SUPPLIER DISPOSITION REQUEST
|
|
- Pauline Fitzgerald
- 6 years ago
- Views:
Transcription
1 Contractor CAGE Code: 4V General Atomics Ct San Diego, CA SUPPLIER DISPOSITION REQUEST DR NO.: REV.: PAGE: of (3) PART NOMENCLATURE: (4) DWG/PART NO.: (5) REV.: (6) LOCATION: (7) DATE: (8) SUPPLIER NAME: (9) SUPPLIER ADDRESS: (10) MFR CAGE CODE: (11) GA-EMS BUYER: (12) P.O. NO.: (13) P.O. LINE : (14) LOT SIZE: (15) QTY INSP: (16) QTY NOT ACC.: (17) LOT/SERIAL NO.: (18) DISCOVERED IN: (19) INSPECTION CRITERIA: Receiving In-Process Final Other Design Document Inspection Instruction Other (20) REQUIREMENTS (21) NONCONFORMING CONDITION (22) PROPOSED DISPOSITION, CAUSE, AND CORRECTIVE ACTION (23) ATTACHMENTS: (24) PREVIOUS SDR/NR NO.: (25) INITIATOR: FOR GENERAL ATOMICS ELECTROMAGNETIC SYSTEMS USE ONLY (26) CONTRACT NUMBER: (27) HWCI PART NO.: (28) HWCI NOMENCLATURE: (29) WBS NO.: (30) PROJECT NO.: (31) SCHEDULE A NO: (32) CSI? YES NO (33) CLASSIFICATION: (34) ECR: NONCONFORMANCE: Critical Major Minor DESIGN CHANGE: Class I Class II INFORMATION ONLY: (35) DISPOSITION: (36) DISPOSITION & TECHNICAL JUSTIFICATION: Use-As-Is Repair Re-Work Scrap Information Only Modify (Design Change ONLY) ECR No: Date Issued:
2 SUPPLIER DISPOSTION REQUEST SDR No. Rev. (continuation page) AGE: FOR GENERAL ATOMICS ELECTROMAGNETIC SYSTEMS USE ONLY (Continuation Sheet) (37) CAUSE OF DISCREPANCY: (38) DEFECT CODE(s): (39) CAUSE (40) CORRECTIVE ACTION: (41) CORRECTIVE ACTION CODE(s): (42) CAUSE RESPONSIBILITY: (43) CORRECTIVE ACTION (BLOCK 44) VERIFICATION: GA-EMS: Supplier Other: (44) CAR REQUIRED? YES NO CAR No.: Date Issued: EFFECT INFORMATION: (45) EFFECT ON CONTRACT COST/PRICE: (46) EFFECT ON DELIVERY SCHEDULE: (47) EFFECT ON LOGISTICS SUPPORT, INTERFACE, OR SOFTWARE: GENERAL ATOMICS ELECTROMAGNETIC SYSTEMS SIGNATURES: (48) DESIGN ENGINEERING: (49) OTHER TECHNICAL: (50) ENGINEERING: (51) ENGINEERING MANAGER: (52) QUALITY ASSURANCE: (53) GA-EMS INTERNAL MATERIAL REVIEW BOARD (IMRB): CUSTOMER MATERIAL REVIEW BOARD: (54) GA-EMS CO-CHAIR: (55) CUSTOMER CO-CHAIR: DISPOSITION ACTION COMPLETED: (56) QTY ACC: (57) QTY NOT ACC: (58) NEW SDR/NR NO: (59) SUPPLIER OR GA-EMS INSPECTOR OR QA REPRESENTATIVE: (60) OTHER SIGNATURES (AS NEEDED) (61) GA-EMS QE VERIFICATION OF IMPLEMENTED DISPOSITION AND C/A SDR CLOSED
3 SUPPLIER DISPOSTION REQUEST SDR No. Rev. (continuation page) PAGE: of
4 Responsible Person Supplier 1 SUPPLIER DISPOSTION REQUEST (continuation page) PAGE: 4 Instructions to Supplier for Completing form EMS-0196 Supplier Disposition Request Block Title Description SDR No. & Revision Supplier 2 Page 1 of The SDR number consists of two parts. The first part is the GA-EMS PO number, and the second part is a three or more digit sequential number (for each PO) that is assigned by the supplier, who manages an SDR number log to avoid duplication or gaps. A letter is used to indicate subsequent revisions of the SDR. Fill in the total number of pages in the SDR, including continuation pages. Do not include the attachment pages; those are documented in Block (23). Supplier 3 Part Nomenclature Part Nomenclature from the drawing or specification. Supplier 4 DWG/Part No. Enter the Drawing Number of the Part that is nonconforming, requiring information, or design change suggestion. List the lowest level part number that the Supplier has. If no drawing number exists, then list the applicable specification number. Supplier 5 Rev. Revision of the Drawing or Spec. Supplier 6 Location Current physical location of the part. Supplier 7 Date The date of occurrence or discovery of the nonconformance, design modification, or information request. Supplier 8 Supplier Name The name of the