standard + History + Goal + 0.5 Goal of this Technical Specification + Remarks for Certification + Remarks for Certification

More information

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,

More information

ISO 9001:2008 Quality Management System QMS Manual

ISO 9001:2008 Quality Management System QMS Manual 2501 Kutztown Road Reading, PA, 19605 Tel. 610-929-3330 Fax 610-921-6861 ISO 9001:2008 Quality Management System QMS Manual The information contained in this document is Fidelity Technologies Corporation

More information

HACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL. ISO 22000:2005 Quality Manual

HACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL. ISO 22000:2005 Quality Manual HACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL ISO 22000:2005 Quality Manual QUALITY MANUAL ISO 22000:2005 Food Safety Management HACCPEuropa Publications 2012 Table of Contents Introduction...

More information

Technical Manufacturing Corporation (TMC)

Technical Manufacturing Corporation (TMC) Revision: 21 Pages: 1 of 14 Date Issued: 05/11/2016 Technical Manufacturing Corporation (TMC) Quality Manual 15 Centennial Drive Peabody MA 01960 Revision: 21 Pages: 2 of 14 Date Issued: 05/11/2016 1.

More information

SECTION 13 RECORDS AND DOCUMENTATION OCS Rig Operations

SECTION 13 RECORDS AND DOCUMENTATION OCS Rig Operations Safety & Environmental Management Version 2.3 SECTION 13 RECORDS AND DOCUMENTATION Reviewed By Director of Production and Operations Steve Bodden Stone Energy Corporation Reviewed By Director Deepwater

More information

Anti-Counterfeit Policy Mouser has adopted this Anti-Counterfeit Policy to eliminate the impact of counterfeit products on Mouser and its customers.

Anti-Counterfeit Policy Mouser has adopted this Anti-Counterfeit Policy to eliminate the impact of counterfeit products on Mouser and its customers. QS-PR-024 Anti-Counterfeit Control Plan Approved by: Chuck Amsden Approved 11/27/17 This procedure is current and approved when viewed on-line. The procedure becomes uncontrolled when printed. Uncontrolled

More information

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry Addendum 1 June 2010 Effective Date: December 1, 2010 Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry ANSI/API SPECIFICATION Q1 EIGHTH EDITION, DECEMBER 2007

More information

ISO AUDIT PREPARATION KIT 2016

ISO AUDIT PREPARATION KIT 2016 ISO AUDIT PREPARATION KIT 2016 IQY Technical College Table of Contents ISO... 3 ISO 9001:2008 Fact Sheet... 6 Further Information... 6 Preparing for the ISO 9001:2008 Audit - 2016... 7 ISO 9001:2008 Definitions...

More information

Required Elements of a Quality Management System

Required Elements of a Quality Management System Quality Management System Review Procedures IAPMO Evaluation Service (IAPMO UES) No.: ES-010 Title: Review Procedures for Certified Manufacturer s Quality Management System (QMS) Documentation By: B. Berneche

More information

ISO 14001:2015 Gap Analysis Check Sheet

ISO 14001:2015 Gap Analysis Check Sheet ? CONTEXT OF THE ORGANIZATION 4.1 Understanding the organization and its context The organization shall determine external and internal issues that are relevant to its purpose and that affect its ability

More information

ISO 14001:2015 READINESS CHECKLIST YOU RE CLOSER THAN YOU THINK LEADERSHIP LIFECYCLE PERSPECTIVE DOCUMENTATION RISK TAKING PROTECTION

ISO 14001:2015 READINESS CHECKLIST YOU RE CLOSER THAN YOU THINK LEADERSHIP LIFECYCLE PERSPECTIVE DOCUMENTATION RISK TAKING PROTECTION LEADERSHIP LIFECYCLE PERSPECTIVE DOCUMENTATION PROTECTION FURTHER EXCELLENCE RISK TAKING PERFORMANCE COMMUNICATION REPUTATION ISO 14001:2015 READINESS CHECKLIST YOU RE CLOSER THAN YOU THINK THE TRANSITION

More information

SUPPLIER EVALUATION CHECKLIST

SUPPLIER EVALUATION CHECKLIST SUPPLIER EVALUATION CHECKLIST 5675 West Burlingame Rd. Tucson AZ 85743 Phone: 520.744.1000 Date: Vendor: Address: City, State, Zip: Web Site: Prepared by: Telephone: Fax: Email: Key Company Personnel Name

More information

ISO 22000:2005 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER FOOD SAFETY MANAGEMENT SYSTEM ISO 22000:2005

ISO 22000:2005 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER FOOD SAFETY MANAGEMENT SYSTEM ISO 22000:2005 SYSTEM KARAN ADVISER & INFORMATION CENTER FOOD SAFETY MANAGEMENT SYSTEM ISO 22000:2005 WWW.SYSTEMKARAN.ORG 1 www.systemkaran.org Foreword... 6 Introduction... 7 Food safety management systems Requirements

More information

Correspondence Between ISO 13485:2016 and 21 CFR Part 820 QMS Requirements

Correspondence Between ISO 13485:2016 and 21 CFR Part 820 QMS Requirements Correspondence Between and 21 CFR Part 820 QMS Requirements 10411 Corporate Drive, Suite 102, Pleasant Prairie, WI 53158 262.842.1250 262.842.1240 info@rcainc.com rcainc.com 2 4 Quality Management System

More information

Security Operations. BS EN ISO 9001: 2008 Issue 1.2: 21/10/2016. Quality Manual. Managing Director. Controlled / Uncontrolled when printed

Security Operations. BS EN ISO 9001: 2008 Issue 1.2: 21/10/2016. Quality Manual. Managing Director. Controlled / Uncontrolled when printed of Security Operations BS EN ISO 9001: 2008 : 21/10/2016 Manual No. 1 Issued to Managing Director Authorised By Date Issued 21/10/2016 Controlled / Uncontrolled when printed SECTION: 0 Index Page 2 Note

More information

APPENDIX B Corrosion Management System Framework and Guidance

APPENDIX B Corrosion Management System Framework and Guidance APPENDIX B Corrosion Management System Framework and B.1 INTRODUCTION A framework for a Corrosion Management System (CMS) for assets is described in this Appendix. The CMS developed shall include and document

More information

UPPLIER ANUAL. Issued: 01 Aug 13

UPPLIER ANUAL. Issued: 01 Aug 13 UPPLIER ANUAL Issued: 01 Aug 13 Table of Contents Our Company 3 Our Vision 3 Scope and Purpose 4 Responsibilities 4 General Expectations and Requirements 5 Supplier Quality Management System 6 Supplier

More information

SAE AS9100 Revision C Requirements beyond ISO 9001:2008 UPDATING YOUR MANAGEMENT SYSTEM

SAE AS9100 Revision C Requirements beyond ISO 9001:2008 UPDATING YOUR MANAGEMENT SYSTEM 3 Terms and Definitions Ensure awareness and understanding of: Risk Special Requirements Critical Items Key Characteristic 4.1 Include process(es) that deploy(s) requirements from: Customers Applicable

More information

SUPPLIER QUALITY ASSESSMENT

SUPPLIER QUALITY ASSESSMENT Supplier Organization Name: Supplier Number: Street Address: Date of This Audit: City, State, Zip Code: Date of Last Audit: Country: of Employees: Main Phone Number: of Buildings/Size: Fax Number: Principal

More information