1 Automated Traffic Enforcement Red Light Running and Railroad Grade Crossing Violations Priscilla Tobias Steve Travia Illinois Department of Transportation
2 Automated Traffic Enforcement Public Act Red Light Running (RLR) Automated Enforcement Picture of Vehicle and License Plate Cook, DuPage, Kane, Lake, Madison, McHenry, St. Clair, and Will Counties
3 Automated Traffic Enforcement Public Act Automated Railroad Grade Crossing Enforcement Picture of Vehicle, Driver, & License Plate Statewide
4 Automated Traffic Enforcement Enhanced Traffic Safety IDOT Policy Safety Engineering Policy Memorandum SAFETY 2-07
5 IDOT Permit Required State Marked & Unmarked Rtes Documented Red Light Running Alternative Countermeasures Implemented
6 RLR Camera Systems Shall Differentiate Vehicles Stopping Slightly Beyond Stop Bar Legal Right Turns on Red
7 Eligible Locations Crashes Attributed to RLR Documented History of RLR Previously Implemented Corrective Actions 12 LED Signal Head Display
8 Eligible Locations Mast Arm Poles Used Far Side of Approach Leg Min. 3 Signal Displays Thru Movements Min. 2 Signal Displays Left Turn Sight Distance Meets MUTCD Min.
9 Restricted Locations Traffic Signals Interconnected to RR Crossing Controlled Devices Installation of RLR Camera Reduces Sight Distance Traffic Signal Devices Signage Pedestrian Facilities
10 Restricted Locations Installation of RLR Cameras Does NOT Meet IDOT Set-Back Min. Negatively Impacts Intersection Operations
11 Justification Report Intersection Location(s) Street Name, Municipality, County Geometric Description of Intersection & Land Use Approach Angles & Speed Limits
12 Justification Crash Data & Collision Diagrams (3yrs) Crash Type (Left Turn, Angle, Rear- End) Average Daily & Peak Period Traffic Volumes
13 Justification Existing Traffic Control Devices Signal Head Displays Location Signal Phasing Closed Loop System Interconnected to Adjacent RR Crossing Control Device
14 Justification Bicycle & Pedestrian Conditions Letter of Concurrence for Use of RLR Cameras from Representative of Roadway Jurisdiction Authority Letter From Chief of Police Certifies RLR Violations and Crashes Concurrence of Use of RLR Systems
15 Submittal Requirements Submit to IDOT District Office Justification Report Detailed Construction Plans Proposed RLR Camera System Existing Traffic Signal Equipment Signing Plans
16 Submittal Requirements Manufacturer Literature Manufacturer Wiring How Will RLR System Be Operated & Maintained
17 Submittal Requirements Ordinance Indemnifying the State of Illinois (Attachment C) Ordinance for an RLR Automated Enforcement Program
18 Submittal Requirements IDOT s Signal Clearance Intervals Shall Meet or Exceed MUTCD Min. IDOT Will Verify Clearances (Upon Request) Yellow Change & All-Red Clearances Set by IDOT (Subject to Change)
19 Signing Requirements Signs In Advance of Each Approach Permit Applicant Responsibilities Provide Signs Install Signs Maintain Signs Coord. w/ IDOT Prior to Installation
20 Sign Standard R10-I104
21 Operational Requirements RLR Equipment Shall NOT Affect Operation of Traffic Control Devices Electrical Service Local Utility Co. Miniature Current Transformers May Be Installed on Yellow/Red Signal Circuits
22 Operational Requirements NO Connections to Traffic Signal Cables by Cutting, Splicing, & Sharing Terminations No RLR Circuitry in IDOT Traffic Signal Facilities Traffic Signal Cabinets, Electrical Conduit, Junction Boxes, Handholes, Mast Arm Poles, Signal Posts
23 Operational Requirements Vehicle Detection Should Utilize Video or Laser Technology Pavement Loops Location by Location Basis (Subject to IDOT Approval) Pavement Type & Condition Existing/Preferred Traffic Signal Detection Methods and Designs Consideration of Potential Countermeasures