organization on the GA-EMS PO. Supplier 9 Supplier Address The location of the manufacturing facility of the Supplier in Block (8). Supplier 10 Mfr CAGE Code Supplier's Contractor and Government Entity (CAGE) Code for the Manufacturing facility. Supplier 11 GA-EMS Buyer Name of the GA-EMS Buyer listed on the GA-EMS PO. Supplier 12 PO No. Enter the GA-EMS PO number. Supplier 13 PO Line Item Enter the PO Line Item(s) for the nonconforming part(s). Supplier 14 Lot Size Size of the Lot. Supplier 15 QTY Insp. Quantity of Items that were Inspected. Supplier 16 QTY Not Acc. Quantity of Items that were not accepted. Supplier 17 Lot/Serial No. Serial Number of nonconforming item, if applicable. If more than one Serial Number, enter "see Block (21) and include the Serial Numbers in the nonconformance description. If multiple nonconforming parts that are not serialized, attach temporary identification tags with "Unit 1," "Unit 2," etc., if necessary to clarify which nonconformance description applies to each unit. Supplier 18 Discovered in Check the box indicating the part of the manufacturing process in which the issue was discovered. For Other, specify the process. Supplier 19 Inspection Criteria Check the box indicating the type of criteria used to determine the issue. For Other, specify the criteria. Supplier 20 Requirements State the required condition, and note the applicable specification number and paragraph or drawing number and location. Describe it quantitatively, be complete, and be concise. Identify any interfacing items affected by the reported or proposed condition. For multiple items, give each a sequential item number in the Item column.
5 Responsible Person Supplier 21 Supplier 22 SUPPLIER DISPOSTION REQUEST (continuation page) PAGE: 5 Block Title Description Nonconforming Condition Proposed Disposition, Cause and Corrective Action Supplier 23 Attachments Supplier 24 Previous SDR/NR No. Identify the actual nonconformance, design modification, or information request. Describe it quantitatively, be complete, and be concise. Identifying any interfacing items affected by the reported or proposed condition. For multiple items, number them with the corresponding item numbers used in Block (20). Provide a clear, concise justification for any proposed changes. Identify any attachments submitted with the SDR. Include the attachment title and number of pages in each attachment. A repair procedure, including the method of verifying acceptability, is required for any repair dispositions. A design modification procedure, including a provision for acceptability verification, is required for any modification dispositions. Sketches or photographs are recommended to add to the clarity of the description of the nonconforming condition or design modification, or recommended disposition. Previous NRs/SDRs that apply to the item covered by the SDR and had similar causes and affected other items supplied to GA- EMS. Identify by NR/SDR number(s). Supplier 25 Initiator The originator shall sign as indicated. Supplier 56 QTY ACC Enter the quantity of items that are now accepted but were included in Block (16). Supplier 57 QTY NOT ACC. Enter the quantity of items that are still not accepted and were included in Block (16). Supplier 58 Supplier 59 NEW REPORT NO. Supplier Inspector or Supplier QA Representative If one or more items are still not acceptable, document on a new SDR form and list the SDR number here. Sign here to attest to the completion of the disposition actions and indicated quantities in Blocks (56) and (57). After the Supplier implements the GA-EMS-approved disposition, then forward the SDR to the Buyer listed on the Purchase Order.
