Subj: MAINTENANCE AND MATERIAL MANAGEMENT (3-M) SYSTEM POLICIES AND PROCEDURES FOR THE NAVAL CONSTRUCTION FORCE (NCF)

Size: px
Start display at page:

Download "Subj: MAINTENANCE AND MATERIAL MANAGEMENT (3-M) SYSTEM POLICIES AND PROCEDURES FOR THE NAVAL CONSTRUCTION FORCE (NCF)"

Transcription

1 DEPARTMENT OF THE NAVY COMMANDER FIRST NAVAL CONSTRUCTION DIVISION th STREET, SUITE 100 NORFOLK, VIRGINIA COMFIRSTNCDINST N43 COMFIRSTNCD INSTRUCTION Subj: MAINTENANCE AND MATERIAL MANAGEMENT (3-M) SYSTEM POLICIES AND PROCEDURES FOR THE NAVAL CONSTRUCTION FORCE (NCF) Ref: (a) OPNAV Instruction C (b) NFELC Notice 4790 of 24 October 2003 (c) COMSECONDNCB/COMTHIRDNCB Instruction A Encl: (1) Naval Construction Force 3-M Policies and Procedures 1. Purpose. To establish 3-M policies and procedures, assign action and provide guidance for the NCF. 2. Cancellation. COMFIRSTNCD NOTICE 4790, Interim Promulgation of Naval Construction Force (NCF) Maintenance Material Management (3-M) Organizational Responsibilities and Work Center Codes (W/C Codes). 3. Discussion. COMFIRSTNCD units will convert from the existing Equipment Repair Order (ERO) System to the Navy s 3-M system. Per reference (a), Naval Sea Systems Command (NAVSEASYSCOM) manages and directs the development, implementation, operational maintenance, and improvements of all aspects of the Ship s 3-M System throughout the Navy. This conversion will bring these standard Navy maintenance and material management practices to the NCF. Naval Facilities Expeditionary Logistics Center (NFELC) Port Hueneme has responsibility for the installation of software and the implementation of 3-M processes. Reference (b) provides information regarding actions to be taken in support of installs. The objectives of 3-M are standardization, efficiency, documentation, analysis, configuration status accounting, and scheduling.

2 4. Responsibility a. COMFIRSTNCD 3-M responsibilities are to: (1) Exercise Program Director/Program Management responsibility for the 3-M System for COMFIRSTNCD. (2) Exercise primary responsibility for the effective operation and support of the 3-M System by COMFIRSTNCD units. (3) Maintain a full time 3-M Program Manager and a staff of adequate size to properly administer the 3-M System. (4) Conduct appropriate review of the quantity and quality of 3-M data submitted (Technical Feedback Reports, MDS documents, et cetera). Ensure accurate processing and prompt submission of 3-M data. (5) Provide necessary resources to ensure adequate 3-M System training for personnel associated with maintenance or maintenance management. (6) Oversee the development of 3-M management tools and initiatives. (7) Evaluate and/or conduct appropriate review of Technical Bulletins, Safety Advisories, Mishap Reports, and Material Inspection reports, Equipment Deficiency Memorandums, et cetera). Where 3-M System deficiencies are evident, initiate corrective action. (8) Monitor the functional adequacy of installed 3-M Systems. to: b. Naval Construction Regiment (NCR) responsibilities are (1) Exercise primary responsibility for the compliance of subordinate units with 3-M policies and procedures. (2) Assign an E-7 or above with NEC 9517 as the Regimental 3-M Coordinator. 2

3 (3) Ensure subordinate units conduct and document 3-M Self-assessments at intervals not to exceed 24months. Each NMCB will conduct a Self-assessment during each deployment. (4) Review unit 3-M Self-assessments conducted by subordinate units and take action as necessary to correct deficiencies or report problems. (5) Conduct appropriate review of the quantity and quality of 3-M data submitted (Technical Feedback Reports, MDS documents, et cetera). Ensure accurate processing and prompt submission of 3-M data by subordinate units. c. Seabee Readiness Group (SRG) responsibilities are to: (1) Provide 3-M training required to support COMFIRSTNCD and Unit 3-M implementation and use as required. (2) Assign an E-7 or above with NEC 9517 as full time 3- M Coordinator to oversee the command 3-M program. Maintain 3-M staff of adequate size to properly administer the 3-M program. (3) Implement and employ the 3-M system for maintenance of any 3-M covered equipment assigned, or under SRG cognizance. (4) Monitor and participate in the development of 3-M management tools and initiatives. (5) Conduct appropriate review of Technical Bulletins, Safety Advisories, Mishap Reports, and Material Inspection reports (Battalion Equipment Evaluation Program (BEEP) and Equipment Deficiency Memorandums, et cetera). Where 3-M System deficiencies are evident, initiate corrective action. (6) Conduct appropriate review of the quantity and quality of 3-M data submitted (Technical Feedback Reports, MDS documents, et cetera). Initiate corrective action as necessary. d. All NCF units responsibilities include: (1) Compliance with 3-M policies and procedures. (2) Assign a 3-M Coordinator in accordance with Appendix E of this instruction to oversee the Command 3-M Program. (3) Prompt and accurate 3-M reporting. 3

4 (4) Participate in the development of 3-M management tools and initiatives. (5) Provide technical feedback and other feedback as necessary to alert the chain of command regarding the effectiveness of 3-M policies and procedures at the unit level. 1. Action. All COMFIRSTNCD units will support the implementation and roll out of 3-M in the NCF. The implementation process will require close cooperation by all units, and close attention at all levels to ensure smooth and effective transition from the ERO system to the Navy 3-M system. (a) Reference (a) provides basic guidance regarding policy and procedures relevant to 3-M Navy wide. Enclosure (1) adapts that guidance to focus on NCF requirements and terminology. All units should refer to enclosure (1) as the primary source of guidance, and to reference (a), when additional guidance is needed. Conflicts or gaps in the information provided should be brought to the attention of the COMFIRSTNCD 3-M Program Manager via the chain-of-command. (b) 3-M installation/implementation at the unit level will be conducted in accordance with the procedures in reference (b). (c) All units performing maintenance will continue to use the existing procedures contained in reference (c) until 3-M is implemented. Enclosure (2) provides modification of the guidance in reference (c) and should be used in conjunction with reference (c) after 3-M implementation. (d) Upon completion of 3-M implementation, all equipment covered by the 3-M system will be maintained using the 3-M system. All reporting, scheduling, and procedural requirements apply. D. C. PHILLIPS By direction Distribution: COMFIRSTNCDINST NCF website 4

5 Naval Construction Force 3-M Policies and Procedures Enclosure (1)

6 Table of Contents Title Page # Executive Summary 4 Chapter 1. 3-M System Program Requirements and Guidelines Policy M Program General Guidance Assessment Requirements M PMS Program M MDS Program Maintenance Duties and Responsibilities PMS Program Supplementary Guidance MDS Program Supplementary Guidance PMS Records Retention JUDGE ADVOCATE GENERAL MANUAL (JAGMAN) 1-17 Chapter 2. 3-M PMS Assessment Background PMS Assessment Objectives PMS Scheduling PMS Accomplishment PMS Performance Rate 2-6 Chapter 3. 3-M MDS Assessment Introduction MDS Assessment Objective MDS Assessment Guidance PMS/MDS Program Administration CSMP Purpose and Content CSMP Maintenance and Utilization 3-4 Chapter 4. 3-M "TYCOM" Supplementary Guidance Guidance 4-1 Appendix A. Real-Time/Spot Check/Assessment Maintenance Check Appendix A-1 Procedures PMS MAINTENANCE CHECK EVALUATION CHECK Appendix A-4 SAFETY REQUIREMENTS EVALUATION Appendix A-6 MRC STEPS EVALUATION Appendix A-6 GRADING THE MAINTENANCE REQUIREMENTS Appendix A-7 MAINTENANCE REQUIREMENTS EVALUATION REMARKS Appendix A-8 Appendix B. 3-M PMS Cycle/Quarterly/Weekly Schedules Appendix B-1 Questionnaires CYCLE PMS SCHEDULE QUESTIONNAIRE Appendix B-1 QUARTERLY PMS SCHEDULE QUESTIONNAIRE Appendix B-3 WEEKLY PMS SCHEDULE QUESTIONNAIRE Appendix B-5 3-M SCHEDULES EVALUATION REMARKS Appendix B-6 2

7 Table of Contents Title Page # Appendix C. 3-M PMS/MDS Assessment Summary Report Forms Appendix C-1 WORK CENTER 3-M PMS ASSESSMENT WORKSHEET Appendix C-2 WORK CENTER CSMP ASSESSMENT WORKSHEET Appendix C-3 3-M PMS/MDS ASSESSMENT SUMMARY WORKSHEET Appendix C-4 3-M PMS/MDS ASSESSMENT SUMMARY REPORT Appendix C-5 Appendix D. 3-M MDS Assessment Questionnaire Appendix D-1 TAB A: 3-M Organizational and Administration Appendix D-1 TAB B: Current SEABEE Maintenance Project (CSMP) Appendix D-19 Assessment Criteria TAB C: Tag Guide List (TGL) Assessment Questionnaire Appendix D-24 TAB D: 3-M Administrative Support Assessment Appendix D-27 Questionnaire TAB E: 3-M MDS Supply Assessment Questionnaire Appendix D-29 Appendix E. 3-M Organizational Responsibilities Appendix E-1 Appendix F. Automated Shore Interface (ASI) Checklist Appendix F-1 Appendix G. Tag-out Procedures Appendix G-1 Figure 10-1: PMS Scheduling Procedures (Brown Line) 1-13 for Deploying Units Table 10-2: PMS Record Retention Requirements 1-17 Table 10-3: 3-M Program Guidance Cross Reference 4-1 Index 3