24 Operational Requirements All Work Inside IDOT Controller or Other Facilities IDOT Approved Contractor IDOT Shall Review and Approve Prior to Turn-On. No Tickets Shall Be Issued for Legal Rt-Turn On Red
25 Costs and Maintenance All Costs Permit Applicant Materials Installation Operation Maintenance Repair Removal
26 Costs and Maintenance All Materials Shall Be Reviewed by IDOT Follow Appropriate District Electrical Maintenance Responsibilities Intersection Improvements Removal and Reinstallation of Equipment: Permit Applicant
27 Automated Traffic Enforcement Public Information Campaign Required Well-Publicized Kickoff Event Orange/Red Flags Bring Attention to Posted Signs
28 Automated Traffic Enforcement Evaluation Report Required 1 Year Post Installation Required Every 3 Years Location Date of Implementation Vendor Manufacturer
29 Automated Traffic Enforcement Evaluation Report Crash Data 3 Yrs Prior & Post Installation Analysis of Crash Data Increase in Crash Types Signal Timing/Settings
30 Automated Traffic Enforcement Evaluation Report Traffic Volumes Prior/Post Recommendations to Further Reduce Violations Summary of Adjudication Results
31
32 Automated Traffic Enforcement Railroad Grade Crossings
33 Railroad Grade Crossing Cameras IDOT Permit Required State Marked & Unmarked Rtes Documented Gate Violations Significant Crash History Alternative Countermeasures Implemented
34 Railroad Grade Crossing Cameras Eligible Locations Public Railroad Grade Crossings Minimum 1000 Vehicle/Day 5 Crashes in 5 Yr Period Diagnostic Team Recommendation Documentation of Law Enforcement Efforts
35 Railroad Grade Crossing Cameras Application Process Written Notice of Interest to ICC by Roadway Authority Representative Requests to ICC (Michael Stead) On-Site Diagnostic Review Team Formed ICC, IDOT, RR, Local Rdwy, Local Law
36 Railroad Grade Crossing Cameras Application Process Local Ordinance Shall Be Passed Local Ordinance Indemnifying State Potential Funding Sources Discussed ICC Issues Stipulated Agreement ICC Issues Order Authorizing
37 Railroad Grade Crossing Cameras Costs and Maintenance Grade Crossing Protection Funds (ICC) Local Federal HSIP-RR
38 Railroad Grade Crossing Cameras Costs and Maintenance 50% of Material & Installation Costs $200k Maximum Future Maintenance & Operations Local Responsibility
39 Railroad Grade Crossing Cameras ICC Mr. Michael Stead Rail Safety Program Administrator Illinois Commerce Commission IDOT Mr. Charles Ingersoll Engineer of Local Roads and Streets Attn: Jeff Harpring
40 Railroad Grade Crossing Cameras Signing Requirements In Advance of RR Crossing Include Amount of Fine Permit Applicant Responsibilities Provide, Install, & Maintain Signs Coordinate with IDOT Prior to Installation
EMERGENCY VEHICLE TRAFFIC SIGNAL PRE-EMPTION AND ENTRANCE SIGNALS
Page 1 of 3 RECOMMENDED PRACTICES PART SECTION SUB-SECTION TRAFFIC SIGNALS General Emergency vehicle pre-emption may be considered if emergency vehicles are consistently having difficulty responding to
More informationTRAFFIC CONTROL STANDARDS
SIGNALS, SIGNS & SPEED THE STATE ROLE TRAFFIC CONTROL STANDARDS 2 Ohio Township Conference 1 TCD STANDARDS o The Rule book for traffic control devices is the Ohio Manual of Uniform Traffic Control Devices
More information#4) UN NUVEDA - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING
#4) UN-60-16 NUVEDA - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: September 14, 2016 Item: UN-60-16 Prepared by: Robert Eastman GENERAL INFORMATION:
More informationPeterborough County Road Safety Audit Guideline Pilot
Peterborough County Pilot Table of Contents 1.0 Purpose... 3 2.0 Road Safety Audit Objectives... 3 3.0 Legal Issues... 3 4.0 Road Safety Audit Procedures... 4 4.1 Project Selection Criteria... 5 4.2 Scope...
