5a. Grid Connection Codes

Size: px
Start display at page:

Download "5a. Grid Connection Codes"

Transcription

1 5a. Grid Connection Codes Requirements for Generators Demand Connection Code HVDC Network Code JESG in Edinburgh 20 August 2013

2 The Third Energy Package 3 regulations and 2 directives. Adopted July 2009, law since March 2011 Key step forward in developing a (more) harmonised European energy market Separation of ownership of monopoly energy transmission activities Formation of European Transmission System bodies, ENTSOG and ENTSO-E Formation of ACER Agency for Cooperation of Energy Regulators Goals: 21

3 European Networks Codes Commission target to enter into force by end of 2014 Connection Codes Market Codes Operational Codes Requirements for Generators CACM Operational Security Demand Connection Code Forward Capacity Allocation Operational Planning and Scheduling HVDC Balancing Load-Frequency Control and Reserves 22

4 ENC High Level Interactions 9 codes, 1 package Possible market splitting Common structures and issues; different timescales Market Market Codes Capacity Allocation & Congestion Management Forward Markets Balancing Offshore generation Generator actions Demand side response Balancing across interconnectors Generation / Demand equivalent rules Capacity limits Coordinated planning Loss of infeed Frameworks & application Operational Codes Operational Security Operational Planning & Scheduling Load Frequency Control & Reserves Frequency control Governance Guidelines Transparency Regulations LCFR provides framework & Balancing takes actions 23

5 European Network Code (ENC) Development Process Commission starts development process The process for developing the European Codes is defined in EU law 6-12 months? 1-3 years ACER develops FWGL Commission invites ENTSO-E to develop European Code ENTSO-E develops European Code ACER reviews European Code Comitology by Commission National application /implementation by member states 6 months To fit work programme Stakeholder Engagement 1 year 3 months TARGET: By end of 2014: Codes become European Law Implementation mainly

6 Stakeholder engagement on the Network Codes Stakeholder Advisory Groups* External to ENTSO-E Public Consultation Stakeholder Working Groups National Regulatory Authority(s) e.g. TSOs * non-exhaustive list, SAG depends on individual Network Code Internal to ENTSO-E 25

7 Connection Codes Connection Codes Requirements for Generators Demand Connection Code HVDC Sets functional requirements which new generators connecting to the network (both distribution and transmission) will need to meet, as well as responsibilities on TSOs and DSOs. Sets functional requirements for new demand users and distribution network connections to the transmission system, basic Demand Side Response capabilities, as well as responsibilities on TSOs and DSOs. Sets functional requirements for HVDC connections and offshore DC connected generation. 26

8 Grid Connection Codes Where is it now? What happens next? Key Issues for GB Requirements for Generators Submitted to Commission DNV Kema impact assessment report for Commission - Sept Implementation guidance document (by Drafting Team) Sept Comitology predicted to finish Q1/ Changes in thresholds - 4 generators bands Requirements on much smaller units (from 800W) Retrospective application Demand Connection Code Submitted to Commission Likely to follow RfG into Comitology Practicality of application to domestic consumers Is this the right vehicle for DSR? HVDC Drafting in progress Initial scope and call for stakeholder input documents written 12 month timeframe for drafting by ENTSO-E finishes in May 2014 Next user group mtg - Sept TSO definitions, roles & responsibilities 27

9 RfG & DCC in Comitology jointly 28 28

10 Requirements for Generators (RfG) RfG was the first of the European codes to be developed and has provided a pilot for the process Applies requirements to smaller, embedded generation (now from 800W rather than 50MW in England & Wales) Operational notification process for all Embedded Plant allocated to Relevant Network Operators Overriding principles for GB application: Fit for purpose to cover future developments (move to increased non-synchronous generation) Assumes GB remains as a synchronous area Extensively replicates GB Grid Code requirements Application within GB is affected by new categorisation of generators (replacing Large, Medium & Small Power Station classifications with type A-D bandings) Generator Direct Connection to: Size SHET SPT NGET Small <10MW <30MW <50MW Medium MW Large 10MW+ 30MW+ 100MW+ RfG Type Generator Connection Capacity Voltage A 800W-1MW <110kV B 1-10MW <110kV C 10-30MW <110kV D 30MW >110kV 29