8 Maintenance and Material Management (3-M) Policy And Procedures Executive Summary The 3-M system applies to all Naval Construction Force equipment including Civil Engineer Support Equipment (CESE), Civil Engineering End Item (CEEI), Weapons, Communications Equipment, and other Table of Allowance (TOA) material that requires periodic or corrective maintenance. All COMFIRSTNCD units shall comply with the 3-M program policy, requirements, and responsibilities as outlined in reference (a) and modified herein. There shall be no deviation from these procedures without the prior written approval of COMFIRSTNCD. 1. The 3-M system is designed to provide an efficient and uniform method of managing and recording corrective and planned maintenance in a way that allows easy access to the collected data. It provides all maintenance and material managers with a means to plan, acquire, organize, direct, control, and evaluate the manpower and material resources expended or planned for in support of maintenance. This is an all-hands, top-down program and it is imperative that each individual understand its importance. Formal schooling, correspondence courses, Personnel Qualification Standards (PQS), and other training in 3-M program procedures and processes are fundamental to the success of the program and should receive appropriate command attention. 2. Reference (a) sets forth the 3-M objectives and prescribes the procedures for completing MDS documents. This instruction provides essential supplementary guidance to reference (a), where applicable, and affirms COMFIRSTNCD s commitment to achieving optimum readiness through effective use of the 3-M program. Accordingly, the purpose of this Chapter of the Maintenance Manual is: a. To provide COMFIRSTNCD 3-M policy and criteria for carrying out the 3-M program and, in particular, the two key systems Planned Maintenance System (PMS) and Maintenance Data System (MDS). b. To provide the procedures and criteria for the periodic evaluation of each command s 3-M program and, when deficiencies are noted, to give Commanding Officers, Officers-In-Charge, and other cognizant program managers the key information needed to initiate corrective action. 4

9 c. To provide 3-M System Self-assessment guidelines with particular emphasis on 3-M program administration and Current Seabee s Maintenance Project (CSMP) management. (The CSMP provides consolidated listing of interim and deferred maintenance, and is a key tool in maintenance managing and scheduling.) d. To provide supplementary guidance and clarification of requirements where reference (a) directs the user to refer to "TYCOM for guidance" and, as necessary, to facilitate the proper, timely and effective documentation of maintenance requirements in support of various planned maintenance availabilities addressed in applicable sections of Chapters 6 - Intermediate Level Maintenance and 7 - Depot Level Maintenance of this manual. 3. Questions concerning policy, requirements, responsibilities, or other 3-M program matters should be directed via the chainof-command to the COMFIRSTNCD 3-M Program Manager. 5

10 100 - Policy COMFIRSTNCDINST Chapter 1 3-M System Program Requirements and Guidelines COMFIRSTNCD policy, as stated in Chapter 1 of this manual, is to use the 3-M System as fully as possible to attain and maintain the highest degree of operational readiness and reliability within current resource limitations. Since this can be achieved only through effective utilization of the 3-M System, an assessment program has been developed to assist the Regimental Commanders, Commanding Officers, and Officers-In-Charge in assessing the use of the 3-M System within their commands and subordinate units and to facilitate the timely recognition and correction of problems impacting material readiness. The assessment program guidelines defined herein shall be used for periodic Self-assessments as well as 3-M Team assessments and assist visits. To this end, Regimental Commanders, Commanding Officers, and Officers-In-Charge shall implement a 3-M System assessment program to monitor and enhance overall 3-M performance. In addition, they shall encourage their subordinates to conduct periodic Self-assessments M Program General Guidance Reference (a) defines the basic responsibilities for monitoring maintenance and material management programs. It highlights the importance of establishing, maintaining, and monitoring 3-M programs for the effective management of organizational level ("O-level") maintenance of Seabee equipment and material. This has particular importance in view of continuing high operating tempos, vital mission assignments, budget constraints, and personnel shortages. The PMS program, in particular, is the least costly and most effective method of keeping Seabee equipment and material in the best possible operating condition using the "O-level" work force. However, maintenance requirements beyond O-level capability and/or capacity need to be well defined and documented to support effective planning, assignment and execution by other maintenance activities. The 3-M program is the only proven method available to effectively manage both O-level and outside activity support in the performance of planned preventive maintenance, corrective maintenance, and parts support in a manner that will ensure optimum equipment readiness. 1-1

11 102 - Assessment Requirements Per reference (a), 3-M PMS and MDS program performance shall be assessed at intervals of not greater than 24 months for conformance with TYPE COMMANDER maintenance policy and 3-M System program requirements. The continuous improvement process shall be utilized while monitoring the 3-M program. 1. Procedure. Procedures for conduct of 3-M assessments are provided in Chapters 2 and 3 of this enclosure. Additional guidance and checklists useful in the assessment process are found in Appendices A through D. Equal emphasis should be placed on the effectiveness of maintenance management and actual maintenance accomplishment. 2. Action a. Each command participating in the 3-M program will conduct a Self-assessment at intervals not to exceed 24 months. For NMCBs, a 3-M Self-assessment will be conducted during each deployment. The NMCB Self-assessments will include an assessment of all maintenance at the deployment site, and at Detachment or Detachment for Training sites, for equipment included in the 3-M program. b. Self-assessments will be evaluated by the cognizant Operational Regiment for thoroughness and accuracy. The Regimental Commander will use the review of these assessments, in conjunction with monthly metrics and information gleaned from site visits to determine the effectiveness of the unit maintenance program. Corrective action, if necessary will be initiated and monitored by the cognizant Regiment. c. Seabee Readiness Groups (SRGs) will report Selfassessment results to COMFIRSTNCD M PMS Program The PMS program has been engineered to prescribe the minimum Maintenance Requirements (MR). Therefore, 100 percent accomplishment of scheduled maintenance is the desired goal. PMS assessments shall specifically address the accuracy of PMS scheduling, the actual PMS accomplishment rate, and the quality of the maintenance actions for the period since the last assessment. 1-2

12 1. Scheduling. Sound judgment and foresight must be applied when tailoring and scheduling PMS to prevent excessive deferral or partial completion of required maintenance. No matter how valid the reasons are for not completing PMS, installed systems and equipment will deteriorate and fail prematurely if not properly maintained. However, it is recognized that there are times and situations when some Maintenance Requirements (MRs) cannot or should not be done (e.g., lack of materials or specialized skill, operational commitments that prevent securing vital equipment; and restrictions against the operation of equipment solely to perform a MR). Situations may arise where it is detrimental to perform certain PMS actions or operate equipment exclusively to accomplish a MR. 2. Deferral. When these circumstances arise, only a senior maintenance manager should, with due consideration to the impact on readiness, make the decision to defer maintenance. Such deferrals should be properly documented for accomplishment at the earliest opportunity. In addition, the cognizant senior maintenance manager and 3-M Coordinator, as applicable, shall play a prominent and proactive role in coordinating outside support for the timely accomplishment of PMS as well as corrective maintenance requirements. 3. Accountability. If enough priority is given to PMS, a normal quarter s operating schedule should offer sufficient time to complete a high percentage of scheduled PMS MRs. Clear accountability for those required, recurring, actions is an integral part of the credibility of the PMS program. For each scheduled MR, the work center supervisor shall assign an individual to perform the PM check and maintain a record of the assignment in the Weekly Work Center PMS Accountability Log, described in paragraph 108 PMS Records Retention, section Accomplishment. The evaluation of PMS accomplishment consists of an examination of PMS schedules for the 13-week period preceding the week of the assessment. From this data various statistical rates [Recorded Accomplishment Rate (RAR), Accomplishment Confidence Factor (ACF), and PMS Performance Rate (PPR)] are developed for use in assessing the overall level and quality of PMS performance. A more detailed analysis and other factors to be considered by 3-M Teams and commands reviewing PMS assessment reports are included in section

13 104-3-M MDS Program The MDS program provides Seabee maintenance managers a method of documenting corrective repairs, man-hours expended, parts usage, configuration changes, and other technical and/or administrative matters and using this data to more effectively manage maintenance programs. 3-M MDS assessments, discussed in Chapter 3, shall focus primarily on CSMP management, MDS reporting, configuration management and the proper use of support programs. Command awareness and effective utilization of MDS shall also be evaluated. 1. MDS Program Elements. The key elements of effective MDS program evaluations include: a. Producing and managing the unit s CSMP. b. Generating maintenance requests for outside assistance. c. Documenting configuration changes. d. Managing the planning, scheduling, and reporting of corrective repairs and material procurement. e. Reporting maintenance actions and material conditions by the accomplishing activity. f. Producing automated reports tailored to meet the needs of different levels of management. 2. Guidelines. The questionnaires in Appendix D to this enclosure are comprehensive. They cover 3-M procedures, responsibilities, and actions from the CO/OIC to the work center level. Due to the variety of NCF units, the various billets/positions and related functions referred to in reference (a) and this manual may not exactly match with the actual organizational structures at the different subordinate activities. For example, smaller COMFIRSTNCD units may not have a CO, XO, or full time 3-M Coordinator; however, each unit shall ensure the requirements of 3-M administration are assigned and adequately performed by responsible personnel within their organization. 3. CSMP Management. The CSMP is the key maintenance management tool that provides Seabee maintenance managers with a consolidated listing of outstanding deferred maintenance actions. 1-4