More informationDISTRICTWIDE MODAL DEVELOPMENT OFFICE (MDO) RAIL CONSULTANT SERVICES SCOPE OF SERVICES FM# Ad # 19627
DISTRICTWIDE MODAL DEVELOPMENT OFFICE (MDO) RAIL CONSULTANT SERVICES SCOPE OF SERVICES FM# 433056-4-12-01 Ad # 19627 Qualification Requirements for Type of Work 99.0 I. Purpose II. Rail Services III. Administration
More informationNovember 28, Patrick Duffy, P.E. Director of Planning and Zoning Middletown Township 3 Municipal Way Langhorne, PA 19047
WWW.TRAFFICPD.COM Patrick Duffy, P.E. Director of Planning and Zoning Middletown Township 3 Municipal Way Langhorne, PA 19047 RE: Stone Farm Preliminary/Final Land Development Plan Review TPD# MTTO.00021
More informationDraft. 1. For grade crossing warning devices, see Manual Part Recommended Guidelines for Grade Crossing Warning Devices.
2017 Part 3.1.10 Recommended Functional/Operating Guidelines for Interconnection Between Highway Traffic Signals or Other Traffic Control Devices and Grade Crossing Warning Systems Reaffirmed 2017 Revised
More informationAPPENDIX D ACCESS MANAGEMENT GUIDELINES
APPENDIX D ACCESS MANAGEMENT GUIDELINES Access management has become an important tool in transportation planning. Access management guidelines are intended to preserve the integrity of roadways by balancing
More informationGuideline For Inspecting and Testing Preemption of Interconnected Traffic Control Signals and Railway Crossing Warning Systems
Guideline For Inspecting and Testing Preemption of Interconnected Traffic Control Signals and Railway Crossing Warning Systems TP 13755 ISBN T33-11/2001 0-662-65823-X Table of Contents 1. Introduction
More informationGeneral Symbols, Ducts and Cables
MUNICIPAL AND COMMON DIVISION 2000 ABBREVIATIONS 2009 11 2000.001 0 Abbreviations, General 2009 11 2011.101 0 General Symbols, Ducts and Cables 2009 11 2011.201 0 General Symbols, Maintenance Holes, Junction
More informationSECTION TRAFFIC REGULATIONS
PART 1 GENERAL 1.1 DESCRIPTION A. Traffic Control permits, notifications, mobilization, temporary signs, barriers, lights, flagging personnel, striping, markings, and demobilization and removal. 1.2 RELATED
More informationSouth Carolina Department of Transportation. Engineering Directive
South Carolina Department of Transportation Engineering Directive Directive Number: ED-78 Effective: March 1, 2019 Subject: References: Primary Department: Business Rules for District Traffic Signal Shop
More informationCHAPTER 13 GROUNDING AND BONDING
GROUNDING AND BONDING CHAPTER 13 GROUNDING AND BONDING Grounding and bonding must be in accordance with Article 250 of the National Electrical Code (NEC). Bonding is defined in the NEC as the permanent
More informationThe following is a summary of parameters for preparation of a traffic impact analysis when such analysis is required by the City of Highland:
9.0 TRAFFIC Traffic studies shall be prepared in accordance with criteria adopted by the City of Highland. Check with the City Engineer for details before starting any traffic reports. Traffic signals
More informationConcept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment
Concept of Operations prepared for Minnesota Department of (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment December 22, 2014 Table of Contents 1. Introduction and Concept Overview...1
More informationTROPICAL PARKWAY IMPROVEMENT
SHEET INDEX DEPARTMENT OF PUBLIC WORKS TROPICAL PARKWAY IMPROVEMENT I-15/215 INTERCHANGE TO LINN LN LINN LN FROM TROPICAL PKWY TO EL CAMPO GRANDE AVE FEDERAL PROJECT NO. DE-003(196) REVIEWED AND APPROVED
More informationGeneral Symbols, Ducts and Cables
DIVISION 2000 ABBREVIATIONS 2009 11 2000.001 0 Abbreviations, General 2009 11 2011.101 0 General Symbols, Ducts and Cables 2009 11 2011.201 0 General Symbols, Maintenance Holes, Junction Boxes, Pads, and