NON-CONFORMING MATERIAL
NON-CONFORMING MATERIAL AND NONCONFORMING MATERIAL REPORTS 1.0 SCOPE This document describes the procedure used in determining the disposition of nonconforming items associated with MIT/CSR parts, materials,
More informationNonconforming Material System Procedure
Page: 1 of 13 Nonconforming Material System Procedure Page: 2 of 13 1.0 PURPOSE AND SCOPE 1.1 Purpose a. To define the system for identifying, segregating and controlling, and disposing of material, identified
More informationQuality Management System
Quality Management System 6.1 Quality Q-Codes () 6.1 Quality Q-Codes Quality Clauses The following quality control clauses apply when specifically noted on the Gear Technology purchase order: Q1- Material
More informationFAA Conformity Inspection Checklist Form N/C 10JAN16
Purpose The purpose of this checklist is to provide a system to assist with the FAA design and installation conformity inspection process. This form is primarily intended to serve applicants for FAA design
More informationINS QA Programme Requirements
Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued
More informationSupplier Quality Manual
Supplier Quality Manual Document No. F-PM010 Rev 3 Owner Supplier Quality Page 1 OF 11 TABLE OF CONTENTS 1.0 Purpose 3 2.0 Scope... 3 3.0 Quality System Requirements... 3 4.0 Approved Supplier List (ASL).
More informationCenterwide System Level Work Instruction
5.ARC.001.1 1 of 4 REVISION HISTORY REV Description of Change Author Effective Date 0 Initial release based on 7/98 DNV Audit and 6/98 Internal Audit (see DCR 98-00). M. Hines 9/24/98 1 Administrative
More informationPMA Quality Assurance Manual Rev. 2 Date 12 Feb 2016
PMA Quality Assurance Manual Date Aviation Technical Services, Inc. 3121 109 th Street SW Everett, WA 98204 425-423-3371 2600 West Casino Road Everett, WA 98204 10315 Airport Road Everett, WA 98204 www.atsmro.com
More informationCALCULATION COVER SHEET
Doc. No.: DQP410FA Rev. Page DQP410FA - 1 of 1 CALCULATION COVER SHEET Calculation Title: Calculation Number: Total Number of Pages (including cover sheet): Total Number of Computer Runs: Prepared
More informationAssociation of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017
Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program
More informationQuality Manual ISO 9001:2000
Quality Manual ISO 9001:2000 Page 2 of 23 TABLE OF CONTENTS COVER PAGE...1 TABLE OF CONTENTS...2 SIGNATURES...3 QUALITY POLICY...4 INTRODUCTION...5 CORPORATE PROFILE...9 4.O QUALITY MANAGEMENT SYSTEM...10
More informationPage 1 / 11. Version 0 June 2014
Page 1 / 11 CORRESPONDENCE MATRIX NQSA NSQ-100 version 0 NUCLEAR SAFETY AND QUALITY MANAGEMENT SYSTEM REQUIREMENTS Model for quality management in design & development, manufacturing, erection, commissioning
More informationSAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES
SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SECTION: SFPUC INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURE NO: 032 TITLE: SQS PLAN AND SURVEILLANCE PROCESS
More informationDesk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT
Desk Audit of Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT-90-5001-02.1 Reviewed by: Element Requirements Applicable 1. Is a quality policy defined
More informationNONCONFORMANCE DOCUMENT VENDOR REQUEST FOR VARIATION
KAMAN INTEGRATED STRUCTURES & METALLIC S J198 Rev. 01/2017 NONCONFORMANCE DOCUMENT VENDOR REQUEST FOR VARIATION A Supplier submitting a Vendor Request for Variation (J198) may be charged a fee of $500
More informationQUALITY OPERATIONS STANDARD
QUALITY OPERATIONS STANDARD TITLE: GUIDELINES FOR SUPPLIER PREPARATION AND PROCESSING OF SUPPLIER MATERIAL REVIEW REPORT (SMRR/WT) Standard Number: QOS 0035 Revision Letter: L Effective Date: July 31,
More informationAssociation of American Railroads Mechanical Division MANUAL OF STANDARDS AND RECOMMENDED PRACTICES
Association of American Railroads MANUAL OF STANDARDS AND RECOMMENDED PRACTICES EQUIPMENT IDENTIFICATION AND WARRANTY ADMINISTRATION Specification M-xxx-xxx Adopted: (date) DRAFT #18 Compiled by the ISM-RIF-WWG
More information2.2. The Seller shall be responsible for achieving and maintaining a quality performance level of either:
2.0. Supplier Quality Performance: 2.1. When requested by Boeing, Seller agrees to work with Boeing to develop and implement processes designed at improving Seller s quality performance. Process will include
More informationLM Logistic Services Quality Notes Conversion Chart
Page 1 of 10 LM Logistic Services s Conversion Chart The latest issue to this document is the version that is available on the Lockheed Martin Logistic Services Supplier Management website: http://www.lockheedmartin.com/us/suppliers/bu-info/aeronautics/sustainment-services.html
More informationQuality Management System Manual
This Page 1 of 47 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies
More informationKorea Aerospace Industries, Ltd. KAI Procurement Quality Management System Requirements for Suppliers (KPQMS 9100)
KPQMS 9100 Rev. 04 Release Date: 2009.05.15 KAI Procurement Quality Management System Requirements (KPQMS 9100) Korea Aerospace Industries, Ltd. Revision status Rev. No. Para. Pages Description Revision
More informationSHELTON INDUSTRIAL PATTERN INC.