14 CSMP management should be routinely reviewed as part of the PMS assessment or command inspection to emphasize our commitment to the 3-M program and the importance of proper CSMP management to a unit s overall readiness posture. 4. Evaluation Process. Unlike PMS Assessments, no indication is provided in these guidelines regarding the relative weight to be accorded individual items. It is not considered possible to realistically predetermine the precise relative importance of various items and the effect that compliance (or noncompliance) will have on a particular 3-M program. The relative importance of each item is to be based on the judgment of a qualified 3-M team member. Considerations will include the effect that the item has on the unit s 3-M program. 5. Related Programs. The 3-M Teams shall also observe and make note of other factors, which have a bearing on maintenance management effectiveness. These include, but are not limited to the following: Maintenance History Records, availability of technical manuals, shop organization and cleanliness, safety awareness, compliance with safety requirements, Electrical Safety, and Lock-Out/Tag-Out programs. Each of these, where applicable, is separate but integral to the overall 3-M program improvement initiative. Any significant deficiency shall be noted in the Summary Report Maintenance Duties and Responsibilities 1. COMFIRSTNCD 3-M Office. The Division 3-M Program Manager, Code N43, in addition to the duties and responsibilities delineated in paragraph TYCOMs of reference (a), shall: a. Coordinate the definition and development of 3-M System Program requirements and operations to include implementation of the 3-M System policy throughout COMFIRSTNCD. b. Ensure comprehensive assessments are conducted at intervals of not greater than 24 months of each command/unit to determine the effectiveness of the 3-M program. c. Ensure the scope of 3-M System training at the unit provides maintenance and management personnel with the necessary skills to successfully support the 3-M System. 1-5

15 d. Promote quality, completeness, and timely submission of data and effective utilization of data collected within COMFIRSTNCD. e. Coordinate and promote utilization of Information Technology (IT) facilities to process 3-M System information. f. Augment MDS data by accessing other Navy and Department of Defense management data files to enhance COMFIRSTNCD s overall 3-M posture. Provide assistance in the selection, development and implementation of 3-M System user-training programs. 2. Regimental Commanders shall: a. Exercise primary responsibility for the effective operation and support of the 3-M System at units under their cognizance. b. Provide sufficient time for subordinate units to perform 3-M functions. Operational orders, plans, and other directives should recognize and support accomplishment of 3-M requirements. c. Maintain a full time, qualified 3-M staff to properly administer the 3-M Program or coordinate requirements with other commands. d. Provide a qualified team to conduct 3-M System training assist visits, installations, and assessments as necessary to ensure subordinate units properly implement and administer the 3-M System. e. Ensure that subordinate units complete of Selfassessments as required by this instruction. f. Conduct appropriate review of Self-assessments, Technical Bulletins, Safety Advisories, Mishap Reports, and Material Inspection reports. Where 3-M System deficiencies are evident, initiate corrective action. 3. Seabee Readiness Group Commanders shall: a. Provide the necessary training opportunities and training aids to NCF units to support the implementation and employment of the 3-M systems. 1-6

16 b. Employ the 3-M system in the maintenance and administration of covered equipment under SRG cognizance. 4. Commanding Officers (CO). The CO shall carry out the duties and responsibilities outlined in paragraph of reference (a). In particular, the CO shall: a. Ensure appropriate personnel receive adequate formal 3-M training. b. Conduct periodic checks to ensure that the 3-M System is functioning properly and require other responsible personnel to perform real-time maintenance checks. (Appendix A to this enclosure refers) Specifically: (1) The CO, or their designated representative, will conduct five maintenance checks per week on maintenance actions currently scheduled (two will be real-time). Ensure Work Center Supervisors (WCS) or Senior Personnel conduct two maintenance checks per week per work center (one will be real-time). (2) Personally conduct a minimum of one real-time maintenance check per month. c. Establish an effective 3-M organization and program to ensure proper: (1) Cycle, Quarterly, and Monthly PMS schedules reparation and maintenance including installation of the Force Revisions. (2) CSMP utilization and management in accordance with reference (a) and this Instruction. (3) MDS documentation and reporting to include review and approval at a responsible level. d. Ensure that accomplishment of all critical PMS on equipment and systems is performed prior to departure on nonroutine deployment, detachment or extended operations. This includes accelerated performance of selected PMS checks in the two-week period prior to departure as discussed later in paragraph

17 e. Ensure that all documentation deferring maintenance is reviewed and approved at a responsible level and that 3-M submissions are being made as required. f. Keep the operational commander advised, as appropriate, concerning the status of 3-M and any factors that prevent full accomplishment of PMS requirements. 5. Executive Officer (XO). Executive Officers are designated 3-M Managers and as such are responsible to their COs for the proper and efficient running of the 3-M Program throughout the command. They shall effectively supervise and monitor the unit s performance and shall promptly report any problems affecting operational readiness to the CO. 6. Officers-in-Charge (OIC). OICs are responsible to their reporting seniors for the proper conduct of 3-M program requirements for assigned equipment. They shall effectively supervise and monitor their unit s performance and shall promptly report any problems affecting operational readiness to the CO. In particular, they shall: a. Function as the 3-M Manager for equipment under their cognizance. b. Be knowledgeable of current 3-M System policies, procedures, programs, and directives. c. Brief their immediate superior at regular intervals on the status of 3-M PMS performance and MDS administration and reporting, CSMP management, and PMS administration. d. Integrate 3-M System training into the activity s training and qualification program and ensure that personnel receive adequate and effective 3-M System training. e. The OIC, or their designated representative, will conduct five maintenance checks per week on maintenance actions currently scheduled (two will be real-time). Ensure Work Center Supervisors (WCS) or Senior Personnel conduct two maintenance checks per week per work center (one will be real-time) M Coordinator. The NMCB 3-M Coordinator shall be conversant with Seabee systems, equipment and maintenance program requirements, be a master chief or senior chief petty officer who has earned a secondary Navy Enlisted Classification (NEC) of 9517, and be assigned to the position as a primary duty. Appendix E to 1-8

18 this enclosure provides specific guidance regarding 3-M Coordinator assignments for each unit type. The 3-M Coordinator shall: a. Coordinate external support and monitor PMS related external maintenance requirements. b. Assist in maintaining an ongoing 3-M Personnel Qualification Standard (PQS) and formal schools training program for 3-M maintenance supervisors and key personnel. c. Coordinate the documentation of all maintenance bulletins and other requirements (as appropriate) identified by external organizations into the CSMP in an accurate and timely manner. d. Review 3-M documentation submissions for accuracy, completeness, and timeliness, and monitor correction and resubmission of deficient documents. e. Establish and maintain a master PMS library applicable to and in direct support of assigned equipment and material. f. Assist Department Heads/Company Commanders, and other key maintenance managers, as applicable, in documenting and correcting all safety related corrective actions. g. Ensure current status reports of maintenance actions for accomplishment by external repair activities are provided to cognizant personnel within the command. h. Ensure timely and accurate Automated Shore Interface (ASI) processing and upline maintenance reporting. Appendix F to this enclosure provides ASI processing guidance. 8. Details and Detachments for Training. The unique organizational and operational requirements of COMFIRSTNCD detachments necessitate further definition of 3-M System requirements. In particular, reference (a) does not address the transfer of PMS requirements from a "parent" (primary) to a detachment or deploying unit (secondary), or the duties and responsibilities of either organization. The 3M Manager and 3-M Coordinator shall, in addition to requirements delineated in paragraph of reference (a), ensure that the cognizant department head or company commander will: 1-9

19 a. Supervise maintenance scheduling for equipment and materials normally under their cognizance within the detachment. Review and approve the cycle and quarterly schedules and comply with other routine administrative requirements. b. Inspect the 3-M System operation weekly within the detachments during homeport and training periods. c. Ensure detachment personnel are properly trained in 3-M System operations, including the importance of PMS scheduling and performance, configuration management, and necessity for timely and accurate documentation. d. Initiate the accelerated accomplishment of PMS requirements during the two-week period prior to departure as discussed in paragraph 3.d above M Assessments/Assist visits. Regimental Commanders will serve as the advocate for 3-M readiness for subordinate units. They may work directly with unit personnel (e.g., 3-M coordinator, department head, company commander, work center supervisor) to evaluate specific aspects of 3-M program administration and execution. Specific inspection requirements are not mandated. On site inspections/assists by Regimental Commanders or their representatives are at the discretion of the Regimental Commander. The 3-M Self-assessment conducted at the unit level is the primary 3-M performance assessment tool. Regimental Commanders are responsible for the overall effectiveness of the 3-M program in subordinate units. To ensure best performance Regiments will: a. Review and evaluate unit level 3-M Self-assessments and take action as appropriate. b. Evaluate PMS scheduling and actual accomplishment of scheduled PMS per chapter 3 reference (a) and as modified by chapter 2 of this instruction. c. Assist subordinate commands, track progress, monitor trends, and provide feedback via the chain-of-command. d. Conduct appropriate review of the quantity and quality of 3-M data submitted (MDS documents, Technical Feedback Reports) and ensure accurate processing and prompt submission of 3-M data. 1-10

20 e. Monitor and participate in the development of 3-M management tools. f. Provide 3-M System training for personnel associated with maintenance or 3-M management. g. Assess the functional adequacy of installed 3-M Systems and assist in discrepancy correction. h. Ensure all activities effectively use their installed automated system for 3-M MDS reporting PMS Program Supplementary Guidance 1. PMS Scheduling Procedures for Deploying/Deployed Units. For the purposes of this instruction deploying/deployed units does not refer to normal NMCB rotations between overseas main body Camps and homeport. Deploying and deployed units should be interpreted as Details, Detachments For Training (DFTs), and non-routine deployments. All PMS scheduling policies and procedures outlined in reference (a) shall remain in effect in developing PMS schedules. Additional procedures are defined herein for interim transfer of PMS requirements between primary and secondary work centers without use of feedback reporting. Guidelines for installation and implementation of Force Revisions (FRs) are also provided. a. PMS Scheduling, "Brown Line" Procedures. The techniques and procedures for transferring maintenance requirements and annotating entries on the master quarterly schedule are as follows (Figure 10-1 provides a sample illustration): (1) The secondary work center will follow the technique of transferring PMS by marking each transferred MIP line and all PMS requirements within the MIP line with a vertical "BROWN" line on the date "tic" the transfer is to take place. On the left side of the "BROWN" vertical line, at the beginning of the transfer, place the appropriate work center designator code. Follow this procedure for each piece of equipment (MIP) to be transferred. (2) For those maintenance requirements to be transferred to a detachment/platoon secondary work center, draw a horizontal "BROWN" line through the periodicity indicating the maintenance has been transferred. 1-11