11 Demand Connection Focuses on the connection of industrial loads and DSOs Sets out requirements which will apply to the demand side of the power system, contributing to system security and efficient load management Generally seeks to mirror RfG requirements Introduces demand side response (DSR) 30

12 Daily Mail moments Sensors in domestic appliances would check [the] frequency every 0.2 seconds, and if it fell to 47Hz a level that would risk blackouts the devices would kick in and shut fridges, freezers and ovens down. 31 Front Cover: Mail on Sunday, 27 April 2013

13 High Voltage Direct Current (HVDC) Specifies requirements for long distance DC connections, links between different synchronous areas and DC-connected Power Park Modules, such as offshore wind farms, which are becoming increasingly prominent in the European electricity system. A relatively new area in which fewer standards or grid codes exist, making a pan- European approach particularly beneficial. Follows on from the RfG and DCC codes building on the same foundations to create a consistent and complete set of connection codes. Covers various configurations of HVDC including: AC connection point requirements for independent, single or multiple links AC connection point requirements for offshore PPMs DC meshed systems not currently included in the Network Code. 32

14 Questions Rob Wilson, nationalgrid 33

Load-Frequency Control and Reserves Network Code. David Bunney JESG 15 January 2013

Load-Frequency Control and Reserves Network Code. David Bunney JESG 15 January 2013 Load-Frequency Control and Reserves Network Code David Bunney JESG 15 January 2013 Agenda Overview and Timescales Key Requirements of the Network Code Key Issues Stakeholder Engagement 2 Overview One of

More information

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON THE ALL TSO PROPOSAL FOR COMMON GRID MODEL METHODOLOGY (CGMM) 13 December 2016 1 I. Introduction and legal context

More information

ROUNDTABLE OF EUROPEAN ENERGY INDUSTRIALISTS // CONCRETE PROPOSALS FOR THE WINTER PACKAGE AND BEYOND

ROUNDTABLE OF EUROPEAN ENERGY INDUSTRIALISTS // CONCRETE PROPOSALS FOR THE WINTER PACKAGE AND BEYOND ROUNDTABLE OF EUROPEAN ENERGY INDUSTRIALISTS // CONCRETE PROPOSALS FOR THE WINTER PACKAGE AND BEYOND CONCRETE PROPOSALS PAGE 2 INTRODUCTION As a follow up to our previous meetings with the European Commission,

More information

GB regulatory approach RIIO price controls and distributed generation

GB regulatory approach RIIO price controls and distributed generation GB regulatory approach RIIO price controls and distributed generation October 2016 James Veaney Head of Connections and Constraints Management Background Much of network installed in 1950s and 60s with

More information

C2-204 SC C2 PS2. Improved TSO coordination in the Central West European region

C2-204 SC C2 PS2. Improved TSO coordination in the Central West European region http : //www.cigre.org C2-204 SC C2 PS2 2012 Paris Session Improved TSO coordination in the Central West European region O. Arrivé (RTE), F. Boulet (Coreso), Cristina Moran-Pena and P. Johnson (National

More information

power grid Solar Eclipse March 2015: Policy Brief 15 July 2015

power grid Solar Eclipse March 2015: Policy Brief 15 July 2015 Solar Eclipse March 2015: The successful stress test of Europe s power grid more ahead Policy Brief 15 July 2015 On 20 March the European electricity grid passed with flying colours an unprecedented stress

More information

Council of the European Union Brussels, 13 December 2017 (OR. en)

Council of the European Union Brussels, 13 December 2017 (OR. en) Council of the European Union Brussels, 13 December 2017 (OR. en) Interinstitutional File: 2016/0379 (COD) 15237/17 ADD 1 NOTE ENER 487 ENV 1016 CLIMA 336 COMPET 841 CONSOM 384 FISC 322 CODEC 1970 From:

More information

Work Program Nordic Energy Regulators (NordREG)

Work Program Nordic Energy Regulators (NordREG) Work Program 2018 Nordic Energy Regulators (NordREG) 1 Report 1/2018 NordREG www.nordicenergyregulators.org 2 Table of Contents 1 Preface... 4 2 Introduction... 5 3 Mission and vision... 6 3.1 Organisational

