1 Doc. No: UPHDB/QM/01 Prepared By: A Page: 1 of 18 Issued by: 7.1 PLANNING OF UPHDB has established a system to plan and develop the processes needed for product realisation. The planning of the product realisation is compatible and consistent with the requirements of the other processes needed for the Quality Management System. UPHDB has established a team of senior officers who discuss, debate and decide on all the aspects relating to the planning of product realisation processes. In planning the product realisation, the team of senior officers determines the following as appropriate a) Quality objectives and requirements for the product; b) The need to establish processes, documents, and provide resources specific to the product; c) Required verification, validation, monitoring, inspection and test activities specific to the product and the criteria for product acceptance; d) Records needed to provide evidence that the realisation processes and resulting product meet requirement. The Executive Engineer / Project Manager will develop the action Plan that is specific to the project assigned to him. The Executive Engineer / Project Manager will also review the action plan prepared from time to time and make the necessary changes as required and obtain the approval for such changes.
2 Doc. No: UPHDB/QM/01 Prepared By: A Page: 2 of 18 Issued by: 7.2 CUSTOMER RELATED PROCESS DETERMINATION OF REQUIREMENTS RELATED TO THE : UPHDB has established systematic methods for determining on a project to project basis:- a) Requirements specified by the customers including requirements for delivery and post delivery activities. b) Requirements not stated by the customer but necessary for the specified or intended use where required. c) Statutory and regulatory requirements related to the product. d) Any additional requirements determined by UPHDB The above requirements are determined at UPHDB on a project to project basis by different sections like Construction Units, Architecture & Planning Wing, and Head Office etc. The requirements of the customers are defined and documented. Other requirements not stated by the customer but necessary for specified or intended use, statuary and /or regulatory requirements specific to the project and any additional requirements are all defined and documented in the Detailed Project Report etc.
3 Doc. No: UPHDB/QM/01 Prepared By: A Page: 3 of 18 Issued by: REVIEW OF REQUIREMENTS RELATED TO THE : UPHDB broadly undertakes two categories of works. The details of the two categories are explained as follows: a) Construction of buildings, roads, drain, parks etc. and other development work for new town ship/ colony b) Work in relation to already agreed requirements of a client. The requirements of the customers relating to the product required are assessed and implemented or discussed, negotiated and agreed upon through formal meetings between the two parties, internal one to one meetings between the representatives of the two parities etc. The objective of the discussions; negotiation etc. is to ensure that; a) All product requirement are clearly defined and understood b) Requirements different from those previously agreed are resolved to the mutual satisfaction by both parties c) UPHDB has the ability to meet the defined requirements. All the records of the internal reviews and discussion with customer or his representative are maintained by UPHDB in the form of notes/files. These notes also specify the actions arising from the reviews. Normally, being a Govt. Organization, UPHDB does not accept verbal statements of requirements from the customers. However, if any such verbal statements of requirements are received, then UPHDB advises the customer to conform the same in writing before their acceptance by UPHDB. Changes to the product requirements can be triggered both by UPHDB and/or the customer. However, any request for change will be intimated discussed and agreed upon before their implementation. The proposal for change request will
4 Doc. No: UPHDB/QM/01 Prepared By: A Page: 4 of 18 Issued by: identify the persons who are required to be informed on the change and the documents that are required to be modified. As organization is not doing any internet sales, so no contract review is applicable. As and when the organization starts it, the same shall be addressed in Quality Management Manual
5 Doc. No: UPHDB/QM/01 Prepared By: A Page: 5 of 18 Issued by: CUSTOMER COMMUNICATION: UPHDB has established effective arrangements for communication with its customers. The arrangements adopted by UPHDB include regular meetings with the customer for reporting the progress, periodic reports updating the status of completion of projects etc. These meetings and reports provide the information to customer on; a) Product required by them b) Inquires, order handling including amendments c) Customer feed back, including customer complaints. References: Process for demand survey and or disposal of properties by registration method. Process for allotment of properties through draw of lots. Process for allotment of properties through auction. Process for service to customer on accounts of demand and recovery for individual allotted properties. Process for issuance of possession letter agreement, deed. Process for customers requests regarding mutation of properties. Process for handling of various application at Zonal offices. Process for handling allotment of school plots. Process for handling of requests/complaints of customers received at property section of the head quarters. UPHDB/PM/PRP/02 UPHDB/PM/PRP/03 UPHDB/PM/PRP/04 UPHDB/PM/PRP/06 UPHDB/PM/PRP/ UPHDB/PM/PRP/08 UPHDB/PM/PRP/09 UPHDB/PM/PRP/10 UPHDB/PM/PRP/11