21 (3) The secondary work center shall develop PMS schedules (Cycle, Quarterly, Weekly) in accordance with reference (a) for a PMS maintenance requirements being transferred. (4) The work center supervisor of the secondary work center will schedule the PMS in the same month and week as it appears on the quarterly schedule of the primary work center. This keeps both schedules in agreement with each other. Both work center supervisors can reschedule and/or defer PMS in accordance with standard procedures to meet their own mission requirements. b. The secondary work center supervisor shall maintain the PMS schedules while deployed and provide a weekly status report to the primary work center. c. Upon return from deployment, the secondary work center supervisor shall return all PMS schedules to the primary work center. The Department Head of the primary work center shall review and sign the back of these schedules as well as the master schedules for the department. The Department Head/Company Commander shall retain both sets of schedules for a period of one year. d. The secondary work center supervisor and assigned maintenance personnel are responsible for the PMS. 1-12

22 Figure 10-1 PMS Scheduling Procedures (Brown Line) for Deploying Units 1. A BROWN vertical line at the beginning of a Quarter indicates that PMS was transferred during the previous Quarter and remains transferred. 2. The line drawn HORIZONTALLY through the MRC periodicity signifies that a Secondary Work Center has PMS responsibility for the equipment. 1-13

23 3. The BROWN vertical line in this position identifies equipment transferred back to the Primary Work Center; and that PMS responsibility has been shifted. 4. The VERTICAL BROWN line indicates a Secondary Work Center has custody of the equipment and is responsible for the PMS from that date on the Quarterly Schedule. 5. The Maintenance Requirement Cards (MRCs) scheduled indicate the Primary Work Center has custody of the equipment and is responsible for PMS. a. Accelerated PMS Scheduling for Deployment. When a COMFIRSTNCD detachment is leaving for deployment or extended operations where PMS accomplishment is critical to maintain optimum readiness, or there is limited storage for PMS materials and test equipment, every effort should be made to accomplish as much of the PMS as possible during the two-week period prior to departure. In particular, all annual, semi-annual and multiplemonthly PMS checks that would be required during the operation should be accomplished in that two-week pre-deployment period. The cognizant Regimental Commander should be advised of the intended actions and any required assistance. This will leave only monthly, quarterly, and situation requirement checks to be accomplished while deployed and will significantly reduce the deployed PMS workload. However, deployed units shall submit a weekly message to the parent command to report PMS accomplishment. b. Force Revision (FR) on Deployed Unit. Whenever a unit s deployment spans the end of one quarter and the beginning of the new quarter in which a FR is to take effect, the actual installation and implementation may be delayed with the CO s approval provided such action will not have an adverse affect on unit readiness. The reason for the delay will be documented on the reverse of the quarterly schedule. Deferral may be approved under the following conditions: (1) If the deployed unit is scheduled to return within 30 days, the unit may continue to perform PMS per the previous quarter s cycle schedule. The FR shall be implemented effective on the first day of the month following return from deployment. (2) If the deployed unit is scheduled to return more than 30 days beyond the start of the new quarter and the FR changes are administrative rather than operational in nature, the FR installation may be deferred until after the unit returns 1-14

24 from deployment. Otherwise, the changes should be implemented at the first opportunity. (3) Any FR change evaluated as significant, but not mandatory (safety related), shall be implemented, if possible, no later than 30 days after the start of the new quarter. Where implementation of the latest FR is delayed, new COMFIRSTNCDINST quarterly schedules should be prepared using the previous cycle schedule. A note should be added at the heading of each month on the quarterly schedule indicating that "FR XXX has been deferred." New cycle and quarterly schedules based on the FR shall be used for the remainder of the quarter when implemented. c. Real-Time Maintenance Check. The number of required weekly "spot checks" is five per week (command wide) for the CO or their designated representative, of which two will be realtime (Work Center Supervisors and Senior Personnel must conduct two spot checks per week per work center, one of these spot checks will be real time). This requirement does not apply to work centers, which have no maintenance responsibilities in the 3-M system. Real time checks shall be performed on a real-time basis. For example, a PMS MR scheduled for accomplishment is selected at random and the maintenance person is observed during the actual performance of the check. If no PMS is scheduled for that week, then no real-time maintenance check is required- "Spot Checks" of completed MRCs shall be conducted by the 3-M team during assessments and assist visits as a QA check on the PMS program. Guidelines for conducting and recording real-time checks are contained in Appendix A to this enclosure. d. Location Guide Lists (LGL). The LGL must not be confused with the EGL (Equipment Guide List). Each EGL, for example, is linked to a controlling MRC and a single entry on the cycle board for a group of like equipment/systems. The number of like equipment items that can be listed on the EGL is limited to a single day s work. The LGL, however, is used for identical equipment individually listed on the cycle board and located in different areas. Therefore, it is not restricted by the day s work limitation. The EGL form shall be used by lining out the word "equipment" and inserting the word "location" on the EGL. Enter the location and serial number for the individual pieces of equipment and attach the LGL to the MRC. In the location block of the MRC, enter "LGL attached." CO/OICs are authorized to tailor the LGLs to the minimum required to locate equipment covered by the MRC. 1-15

25 107 - MDS Program Supplementary Guidance 1. PMS Auto Scheduler (SKED). COMFIRSTNCD units are encouraged to use auto scheduler to reduce administrative requirements of the PMS program. Use of PMS Scheduler is a special interest item and will be evaluated during PMS Assessments. 2. Inactive Equipment Maintenance (IEM). IEM includes equipment in Live Storage. IEM procedures can be performed using PMS Auto Scheduler. However, the following manual additions to the computer print-out of quarterly schedules are required: a. Draw a red line in the weekly column to identify start and stop of IEM. b. Line-out in blue ink PMS checks that need to be deleted during IEM. c. Schedule IEM checks (LU/PM/SU/OT) in green. Note: This same criteria applies to work centers on deploying units using the Brown Line method discussed in paragraph a, above. Pen and ink additions have to be made to computer printout of the quarterly schedules to reflect the Brown Line method PMS Records Retention (See Table 10-2) 1. Quarterly and Cycle Schedules. The cognizant Department Head (DH) (or organizational equivalent) will review and submit closed-out schedules to the 3-M Coordinator for review at the end of each quarter. The four previously completed quarters worth of schedules shall be maintained on file with the DH. 2. Weekly Work Center PMS Report. This report which includes weekly PMS accomplishment and weekly real-time maintenance checks data shall be submitted to the 3-M Coordinator after review by the Division Officer and DH (or equivalent). The last 13 weeks of weekly PMS reports shall be kept on file by the 3-M Coordinator. 3. Weekly Work Center PMS Accountability Log. For work centers using SKEDPORT, a computer print-out of the completed weekly schedules is an acceptable accountability log provided the same maintenance person was assigned to and accomplished all PMS checks scheduled for that MIP line item. 1-16

26 For non-automated work centers, a manual accountability log shall be maintained which identifies the performance period, the MRs scheduled and accomplished, and the maintenance person. The work center supervisor shall maintain a 13 week accountability log. PMS Weekly Schedule PMS Quarterly Schedules PMS Cycle Schedule PMS Feedback Reports Weekly Work Center Accountability Log Weekly Work Center PMS Report Real-Time Spot- Check Forms Current schedule only (posted) Current schedule (posted) The Department Head (DH) retains 4 previous quarters Current schedule (posted) The DH retains superseded cycle schedules for 12 months Until a response is received (submit follow-up after one year) Work Center Supervisor retains most recent thirteen weeks 3-M Coordinator retains most recent thirteen weeks The Work Center Supervisor (WCS) retains most recent thirteen weeks with their accountability sheets Table 10-2 PMS Record Retention Requirements JUDGE ADVOCATE GENERAL MANUAL (JAGMAN) Under certain significant casualty situations, the Regimental Commander or CO/OIC may require the conduct of a Judge Advocate General Manual (JAGMAN) investigation or inquiry to determine the cause of the casualty. This is particularly true for casualties involving personnel injury, operational incidents (e.g. collisions, etc.), or catastrophic material failures in equipment/systems. Where 3-M Systems have been installed, the JAGMAN investigation shall include in its report of findings of fact, opinions, and recommendations, comments on the following: 1. Determination if inadequate PMS coverage is considered to be a factor in the cause of the casualty, and give recommendations to correct the PMS coverage, as appropriate. 2. Determination if PMS was performed properly, with regard to periodicity as well as technical requirements and if personnel are adequately trained to perform the maintenance requirements. 3. Determination if completion of proper PMS could have prevented or lessened the severity of the casualty. 1-17

27 4. Determination if appropriate seniors were notified of any inadequate PMS coverage or accomplishment and determine what action, if any, was taken to correct the problem. 1-18

28 200 - Background Chapter 2 3-M PMS Assessment COMFIRSTNCDINST The PMS assessment shall focus on scheduling and accomplishment of MRs. In particular, equipment and personnel shall be evaluated to determine if PMS, recorded as completed or partial, has in fact been accomplished in accordance with the MRC. Various administrative tools: cycle, quarterly and weekly schedules; MIPs, MRC decks, etc. shall be reviewed for accuracy and completeness. A summary report identifying discrepancies and areas that need improvement will be provided to the CO/OIC, and other responsible personnel, as appropriate. These discrepancies will be revisited during unit Self-assessment or at CO/OIC discretion PMS Assessment Objectives Proper PMS performance cannot be overstated in light of today s operational and fiscal climate. Equipment/system reliability, personnel safety, environmental issues, and other contemporary concerns require the personal attention and commitment of each CO/OIC and the personnel under their charge. The primary objectives of the PMS Assessment are: 1. To ensure that PMS requirements (MRCs) match installed equipment and systems. 2. To ensure that PMS checks are done in accordance with the MRC. In particular, the following, at a minimum shall be assessed: a. Safety precautions are followed. b. Required tools and materials are available and used properly. c. Lock-out/Tag-out procedures are properly used, when applicable. d. Proper handling and disposal procedures and personal protective equipment were used for the type of hazardous materials (HAZMAT) in use. 3. To analyze recorded reasons for non-accomplishment of PMS to determine trends and actions taken or required to improve PMS System performance. 2-1