More information

OPTIONS FOR THE FUTURE OF POWER SYSTEM REGIONAL COORDINATION

OPTIONS FOR THE FUTURE OF POWER SYSTEM REGIONAL COORDINATION Report for ENTSO-E OPTIONS FOR THE FUTURE OF POWER SYSTEM REGIONAL COORDINATION 8 December 2016 ENERGY Disclaimer The authors and the publisher of this work have used sources believed to be reliable in

More information

EU policy objectives and European research on Smart Grids

EU policy objectives and European research on Smart Grids EU policy objectives and European research on Smart rids European Commission, D Research Henrik Dam Research Programme Officer ADDRESS international workshop - Paris 9th June 2010 Key targets Sustainability:

More information

June 2017 Disclaimer

June 2017 Disclaimer Explanatory note for Channel TSOs proposal of common capacity calculation methodology for the dayahead and intraday market timeframe in accordance with Article 20 of Commission Regulation (EU) 2015/1222

More information

Design options of TERRE Project. (Trans European Replacement Reserves Exchange) Executive Summary

Design options of TERRE Project. (Trans European Replacement Reserves Exchange) Executive Summary Design options of TERRE Project (Trans European Replacement Reserves Exchange) Executive Summary 15 th of June 2016 Executive Summary TERRE (Trans European Replacement Reserve Exchange) is the pilot project

More information

The Electric Power System

The Electric Power System Country s flag The Electric Power System - Spain - Spanish Power System 1 Basic facts Area: 505 957 km 2 Population: 46 439 864 (2015) Number of TSOs: 1 Number of DSOs: 336 (source: MINETUR) 28 Mio. consumers

More information

P295 Submission and publication of Transparency regulation data via the BMRS

P295 Submission and publication of Transparency regulation data via the BMRS Stage 01: Submission and publication of Transparency regulation data via the BMRS What stage is this document in the process? The EU Transparency regulation requires primary data owners to submit information

More information

Power System Integration of Offshore Wind Farms:

Power System Integration of Offshore Wind Farms: Power System Integration of Offshore Wind Farms: Challenges Towards Horizon 2020 Tobias Hennig, M.Sc. Fraunhofer IWES Agenda What is EERA JP Wind? Power system integration challenges towards 2020 Example

More information

European best practice regarding to the connection to the grid, connection tariffs

European best practice regarding to the connection to the grid, connection tariffs Ad Hoc Expert Facility under the INOGATE project Support to Energy Market Integration and Sustainable Energy in the NIS (SEMISE) European best practice regarding to the connection to the grid, connection

More information

The EU Electricity Network Codes

The EU Electricity Network Codes The EU Electricity Network Codes Course text for the Florence School of Regulation online course By Leonardo Meeus and Tim Schittekatte October 2017 I Contents Abbreviations... VIII Disclaimer & invitation

More information

Clean Energy for all Europeans

Clean Energy for all Europeans Clean Energy for all Europeans EC s Winter Package - 30 November 2016 Users Group Plenary meeting 30 March 2017 Towards an European Energy Union Jean-Claude Juncker President of the European Commission

More information

System operations and market development plan Executive summary

System operations and market development plan Executive summary System operations and market development plan 2017-2021 Executive summary Her må Statnett fylle på med bildetekster. Her må Statnett fylle på med bildetekst. Preface The power system is a crucial infrastructure

More information

ANTICIPATING AND ADDRESSING SECURITY CHALLENGES IN AN EVOLVING POWER SYSTEM

ANTICIPATING AND ADDRESSING SECURITY CHALLENGES IN AN EVOLVING POWER SYSTEM ANTICIPATING AND ADDRESSING SECURITY CHALLENGES IN AN EVOLVING POWER SYSTEM January 2017 PRESENTED BY JENNY RIESZ SLIDE 1 AGENDA 1. Introduction to the NEM 2. Future Power System Security Program 3. Identifying

More information

All-island European Stakeholder Forum. 11 October 2017 Belfast

All-island European Stakeholder Forum. 11 October 2017 Belfast All-island European Stakeholder Forum 11 October 2017 Belfast Agenda 10h30 Session 1: Network Codes update Welcome & Introductions RA update on regulatory developments related to the Network Codes and