6 Doc. No: UPHDB/QM/01 Prepared By: A Page: 6 of 18 Issued by: 7.3 DESIGN AND DEVELOPMENT: UPHDB has established appropriate systems to plan and control the design and development of product as follows: : Design & Development Planning For the design and development planning UPHDB determines the various stages of design and development and their review, verification and validation with responsibilities and authorities for design and development. UPHDB ensures effective communication and clear assignment of responsibility between different groups involved in planning & design and development. It updates the planning & design outputs, as appropriate, as the design and development progresses. Reference: Process Manual UPHDB/PM/APD/01 to Process for Town notification Process for Transportation-Zonal Plan preparation Process for preparation of Layout Plan Process for Preparation of Numbering & Development control plan Process for Preparation of Building Designs Process for Approval of Building Layout Plan Process for Preparation of compounding of Unauthorized UPHDB/PM/APD/01 UPHDB/PM/APD/02 UPHDB/PM/APD/03 UPHDB/PM/APD/04 UPHDB/PM/APD/05 UPHDB/PM/APD/06 UPHDB/PM/APD/
7 Doc. No: UPHDB/QM/01 Prepared By: A Page: 7 of 18 Issued by: : Design & Development Inputs Inputs relating to product requirements are determined and documented. The Inputs includes rules, regulation, acts, IS Codes/standards, MOU s, National Buildings Codes, PWD/CPWD specifications, functional and performance requirements, applicable statutory and regulatory requirements, and other requirements essential for design and development. Inputs also include relevant information derived from the similar past designs. Inputs are reviewed for adequacy and completeness. The records of review of inputs for adequacy and completeness are available in the project specific files. The evidence will be in the from of endorsement/signature of the A.P. /E.E. These will be unambiguous and not in conflict with each other. Reference: Process Manual for Provision of Uniform Process Manual for Medical Reimbursement & Medical Advance Process for designing of development services Sectorial Process for designing of development services Trunk Process for Approval of Design of External Electrification from UPPCL UPHDB/PM/CC/01 UPHDB/PM/CC/02 UPHDB/PM/ENG-DES/05 UPHDB/PM/ENG-DES/06 UPHDB/PM/ENG-ELE/10
8 Doc. No: UPHDB/QM/01 Prepared By: A Page: 8 of 18 Issued by: : Design & Development Outputs Outputs of planning and design are provided in the form of Layout Plans, Concept Plans, Architectural and Structural Design, Design Calculations, Specifications etc. to ensure verification against the design and development inputs and are approved by the competent authority prior to release for use. It is ensured that outputs meet the input requirements, provide appropriate information for all relevant activities required for product realisation. The design outputs are all complied and documented in the form of DPR and this provides the detailed information for the project personnel to carryout the material procurement and execution activity. The DPR also provides information on the characteristics of the product that are essential for the safe and proper use. Outputs also include product acceptance criteria and specific characteristics of the product that are essential for its use : Design & Development Review Systematic and periodic review of design and development are performed in accordance with the planned arrangements; reviews are aimed to evaluate the ability of the results of design and development to meet requirements, reviews also identify problems if any, and propose necessary actions. Records of the review and necessary actions maintained in the form of notes in the project specific files. Representatives of different wings associated with the design and development stages attend reviews. Reference: In process manuals at relevant stages of review.
9 Doc. No: UPHDB/QM/01 Prepared By: A Page: 9 of 18 Issued by: : Design & Development Verification Verification of the output is performed in accordance with the planned arrangements to ensure that the design and development outputs meet the input requirements. Records of verification are maintained. Reference: Process for Site inspection for the Quality of Works UPHDB/PM/ENG -QCC /, Process for Inspection, handling over and energisation of external UPHDB/PM/ENG-ELE/11 electrification work : Design & Development Validation Validation of design and development is performed in accordance with the planned arrangements to ensure that resulting product is capable of meeting the requirements for the intended use. Wherever possible, validation is completed prior to the delivery of the product. Records of the result of validation and any necessary actions are maintained.. Reference: Process Manual for Approval of Design of External Electrification from UPPCL Process Manual for Administrative & Financial Approval and Technical Sanction Process Manual for Approval of Building Layout Plan UPHDB/PM/ENG-ELE/10 UPHDB/PM/ENG /02 UPHDB/PM/APD/06
10 Doc. No: UPHDB/QM/01 Prepared By: A Page: 10 of 18 Issued by: : Control of Design & Development Changes The changes of design and development are identified, documented and maintained. The changes are reviewed, verified, validated and approved by competent authority before implementation. The reviews of design and development changes include evaluation of the effect of the changes on constituent parts and product already delivered. The result of the review of changes and any necessary actions are documented and records maintained. Where the nature of work is repetitive then UPHDB may carry out validation of product by carrying out with a sample house before going in for mass construction. Joint inspection by Executive Engineer and Architect Planner are conducted to validate the architectural and structural designs. To support the validation activities, various tests are carried out and records maintained. Reference: Concerned drawings, feasibility reports, DPR, calculations.