Defintions: Seller : Supplier of materials, parts and or services that support production Supplies : materials, parts that support production FOD : Foreign Object Debri / Damage 1. Quality Management System
More informationFAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM
FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM 1 QA.101 rev. 3-2012 PURPOSE OF THIS STANDARD Fairfield is committed to continuous product quality improvement. Our management team is convinced that only with
More informationCODE: FD10 Rev: A Date: 9/24/2008 CONFIGURATION MANAGEMENT
1.0 Definition of terms: CONFIGURATION MANAGEMENT 1.01 The term shall, will and may are used with specific intent thought-out these documents and will observe the following rules: 1.1 Requirements defined
More informationExternal Provider Quality Requirements QCS-001 Processing Sources
Page 1 of 11 The latest issue to this document is the version that is available on the Lockheed Martin Logistics Services Supplier Quality Management website: http://www.lockheedmartin.com/us/suppliers/bu-info/aeronautics/sustainment-services.html
More informationWork Instruction PUI Supplier Request for Nonconforming Material (Rev 2)
1.0 Purpose To provide Insitu suppliers a method to request Insitu s authority to supply/ship nonconforming material (NCM). This document defines how the Supplier Nonconforming Material Request (NCMR)
More informationZOLL Document Number: 90E0004 Page 5 of 15 Maintenance of Quality Records
ZOLL Number: 90E0004 Page 5 of 15 1. INTRODUCTION 1.1 Purpose 1.2 Scope The purpose of this document is to provide guidance regarding the identification of a quality record and the documentation practices
More informationIn case of of differences or inconsistencies with texts in the Main Contract, the stipulations in this Appendix I will prevail.
This Appendix I with the Supplier Quality Assurance Requirements for the Hondajet HA-420 program defines Fokker Aerostructures (Buyer) additional Program Specific Quality Requirements and forms an integral
More informationViaSat, Inc. Quality PR Third Party Inspection Services, PWB Verification and DPA Samples Quality 1 of 12 Purpose and Scope
ViaSat, Inc. Process Area: Document Number: Revision: Quality PR001362 001 Name of Document: Process Category: Page: Quality 1 of 12 1 Purpose and Scope The purpose of this procedure is to define the process
More informationITER Quality Assurance
US ITER Central Solenoid Vendor Meeting ITER Quality Assurance by John Mashburn USIPO QA Manager 1 QA Topics ITER s Nuclear License Graded Approach Proposal QA Items Quality Plan Specific to Contract Manufacturing
More informationDefinitions contained in the above mentioned document and industry regulations are applicable herein.
Quality Specification TEC-1021 21May12 Rev E Global Quality Management System Supplement for Various International Nuclear Quality Assurance Criteria, Regulations, and Requirements 1. SCOPE 1.1. Content
More informationSupplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260
Supplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260 Firestone Industrial Products Quality Policy We will
More informationBAITY SCREW MACHINE PRODUCTS QUALITY MANUAL
BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL Page 1 of 33 TABLE OF CONTENTS SECTION TITLE PAGE 0 Company Introduction... 4 0 Organizational Chart.. 5 1 Scope.. 6 2 Related Documents... 6 3 Terminology...
More informationAppendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items
Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items REVISION RECORD The latest issue to this document is the version that is available on the Lockheed Martin
More informationTITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager
Scope: This process outlines the Exotic Tool Welding (ETW) quality control terms and conditions levied to suppliers providing product or service for ETW. The QA codes identified on the purchase order correlate
More informationControlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70
Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70 RUSSTECH PURCHASE ORDER CLAUSES RPOC 1000 EARLY DELIVERY OK "Time is of the essence for performance under this Purchase Order. Seller
More informationQuality Assurance Policy and Procedures
650 Montana Ave, Suite A Las Cruces, NM 88001 (575) 522-0430 www.rmgovernmentservices.com Quality Assurance Policy and Procedures PURPOSE. The purpose of this policy is to outline the quality assurance
More information4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:
Approved By: Purchasing Manager Candice Lane (signature on file) Date: 5/26/17 Approved By: Process Owner James D. Moore (signature on file) Date: 5/26/17 1. PURPOSE 1.1. To define Cambridge Valley Machining,
More informationQUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.