More information

27 October Allegato A

27 October Allegato A All TSOs proposal for the day-ahead firmness deadline (DAFD) in accordance with Article 69 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and

More information

I-SEM Testing Tariff High Level Options Consultation

I-SEM Testing Tariff High Level Options Consultation I-SEM Testing Tariff High Level Options Consultation 02 June 2017 Version 1.0 EXECUTIVE SUMMARY Testing Tariffs are currently applied to Units Under Test (UUT) in the Single Electricity Market (SEM) on

More information

Electricity interconnection projects between North Africa and Europe: challenges and opportunities

Electricity interconnection projects between North Africa and Europe: challenges and opportunities Electricity interconnection projects between North Africa and Europe: challenges and opportunities Michele Benini,, Angelo L Abbate RSE (former ERSE) SpA,, Italy SECURE Regional Stakeholders Meeting Cairo,

More information

Grid Code Review Panel Intermittent Generation Strategy Paper Date Raised: 18 July 2012 GCRP Ref: pp12/34 A Panel Paper by Steven Lam National Grid

Grid Code Review Panel Intermittent Generation Strategy Paper Date Raised: 18 July 2012 GCRP Ref: pp12/34 A Panel Paper by Steven Lam National Grid Grid Code Review Panel Intermittent Generation Strategy Paper Date Raised: 18 July 2012 GCRP Ref: pp12/34 A Panel Paper by Steven Lam National Grid Summary The purpose of this paper is to describe the

More information

Intelligent Smart Grids: Driving change in urban energy systems whereto and how?

Intelligent Smart Grids: Driving change in urban energy systems whereto and how? Intelligent Smart Grids: Driving change in urban energy systems whereto and how? OLOF SAMUELSSON, INDUSTRIAL ELECTRICAL ENGINEERING AND AUTOMATION, LTH Outline New technology Paradigm shifts Driving change

More information

Transmission Systems of the Future: Trends, Challenges and innovative Solutions

Transmission Systems of the Future: Trends, Challenges and innovative Solutions Transmission Systems of the Future: Trends, Challenges and innovative Solutions Rainer Krebs, Principal Expert, Head of Protection and Control System Studies Dept. siemens.at/future-of-energy Transmission

More information

A review on Institutional Framework, Principles, and Key Elements for Integrated Electricity Market: Implications for ASEAN

A review on Institutional Framework, Principles, and Key Elements for Integrated Electricity Market: Implications for ASEAN ERIA-DP--26 ERIA Discussion Paper Series A review on Institutional Framework, Principles, and Key Elements for Integrated Electricity Market: Implications for ASEAN Tsani Fauziah RAKHMAH Economic Research

More information

ELEXON S RESPONSE TO THE PROJECT MARI CONSULTATION

ELEXON S RESPONSE TO THE PROJECT MARI CONSULTATION Introduction On 21 November, European Project MARI, which is creating a European platform for the exchange of manuallyactivated Frequency Restoration Reserve (mfrr), issued its first public consultation

More information

The present ACER Guidance to ENTSOG provides a framework for the development of a

The present ACER Guidance to ENTSOG provides a framework for the development of a ACER guidance to ENTSOG on the development of amendment proposals to the Network Code on Capacity Allocation Mechanisms on the matter of incremental and new capacity 1. Introduction a) The Network Code

More information

Energy Networks Association

Energy Networks Association The Voice of the Networks Energy Networks Association TDI Stakeholder Engagement Workshop TDI Stakeholder Engagement Workshop Objectives To engage with and disseminate information to the energy community,

More information

Proposal for a common set of requirements used for the continuous trading matching algorithm

Proposal for a common set of requirements used for the continuous trading matching algorithm Proposal for a common set of requirements used for the continuous trading matching algorithm 13 November 2017 1. Background 1. This document is a common proposal developed by all Transmission System Operators

More information

Open Networks Project

Open Networks Project Open Networks Project Charging Scenarios 16 August 2017 Document Ref: ON-WS4-P1 Charging Scenarios-170816 Restriction: None Document Control Version Control Version Issue Date Author Comments 2.0 16/08/17