11 Doc. No: UPHDB/QM/01 Prepared By: A Page: 11 of 18 Issued by: 7.4 PURCHASING PURCHASING PROCESS UPHDB has established appropriate systems to ensure that the purchased product or material conforms to specified purchase requirements. The degree of control applied to the supplier and purchased product or material is dependent upon the effect of the purchase product on subsequent product realisation or final product. UPHDB also registers selected suppliers after evaluation of their ability to supply product in accordance with it requirements. Criteria for selection, evaluation and re-evaluation are established. The results of evaluation and any necessary action arising from the evaluation are documented and records maintained. UPHDB operates a system for evaluation of its suppliers to decide on continuation of their service. The evaluation broadly covers quality and timely performance. The supplier has to meet certain specific norms for continuation. References: - Process for Purchase of materials through Quotations & Tenders UPHDB/PM/ ENG /03
12 Doc. No: UPHDB/QM/01 Prepared By: A Page: 12 of 18 Issued by: PURCHASING INFORMATION UPHDB ensures that purchasing information, describes the product or material to be purchased. Where necessary, requirements for approval of product, procedures, processes and equipment are defined and established. Where appropriate, the requirements of the QMS and qualification of personnel are ensured as required for the product realisation. UPHDB ensures the adequacy of specified purchase requirement prior to their communication to the supplier. Reference Process for Purchase of materials through Quotations & Tenders UPHDB/PM/ ENG / VERIFICATION OF PURCHASE. UPHDB has established a system for verification of purchase product. It ensures that the purchase product meets the specified purchase requirements by inspections, tests, checklists, formats etc. If it is necessary to perform verification at the supplier's premises, it states the intended verifications arrangements and the method of product release in the purchasing information. Reference: Process Manual for material Testing by the Quality Control Cell UPHDB/PM/ENG- QCC/08 Stock register Measurement Book Quality Control plans, Work order
13 Doc. No: UPHDB/QM/01 Prepared By: A Page: 13 of 18 Issued by: 7.5 ION AND SERVICE PROVISION CONTROL OF ION UPHDB has established a system to plan and carryout production and service provisions under controlled conditions. Controlled conditions include - a) The availability of information that describes the characteristics of the product. b) The availability of work instructions as necessary, c) The use of suitable equipment, d) The availability and use of monitoring and measuring devices. e) The implementation of monitoring and measurement and f) The implementation of release, delivery and post delivery activities. Reference: Process for Release of Advertisements and Publications Process for Execution of Works Process for Inspection/ Handing over and Energisation of External Electrical Works UPHDB/PM/PRO/01 UPHDB/PM/ENG/04 UPHDB/PM/ENG-ELE/11
14 Doc. No: UPHDB/QM/01 Prepared By: A Page: 14 of 18 Issued by: VALIDATION OF PROCESSES FOR ION UPHDB validates any process for production and service provision where the resulting output cannot be verified by subsequent monitoring or measurement. This includes processes where deficiencies become apparent only after the product is in use or the service has been delivered. Validation demonstrates the ability of these processes to achieve planned results. UPHDB has established arrangements for these processes which include: a) Defined criteria for review and approval of the processes. b) Approval of equipment and qualification of personnel. c) Use of specific methods and procedures. d) Requirements for records and e) Revalidation. Construction activities are an outsourced process for UPHDB. Systematic methods have been established by UPHDB for ensuring that the contractors carryout the work as per requirements of UPHDB. The requirements are communicated to the contractors through tender documents including Bill of Quantity which includes the specifications of work. The works carried out by the contractors are supervised by the team of Engineers headed by EE and Quality Control Cell of UPHDB. References: Quality Control Manual of UPHDB
15 Doc. No: UPHDB/QM/01 Prepared By: A Page: 15 of 18 Issued by: IDENTIFICATION & TRACEABILITY: UPHDB identifies the product by suitable means throughout product realisation and the product status with respect to monitoring and measurement requirement, where traceability is a requirement, UPHDB controls and records the unique identification of the product. At site leveling, numbering, tagging, marking, segregating etc. methods are applied at the three stages like receipt at stores, during construction and finished stages. Identification A- Receipt Area S. No. Item Method 1- Cement By Brand Name & Grade on each bag 2- Steel Stack cards 3- Door Shutters Stack cards B- Construction Sites S. No. Item Method 1- Cement By Brand Name & Grade on each bag 2- Steel Stack cards 3- Door Shutters Stack cards 4- Bricks By Class Designation 5- Coarse Sand By Fineness 6- Stone Grit By Nominal Size 7- Pipes for W/S & Sewerage By Diameter
16 Doc. No: UPHDB/QM/01 Prepared By: A Page: 16 of 18 Issued by: C- Finished stage S. No. Item Method 1- House By Unique Number 2- Plots By Unique Number 3- Sector By Unique Number / Name 4- Yojna By Name The identification of material /equipment at the construction sites under the contractors is carried out by the contractors. Taking the definition of product to mean the output of a process, identification of outputs in the form of documents and records, is carried out as per the procedures for control of documents and control of records.