29 4. To assess the effectiveness of the command s 3-M program. NOTE: Appendices A through D to this enclosure contain detailed guidelines, questionnaires and report forms for use in 3-M Program assists and Self-assessments PMS Scheduling Proper scheduling of PMS requirements is fundamental for an effective 3-M program. The integration of cycle, quarterly, and weekly schedules provides an orderly means for units to effectively plan or reschedule maintenance requirements during the respective periods within a maintenance cycle, allocate resources to accomplish planned maintenance, and identify personnel, material, or logistics problems that may impact readiness. PMS schedules should be prepared per paragraph of reference (a), except as noted in paragraphs 106 and 107, above. 1. Schedule Evaluations. The first step in conducting a thorough assessment is to review the PMS scheduling process. In particular, using Appendix B to this enclosure as a guide: a. Evaluate all master schedules and related documents (e.g., Departmental Master Manuals, Work Center Manuals, List of Effective Pages, etc.) for completeness, proper preparation, and maintenance. b. Validate work center PMS schedules and documents against the Master Manuals and the PMS Cycle Schedules. c. Gather statistics on the number of checks scheduled, completed, and recorded as "partials." 2. Recorded Accomplishment Ratio (RAR). The next step is to compute the RAR which is the ratio of the number of checks recorded as completed plus half credit for partially completed checks divided by the total number of MRs which were and should have been scheduled for accomplishment during the last 13-week period. Calculate PMS RAR. a. Number Scheduled. The total number of scheduled MRs includes those properly rescheduled from the preceding 13-week period and/or the previous quarter s schedule, and all Inactive Equipment Maintenance (including live storage ), biweekly, monthly, multiple month, quarterly, semiannual, annual cycle, and situation MRs, except for daily and weekly situation MRs, 2-2

30 which should have been scheduled and recorded as completed on the Quarterly PMS Schedule. Those MRs not properly recorded shall count as scheduled MRs. b. Number Accomplished. This total includes all MRs recorded on the quarterly schedules as having been completed or partially completed. Partial MRs must be properly documented to receive credit toward the RAR. Proper documentation includes the circling of all Partial MRs on the front of the Quarterly PMS Schedule; annotating all steps of the MRC not completed and stating, clearly and completely, the reasons for not completing the steps, on the back of the Quarterly PMS Schedule. c. Data Records. The forms in Appendix C to this enclosure shall be used to record the findings and RAR calculation. Appropriate comments should be included in the 3-M Assessment Summary Report. NOTE: To receive credit for a partial check, the completed steps must support the intent of the MRC. Every effort should be made to complete the partially completed MR at the first opportunity PMS Accomplishment PMS provides the means to identify problems and initiate corrective maintenance actions often before the equipment or system becomes inoperative. It is the best insurance against catastrophic failure of critical systems and equipment. Proper and timely performance of PMS is the key to optimum readiness and reliability. 1. Accomplishment Confidence Factor (ACF). The formula for calculating the ACF is provided on the Department and Unit 3-M Assessment Worksheets in Appendix C to this enclosure. The previous quarter s PMS schedule will be needed to complete this step since the ACF evaluation is intended to cover the most recent 13week performance period. Selection of completed MRs for the ACF calculation should encompass a representative sample from the various work centers and involving different maintenance procedures, personnel, and equipment. The assessor then observes the maintenance person who performed the checks demonstrate the method and procedures used for conformance with the MRC. Each check observed is evaluated as complete, partial, or non-accomplished and a quantitative score is derived for each department/work center. 2-3

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

OPNAVINST G N15 15 May a. To issue policy, procedures, and responsibilities for the Personnel Qualification Standards (PQS) Program.

OPNAVINST G N15 15 May a. To issue policy, procedures, and responsibilities for the Personnel Qualification Standards (PQS) Program. DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 3500.34G N15 OPNAV INSTRUCTION 3500.34G From: Chief of Naval Operations Subj: PERSONNEL

More information

SRI LANKA AUDITING STANDARD 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS CONTENTS

SRI LANKA AUDITING STANDARD 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS CONTENTS SRI LANKA AUDITING STANDARD 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS (Effective for audits of financial statements for periods beginning on or after 01 January 2014) * CONTENTS Paragraph Introduction

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

The Auditor s Responses to Assessed Risks

The Auditor s Responses to Assessed Risks SINGAPORE STANDARD SSA 330 ON AUDITING The Auditor s Responses to Assessed Risks SSA 330, The Auditor s Responses to Assessed Risks superseded SSA 330, The Auditor s Procedures in Response to Assessed

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

CHAPTER 11 PERSONNEL MANAGEMENT EVALUATION SECTION 1 - GENERAL

CHAPTER 11 PERSONNEL MANAGEMENT EVALUATION SECTION 1 - GENERAL CHAPTER 11 PERSONNEL MANAGEMENT EVALUATION SECTION 1 - GENERAL 11-1. Purpose of Personnel Management Evaluation. Evaluation is an essential component in the personnel management process. Its purpose is

More information

DATA ITEM DESCRIPTION TITLE: TRAINING SITUATION DOCUMENT Number: DI-SESS-81517C Approval Date:

DATA ITEM DESCRIPTION TITLE: TRAINING SITUATION DOCUMENT Number: DI-SESS-81517C Approval Date: DATA ITEM DESCRIPTION TITLE: TRAINING SITUATION DOCUMENT Number: DI-SESS-81517C Approval Date: 20130524 AMSC Number: N9379 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility:

More information

BROOKHAVEN NATIONAL LABORATORY SBMS Interim Procedure

BROOKHAVEN NATIONAL LABORATORY SBMS Interim Procedure BROOKHAVEN NATIONAL LABORATORY SBMS Interim Procedure Interim Procedure Number: 2004-18001-005 Revision: 12 on 1-26-07 Title: 18001 Audit Checklist Point of Contact: Pat Williams Management System: Occupational

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

Evaluating Internal Controls

Evaluating Internal Controls A SSURANCE AND A DVISORY BUSINESS S ERVICES Fourth in the Series!@# Evaluating Internal Controls Evaluating Overall Effectiveness, Identifying Matters for Improvement, and Ongoing Assessment of Controls

More information

Internal Audit Quality Analysis Evaluation against the Standards International Standards for the Professional Practice of Internal Auditing (2017)

Internal Audit Quality Analysis Evaluation against the Standards International Standards for the Professional Practice of Internal Auditing (2017) Internal Audit Quality Analysis Evaluation against the Standards International Standards for the Professional Practice of Internal Auditing (2017) Assessor 1: Assessor 2: Date: Date: Legend: Generally

More information

PHILIPPINE STANDARD ON AUDITING 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS CONTENTS

PHILIPPINE STANDARD ON AUDITING 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS CONTENTS PHILIPPINE STANDARD ON AUDITING 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS (Effective for audits of financial statements for periods beginning on or after December 15, 2009) CONTENTS Paragraph Introduction

More information

TIER II STANDARD FOR TECHNICAL COOPERATION ADMINISTRATORS INTRODUCTION

TIER II STANDARD FOR TECHNICAL COOPERATION ADMINISTRATORS INTRODUCTION Job Classification Manual Page 1 of 49 TIER II STANDARD FOR TECHNICAL COOPERATION ADMINISTRATORS INTRODUCTION 1. This grade level standard illustrates the application of the ICSC Master Standard (Tier

More information

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26 Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including

More information

GoldSRD Audit 101 Table of Contents & Resource Listing

GoldSRD Audit 101 Table of Contents & Resource Listing Au GoldSRD Audit 101 Table of Contents & Resource Listing I. IIA Standards II. GTAG I (Example Copy of the Contents of the GTAG Series) III. Example Audit Workprogram IV. Audit Test Workpaper Example V.

More information

INSPECTION SYSTEM REQUIREMENTS

INSPECTION SYSTEM REQUIREMENTS MILITARY SPECIFICATIONS MIL-I-45208A INSPECTION SYSTEM REQUIREMENTS This specification has been approved by the Department of Defense and is mandatory for use by all Agencies. 1. SCOPE 1.1 Scope. This

More information

Report. Quality Assessment of Internal Audit at <Organisation> Draft Report / Final Report

Report. Quality Assessment of Internal Audit at <Organisation> Draft Report / Final Report Report Quality Assessment of Internal Audit at Draft Report / Final Report Quality Self-Assessment by Independent Validation by Table of Contents 1.