More information

PHILIPPE LIENHART EDF 1

PHILIPPE LIENHART EDF 1 NEA SYMPOSIUM MARCH 8TH, 2018 IN LINO HALL TOKYO STRATEGY FOR NORTHEAST ASIA POWER SYSTEM INTERCONNECTION EDF TECHNICAL ASSISTANCE TO MONGOLIA ADB PROJECT MID-TERM INFORMATION ON THE PROJECT PHILIPPE LIENHART

More information

ENA Open Networks Project Workstream 1: Product 1

ENA Open Networks Project Workstream 1: Product 1 The Voice of the Networks ENA Open Networks Project Workstream 1: Product 1 Mapping current SO, TO and DNO processes 12 th June 2017 Energy Networks Association Document Ref: TDWS1P1 Restriction: None

More information

Germany s Energiewende Current and imminent challenges for the Transmission System Operator in Germany

Germany s Energiewende Current and imminent challenges for the Transmission System Operator in Germany Germany s Energiewende Current and imminent challenges for the Transmission System Operator in Germany Jens Jacobs Transmission System Operation Brauweiler Budapest, 04 December 2014 Agenda Germany s Energiewende

More information

Wind of change: The process of market integration and congestion management

Wind of change: The process of market integration and congestion management e-control Workshop on Market Design of the Future, Wind of change: The process of market integration and congestion management Karsten Neuhoff Wien, 29.3.2012 Wind of change: The process of market integration

More information

Annual Renewable Energy Constraint and Curtailment Report 2016

Annual Renewable Energy Constraint and Curtailment Report 2016 Annual Renewable Energy Constraint and Curtailment Report 2016 07/04/2017 Contents Executive Summary... 3 1 Introduction... 5 1.1 Context... 5 1.2 Reasons for Dispatch-Down... 5 1.3 Reporting Methodology...

More information

Consultation on Connecting Further Generation in Northern Ireland. Call for Evidence

Consultation on Connecting Further Generation in Northern Ireland. Call for Evidence Consultation on Connecting Further Generation in Northern Ireland Call for Evidence 12 Table of Contents 1 Executive Summary... 3 2 Introduction... 6 2.1 Purpose of this Paper... 6 3 Alternative Connection

More information

Energy Networks Association

Energy Networks Association The Voice of the Networks Energy Networks Association TSO-DSO Project Forward Plan for Work TSO-DSO Project Introduction In December Energy Networks Futures Group & ENA Board (Business Leaders) gave their

More information

Summary of Studies on Rate of Change of Frequency events on the All-Island System

Summary of Studies on Rate of Change of Frequency events on the All-Island System Summary of Studies on Rate of Change of Frequency events on the All-Island System August 212 Authored by: Salim Temtem & Karen Creighton Checked by: David Cashman & Raymond Skillen Approved by: Jonathan

More information

Electricity Market Code

Electricity Market Code Electricity Market Code Chapter 1 Definitions Version 2.0 This documents contains a partial translation of the Austrian Electricity Market Code from German into English. It is provided for the reader s

More information

Black Start Strategy

Black Start Strategy Issue 1 Revision Black Start Strategy Produced in accordance with Standard Condition C16 of the NGET Transmission Licence Effective from 1 st April 2017 to 31 st March 2018 DOCUMENT HISTORY Version 1.0

More information

Offshore Connectivity and European Energy Policy

Offshore Connectivity and European Energy Policy Offshore Connectivity and European Energy Policy Berliner Energietage 2010 EUROPEAN COMMISSION Mr. Georg Wilhelm Adamowitsch, European Coordinator Connection of offshore wind power in Northern Europe (North

More information

RISK OF A CAPACITY SHORTAGE IN THE POLISH ELECTRICITY SYSTEM UP TO 2020

RISK OF A CAPACITY SHORTAGE IN THE POLISH ELECTRICITY SYSTEM UP TO 2020 RISK OF A CAPACITY SHORTAGE IN THE POLISH ELECTRICITY SYSTEM UP TO 2020 SEPTEMBER 2014 CONTENTS 1. KEY CONCLUSIONS... 4 2. BACKGROUND OF THE STUDY...5 Forum for Energy Analysis 3. EUROPEAN CONTEXT... 6

More information

Electricity generation, electricity consumption, system integration, production and consumption balance

Electricity generation, electricity consumption, system integration, production and consumption balance Prof. Dr. Andrej Gubina University of Ljubljana, Faculty of Electrical Engineering Electricity generation, electricity consumption, system integration, production and consumption balance Maribor, Slovenia,

More information

Research and Development Plan European Grid : Towards 2020 Challenges and Beyond

Research and Development Plan European Grid : Towards 2020 Challenges and Beyond Research and Development Plan European Grid : Towards 2020 Challenges and Beyond European Network of Transmission System Operators for Electricity 2 ENTSO-E Research And Development Plan Research and Development

More information

QUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller Approved: F. Wester BACKGROUND MATERIAL...

QUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller Approved: F. Wester BACKGROUND MATERIAL... POSITION PAPER STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Position paper Work stream Technical Topic: T.1 Voltage level Filename ONL15-058-T1_Voltage level_pp_v1 Version 1 - release for Expert

More information

Simulatie van het EU-wijde elektriciteitsysteem. Modellering van de elektriciteitsmarkt en de hierin gebruikte elektriciteitsinfrastructuur

Simulatie van het EU-wijde elektriciteitsysteem. Modellering van de elektriciteitsmarkt en de hierin gebruikte elektriciteitsinfrastructuur Document number Simulatie van het EU-wijde elektriciteitsysteem Modellering van de elektriciteitsmarkt en de hierin gebruikte elektriciteitsinfrastructuur Presentatie voor Kivi Niria Utrecht, 16 April

More information

The Electric Power System

The Electric Power System The Electric Power System - Romania- Romanian Power System 1 2 Basic facts Area: 238 391 km² Population: 19 960 000 Number of electricity consumers: 9150000 Number of TSOs: 1 Number of DSOs: 8 Peak load:

More information

Conditions for accelerating the deployment of offshore wind power in the BSR - Seminar 27 April 2012, Wind Power in the Nordic and Baltic Region

Conditions for accelerating the deployment of offshore wind power in the BSR - Seminar 27 April 2012, Wind Power in the Nordic and Baltic Region Conditions for accelerating the deployment of offshore wind power in the BSR - Seminar 27 April 2012, Wind Power in the Nordic and Baltic Region BASREC - Wind Contents: 1. Objectives & Implementation Framework

More information

FEASIBILITY STUDY REGARDING COOPERATION BETWEEN THE NORDIC AND THE BALTIC POWER SYSTEMS WITHIN THE NORDIC ENTSO-E PILOT PROJECT ON ELECTRICITY

FEASIBILITY STUDY REGARDING COOPERATION BETWEEN THE NORDIC AND THE BALTIC POWER SYSTEMS WITHIN THE NORDIC ENTSO-E PILOT PROJECT ON ELECTRICITY FEASIBILITY STUDY REGARDING COOPERATION BETWEEN THE NORDIC AND THE BALTIC POWER SYSTEMS WITHIN THE NORDIC ENTSO-E PILOT PROJECT ON ELECTRICITY BALANCING 1 This feasibility study regarding cooperation between

More information

Lesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System

Lesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System Lesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System Primary Interest Groups Balancing Authorities (BAs) Transmission Operators (TOPs) Generator Operators

More information

Energy Regulation: A Bridge to 2025 Conclusions Paper September 2014

Energy Regulation: A Bridge to 2025 Conclusions Paper September 2014 Energy Regulation: A Bridge to 2025 Conclusions Paper 1 19 September 2014 Recommendation of the Agency on the regulatory response to the future challenges emerging from developments in the internal energy

More information

Transmission and Interconnectors

Transmission and Interconnectors Transmission and Interconnectors Peter Børre Eriksen Head of Systems Analysis Energinet.dk 1 ENTSO-E: 41 TSOs from 34 countries Founded on 19 Dec 2008 and fully operational since July 2009 A trans-european

More information

Connection & Compliance processes Session 2

Connection & Compliance processes Session 2 Connection & Compliance processes Session 2 Experts Group Implementation NCs Brussel, 25/02/2016 Ann Larsen Approval of minutes of last meeting Draft minutes have been sent around to all participants.