17 Doc. No: UPHDB/QM/01 Prepared By: A Page: 17 of 18 Issued by: CUSTOMER S PROPERTY: UPHDB exercises due care with customer property or record while it is under its control or being used by it. UPHDB has a system to identify, verify, protect and safeguard customer property for use in the product. If any such property is lost, damaged or not found suitable for use, it is reported to the customer and records maintained. Reference: Process for MOU & contracting UPHDB/PM/ENG-GCC/ PRESERVATION OF : UPHDB preserves the conformity of product during internal processing and delivery to the intended destination. The methods preservation is applicable on all the material, machinery etc at sites, during construction and finished stages. The preservation includes identifications, handling and packaging where applicable, storage and protection. It also applies to the constituent part of a product. References: Financial handbook Office Orders / Instructions/ Guidelines
18 Doc. No: UPHDB/QM/01 Prepared By: A Page: 18 of 18 Issued by: 7.6 CONTROL OF MONITORING AND MEASUREMENT EQUIPMENTS: UPHDB has a system to determine the monitoring and measurement requirements to be undertaken and devices needed to provide the evidence of conformity of product to determine requirements. It has established suitable methods, processes to ensure that monitoring and measurement are carried out in a manner that is consistent with the monitoring of measurement requirements. To ensure correct and valid results measuring equipment are calibrated or verified at specified intervals or prior to use against measurements standards established nationally and internationally. Where no such standards exists the basis for calibrations is documented and records maintained. The measuring equipment are adjusted or re-adjusted as necessary, identified to enable the calibration status to be determined and safeguarded from such maladjustments that would invalidate the measurement result. They are protected from damage and deterioration during handling, maintenance and storage. UPHDB has a system to assess and record the validity of the previous measuring result when the equipment is found not to conform to requirements. It takes appropriate action on the equipment and any product or material effected. Records of the results of calibrations and verification are documented and maintained. In case the ability of the computer software to satisfy intended application for monitoring and measurement of specified requirement is established and conformed, it is undertaken prior to initial use and re-confirmed as necessary. Reference: Process for Calibration of Equipments: UPHDB/PM/ENG-QCC/09
ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX
In completing your Documented Quality Management System Review, it is important that the following matrix be completed and returned to us as soon as possible. This will save time during the review and
More informationUPGRADE ASSESSMENT CHECKLIST
Checklist Instructions : Prior to auditing each element, the auditor shall review the documentation and mark a 0 in each box where functions /departments are referenced. As each function/department is
More informationQUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED
Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 2 of 18 REVISION HISTORY DATE CHANGE DESCRIPTION 10/11/06 Original release 10/21/09 Revised to ISO9001:2008
More informationQuality Assurance Manual, Revision F Page 1 of 20
Quality Assurance Manual, Revision F Page 1 of 20 AUTOMATION TECHNOLOGY QUALITY ASSURANCE MANUAL Prepared By: Joseph Pollard Date: 7/6/2015 Quality Assurance Manager Quality Management System Representative
More information25 D.L. Martin Drive Mercersburg, PA (717)
QUALITY MANUAL D. L. MARTIN CO. 25 D.L. Martin Drive Mercersburg, PA 17236 (717) 328-2141 Revision 14 August 2012 Michael A. White Manager, QA & Engineering D.L. Martin Co. Quality Manual UNCONTROLLED
More informationThe following is an example systems manual from a low volume (TE, but not an automotive supplier) company.
The following is an example systems manual from a low volume (TE, but not an automotive supplier) company. You will note that this is essentially a copy of ISO 9001:2000. I take this path because long
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 9001 Quality management systems Requirements Systèmes de management de la qualité Exigences Fourth edition 2008-11-15 Reference number ISO 9001:2008(E) ISO 2008 PDF disclaimer
More informationAssociation of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017
Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program
More informationAPS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.
Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Table of Contents Contents 1. Introduction... 3 1.1. Process Approach...
More informationAEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing
AEROSPACE STANDARD AS9100 Technically equivalent to AECMA pren 9100 Issued 1999-11 Revised 2001-08 Superseding AS9100 REV. A Quality Systems - Aerospace - Model for Quality Assurance in Design, Development,
More informationDocument Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy
QM001 Page 1 of 19 Quality Manual QM001 Page 2 of 19 Table of Contents Page Company Profile 4 Approval 4 Revision History 4 Distribution List 4 1.0 Scope 5 Section 2: Normative Reference 6 2.0 Quality
More informationCORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
More informationLuminus Devices, Inc Quality Management Systems Manual ISO 9001:2008
Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008 This document belongs to Luminus Devices, Inc. It cannot be reproduced without authorized authority. Area: Quality System Document Page
More informationQuality Manual. AARD Spring & Stamping Quality Manual
Quality Manual Page 1 of 25 AARD Spring & Stamping QM/5.0 Title: QM 5.0 AARD Spring & Stamping Quality Manual Copy Approval Date: 1/27/2011 Reviewer(s): Sign / Print Title Date Dan Wheeler Document Originator
More informationISO AUDIT PREPARATION KIT 2016
ISO AUDIT PREPARATION KIT 2016 IQY Technical College Table of Contents ISO... 3 ISO 9001:2008 Fact Sheet... 6 Further Information... 6 Preparing for the ISO 9001:2008 Audit - 2016... 7 ISO 9001:2008 Definitions...
More informationQUALITY SYSTEM MANUAL
QUALITY SYSTEM MANUAL This Manual is a Proprietary Document and any Unauthorized Reproduction is prohibited. ISSUE DATE July 26, 2012 AUTHORIZED BY: Quality Management Representative Eric Hoff Managing
More informationOsprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -
February 8, 2015 1 Osprey Technologies, LLC Quality Manual ISO9001:2008 Rev - February 8, 2015 Released by Dave Crockett President 6100 S. Maple Avenue, Suite 117 Tempe, AZ 85283 www.osprey-tech.com February
More informationQUALITY SYSTEM MANUAL
TITLE: QUALITY SYSTEM MANUAL Page 1 of 15 QUALITY SYSTEM MANUAL TITLE: QUALITY SYSTEM MANUAL Page 2 of 15 Index PARAGRAPH TITLE... PAGE 1.0 GENERAL INFORMATION... 3 2.0 DEFINITIONS... 5 3.0 RELATED DOCUMENTS...