More informationProject that requires RR design, materials & costs. RR will draft design & cost est. for crossing agreement. End ALJ hearing date set
Project that requires RR design, materials & costs End Request revision from RR? RR agreement received & accepted? ACC Application ACC Staff s data request RR will draft design & cost est. for crossing
More informationHighway Safety Manual Implementation. Priscilla Tobias, P.E. State Safety Engineer Illinois Department of Transportation
Highway Safety Manual Implementation Priscilla Tobias, P.E. State Safety Engineer Illinois Department of Transportation HSM Lead State Peer to Peer Workshop Highlights Illinois HSM Implementation HSM Lead
More informationTraffic & Safety Engineering Project Selection Process
Traffic & Safety Engineering Project Selection Process By Neil E. Boudreau State Traffic Engineer MassDOT Highway Division 1 Leading the Nation in Transportation Excellence www.mass.gov/massdot Traffic
More informationThis project will provide optimized traffic signal timings for the following signals listed below:
Project Scope This project will provide optimized traffic signal timings for the following signals listed below: Main Street Cross Street Maintaining Agency Main Street 1 Cross Street 1 ODOT DX Main Street
More informationHALIFAX REGIONAL MUNICIPALITY MUNICIPAL DESIGN GUIDELINES
HALIFAX REGIONAL MUNICIPALITY MUNICIPAL DESIGN GUIDELINES 2013 PART B STANDARD DETAILS Municipal Design Guidelines Contents PART B: STANDARD DETAILS Municipal Roads/Streets HRM 1 HRM 2 HRM 3 HRM 4 HRM
More informationDouglas County Traffic Signal Installation Guidelines (January 2013)
Douglas County Traffic Signal Installation Guidelines (January 2013) The following guidelines are minimum requirements for equipment installation. Section A. Poles and Foundations ( Wood, Concrete, Mast
More informationSECTION HIGHWAY GRADE CROSSING WARNING SYSTEMS
SECTION 18700 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for highway grade crossing warning systems. B. Where shown on the Contract Drawings or as required to accommodate associated
More informationTRAFFIC STUDY GUIDELINES
TRAFFIC STUDY GUIDELINES December 2013 The scope of the traffic impact analysis (TIA) should follow these guidelines and the requirements of VMC 11.80.130 and VMC 11.70, transportation concurrency (attached
More information2015 DelDOT Traffic Design Manual MASITE Annual Meeting October 5, 2015 King of Prussia, Pennsylvania
2015 DelDOT Traffic Design Manual October 5, 2015 King of Prussia, Pennsylvania Previous Manual DelDOT Signal Design Manual o Created In-house by DelDOT Staff o Published in Summer 2000 (Prior to 2000
More informationINTERSECTION SAFETY. Case study: Hong Kong
INTERSECTION SAFETY Case study: Hong Kong MEETING THE INTERSECTION SAFETY CHALLENGES OF HONG KONG Hong Kong has the second highest population density in the world and with that comes a high density of
More informationMEMO. Please submit written comments by US Mail to: North Coast Railroad Authority Attn: Heather Lindsteadt 419 Talmage Road, Suite M Ukiah, Ca 95482
MEMO The primary purpose of these proposed guidelines is to establish safety and operational standards for any trail proposed on NCRA right-of-way. On August 13, 2008 the North Coast Railroad Authority
More informationINTELLIGENT TRANSPORTATION SYSTEMS APPENDIX
INTELLIGENT TRANSPORTATION SYSTEMS APPENDIX Southern California Association of Governments ADOPTED APRIL 2012 INTELLIGENT TRANSPORTATION SYSTEMS Introduction 1 Existing System Description 1 Existing System
More informationJustice and Solicitor General, Government of Alberta February 2019 Automated Traffic Enforcement Technology Guideline Justice and Solicitor General
Justice and Solicitor General, Government of Alberta February 2019 Automated Traffic Enforcement Technology Guideline Justice and Solicitor General Law Oversight Branch Table of Contents A. Preamble...