More information

Elia s view on Belgium s Energy Vision for Our contribution to the energy debate in Belgium

Elia s view on Belgium s Energy Vision for Our contribution to the energy debate in Belgium Elia s view on Belgium s Energy Vision for 2050 Our contribution to the energy debate in Belgium June 2017 FOREWORD Dear reader, Belgium is about to take some important decisions about the future of its

More information

European Energy Regulation: A Bridge to 2025

European Energy Regulation: A Bridge to 2025 European Energy Regulation: A Bridge to 2025 Public Consultation Paper PC_2014_O_01 29 APRIL 2014 This consultation paper, issued by the Board of Regulators (BoR) and the Director of the Agency for the

More information

UK Electricity Market Reform: Lessons from a policy and regulatory journey

UK Electricity Market Reform: Lessons from a policy and regulatory journey UK Electricity Market Reform: Lessons from a policy and regulatory journey Michael Grubb Professor of Energy and Climate Change, University College London (UCL) Chair, UK Panel of Technical Experts on

More information

UK Electricity Market Reform: Lessons from a policy and regulatory journey

UK Electricity Market Reform: Lessons from a policy and regulatory journey UK Electricity Market Reform: Lessons from a policy and regulatory journey Michael Grubb Professor of Energy and Climate Change, University College London (UCL) Institute of Sustainable Resources & Energy

More information

A Test System Model for Stability Studies of UK Power Grid

A Test System Model for Stability Studies of UK Power Grid A Test System Model for Stability Studies of UK Power Grid Linash P. Kunjumuhammed Department of Electrical and Electronic Engineering Imperial College London United Kingdom linash.p.k@imperial.ac.uk Bikash

More information

BALANCING CODE NO. 1 (BC1)

BALANCING CODE NO. 1 (BC1) Paragraph No/Title BALANCING CODE NO. 1 (BC1) PRE GATE CLOSURE PROCESS CONTENTS (This contents page does not form part of the Grid Code) Page Number BC1.1 INTRODUCTION... 1 BC1.2 OBJECTIVE... 1 BC1.3 SCOPE...

More information

REGIONAL INTEGRATION OF ENERGY NETWORKS IN THE BALKAN AREA. Gas & Power Business Forum 2012 Sofia, May 11, 2012

REGIONAL INTEGRATION OF ENERGY NETWORKS IN THE BALKAN AREA. Gas & Power Business Forum 2012 Sofia, May 11, 2012 REGIONAL INTEGRATION OF ENERGY NETWORKS IN THE BALKAN AREA by Dimitrios Kardomateas Division Director, Strategy, Development & Regulation, DESFA S.A. Member of the Board of ENTSOG Member of the Board of

More information

Pilot 5: The Nordic Regulating Power Market

Pilot 5: The Nordic Regulating Power Market Pilot 5: The Nordic Regulating Power Market Optimizing the existing Nordic mfrr market and investigating possibilities to exchange with other regions Thomas Elgaard Jensen, Energinet.dk ENTSO-E, Bruxelles,

More information

ACER/CEER Annual Report on the Results of Monitoring the Internal Electricity and Gas Markets in Summary

ACER/CEER Annual Report on the Results of Monitoring the Internal Electricity and Gas Markets in Summary ACER/CEER Annual Report on the Results of Monitoring the Internal Electricity and Gas Markets in 216 Summary October 217 The support of the Energy Community Secretariat in coordinating the collection and

More information

OFFSHORE WIND ENERGY RENEWABLE BULK POWER BUT NO TRANSMISSION? 5 TH CONFERENCE ON APPLIED INFRASTRUCTURE RESEARCH

OFFSHORE WIND ENERGY RENEWABLE BULK POWER BUT NO TRANSMISSION? 5 TH CONFERENCE ON APPLIED INFRASTRUCTURE RESEARCH OFFSHORE WIND ENERGY RENEWABLE BULK POWER BUT NO TRANSMISSION? 5 TH CONFERENCE ON APPLIED INFRASTRUCTURE RESEARCH SUSTAINABLE EUROPEAN INFRASTRUCTURE FINANCING UNDER THE CONDITIONS OF COMPETITION, ENVIRONMENTAL

More information

Calculation of transmission capacities between partner-grids

Calculation of transmission capacities between partner-grids Translation for information purposes only. See especially the German version approved by the German Federal Networks Agency (BNetzA). Calculation of transmission capacities between partner-grids 20th May