More informationA Division of Research Products Corporation
A Division of Research Products Corporation Quality Manual ISO 9001:2008 Table of Contents Page Number Approvals 2 Table of Contents 3 Revision History 4 Distribution List - Controlled Copies 5 Introduction,
More informationMALAYSIAN STANDARD QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS (FIRST REVISION) (ISO 9001:2008, IDT) (PUBLISHED BY STANDARDS MALAYSIA IN 2009)
MALAYSIAN STANDARD MS ISO 9001:2008 QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS (FIRST REVISION) (ISO 9001:2008, IDT) (PUBLISHED BY STANDARDS MALAYSIA IN 2009) ICS: 03.120.10 Descriptors: quality management,
More informationKEVLIN CORPORATION DIVISION OF COBHAM DEFENSE ELECTRONIC SYSTEMS
1.doc KEVLIN CORPORATION DIVISION OF COBHAM DEFENSE ELECTRONIC SYSTEMS QUALITY POLICY MANUAL QPM 4. 596 Lowell St Methuen, MA 01844 USA 2.doc TABLE OF CONTENTS Clauses Procedure Description of Contents
More informationISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER
SYSTEM KARAN ADVISER & INFORMATION CENTER PETROLEUM, PETROCHEMICAL AND NATURAL GAS INDUSTRIES -- SECTOR-SPECIFIC QUALITY MANAGEMENT SYSTEMS -- REQUIREMENTS FOR PRODUCT AND SERVICE SUPPLY ORGANIZATIONS
More informationRevision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C
1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100
More information14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic
More informationComparison Matrix ISO 9001:2015 vs ISO 9001:2008
Comparison Matrix ISO 9001:2015 vs ISO 9001:2008 Description: This document is provided by American System Registrar. It shows relevant clauses, side-by-side, of ISO 9001:2008 standard and the ISO 9001:2015
More informationISO 9001:2008 Quality Management System QMS Manual
2501 Kutztown Road Reading, PA, 19605 Tel. 610-929-3330 Fax 610-921-6861 ISO 9001:2008 Quality Management System QMS Manual The information contained in this document is Fidelity Technologies Corporation
More informationStanley Industries, Inc. ISO 9001:2008 Quality Policy Manual
Stanley ISO 9001:2008 Table of Contents and STANLEY Document Reference Related STANLEY Section Page Procedure(s) 1. Introduction 1 None 2. Scope 1 None 3. Organizational Structure & 1 STANLEY Company History
More informationEPICOR, INCORPORATED QUALITY ASSURANCE MANUAL
EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:
More informationAtlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD USA Office: (410) Fax: (410)
ISO 9001 Page: 1 of 29 Quality Assurance Manual ISO 9001:2008 Atlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD 21108 USA Office: (410) 507-2779 Fax: (410) 451-9609 APPROVALS
More informationSubject: Quality Management System. Clause 8 - Operation
Subject: Quality Management System Clause 8 - Operation 31.3.2016. HOMEWORK? I cannot teach anybody anythink. I can only make them think. Socrates (Greek philosopher, 470/469 399 BC ) Contents ISO 9001:2015
More informationQuality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702
Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 11 Status : APPROVED Effective: 09/07/2017 Page 2 of 32 Quality Manual Table of Contents
More informationTOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA
Page 1 of 42 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 10051 OLD GROVE RD. SAN DIEGO, CA 92131 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza
More informationQUALITY MANUAL. This document defines the requirements, processes, structure and documentation for the Teledyne DGO Quality Management System.
Page 1 of 13 1. PURPOSE This document defines the requirements, processes, structure and documentation for the Teledyne DGO Quality Management System. 2. SCOPE The Teledyne DGO Quality Management System
More informationQUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008
QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008 EXPRESS CONTRACTING SERVICES PTY LTD TRADING AS GOLDEN BROWN CLEANING SERVICES Unit 8/217 Mickleham Road Tullamarine VIC 3043 www.goldenbrown.com.au
More informationQuality Manual. This manual has been written to the ISO 9001:2000 International Quality Standard
Sceptre CNC Machining Inc. Quality Manual This manual has been written to the ISO 9001:2000 International Quality Standard Sceptre CNC Machining Inc. Unit 401 1485 Coast Meridian Road Port Coquitlam, B.C.
More informationBeaver Machine. Quality Manual
Beaver Machine Quality Manual This manual has been written to the ISO 9001:2000 International Quality Standard Beaver Machine Inc. 5273 Hanson Court Minneapolis, MN 55429 763-535-2204 www.beavermachine.com
More informationRUWACON QUALITY MANUAL
RUWACON QUALITY MANUAL Rev Date Preparation Review Approved Description of Revision 1 29 June SHEQ Manager SHEQ Manager Managing 2011 Director Ruwacon (PTY) Ltd P.O. Box 13596 Noordstad 9303 THIS DOCUMENT
More informationQuality Manual ISSUED JANUARY Approved By: January 12, 2004 (President & Chief Executive Officer)
Quality Manual ISSUED JANUARY 2004 Approved By: January 12, 2004 (President & Chief Executive Officer) (Date) Quality Policy To be the industrial control industry's most preferred supplier of sensor integration
More informationINS QA Programme Requirements
Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued
More informationJ. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual
McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ Quality Manual Quality Manual Issue I Dated 8 th October 2012 Contents Page Section 1 - Introduction 2 Section 2 - Company Details 2 Section
More informationEVANS CAPACITOR COMPANY
DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution
More informationYOU RE CLOSER THAN YOU THINK
YOU RE CLOSER THAN YOU THINK ISO 13485:2016 READINESS CHECKLIST We understand that some of our customers would like to be able to check how close they are to meeting the requirements of ISO 13485:2016.