More informationTRAFFIC ENGINEERING DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Administrative and Engineering SPECIFIC SUBJECT: Sealing and Signing of Traffic
More informationINTERCHANGE SAFETY. Steve Allen. Houston Daugherty. Director, Strategic Transportation Investments Division (TDOT)
INTERCHANGE SAFETY Steve Allen Director, Strategic Transportation Investments Division (TDOT) Houston Daugherty Director of Transportation & Traffic (Cannon & Cannon Inc.) 2014 TSITE Summer Meeting August
More informationSTATE AID GUIDE FOR: Updated: December 16, 2005
STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,
More informationCITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY
CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY The Right-of-Way Encroachment, Excavation & Grading Permit issued by the Public Works Department
More informationSouth Carolina Department of Transportation Engineering Directive Memorandum
South Carolina Department of Transportation Engineering Directive Memorandum Number: 33 Primary Department: Traffic Engineering Referrals: None Subject: SCDOT Mast Arm Standards This directive provides
More informationSPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work
2004 Specifications CSJ 0027-12-134 SPECIAL PROVISION 000--2823 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,
More informationProfessional Underground Locating and Marking Services Division of Transportation
Professional Underground Locating and Marking Services Division of Transportation Overview: The Division of Transportation is in need of Professional Underground Locating and Marking services for tickets
More informationAPPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS
APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS Page 1 of 15 ST-01: I-95 ITS DEPLOYMENT (DE STATE LINE TO AIRPORT) PROJECT DESCRIPTION AND SCOPE: Project will address gaps in ITS device coverage on I-95 from
More informationSPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work
2004 Specifications CSJ 0110-04-181 SPECIAL PROVISION 000--1278 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,
More informationAPPLICATION FOR PIPE OR WIRE OCCUPANCY
APPLICATION FOR PIPE OR WIRE OCCUPANCY Please answer all questions and direct cover letter / project description, completed application, application fee, and three (3) copies of project plans to: AECOM
More information800 RAIL GRADE CROSSINGS Traffic Engineering Manual
800 RAIL GRADE CROSSINGS Traffic Engineering Manual TABLE OF CONTENTS Part 8 - RAIL GRADE CROSSINGS 800 GENERAL...8-3 801 SIGNING...8-3 801-1 General...8-3 801-2 STOP Signs at Highway-Rail Grade Crossings...
More informationPRIVATE ROAD AND DRIVEWAY STANDARDS Development Standard #1 (Rev 7/18)
PRIVATE ROAD AND DRIVEWAY STANDARDS Development Standard #1 (Rev 7/18) I. GENERAL REQUIREMENTS FOR DRIVEWAYS AND PRIVATE ROADS A. Fire District access roads shall be provided and maintained in accordance
More informationLOCATION AND DESIGN DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design Exceptions / Waivers SPECIFIC SUBJECT: Design Exception Request Form
More informationPost Office Box 500 Carson, WA Phone (509) Fax (509) Toll Free (800)
Public Utility District No. 1 of Skamania County Post Office Box 500 Carson, WA 98610 Phone (509) 427-5126 Fax (509) 427-8416 Toll Free (800) 922-5329 ELECTRIC LINE EXTENSION If you are purchasing property
More informationSTRUCTURE AND BRIDGE DIVISION
Sheet 1 of 8 VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: State of Good Repair Bridge Project Selection and Eligible Work
More informationLongmeadow Parkway Fox River Bridge Corridor. Kane County Board Committee of the Whole July 25, 2007
Longmeadow Parkway Fox River Bridge Corridor Kane County Board Committee of the Whole July 25, 2007 Purpose of Presentation On the behalf of 11 local communities in the northern Fox Valley, we are requesting
More informationWisconsin Department of Transportation (WisDOT) Stand-alone Signals and ITS Program FY17 Project Application Form GENERAL INSTRUCTIONS
Wisconsin Department of Transportation (WisDOT) Stand-alone Signals and ITS Program FY17 Project Application Form GENERAL INSTRUCTIONS APPLICATIONS DUE: FEBRUARY 16, 2016 Please upload applications to
More informationSECTION LIGHTNING PROTECTION SYSTEM
SECTION 16670 - LIGHTNING PROTECTION SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More information1.0 Background and Purpose
1.0 Background and Purpose 1.1 Background Portable Temporary Traffic Signals (PTTS) were first approved for use on Ministry contracts in the mid 1990 s after a site review and evaluation was undertaken.