More information

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution

More information

DOD INSTRUCTION , VOLUME 431 DOD CIVILIAN PERSONNEL MANAGEMENT SYSTEM: PERFORMANCE MANAGEMENT AND APPRAISAL PROGRAM

DOD INSTRUCTION , VOLUME 431 DOD CIVILIAN PERSONNEL MANAGEMENT SYSTEM: PERFORMANCE MANAGEMENT AND APPRAISAL PROGRAM DOD INSTRUCTION 1400.25, VOLUME 431 DOD CIVILIAN PERSONNEL MANAGEMENT SYSTEM: PERFORMANCE MANAGEMENT AND APPRAISAL PROGRAM Originating Component: Office of the Under Secretary of Defense for Personnel

More information

A Firm s System of Quality Control

A Firm s System of Quality Control A Firm s System of Quality Control 2759 QC Section 10 A Firm s System of Quality Control (Supersedes SQCS No. 7.) Source: SQCS No. 8; SAS No. 122; SAS No. 128. Effective date: Applicable to a CPA firm's

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY Template modified: 27 May 1997 14:30 BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 63-501 31 MAY 1994 Certified Current 4 November 2009 Acquisition AIR FORCE ACQUISITION QUALITY PROGRAM

More information

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

MANUAL QUALITY CONTROL & QUALITY ASSURANCE MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE

More information

QUALITY MANUAL W.R. Larson Rd. P. O. Box San Antonio, Texas San Antonio, Texas (830) (210) FAX

QUALITY MANUAL W.R. Larson Rd. P. O. Box San Antonio, Texas San Antonio, Texas (830) (210) FAX Company Location: Postal Address: 2420 W.R. Larson Rd. P. O. Box 591730 San Antonio, Texas 78261 San Antonio, Texas 78259-0136 (830) 438-2309 (210) 384-3484 FAX David Martinez, Vice President Bradley Buchanan,

More information

NATIONAL INCIDENT MANAGEMENT SYSTEM CAPABILITY ASSESSMENT SUPPORT TOOL (NIMCAST) SELF-ASSESSMENT INSTRUMENT 6

NATIONAL INCIDENT MANAGEMENT SYSTEM CAPABILITY ASSESSMENT SUPPORT TOOL (NIMCAST) SELF-ASSESSMENT INSTRUMENT 6 NATIONAL INCIDENT MANAGEMENT SYSTEM CAPABILITY ASSESSMENT SUPPORT TOOL (NIMCAST) TABLE OF CONTENTS Page TABLE OF CONTENTS 1 NATIONAL INCIDENT MANAGEMENT SYSTEM CAPABILITY ASSESSMENT SUPPORT TOOL (NIMCAST)

More information

Quality Management System

Quality Management System Quality Management System ZYQ Testing Laboratory 11111 Testing Avenue Testing Town, Alaska 22222 (555) 555-5555 Date Prepared: January 19, 2009 1 Please note that this Quality Management System (QM) was

More information

Defense Civilian Intelligence Personnel System Performance Management

Defense Civilian Intelligence Personnel System Performance Management Department of the Army Volume 2011 Defense Civilian Intelligence Personnel System Performance Management July 2011 Department of the Army DCIPS Policy Summary of Change, July 2011 VOLUME 2011 Defense Civilian

More information

RUWACON QUALITY MANUAL

RUWACON QUALITY MANUAL RUWACON QUALITY MANUAL Rev Date Preparation Review Approved Description of Revision 1 29 June SHEQ Manager SHEQ Manager Managing 2011 Director Ruwacon (PTY) Ltd P.O. Box 13596 Noordstad 9303 THIS DOCUMENT

More information

Planning an Audit of Financial Statements

Planning an Audit of Financial Statements ISA 300 February 2008 International Standard on Auditing Planning an Audit of Financial Statements INTERNATIONAL STANDARD ON AUDITING 300 Planning an Audit of Financial Statements Explanatory Foreword

More information

From: Commanding Officer, Navy Recruiting District New Orleans

From: Commanding Officer, Navy Recruiting District New Orleans NAVCRUITDIST NEW ORLEANS INSTRUCTION 1000.1E NAVCRUITDISTNOLAINST 1000.1E 01A From: Commanding Officer, Navy Recruiting District New Orleans Subj: COMMAND MENTORING PROGRAM DEPARTMENT OF THE NAVY NAVY

More information

Audit of Departmental Security

Audit of Departmental Security Audit of Departmental Security Office of the Chief Audit and Evaluation Executive Audit and Assurance Services Directorate October 2013 Cette publication est également disponible en français. This publication

More information

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,

More information

Concept of Operations. Disaster Cycle Services Program Essentials DCS WC OPS PE

Concept of Operations. Disaster Cycle Services Program Essentials DCS WC OPS PE Concept of Operations Disaster Cycle Services Program Essentials DCS WC OPS PE October 2014 Change Log Date Page(s) Section Change Owner: Disaster Cycle Services 2 Change Log... 2 Introduction... 4 Purpose...

More information

SRI LANKA AUDITING STANDARD 600 SPECIAL CONSIDERATIONS AUDITS OF GROUP FINANCIAL STATEMENTS (INCLUDING THE WORK OF COMPONENT AUDITORS) CONTENTS

SRI LANKA AUDITING STANDARD 600 SPECIAL CONSIDERATIONS AUDITS OF GROUP FINANCIAL STATEMENTS (INCLUDING THE WORK OF COMPONENT AUDITORS) CONTENTS SRI LANKA AUDITING STANDARD 600 SPECIAL CONSIDERATIONS AUDITS OF GROUP FINANCIAL STATEMENTS (INCLUDING THE WORK OF COMPONENT AUDITORS) (Effective for audits of group financial statements for periods beginning

More information

Auditing Standards and Practices Council

Auditing Standards and Practices Council Auditing Standards and Practices Council PHILIPPINE STANDARD ON AUDITING 330 THE AUDITOR S PROCEDURES IN RESPONSE TO ASSESSED RISKS PHILIPPINE STANDARD ON AUDITING 330 THE AUDITOR S PROCEDURES IN RESPONSE

More information

Common Criteria Evaluation and Validation Scheme For. Information Technology Laboratory. Guidance to Validators of IT Security Evaluations

Common Criteria Evaluation and Validation Scheme For. Information Technology Laboratory. Guidance to Validators of IT Security Evaluations Common Criteria Evaluation and Validation Scheme For Information Technology Security Guidance to Validators of IT Security Evaluations Scheme Publication #3 Version 1.0 February 2002 National Institute

More information

Independent Validation of the Internal Auditing Self-Assessment

Independent Validation of the Internal Auditing Self-Assessment Minnesota State Colleges & Universities Office of Internal Auditing Independent Validation of the Internal Auditing Self-Assessment Final Report March 7, 2007 Reference Number: 2007-03-004 INDEPENDENT

More information

Sawdey Solution Services

Sawdey Solution Services Sawdey Solution Services I n c o r p o r a t e d COMMERCIAL PRICE LIST 2016 1430 Oak Court, Suite 304 Beavercreek, OH 45430 Office Phone: (937) 490-4060 Fax: (937) 490-4086 www.sawdeysolut ionservices.com

More information

Auditing Standard for Islamic Financial Institutions No. 6

Auditing Standard for Islamic Financial Institutions No. 6 Auditing Standard for Islamic Financial Institutions No. 6 External Shari ah Audit (Independent Assurance Engagement on an Islamic Financial Institution s Compliance with Shari ah Principles and Rules)

More information

QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008

QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008 QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008 Revision: 9 Issue Date: 28 April 2014 CONTROLLED COPY Number: Issued to: UNCONTROLLED COPY A.M.S. Electronics, Inc. 113 Pillow Street, Butler, PA 16001 (724)

More information

Subj: CIVILIAN WORK SCHEDULES FOR THE BUREAU OF NAVAL PERSONNEL

Subj: CIVILIAN WORK SCHEDULES FOR THE BUREAU OF NAVAL PERSONNEL BUPERS-05 BUPERS INSTRUCTION 12600.2 From: Chief of Naval Personnel Subj: CIVILIAN WORK SCHEDULES FOR THE BUREAU OF NAVAL PERSONNEL Ref: (a) 5 U.S.C. (b) 5 CFR 610 (c) DoD 7000.14-R, Volume 8, Financial

More information

Guidance Note: Corporate Governance - Audit Committee. March Ce document est aussi disponible en français.

Guidance Note: Corporate Governance - Audit Committee. March Ce document est aussi disponible en français. Guidance Note: Corporate Governance - Audit Committee March 2015 Ce document est aussi disponible en français. Applicability The Guidance Note: Corporate Governance Audit Committee (the Guidance Note )

More information

Product Documentation SAP Business ByDesign February Business Configuration

Product Documentation SAP Business ByDesign February Business Configuration Product Documentation PUBLIC Business Configuration Table Of Contents 1 Business Configuration.... 4 2 Business Background... 5 2.1 Configuring Your SAP Solution... 5 2.2 Watermark... 7 2.3 Scoping...

More information

AICPA Peer Review Program Compliance: Responding to Latest Developments

AICPA Peer Review Program Compliance: Responding to Latest Developments AICPA Peer Review Program Compliance: Responding to Latest Developments TUESDAY, JUNE 24, 2014 1:00-2:50 pm Eastern IMPORTANT INFORMATION This program is approved for 2 CPE credit hours. To earn credit

More information

Audit Committee Manual

Audit Committee Manual Audit Committee Manual 2 Audit Committee Manual 2007 This manual is based on the best practices concerning audit committees. It was revised by a number of professional Egyptian experts and professionals

More information

Appendix D. Living Marine Resources Program Ocean Observing System Notification Procedures

Appendix D. Living Marine Resources Program Ocean Observing System Notification Procedures Appendix D Living Marine Resources Program Ocean Observing System Notification Procedures All LMR funded activities must comply with the Ocean Observing System (OOS) Handling Procedures in Enclosure 1

More information

Auditing Standards and Practices Council

Auditing Standards and Practices Council Auditing Standards and Practices Council PHILIPPINE STANDARD ON AUDITING 315 UNDERSTANDING THE ENTITY AND ITS ENVIRONMENT AND ASSESSING THE RISKS OF MATERIAL MISSTATEMENT PHILIPPINE STANDARD ON AUDITING

More information

BHG Operational Awareness Program May 8, 1998 Hazard Identification, Analysis, Control and Abatement Revision 0 Page 1 of 10