More informationUPPLIER ANUAL. Issued: 01 Aug 13
UPPLIER ANUAL Issued: 01 Aug 13 Table of Contents Our Company 3 Our Vision 3 Scope and Purpose 4 Responsibilities 4 General Expectations and Requirements 5 Supplier Quality Management System 6 Supplier
More informationQUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008
QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008 Revision: 9 Issue Date: 28 April 2014 CONTROLLED COPY Number: Issued to: UNCONTROLLED COPY A.M.S. Electronics, Inc. 113 Pillow Street, Butler, PA 16001 (724)
More informationPRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK
SAE AS9100 DOCUMENT PRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK REV. 005 10/27/10 Page 2 Page 4 Page 5 Page 6 Page 7 Page 8 Page
More informationPlastics and Concepts of Connecticut Inc. Quality Manual
Plastics and Concepts of Connecticut Inc. Quality Manual Nature of Changes For This Issue: 1. Initial Release 8/14/2000 2. Reformatted and grammatical errors corrected 6/11/02 3. Minor grammatical errors
More informationSAMPLE THIS IS NOT A COMPLETE MANUAL All References have been Updated to Comply with ISO 9001:2008
THE QUALITY MANAGEMENT SYSTEM Insert Your Logo Image Here See Template Revision Instructions SAMPLE THIS IS NOT A COMPLETE MANUAL All References have been Updated to Comply with ISO 9001:2008 Random text
More informationQuality Manual. Specification No.: Q Revision 07 Page 1 of 14
Page 1 of 14 Quality Manual This Quality Manual provides the overall quality strategy and objectives of Pyramid Semiconductor s quality system. It is based on the requirements of ISO 9000. This manual
More informationWebster - Hoff Corporation. Quality Manual
Registered to ISO 9001:2008 ANSI/ISO/ASQ Q9001-2008 QM-1 Page 2 of 35 TABLE OF CONTENTS Section Name Page Management Approval Of / List of Exclusions 3 Corporate Quality Policy 4 Webster-Hoff Corporation,
More informationGTG Inc. ISO 9001:2008 QMS Manual. Continuous Improvement
GTG Inc. ISO 9001:2008 QMS Manual Technology & Innovation Customer Satisfaction Continuous Improvement Title: QMS Manual & Procedures Rev: C Page: 2 of 39 Table of Contents 1.0 QMS System 2.0 Scope 2.1
More informationMANUAL QUALITY CONTROL & QUALITY ASSURANCE
MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE
More informationSpecification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry
Addendum 1 June 2010 Effective Date: December 1, 2010 Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry ANSI/API SPECIFICATION Q1 EIGHTH EDITION, DECEMBER 2007
More informationSecurity Operations. BS EN ISO 9001: 2008 Issue 1.2: 21/10/2016. Quality Manual. Managing Director. Controlled / Uncontrolled when printed
of Security Operations BS EN ISO 9001: 2008 : 21/10/2016 Manual No. 1 Issued to Managing Director Authorised By Date Issued 21/10/2016 Controlled / Uncontrolled when printed SECTION: 0 Index Page 2 Note
More informationCorrelation Matrix & Change Summary
The correlation matrix compares the new requirements of ISO 9001:2015 to the requirements of ISO 9001:2008, and provides a summary of the changes. Correlation Matrix & Change Summary Introduction Correlation
More informationCorrespondence between ICMED criteria and ISO 13485: 2012
Annexure A (Informative) Correspondence between ICMED 13485 criteria and ISO 13485: 2012 Green Font is additional ICMED 13485 criteria requirement. Additional ICMED 13485 criteria Requirements are also
More informationQMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets
QMS Roles, Responsibility and Authority Process Clause Activities Records Required Responsibility Authority Deadline Clause 4: Process Development 4.1 Develop processes and sequence, operation controls
More informationBusiness Management System Manual Conforms to ISO 9001:2015 Table of Contents
Table of Contents 1.0 Welcome to Crystalfontz... 3 2.0 About the Crystalfontz Business Systems Manual... 4 3.0 Terms and Conditions... 5 4.0 Context of the Organization... 6 4.1. Understanding the Organization
More informationISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS
ISO 22000:2005 Standard Food Safety Management System INTERNATIONAL STANDARDS REGISTRATIONS 3.1 FOOD SAFETY concept that food will not cause harm to the consumer when it is prepared and/or eaten according
More informationDOCUMENTATION FOR QUALITY MANAGEMENT SYSTEM AS PER IS/ISO 9001 : 2015
DOCUMENTATION FOR QUALITY MANAGEMENT SYSTEM AS PER IS/ISO 9001 : 2015 01-12-2017 1 DEFINITION: INFORMATION SUPPORTED BY MEDIUM 01-12-2017 2 Some of the reasons are: Required by any Management System Standard
More informationQM-1 QUALITY MANAGEMENT SYSTEMS MANUAL. Revision 10
QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL Revision 10 Page: 1 of 54 TABLE OF CONTENTS 1. DOCUMENT REVISION HISTORY... 5 2. INTRODUCTION... 6 2.1 Purpose... 6 2.2 Scope... 7 Figure 1: Sequence and Interaction
More informationQuality Manual QM-9001 Revision 25 May 2013
Lion Precision 563 Shoreview Park Road Shoreview, MN 55126 Phone: (651) 484-6544 Fax: (651) 484-6824 info@lionprecision.com Quality Manual QM-9001 Revision 25 May 2013 Approved by: Don Martin, President
More informationNR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26
Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including
More informationQMS CO-ORDINATOR & GENERAL PROCEDURES:-
1. QMS CO-ORDINATOR & GENERAL PROCEDURES:- (1) How do you measure effectiveness of system for working of your company? How do you collect necessary information for the same? Are you getting information
More informationQuality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard.