More informationAt a minimum, the cost estimate should address the following specific items if applicable to your project:
The Pennsylvania Department of Transportation s application process for the Green Light Go program requires the development of a project cost estimate. In order to provide consistency in the cost estimating
More informationVillage of Glendale Quiet Zone Evaluation. Final Report Presented by: Railroad Controls, LP March, 2007
Village of Glendale Quiet Zone Evaluation Final Report Presented by: Railroad Controls, LP Sharon Road Albion Avenue Oak Street Quiet Zone Evaluation Village of Glendale, OH Introduction The Village of
More informationNAME STREET ADDRESS CITY, STATE & ZIP CODE. GAS ELECTRIC TELEVISION TELECOMMUNICATION OTHER (check one) UNDERGROUND OVERHEAD BOTH (check one)
Des Plaines Utility Permit #: PUBLIC WORKS AND ENGINEERING 1420 Miner Street Des Plaines, IL 60016 P: 847.391.5390 F: 847.391.5619 desplaines.org CITY OF DES PLAINES UTILITY PERMIT APPLICATION All entities
More informationArticle 16 Traffic Impact Analysis
Article 16 Traffic Impact Analysis Table of Contents... 16-1 Chapter 16.1 Purpose and Intent... 16-2 Chapter 16.2 Applicability... 16-2 Chapter 16.3 Exemptions... 16-2 Chapter 16.4 Trip Generation Data...
More informationGeneral Symbols, Ducts and Cables
DIVISION 2000 - ABBREVIATIONS 2009 11 2000.001 0 Abbreviations, General 2009 11 2011.101 0 General Symbols, Ducts and Cables 2009 11 2011.201 0 General Symbols, Maintenance Holes, Junction Boxes, Pads,
More informationROADWAY DESIGN AND CONSTRUCTION STANDARDS
ROADWAY DESIGN AND CONSTRUCTION STANDARDS Adopted: 1990 Amended: 1994 2003 2011 2013 ROADWAY DESIGN AND CONSTRUCTION STANDARDS ORIGINALLY ADOPTED IN 1990 Resolution No. R-990-046 OFFICIALLY AMENDED IN
More informationName: Last First Middle. Residence: Street/P.O. Box City State Zip Code. Name of Business: Registered Address of Business:
NONFERROUS METALS PURCHASE PERMIT APPLICATION Name: Last First Middle Residence: Street/P.O. Box City State Zip Code Primary Telephone Number: ( ) Email Address: Name of Business: Registered Address of
More informationSECTION TRAFFIC CONTROL. A. The following is a list of standards which may be referenced in this section:
SECTION 01 55 26 TRAFFIC CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. Section covers requirements for traffic control during construction of the PROJECT. 1.02 REFERENCES A. The following is a list of
More informationEXHIBIT A. SCOPE OF SERVICES District-Wide Traffic Operations/Safety Studies (Work Group 6.1)
EXHIBIT A SCOPE OF SERVICES District-Wide Traffic Operations/Safety Studies (Work Group 6.1) TABLE OF CONTENTS OBJECTIVE... 1 SERVICES... 1 PROJECT MANAGEMENT... 1 SCHEDULE/STATUS REPORTS... 2 MEETINGS...
More informationBetween existing Interstate 70 in St. Louis, MO to west of the IL 203 Interchange on existing I-55/70 in Madison, IL
American Association of State Highway and Transportation Officials An Application from the State Highway or Transportation Department of Illinois for: Elimination of a U.S. (Interstate) Route Establishment
More informationNaperville APPLICATION FOR FENCE. Address of Fence: Permit # City: State: Zip: Phone: Fax: City: State: Zip: Phone: Fax: Yes No
Naperville APPLICATION FOR FENCE Address of Fence: Permit # Property Owner Information: Name: Address: City: State: Zip: E-Mail: Phone: Fax: Contractor/Applicant Information: Name: Contact Person: (if
More information10 Stockton 4. Guard Rail and Impact Attenuator Installation. HSIP Cycle 7
10 Stockton 4 Guard Rail and Impact Attenuator Installation HSIP Cycle 7 2015 Form Date: April 26, 2015 HSIP Cycle 7 Application Form APPLICATION FOR CYCLE 7 HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) APPLICATION
More informationCITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application
CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and
More informationWelcome to Douglas County PUD
Welcome to Douglas County PUD We are committed to providing the best possible utility services at the lowest possible cost consistent with sound business principles To better serve you, please fill out
More informationWOOD POLE SPAN WIRE SIGNAL SYSTEMS
7 A wood pole span wire traffic control signal system differs from a mast arm steel pole traffic control signal system in that it uses wood poles and span wires to place the signal indications in the driver
More informationDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC 20314-1000 REPLY TO ATTENTION OF S: 30 September 2014 CECW-CO 3 0 December 20 11 MEMORANDUM FOR MSC and District Chiefs,
More informationFDOT District 4 Safety Program
FDOT District 4 Safety Program FM# 424855-3-32 Districtwide Traffic Operations Safety Studies Scope of Services I. GENERAL REQUIREMENTS This exhibit forms an integral part of the agreement between the
More informationBlow Ice Detection and Advanced Warning System
Blow Ice Detection and Advanced Warning System Concept of Operations Final MnDOT OTST MnDOT District 8 September 2013 SRF No. 8221 Table of Contents Purpose and Scope... 1 Document Purpose... 1 Project
More informationCITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application
CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY
More informationEXHIBIT A SCOPE OF SERVICES CONSULTANT SERVICES DISTRICTWIDE TRAFFIC SIGNAL RETIMING FINANCIAL PROJECT ID:
EXHIBIT A SCOPE OF SERVICES CONSULTANT SERVICES DISTRICTWIDE TRAFFIC SIGNAL RETIMING FINANCIAL PROJECT ID: 22089863202 EXHIBIT A SCOPE OF SERVICES DISTRICTWIDE TRAFFIC SIGNAL RETIMING I. GENERAL REQUIREMENTS...