BHG Operational Awareness Program May 8, 1998 Hazard Identification, Analysis, Control and Abatement Revision 0 Page 1 of 10 Page 1 of 10 HAZARD IDENTIFICATION, ANALYSIS, CONTROL, AND ABATEMENT 1.0 SCOPE This Performance Assessment Guide for Hazard Identification, Analysis, Control, and Abatement will be used to carry out the

More information

Quality Manual ISO 9001:2000

Quality Manual ISO 9001:2000 Quality Manual ISO 9001:2000 Page 2 of 23 TABLE OF CONTENTS COVER PAGE...1 TABLE OF CONTENTS...2 SIGNATURES...3 QUALITY POLICY...4 INTRODUCTION...5 CORPORATE PROFILE...9 4.O QUALITY MANAGEMENT SYSTEM...10

More information

Quality Assurance Policy and Procedures

Quality Assurance Policy and Procedures 650 Montana Ave, Suite A Las Cruces, NM 88001 (575) 522-0430 www.rmgovernmentservices.com Quality Assurance Policy and Procedures PURPOSE. The purpose of this policy is to outline the quality assurance

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 11.12.2010 Official Journal of the European Union L 327/13 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 1169/2010 of 10 December 2010 on a common safety method for assessing conformity

More information

WHO Prequalification of In Vitro Diagnostics Programme

WHO Prequalification of In Vitro Diagnostics Programme P r e q u a l i f i c a t i o n T e a m - D i a g n o s t i c s Information for Manufacturers on the Manufacturing Site(s) Inspection (Assessment of the Quality Management System) WHO Prequalification

More information

WORKGROUP-LEVEL OVERVIEW. What You Will Learn. What You Will Apply To Your Workgroup

WORKGROUP-LEVEL OVERVIEW. What You Will Learn. What You Will Apply To Your Workgroup INTRODUCTION TO PERFORMANCE SCORECARDS WORKGROUP-LEVEL OVERVIEW What You Will Learn 1. By implementing Performance Scorecards, you are adopting an organized, proven method of defining key business outcomes

More information

POLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy

POLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy POLICY MANUAL FOR ISO 9001:2008 Document: PM-9001:2008 Date: April 7, 2015 REVIEWED BY: Tim Powers DATE: 4-7-2015 APPROVED BY: C._Bickford Uncontrolled Copy DATE: 4-7-2015 1.0 GENERAL ISS: 1 REV: E Page:

More information

Senior Civil Engineer - Concord Naval Weapons Station Reuse Project

Senior Civil Engineer - Concord Naval Weapons Station Reuse Project Page 1 of 5 CITY OF CONCORD invites applications for the position of: Senior Civil Engineer - Concord Naval Weapons Station Reuse Project SALARY: $50.14 - $68.94 Hourly $104,291.20 - $143,395.20 Annually

More information

REPORT 2015/082. Lebanon. in the United Nations Interim Force in FINAL OVERALL RATING: PARTIALLY SATISFACTORY

REPORT 2015/082. Lebanon. in the United Nations Interim Force in FINAL OVERALL RATING: PARTIALLY SATISFACTORY INTERNAL AUDIT DIVISION REPORT 2015/082 Audit of engineering support services in the United Nations Interim Force in Lebanon Overall results relating to the effective management of engineering support

More information

SOURCE SELECTION PLAN. {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx

SOURCE SELECTION PLAN. {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx SOURCE SELECTION PLAN {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx {INSERT MONTH & YEAR} COORDINATION: Contracting Officer Date IPT Leader

More information

JAA Administrative & Guidance Material Section Six: Synthetic Training Devices (STD/FSTD), Part Three: Temporary Guidance Leaflet

JAA Administrative & Guidance Material Section Six: Synthetic Training Devices (STD/FSTD), Part Three: Temporary Guidance Leaflet LEAFLET NO. 9 (rev. 1): ADDITIONAL GUIDANCE ON QUALITY SYSTEMS FOR OPERATORS OF SYNTHETIC TRAINING DEVICES NOTE: The material contained in this Leaflet has been issued in accordance with Chapter 9 of Administrative

More information

DEPARTMENT OF THE NAVY SHIPS MAINTENANCE AND MATERIAL MANAGEMENT (3-M) MANUAL

DEPARTMENT OF THE NAVY SHIPS MAINTENANCE AND MATERIAL MANAGEMENT (3-M) MANUAL DEPARTMENT OF THE NAVY NAVAL SEA SYSTEMS COMMAND 1333 ISAAC HULL AVE SE WASHINGTON NAVY YARD DC 20376-0001 NAVSEA INSTRUCTION 4790.8B In reply refer to: NAVSEAINST 4790.8B SEA 04RM November 13, 2003 From:

More information

REFERENCES Overview Quality Assurance Engineering Program...5

REFERENCES Overview Quality Assurance Engineering Program...5 TABLE OF CONTENTS REFERENCES... 4 CHAPTER 1 QAE GUIDANCE OVERVIEW 1.1. Overview... 5 1.2. Quality Assurance Engineering Program...5 CHAPTER 2 QAE MANAGEMENT STRUCTURE 2.1. Heads of DCMA QA-HQ and Operations...6

More information

Siuslaw valley Fire Rescue & Western Lane Ambulance. SHARED ADMINISTRATIVE SERVICES Proposed Implementation Plan

Siuslaw valley Fire Rescue & Western Lane Ambulance. SHARED ADMINISTRATIVE SERVICES Proposed Implementation Plan Siuslaw valley Fire Rescue & Western Lane Ambulance SHARED ADMINISTRATIVE SERVICES Proposed Implementation Plan June 2016 Table of Contents Purpose 3 Strategic Planning 4 Format 5 Direction and Oversight

More information

AS9003A QUALITY MANUAL

AS9003A QUALITY MANUAL Your Logo AS9003A QUALITY MANUAL Origination Date: (month/year) Document Identifier: Date: Document Status: Document Link: AS9003A Quality Manual Latest Revision Date Draft, Redline, Released, Obsolete

More information

Page 1 / 11. Version 0 June 2014

Page 1 / 11. Version 0 June 2014 Page 1 / 11 CORRESPONDENCE MATRIX NQSA NSQ-100 version 0 NUCLEAR SAFETY AND QUALITY MANAGEMENT SYSTEM REQUIREMENTS Model for quality management in design & development, manufacturing, erection, commissioning

More information

Chapter 2 GALP Implementation Assistance

Chapter 2 GALP Implementation Assistance Chapter 2 GALP The GALP Implementation is based on established data management principles. 1. PRINCIPLES Control is the essential objective behind most data management principles. Effective management

More information

INTERNATIONAL STANDARD ON AUDITING 315 UNDERSTANDING THE ENTITY AND ITS ENVIRONMENT AND ASSESSING THE RISKS OF MATERIAL MISSTATEMENT CONTENTS

INTERNATIONAL STANDARD ON AUDITING 315 UNDERSTANDING THE ENTITY AND ITS ENVIRONMENT AND ASSESSING THE RISKS OF MATERIAL MISSTATEMENT CONTENTS INTERNATIONAL STANDARD ON AUDITING 315 UNDERSTANDING THE ENTITY AND ITS ENVIRONMENT AND ASSESSING THE RISKS OF MATERIAL MISSTATEMENT (Effective for audits of financial statements for periods beginning

More information

UPPLIER ANUAL. Issued: 01 Aug 13

UPPLIER ANUAL. Issued: 01 Aug 13 UPPLIER ANUAL Issued: 01 Aug 13 Table of Contents Our Company 3 Our Vision 3 Scope and Purpose 4 Responsibilities 4 General Expectations and Requirements 5 Supplier Quality Management System 6 Supplier

More information

SRI LANKA AUDITING STANDARD 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS CONTENTS

SRI LANKA AUDITING STANDARD 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS CONTENTS SRI LANKA AUDITING STANDARD 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS (Effective for all the audits carried out on or after ) CONTENTS Paragraph Introduction 1-5 Preliminary Engagement Activities 6-7

More information

Quality Assurance Manual

Quality Assurance Manual Quality Assurance Manual Current Electrical is committed to leading the market in satisfying customer needs by providing versatile and innovative electrical and control solutions We take pride in the ability

More information

AUDIT COMMITTEE CHARTER REINSURANCE GROUP OF AMERICA, INCORPORATED. the audits of the Company s financial statements;

AUDIT COMMITTEE CHARTER REINSURANCE GROUP OF AMERICA, INCORPORATED. the audits of the Company s financial statements; AUDIT COMMITTEE CHARTER REINSURANCE GROUP OF AMERICA, INCORPORATED I. Role of the Committee The Audit Committee (the Committee ) of the Reinsurance Group of America, Incorporated (the Company ) Board of

More information

ISO 9001 QUALITY MANUAL

ISO 9001 QUALITY MANUAL ISO 9001 QUALITY MANUAL Origination Date: 10/01/14 Document Identifier: AIF quality control manual Date: 10/01/14 Project: Customer review Document Status: Released Document Link: www.aeroindfast.com Abstract:

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION NUMBER 1400.25-V2007 April 17, 2012 USD(P&R) SUBJECT: DoD Civilian Personnel Management System: Defense Civilian Intelligence Personnel System (DCIPS) Occupational Structure

More information

General Principles for Engagements Performed in Accordance With Statements on Standards for Accounting and Review Services

General Principles for Engagements Performed in Accordance With Statements on Standards for Accounting and Review Services General Principles for Engagements 2115 AR-C Section 60 General Principles for Engagements Performed in Accordance With Statements on Standards for Accounting and Review Services Source: SSARS No. 21;

More information

Reliance Aerospace Solutions

Reliance Aerospace Solutions Reliance Aerospace Solutions Quality Manual The information contained in this document is the property of Reliance Aerospace Solutions, a division of Reliance Steel & Aluminum Company This manual is a

More information

Justice Canada. Audit of Cost Recovery Process Improvement (CRPI) Initiative Phase 1. Audit Report. Internal Audit Services.