REF ONLY-DATA MANAGEMENT: 1 ST (2) PAGES IS NOT PART OF FORM 1135. QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised. FORM 1135 QUALITY ASSURANCE CLAUSES
More informationSECTION QUALITY REQUIREMENTS
SECTION 014000 - PART 1 - GENERAL 1.1 SUMMARY A. Defines SRP requirements for Contractor Quality Control and Owner Quality Assurance. As an Electric and Water Utility, SRP has many critical facilities.
More informationCORPORATE QUALITY SYSTEM PROCEDURE
Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 1 of 10 Approvals Author Quality System Manager Name: Randy Bennett Doyle Cassity Signature: Date: 11/29/2011 11/29/2011 Electronic versions of this procedure
More informationMantor Aviation Company
Mantor Aviation Company QUALITY ASSURANCE MANUAL QA Manual 2013 Revision 8 Uncontrolled Copy Ph: 507-553-5053 Fax: 612-395-5267 Introduction Mantor Aviation Company is a supplier of aircraft parts, components,
More informationThis procedure covers evaluating and analyzing supplier for addition to the Approved Supplier List (ASL) and performance evaluation.
1.0 Scope and Purpose This procedure covers evaluating and analyzing supplier for addition to the Approved Supplier List (ASL) and performance evaluation. This procedure covers all purchased items obtained
More informationFlooring Contractor QA/QC Plan Sample Selected pages (not a complete plan)
Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan) Part 1: Project Specific Quality Plan Part 2: Quality Manual Part 3: Submittal Forms Part 4: Inspection Checklist Forms Contact:
More informationANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS
CONTROL OF NON-CONFORMING PRODUCTS (8.3) Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: ALL ALL RELEASE DATE: Revision Approval: J.BENTINK Signature: Date: 20/02/17
More informationEPICOR, INCORPORATED QUALITY ASSURANCE MANUAL
EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:
More informationU.S. Technical Advisory Group to ISO/Technical Committee 207 Clarification of Intent of ISO 14001
Committee Correspondence US SUB-TAG to ISO/TC/207/SC1 on Environmental Management Systems Administrator: Jennifer Admussen, ASQ Chair: Susan L.K. Briggs When originating or replying, please send copy to
More informationNR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26
Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including
More informationFO-5 PR-1, FO-1,2 PR-1 EM-6 PR-1, FE-1, NA-1 FO-10 FO-7, EM-2 EM-2. ISO Environmental Management Systems - Specification Yes.
ISO 14001 Environmental Management Systems - Specification Yes Minor No Comments/Questions 4.1 GENERAL The organization shall establish and maintain an environmental management system, the requirements
More informationQuality Manual Revision: C Effective: 03/01/10
TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL
More informationROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual
ROTEK IIInnInstI Instrument Corp. ISO 9001 Quality System Manual QSM900100-01 REV O MANUAL NO: 10 ISSUED TO: Rotek Web Site DATE OF ISSUE: 17 July 2002 APPROVALS: ORIGINATOR: Lawrence E. Weissbach Lawrence
More informationZODIAC INTERCONNECT US ZODIAC AEROSYSTEMS SEGMENT ZODIAC INTERCONNECT DIVISION
Document Number: PWI-003 Document Title: Supplier Detailed Inspection Revision: A Released Date: 11-14-2017 Approved By: Harold Julander Signature Approval: See Electronic Approval Table of Contents: Section
More informationHow to Set Up a Quality Assurance System A Step by Step Guide to Quality Control Management System
How to Set Up a Quality Assurance System A Step by Step Guide to Quality Control Management System By BizMove Management Training Institute Other free books by BizMove that may interest you: Free starting
More informationPCX Aerostructures, LLC Quality Notes Supplier Quality Assurance Requirements - Quality Clauses Revision 29 - March 30, 2017
PCX Aerostructures, LLC Quality Notes Supplier Quality Assurance Requirements - Quality Clauses Revision 29 - March 30, 2017 1.All special processes required by the Purchase Order must be performed by
More informationPPI/TZ Standard Quality Requirements for Suppliers -SQRS-
PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: March 19, 2014 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact
More informationQUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008
QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008 Revision: 9 Issue Date: 28 April 2014 CONTROLLED COPY Number: Issued to: UNCONTROLLED COPY A.M.S. Electronics, Inc. 113 Pillow Street, Butler, PA 16001 (724)
More informationJUL 14 Rev B All Paragraphs Revised
Quality Specification 102-32039 22 JUL 14 Rev B All Paragraphs Revised Counterfeit Electronic Parts Detection and Avoidance System 1. PURPOSE 1.1. Content The purpose of this document is to describe the
More informationCorrective Action(s) System Procedure
Page: 1 of 7 Corrective Action(s) System Procedure Page: 2 of 7 1.0 PURPOSE AND SCOPE 1.1 Purpose 1.1.1 To define the methods for preventive action, nonconformance trend identification, customer complaints/concerns
More informationInstructions for Supplier Survey
Instructions for Supplier Survey In order to be become a vendor and/or a repair station for Aero Precision, you are required to complete a Quality Systems Survey. Once you have completed the survey, please
More informationDigital Supplier Handbook
Digital Supplier Handbook Table of Contents Prospective Suppliers... 3 Current Suppliers... 3 Request for Quote... 3 Purchase Order... 4 Terms and Conditions... 5 Quality Requirements... 6 Shipping Instructions...
More informationQM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope
SECTION 1 Page 1/1 1.0 INTRODUCTION 1.1 Scope The purpose of the Quality Manual is to provide a documented quality management system for BOLTEX mfg. The manual includes the organization structure, responsibilities,
More informationSupplier Rating System (SRS)
Supplier Rating System (SRS) Aerojet Rocketdyne March 2017 1 Supplier Rating System As a supplier to Aerojet Rocketdyne, you should know and understand our supplier rating system. Aerojet Rocketdyne uses
More informationISS PRE-SHIPMENT AND ACCEPTANCE REVIEW CHECKLIST AND GUIDELINES FOR DELIVERY OF HARDWARE ACCEPTANCE DATA PACKAGE (ADP)
ISS PRE-SHIPMENT AND ACCEPTANCE REVIEW CHECKLIST AND GUIDELINES FOR DELIVERY OF HARDWARE ACCEPTANCE DATA PACKAGE (ADP) Date: Item Name: CI Number: Part Number: CAGE Code: Serial Number: Model number: Contract
More informationQUALITY MANUAL W.R. Larson Rd. P. O. Box San Antonio, Texas San Antonio, Texas (830) (210) FAX
Company Location: Postal Address: 2420 W.R. Larson Rd. P. O. Box 591730 San Antonio, Texas 78261 San Antonio, Texas 78259-0136 (830) 438-2309 (210) 384-3484 FAX David Martinez, Vice President Bradley Buchanan,
More informationSupplier Quality Manual
Supplier Quality Manual February 2010 Page 1 of 6 Table of Contents 1.0 Purpose 2.0 Scope 3.0 Quality System Requirements 4.0 Supplier Assessments 5.0 Advance Product Quality Planning 6.0 First Article
More informationOil and Gas Contractor QA/QC Plan Sample Selected pages (not a complete plan)
Oil and Gas Contractor QA/QC Plan Sample Selected pages (not a complete plan) Part 1: Project Specific Quality Plan Part 2: Quality Manual Part 3: Submittal Forms Part 4: Inspection Checklist Forms Contact:
More informationNRC INSPECTION MANUAL INSPECTION PROCEDURE 35065
NRC INSPECTION MANUAL INSPECTION PROCEDURE 35065 DQASIP PROCUREMENT, RECEIVING, AND STORAGE PROGRAM APPLICABILITY: 2512 35065-01 INSPECTION OBJECTIVES To determine whether equipment procurement specifications
More informationQUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A
Page 1 1 of 57 President Design Engineering Production Production Engineering Materials Control Purchasing Service Marketing Sales Contracts Human Resources Quality Assurance Quality Control Production
More informationFLYSHEET 100 Rev. 14 QUALITY SYSTEM REQUIREMENTS
FLYSHEET 100 Rev. 14 QUALITY SYSTEM REQUIREMENTS In addition to the applicable Quality System Code incorporated in this contract, Seller shall comply with the requirements of Section 2.0, titled Additional
More informationQUALITY ASSURANCE MANUAL. D SECTION XV: Revision A SUBJECT: INSTRUCTIONS FOR COMPLETING AN ELECTRONIC SUPPLIER INITIATED REJECTION REPORT.