More informationWelcome to Douglas County PUD
Welcome to Douglas County PUD We are committed to providing the best possible utility services at the lowest possible cost consistent with sound business principles. To better serve you, please fill out
More informationIndianapolis Power & Light Company
Indianapolis Power & Light Company Electric Service and Meter Manual The Electric Service & Meter Manual is not copyrighted and permission is hereby given to reproduce this document. However, the Indianapolis
More informationAPPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies
APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS
More informationTABLE OF DRAWINGS. Pierce County Public Works & Utilities
Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 05/10/2018 PC.A1.2 Arterial with Cement
More informationDrawing Modification Summary Effective:
Illinois Tollway Base Sheet Revisions Section M Base Sheet Drawings Drawing Modification Summary Effective: 03-31-2017 Roadway (RDY)-Series 400 M-RDY-408 Approach Slab, Mainline Sheet 3 Added slipforming
More informationChapter 4 Chapter 4 INTERSECTION TURNING MOVEMENT COUNTSSUMMARY OF VEHICLE MOVEMENTS PURPOSE TYPES OF COUNTS
Chapter 4 Chapter 4 INTERSECTION TURNING MOVEMENT COUNTSSUMMARY OF VEHICLE MOVEMENTS Formatted: Heading 1, None Formatted: Font: (Default) Arial, 16 pt Formatted: Heading 2 1.3484.14.1 PURPOSE (1) The
More information8.0 MITIGATION MONITORING AND REPORTING PROGRAM
8.0 MITIGATION MONITORING AND REPORTING PROGRAM Public Resources Code, Section 21081.6 requires that mitigation measures identified in environmental review documents prepared in accordance with CEQA are
More informationAppendix A: Equipment Packages for St. Louis Regional ITS Architecture
Appendix A: Equipment Packages for St. Louis Regional ITS Architecture Appendix A: Equipment Packages for St. Louis Regional ITS Architecture... 1 1.1 ATMS01: Network Surveillance - Supporting Equipment
More informationThe Power of Data Integration
The Power of Data Integration Building a Quality Crash Record through Data Collaboration, Coordination and Integration Lynn Peterson Secretary Cam Gilmour Deputy Secretary Nadine Jobe Crash Data and Reporting
More informationFall 2018 Engineer Trainee Recruitment Preference Sheet
Please indicate with an X your position preference. Please also indicate your preferred work location(s) for the postion(s) in which you are interested, by using 1 to indicate your first choice, 2 as your
More informationRE: NCHRP Synthesis 20-05/Topic 47-15, State of the practice for traffic signal preemption at intersections near highway-railway grade crossings
Mr. Jon Williams August 21, 2015 Program Director, IDEA and Synthesis Studies Transportation Research Board RE: NCHRP Synthesis 20-05/Topic 47-15, State of the practice for traffic signal preemption at
More informationTABLE OF DRAWINGS. Pierce County Public Works & Utilities
Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 04/01/2019 PC.A1.2 Arterial with Cement
More informationMATERIALS & RESEARCH SECTION Research & Technology Implementation Prepared by: RESEARCH UPDATE. Wavetronix SmartSensor Matrix Radar Stop Bar Detection
MATERIALS & RESEARCH SECTION Research & Technology Implementation Prepared by: :~ December 11, 2013 RESEARCH UPDATE Wavetronix SmartSensor Matrix Radar Stop Bar Detection U2013-04 INTRODUCTION According
More informationSPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.