Quality Manual This manual complies with the requirements of the ISO 9001:2015 International Standard. Northeast Power Systems, Inc. 66 Carey Road Queensbury, New York 12804 Quality Manual Rev 0 Printed
More informationQUALITY MANAGEMENT SYSTEM QUALITY MANUAL
AERO SUPPLY USA 21941 US HWY 19 NORTH Clearwater, FL. 33765 USA P.(727) 754-4915 F.(727) 754-4920 Website: www.aerosupplyusa.com Email: sales@aerosupplyusa.com QUALITY MANAGEMENT SYSTEM QUALITY MANUAL
More informationFEC QUALITY MANUAL. Federal Equipment Company River Rd. Cincinnati, Ohio
QMS-20 2016 FEC QUALITY MANUAL Federal Equipment Company 5298 River Rd Cincinnati, Ohio 45233 www.federalequipment.com www.fecheliports.com www.usdrillhead.com www.orionseals.com www.tkf.com REVISION:
More informationISO/TS TECHNICAL SPECIFICATION
TECHNICAL SPECIFICATION ISO/TS 29001 Third edition 2010-06-01 Petroleum, petrochemical and natural gas industries Sector-specific quality management systems Requirements for product and service supply
More informationQuality Systems Manual
Quality Systems Manual This manual was developed to support ISO 9001 elements 1445 Oakland Drive, San Jose, CA 95112-2702 - Tel: (408) 294-9897 - Fax: (408) 297-1540 http://www.gorillacircuits.com Reference
More informationISO 9001:2015 Checklist with 9001:2008 Comparisons Observations/comments
(comments in italic are t in the standard) Key: Yellow text indicates potential new requirements that may need to be included in an organization s quality management system. Blue text indicates 2008 version
More informationQuality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard. AW2 Logistics, Inc Ace Industrial Dr.
Quality Manual This manual complies with the requirements of the ISO 9001:2015 International Standard. AW2 Logistics, Inc. 6001 Ace Industrial Dr. Cudahy, WI 53210 Quality Manual Rev 3 Page 1 of 30 Table
More informationISO 9001:2015 Readiness Review
ISO 9001:2015 Readiness Review Company Name Address Certification No. Contact Name Job Title Telephone Email BSI is committed to ensuring a smooth assessment for all clients wishing to certify to ISO 9001:2015,
More informationVendor Qualification Survey
1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service
More informationThe Prophotonix (Irl) Ltd Quality manual
The Prophotonix (Irl) Ltd Quality manual Date: October 2013 Revision: D 3020 Euro Business Park, Little Island, Cork, Ireland Tel: +353 (0)21 5001313 Fax: +353 (0)21 4297749 e-mail: info@prophotonix.com
More informationCERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS
CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS 1. Introduction 1.1 Scheme for type approval of products of Indian Register of Shipping (IRS) is an impartial certification system based on a design review
More informationQuality Assurance Policy and Procedures
650 Montana Ave, Suite A Las Cruces, NM 88001 (575) 522-0430 www.rmgovernmentservices.com Quality Assurance Policy and Procedures PURPOSE. The purpose of this policy is to outline the quality assurance
More informationSAE AS9100/ISO 9001:2008
Table 0: Revision History SAE AS9100/ISO 9001:2008 Rev. Date DCN Description A 10/8/2003 465 Initial Release B 11/18/2003 482 Removed SP and SWI from Section 3.1. Updated terms in Section 3.2. Corrected
More informationCERTIFICATE OF REGISTRATION
03/31/2017 CERTIFICATE OF REGISTRATION This Certificate bears witness that Great Western Registrar LLC (An ANAB-accredited CB) has assessed the management system of: INTEGRATED IDEAS & TECHNOLOGIES, INC.
More informationTUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME
TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME Copyright TUV SUD BABT 2017 A Certification Body of: Page 1 of 33 Contents AMENDMENT RECORD 3 0. INTRODUCTION 3 1. PRE-CONDITIONS TO SUPPORT PRODUCTION
More informationQuality Manual ISO 9001:2000
Quality Manual ISO 9001:2000 Page 2 of 23 TABLE OF CONTENTS COVER PAGE...1 TABLE OF CONTENTS...2 SIGNATURES...3 QUALITY POLICY...4 INTRODUCTION...5 CORPORATE PROFILE...9 4.O QUALITY MANAGEMENT SYSTEM...10
More informationMCBO B Jun 13. Subj: IMPLEMENTATION AND MANAGEMENT OF INTERNATIONAL ORGANIZATION OF STANDARDS QUALITY MANAGEMENT SYSTEM
UNITED STATES MARINE CORPS MARINE CORPS BASE 3250 CATLIN AVENUE QUANTICO VA 22134 5001 MCBO 5220.1 B 021 05 Jun 13 MARINE CORPS BASE ORDER 5220.1 From: Commander To: Distribution List Subj: IMPLEMENTATION
More informationFood Safety Quality Management System
Introduction The company has planned, established, documented and implemented a food safety and quality management system for the site, which is maintained in order to continually improve its effectiveness
More informationISO 9001: 2015 Quality Management System Certification. Awareness Training
ISO 9001: 2015 Quality Management System Certification Awareness Training ISO 9001: 2015 STRUCTURE The new standard is modeled around the ISO Directive Annex SL, a high level structure (HSL) based on the
More informationCorrespondence Between ISO 13485:2016 and 21 CFR Part 820 QMS Requirements
Correspondence Between and 21 CFR Part 820 QMS Requirements 10411 Corporate Drive, Suite 102, Pleasant Prairie, WI 53158 262.842.1250 262.842.1240 info@rcainc.com rcainc.com 2 4 Quality Management System
More informationISO 14001: 2015 Environmental Gap Analysis
Environmental Gap Analysis The revised ISO 14001 standard was published on 14 TH September 2015. How to use this document This document provides an overview of the changes between ISO 14001:2004 and ISO
More informationSANAS Accr. No/s. F Date/s of evaluation
ISO/IEC 17020: 2012 Generic Checklist for Accreditation of Various Types of Bodies Performing Inspection to ISO/IEC 17020:2012, incorporating TR 80: Technical Requirements for Inspection Bodies in the
More informationA-M SYSTEMS QUALITY MANUAL
A-M SYSTEMS QUALITY MANUAL ORIGINATED BY: TITLE: DATE: Robert J. Thompson Quality Manager 22-Sept-2011 APPROVED BY: TITLE: DATE: Arthur B. Green III President 22-Sept-2011 Revision History Page: 2 of 32
More informationDEVDATT INDUSTRIES TITLE: MASTER LIST OF QUALITY MANUAL DOC. NO : QF/01 CL. NO. : -- PG. NO. : 01 of 02 Sr. No.
TITLE: MASTER LIST OF QUALITY MANUAL DOC. NO : QF/01 CL. NO. : -- PG. NO. : 01 of 02 Sr. No. CONTENTS ID NO. ISO 9001 2008 CLAUSE NO. NO. OF PG REV. NO. 01 RECORD OF REVISION STATUS QF/06 4.2 01 00 02
More informationQUALITY MANUAL. Conforming To AS9120B and ISO9001:2015. QM-001 Page 0 of 32 Revision 22:
QUALITY MANUAL Conforming To AS9120B and ISO9001:2015 QM-001 Page 0 of 32 Revision 22: 2017-08-29 Contents... 0 I. FOREWORD... 3 II. INTRODUCTION... 3 1 SCOPE... 3 1.1 SCOPE STATEMENT... 3 1.2 FACILITIES
More informationPOLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy
POLICY MANUAL FOR ISO 9001:2008 Document: PM-9001:2008 Date: April 7, 2015 REVIEWED BY: Tim Powers DATE: 4-7-2015 APPROVED BY: C._Bickford Uncontrolled Copy DATE: 4-7-2015 1.0 GENERAL ISS: 1 REV: E Page:
More informationDefinitions contained in the above mentioned Specifications and Industry Standards are applicable herein.
1. SCOPE Quality Specification TEC-1019 12 Jul 11 Rev C All Paragraphs Revised Global Quality Management System Supplement for the Aerospace Industry Model, AS 9100 (C) 1.1. Content This specification
More informationUS SCALE, INCORPORATED QUALITY SYSTEM MANUAL
US SCALE, INCORPORATED QUALITY SYSTEM MANUAL DATE: 2/16/2011 REVISION: 1.2 UNCONTROLLED COPY CONTROLLED COPY Serial # Issued To: Date: REV. 1.2 DATE: 2/16/2011 PAGE 1 OF 48 TABLE OF CONTENTS Section Page
More informationIntermaritime Certification Services (ICS) QUALITY MANAGEMENT SYSTEM INSTRUCTIVE FOR ISM-CODE
1.0 TITLE: 2.0 OBJECTIVES This Instructive reflect, as applicable, the IMO Resolution A.1022 (26) "Guidelines on the Implementation of the ISM-Code by Administrations" and the IMO Resolution A.741 (18)
More informationAVNET Logistics & EM Americas. Quality Manual
AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished
More information9001:2015. Quality Manual 9001:2015. Engineering Value through Quality and Innovation.
Quality Manual 9001:2015 9001:2015 Suburban Manufacturing, Inc. encourages comments from customers, suppliers, employees and friends in order to improve our business and its performance. Information contained
More informationProcedures: QP 4 through QP 8, QP 16, QP 17, and QP 19
SRI Quality System Registrar Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19 Booklet Version 171122 Revision Date QP 4.0 Pre-Audit Registration Procedures 15 11/07/15 QP 5.0 On-Site Audit Procedure
More informationReliance Aerospace Solutions
Reliance Aerospace Solutions Quality Manual The information contained in this document is the property of Reliance Aerospace Solutions, a division of Reliance Steel & Aluminum Company This manual is a
More informationPre Audit Transition Gap Analysis QMS and EMS
Pre Audit Transition Gap Analysis QMS and EMS Company: Contact Name: Certification Number: Email: Contact Number: This document should be used in conjunction with the ISO 9001:2015 and ISO 14001:2015 standards
More informationQuality Manual ISO Cedarburg, Wisconsin Revision: L
Quality Manual ISO 9001-2015 Cedarburg, Wisconsin Revision: L Section: 1 Revision: L Title: Table of Contents Management Rep. Chris Andersen President/CEO Jerry Edquist Effective Date: 10/9/2017 (CHANGES
More information