BOEING PHILADELPHIA QUALITY ASSURANCE D8 INSTRUCTIONS QUALITY ASSURANCE MANUAL D8-4899.150 SECTION XV DATE: February 16, 2007 Supersedes:12/7/06 [0 INDEX] [1H1HOME] [2H2HSEARCH] D8-4899.150 SECTION XV:
More informationLimited Shelf Material Control Procedure
Page: 1 of 7 Limited Shelf Material Control Procedure Page: 2 of 7 1.0 PURPOSE AND SCOPE 1.1 Purpose 1.1.1 The purpose of this procedure is to define the method for Limited Shelf Material Control used
More informationIMMEDIATE POLICY CHANGE
DEPARTMENT OF DEFENSE Defense Contract Management Agency IMMEDIATE POLICY CHANGE Data Collection and Analysis Component Name DCMA-INST 323 (IPC-1) OPR: DCMA-QA June 26, 2015 Administrative Change, July
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 4000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationQUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES
Your Company Name QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 QMS Policies and Procedures Latest Revision Date Abstract:
More informationInstructions For Populating GFP Attachments
Instructions For Populating GFP Attachments August 2014 The two attachments for GFP serve multiple purposes in the contract. They document the agreement between the Government and the contractor on what
More informationReport number A0436 PRODUCT REQUIREMENTS FOR SELLERS OF BOEING DESIGNED DETAIL PARTS AND NON-FUNCTIONAL MINOR ASSEMBLIES
Report number A0436 PRODUCT REQUIREMENTS FOR SELLERS OF BOEING DESIGNED DETAIL PARTS AND NON-FUNCTIONAL MINOR ASSEMBLIES Revision date 14 DEC 2007 Revision letter T Issue date 30 APRIL 1970 Contract number
More informationTOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA
Page 1 of 42 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 10051 OLD GROVE RD. SAN DIEGO, CA 92131 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza
More informationSUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210
SUPPLIER MANUAL Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210 TABLE OF CONTENTS Page Title 1... Introduction, Purpose, Scope Quality Policy, Certification & Exemptions
More informationWork Instruction PUI Supplier Request for Nonconforming Material (Rev 1)
1.0 Purpose To provide Insitu suppliers a method to request Insitu s authority to supply/ship nonconforming material (NCM). This document defines how the Supplier Nonconforming Material Request (NCMR)
More informationApproved Supplier Guidance
Approved Supplier Guidance Administrative Office: 2420 W. R. Larson Rd. San Antonio, Texas 78261 (210) 384-3484 FAX (830) 438-2309 D&D Machinery and Sales Inc. Approval by: Original copy retained in D&D
More informationZOLL Document Number: 90F1087 Page 3 of 18 MES/ERP Nonconforming Material Transaction Instructions REV B
ZOLL Document Number: 90F1087 Page 3 of 18 1. INTRODUCTION The purpose of this document is to provide instruction for when and how to perform the ERP and MES transactions required to process nonconforming
More informationCQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015
CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,
More informationAS9003A QUALITY MANUAL
AS9003A QUALITY MANUAL Origination Date: (month/year) Document Identifier: Date: Document Status: Document Link: AS9003A Latest Revision Date Draft, Redline, Released, Obsolete Location on Server (if used)
More informationQUALITY ASSURANCE SPECIFICATION WELDING HEAT TREATMENT PAGE 1 OF 6
QUALITY ASSURANCE SPECIFICATION REVISION: 0 DATE: 08/29/14 WELDING HEAT TREATMENT PAGE 1 OF 6 1.0 Purpose The purpose of this specification is to establish the minimum quality assurance requirements for
More informationQuality Clauses F Rev. I West Brooks Avenue North Las Vegas, NV Phone (702) Fax (702)
Quality Code Quality Clause Title Q-001 Flow Down Requirements Q-002 Quality System Q-003 Discrepancies Q-004 FOD Foreign Object Debris/Damage Program Q-005 ESD Electrostatic Discharge Control Program
More informationASA-100 QUALITY MANUAL