2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction
More informationHennepin County Transportation Department ADDENDUM
Hennepin County Transportation Department ADDENDUM TO PLANS, SPECIFICATIONS AND SPECIAL PROVISIONS FOR SPAN WIRE AL REPLACEMENTS HENNEPIN COUNTY TRANSPORTATION DEPARTMENT (To be opened Tuesday, February
More informationSection 200 Design Process and Quality Management. Electrical Engineering Centre
Section 200 Design Process and Quality Management Electrical Engineering Centre April 2013 TABLE OF CONTENTS 200 DESIGN PROCESS AND QUALITY MANAGEMENT 201 INTRODUCTION TO DESIGN PROCESS... 1 201.1 ABOUT
More informationChapter 2 Transportation Element Goals, Objectives and Policies
Chapter 2 Transportation Element Goals, Objectives and Policies City of Belleview Comprehensive Plan Adopted by Ord 2016-10 on July 5, 2016 GOALS, OBJECTIVES AND POLICIES Goal 2 Transportation...1 Objective
More informationCity of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH)
City of St. Catharines Standard Drawings JULY 2017 Revised July 21, 2017 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 1 Monolithic Curb-Faced Sidewalk for Concrete Road 110-2002
More informationMontgomery County Program
Automated Speed Enforcement: Responsible Mgmt. of Technology That Produces Positive Results Captain Thomas Didone Director, Traffic Division Montgomery County Program Safe Speed Program began in 2007 Strong
More informationKing County Intelligent Transportation Systems
King County Intelligent Transportation Systems Signal Synchronization and Beyond Presentation to the Transportation Leadership Forum Department of Transportation February 24, 2005 System Control & Evaluation
More informationSYSTEMS ENGINEERING CONCEPT OF OPERATIONS (ConOps) for: STANDARD TRAFFIC SIGNAL
SYSTEMS ENGINEERING CONCEPT OF OPERATIONS (ConOps) for: STANDARD TRAFFIC SIGNAL MINNESOTA DEPARTMENT OF TRANSPORTATION Contract Number: Approval Date: Prepared by: Document Control Number: Revision Version
More informationCity of Reno Public Works
City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV 89505 (775) 334-3304 (775) 334-1226 FAX SPECIAL CONDITIONS OF APPROVAL FOR Permit # EAE11-00XXX Applicant: Job Description:
More informationEngineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 105 ELECTRICAL DETAILS. base. base. base.
Schedule H to Bylaw 7452, Subdivision Bylaw Page 105 4.3.7 Electrical Details ELECTRICAL DETAILS MMCD Standard Detail Drawing Saanich Supplemental Specification E1.1 Concrete Base Index E1.2 Type A and
More informationEXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE
EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.
More informationCommunity Development Department Council Chambers, 7:30 PM, July 20, 2017
STAFF REPORT 2017-26P: Special Use Permit Community Development Department Council Chambers, 7:30 PM, July 20, 2017 To: From: Re: Paul Luke, Chairman, Skokie Plan Commission Steve Marciani, AICP, Planning
More information2017 Highway Safety Improvement Program Call
2017 Highway Safety Improvement Program Call The Highway Safety Improvement Program (HSIP) is for highway safety projects that eliminate or reduce the number of fatalities and serious injuries on all public
More informationTacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)
Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Comment Form Date: To: From:
More informationGENERAL SPECIFICATION FOR ELECTRICAL WORK
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 106 April 2017 GENERAL SPECIFICATION FOR ELECTRICAL WORK TABLE OF CONTENTS 106.01 SCOPE 106.02 REFERENCES 106.03 DEFINITIONS 106.04 DESIGN AND
More informationWELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017
WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule
More informationConclusions & Lessons Learned
What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned It s not about you, it s about the public Developed by Access Utah County
More informationLOCATION AND DESIGN DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Interstate, NHS Non-Interstate and Non-NHS (IJR / IMR Guidance) SPECIFIC SUBJECT:
More information