Justice Canada. Audit of Cost Recovery Process Improvement (CRPI) Initiative Phase 1. Audit Report. Internal Audit Services. IA S AI Justice Canada Audit of Cost Recovery Process Improvement (CRPI) Initiative Phase 1 Audit Report Internal Audit Services March 2015 Information contained in this publication or product may be reproduced,

More information

Internal Audit Appendix: IIA Standards

Internal Audit Appendix: IIA Standards Accountability Modules Internal Audit Appendix: IIA Standards Return to Table of ontents The following section provides additional detailed steps to examine when evaluating an internal audit function.

More information

OFFICER USE ONLY. 2. Position No: Title of Immediate Supervisor: University Secretary 3. Level: 10

OFFICER USE ONLY. 2. Position No: Title of Immediate Supervisor: University Secretary 3. Level: 10 C A R L E T O N U N I V E R S I T Y POSITION DESCRIPTION PART A Employee Name: OFFICER USE ONLY 1.Title: 2. Position No: 298659 Title of Immediate Supervisor: University Secretary 3. Level: 10 Position

More information

CORPORATE GOVERNANCE GUIDELINES

CORPORATE GOVERNANCE GUIDELINES CORPORATE GOVERNANCE GUIDELINES OF Ed. Nov.2016 TABLE OF CONTENTS A. DIRECTOR RESPONSIBILITIES 4 B. DIRECTOR QUALIFICATION STANDARDS 4 (1) Board Membership Criteria 4 (a) Independence 4 (b) Limits on Number

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved:

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved: VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Revisions to Chapter VII of Manual of Instructions Materials Acceptance and Materials Notebook Program NUMBER: MD 407-17

More information

CENTRAL BANK OF CYPRUS

CENTRAL BANK OF CYPRUS GUIDELINES TO BANKS ON THE APPROVAL PROCESS OF THE INTERNAL RATINGS BASED (IRB) AND THE ADVANCED MEASUREMENT (AMA) APPROACHES FOR THE CALCULATION OF CAPITAL REQUIREMENTS APRIL 2007 TABLE OF CONTENTS 1.

More information

Request for Proposal For: 2018 American Bar Association Temporary Services

Request for Proposal For: 2018 American Bar Association Temporary Services Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet

More information

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems STUDENT GUIDE CON 170 Fundamentals of Cost & Price Analysis Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems January 2017 CON170, Unit 5 Lesson 1 Cost Analysis Process and Players

More information

Planning an Audit 259

Planning an Audit 259 Planning an Audit 259 AU-C Section 300 Planning an Audit Source: SAS No. 122; SAS No. 128. Effective for audits of financial statements for periods ending on or after December 15, 2012. Introduction Scope

More information

Community)Policing)Plan/Task)47)Audit)Report)

Community)Policing)Plan/Task)47)Audit)Report) OAKLAND POLICE DEPARTMENT Community)Policing)Plan/Task)47)Audit)Report) Project)No.:)E2013OPDT47CPFB) Project)Manager:)Dawn)Reynolds,)JD,)CLEA,)CPO) Staff)Auditor:)Christopher)Figueroa,)DPA,)CGAP,)CFE,)CFS,)CLEA,)CRMA)

More information

P&O MARITIME Limassol, Cyprus Position Description

P&O MARITIME Limassol, Cyprus Position Description POSITION TITLE Marine Manager DIVISION P&O Maritime Limassol REPORTS TO Reports to the Board with dotted lines reporting to Head of Group Marine P&OM Direct Reports 5+ PRIMARY LOCATION Limassol Port -

More information

Internal Audit Policy and Procedures Internal Audit Charter

Internal Audit Policy and Procedures Internal Audit Charter Mission Statement Internal Audit Policy and Procedures Internal Audit Charter The mission of the Internal Audit Department is to provide independent and objective reviews and assessments of the business

More information

Environmental, Safety, and Occupational Health Plan Fiscal Year 2016

Environmental, Safety, and Occupational Health Plan Fiscal Year 2016 DEFENSE LOGISTICS AGENCY STRATEGIC MATERIALS Environmental, Safety, and Occupational Health Plan Fiscal Year 016 1. Introduction Purpose The purpose of the Defense Logistics Agency (DLA) Strategic Materials

More information

ADMINISTRATIVE INSTRUCTION 40 EMPLOYEE LEARNING AND DEVELOPMENT

ADMINISTRATIVE INSTRUCTION 40 EMPLOYEE LEARNING AND DEVELOPMENT ADMINISTRATIVE INSTRUCTION 40 EMPLOYEE LEARNING AND DEVELOPMENT Originating Component: Office of the Deputy Chief Management Officer of the Department of Defense Effective: July 19, 2017 Releasability:

More information

Level 6 NVQ Diploma in Construction Site Management (Construction)

Level 6 NVQ Diploma in Construction Site Management (Construction) Level 6 NVQ Diploma in Construction Site Management (Construction) Qualification Specification ProQual 2014 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile

More information

2017 Archaeology Audit Program Procedure Manual. April 2017

2017 Archaeology Audit Program Procedure Manual. April 2017 2017 Archaeology Audit Program Procedure Manual April 2017 Table of Contents Contents Table of Contents... 2 1.0 Introduction and Scope... 3 2.0 Audit Objectives... 3 3.0 Audit Procedures... 4 3.1 Audit

More information

IMDRF. Final Document. Regulatory Authority Assessor Competence and Training Requirements. IMDRF MDSAP Work Group

IMDRF. Final Document. Regulatory Authority Assessor Competence and Training Requirements. IMDRF MDSAP Work Group IMDRF/ WG /N6 FINAL:2013 IMDRF International Medical Device Regulators Forum Final Document Title: Authoring Group: Regulatory Authority Assessor Competence and Training Requirements IMDRF MDSAP Work Group

More information

AN AUDIT OF INTERNAL CONTROL THAT IS INTEGRATED WITH AN AUDIT OF FINANCIAL STATEMENTS: GUIDANCE FOR AUDITORS OF SMALLER PUBLIC COMPANIES

AN AUDIT OF INTERNAL CONTROL THAT IS INTEGRATED WITH AN AUDIT OF FINANCIAL STATEMENTS: GUIDANCE FOR AUDITORS OF SMALLER PUBLIC COMPANIES 1666 K Street, NW Washington, D.C. 20006 Telephone: (202) 207-9100 Facsimile: (202) 862-8430 www.pcaobus.org PRELIMINARY STAFF VIEWS AN AUDIT OF INTERNAL CONTROL THAT IS INTEGRATED WITH AN AUDIT OF FINANCIAL

More information

6. Procedures for Maintenance of Inventory Records by School/Centre Responsible Officer 5

6. Procedures for Maintenance of Inventory Records by School/Centre Responsible Officer 5 August 2016 Management Circular No. 54 Glasgow City Council City Chambers 40 John Street Merchant City GLASGOW G1 1JL To Heads of all Schools* Dear Colleague Inventory Procedures 1. Introduction 2 1.1

More information

Audit Committee of the Board of Directors Charter CNL HEALTHCARE PROPERTIES II, INC.

Audit Committee of the Board of Directors Charter CNL HEALTHCARE PROPERTIES II, INC. Audit Committee of the Board of Directors Charter CNL HEALTHCARE PROPERTIES II, INC. [Insert CNL logo] PURPOSE The primary purpose of the Audit Committee (the Committee ) is to assist the Board of Directors

More information

0. 0 TABLE OF CONTENTS

0. 0 TABLE OF CONTENTS QUALITY MANUAL Conforming to ISO 9001:2008 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2

More information

SA 230 Audit Documentation SA 300 Planning an Audit of FS

SA 230 Audit Documentation SA 300 Planning an Audit of FS ICAI YMEC & AASB Hosted by WIRC of ICAI Workshop on Auditing Standards SA 230 Audit Documentation SA 300 Planning an Audit of FS 22 nd November 2014 Disclaimer These are my personal views and can not be

More information

Administrative Analyst/Specialist Non-Exempt

Administrative Analyst/Specialist Non-Exempt Administrative Analyst/Specialist Non-Exempt Entry to this classification requires general knowledge and skills in the applicable administrative and/or program field with a foundational knowledge of public

More information

Practice Advisory : Quality Assurance and Improvement Program

Practice Advisory : Quality Assurance and Improvement Program Practice Advisory 1300-1: Quality Assurance and Improvement Program Primary Related Standard 1300: Quality Assurance and Improvement Program The chief audit executive must develop and maintain a quality

More information

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER PETROLEUM, PETROCHEMICAL AND NATURAL GAS INDUSTRIES -- SECTOR-SPECIFIC QUALITY MANAGEMENT SYSTEMS -- REQUIREMENTS FOR PRODUCT AND SERVICE SUPPLY ORGANIZATIONS

More information

IMMUNOGEN, INC. CORPORATE GOVERNANCE GUIDELINES OF THE BOARD OF DIRECTORS

IMMUNOGEN, INC. CORPORATE GOVERNANCE GUIDELINES OF THE BOARD OF DIRECTORS IMMUNOGEN, INC. CORPORATE GOVERNANCE GUIDELINES OF THE BOARD OF DIRECTORS Introduction As part of the corporate governance policies, processes and procedures of ImmunoGen, Inc. ( ImmunoGen or the Company

More information

A02 Assessment Rating Guide Revision 2.9 August 21, 2016

A02 Assessment Rating Guide Revision 2.9 August 21, 2016 Revision 2.9 August 21, 2016 Laboratory Name: Assessment Date: (Lead) Assessor: Signature: ! TABLE OF CONTENTS 1.0! INTRODUCTION... 1 2.0! ASSESSOR NOTES ON THE USE OF CALA A02 ASSESSMENT RATING GUIDE...

More information