Your Company Name ASA-100 QUALITY MANUAL Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 Quality Manual Latest Revision Date Abstract: This quality manual describes (your Company's)
More informationQuality Manual. Specification No.: Q Revision 07 Page 1 of 14
Page 1 of 14 Quality Manual This Quality Manual provides the overall quality strategy and objectives of Pyramid Semiconductor s quality system. It is based on the requirements of ISO 9000. This manual
More informationSRCTec, Inc. SUPPLIER QUALITY CLAUSES (SQC S)
01 SOURCE INSPECTIONS A1. Level 1: Government Source Inspection (GSI) Government Source Inspection is required prior to shipment from your facility. Upon receipt of this purchase order, notify the government
More informationMETUCHEN CAPACITORS INCORPORATED. Quality Manual P.O. BOX HIGHWAY 35, SUITE 2 HOLMDEL NJ USA
METUCHEN CAPACITORS INCORPORATED Quality Manual P.O. BOX 399 2139 HIGHWAY 35, SUITE 2 HOLMDEL NJ 07733 USA Copy Holder Copy Number : 1 This Quality Manual Covers the activities and functions performed
More information12. Inventory - Receiving & Shipping
1.0 PURPOSE 1.1 To establish a procedure for dealing with Warehouse issues including: i ii iii iv Receiving Shipping Handling and storage including ESD RMA & Quarantine 2.0 RESPONSIBILITY 2.1 The Warehouse
More informationSupplier Quality Manual
ALLIANCE ELECTRONICS DISTRIBUTOR Supplier Quality Manual 22412 Gilberto Rd. Rancho Santa Margarita, CA 92688 INTRODUCTION Welcome to Alliance Electronics Distributor (AED) Alliance Electronics Distributor
More informationSUPPLIER QUALITY ASSESSMENT
Supplier Organization Name: Supplier Number: Street Address: Date of This Audit: City, State, Zip Code: Date of Last Audit: Country: of Employees: Main Phone Number: of Buildings/Size: Fax Number: Principal
More informationGKN Aerospace - St. Louis Supplier Quality Assurance Manual
GKN Aerospace - St. Louis Supplier Quality Assurance Manual This manual contains requirements that are applicable when invoked by GKN Aerospace St. Louis Purchase Orders. Use of this manual is required
More informationSupplier Approval and Performance Evaluation
Quality Management System QMS-702 Revision Log Page: 1 of 6 Supplier Approval and Performance Evaluation Rev. Date Description of Change Prepared By N/C 10/1996 Original issue to replace procedure 040-010
More information2. GENERAL REQUIREMENTS
1. PURPOSE AND SCOPE 1.1 This document defines the Supplier Quality Requirements to be met by suppliers in the performance of the purchase order issued by Sagetech to ensure that externally provided processes,
More informationP&W Supplier Tooling Package Guidelines
P&W Supplier Tooling Package Guidelines (Supplier Guide to Submitting a Complete and Compliant Tooling Package with a Manifest for New (Original) Tooling, Rate (Additional) Tooling, Replacement Tooling,
More informationCURTISS WRIGHT Actuation Systems 201 Old Boiling Springs Rd Shelby, NC SUPPLIER QUALITY REQUIREMENTS SQR-100. Rev. L.
CURTISS WRIGHT Actuation Systems 201 Old Boiling Springs Rd Shelby, NC 28152-8008 SUPPLIER QUALITY REQUIREMENTS SQR-100 Rev. L Approved by: PREFACE This document is to be used to define the quality requirements
More informationClause "A" Subcontractor Controls, General Requirements (Applicable when Clause "A" is invoked in the Purchase Order "Remarks")
Clause "A" Subcontractor Controls, General Requirements (Applicable when Clause "A" is invoked in the Purchase Order "Remarks") (1) Any non-destructive testing defined within this Seyer Industries Purchase
More informationAltech Machining, Inc. Terms and Conditions
11000 Woodside Avenue North Phone: (619) 448-3392 Santee, CA 92071 Fax: (619) 448-6854 info@altechmachining.net Altech Machining, Inc. Terms and Conditions The terms and conditions listed in this document
More informationNUCLEAR SAFETY REQUIREMENTS BSR
NUCLEAR SAFETY REQUIREMENTS BSR-1.8.2-2015 APPROVED BY Order No. 22.3-99 of The Head of State Nuclear Power Safety Inspectorate, of 7 October 2011 (as amended by Order No. 22.3-57 of the Head of State
More information