More information

Cluster Design Toolbox. Cluster Design Workshop, 15/04/2016

Cluster Design Toolbox. Cluster Design Workshop, 15/04/2016 Cluster Design Toolbox Cluster Design Workshop, 15/04/2016 Layout 1 Idea and Concept Integrated approach 2 3 Architecture Toolbox compartments Architecture of the toolbox Interaction with computation models

More information

APEx Conference 2009

APEx Conference 2009 APEx Conference 2009 Boston, October 11-13, 2009 The European energy policy and situation Ignacio J. Pérez-Arriaga IIT, Comillas University CEEPR, MIT The struggle to establish a EU energy policy A quick

More information

Protection Settings: Calculating, Administering and Testing ADMO at Energinet.dk

Protection Settings: Calculating, Administering and Testing ADMO at Energinet.dk Conference Proceedings 15.1 Protection Settings: Calculating, Administering and Testing ADMO at Energinet.dk Sabine Seeger, Energinet.dk Abstract This paper describes the experiences of Energinet.dk in

More information

Fault current interruption in HVDC networks. Tim Schultz

Fault current interruption in HVDC networks. Tim Schultz Fault current interruption in HVDC networks Tim Schultz 1 Structure 1. Power transmission basics 2. Current developments 3. Research: Fault current interruption in HVDC grids Simulation: How are breaker

More information

INTERACTIVE CUSTOMER GATEWAY FOR ELECTRICITY DISTRIBUTION MANAGEMENT, ELECTRICITY MARKET, AND SERVICES FOR ENERGY EFFICIENCY

INTERACTIVE CUSTOMER GATEWAY FOR ELECTRICITY DISTRIBUTION MANAGEMENT, ELECTRICITY MARKET, AND SERVICES FOR ENERGY EFFICIENCY INTERACTIVE CUSTOMER GATEWAY FOR ELECTRICITY DISTRIBUTION MANAGEMENT, ELECTRICITY MARKET, AND SERVICES FOR ENERGY EFFICIENCY Pertti Järventausta Jarmo Partanen Seppo Kärkkainen Tampere University of Lappeenranta

More information

Connecting New Generation in New Zealand. Len Gould Customer Services Manager Transpower New Zealand Ltd

Connecting New Generation in New Zealand. Len Gould Customer Services Manager Transpower New Zealand Ltd Connecting New Generation in New Zealand Len Gould Customer Services Manager Transpower New Zealand Ltd Outline New Zealand s power system & Transpower s roles The planning process for new generation The

More information

The new role of DSO. David Trebolle Trebolle Manager, Active Networks and Network Analysis Applications Gas Natural Fenosa

The new role of DSO. David Trebolle Trebolle Manager, Active Networks and Network Analysis Applications Gas Natural Fenosa The new role of DSO David Trebolle Trebolle Manager, Active Networks and Network Analysis Applications Gas Natural Fenosa 1 1 About us Installed capacity: 15.443 MW 1- Figures at the end of 2011 2 Union

More information

FRT-Testing and Direct TSO-Control of Reactive Power Output of Large Wind Farms

FRT-Testing and Direct TSO-Control of Reactive Power Output of Large Wind Farms FRT-Testing and Direct TSO-Control of Reactive Power Output of Large Wind Farms Peter Van Roy, H. Lemmens, T. Springuel, A. Dabin (Elia) Eckard Quitman (Enercon), Jaap-Jan Ferweda (WindVision) Background

More information

ENTSO-E TYNDP and RegIPs

ENTSO-E TYNDP and RegIPs ENTSO-E TYNDP and RegIPs Presenter: Andriy Vovk, TYNDP PMO Advisor Athens, 01 June 2017 CONTENT Objectives Organization Timeline for all deliverables Scenario Building Identification of the System Needs

More information

Power-to-Gas energy storage is key to Germany s energy transition

Power-to-Gas energy storage is key to Germany s energy transition Power-to-Gas energy storage is key to Germany s energy transition Dr. Roland Kircher Corporate Technology, Research & Technology Center Energy Conversion 3 rd Energy Policy Round Table Tokyo, 2012.07.12

More information

RtCC_CGMM-v2_as_of_2017_05_23_1000h 1 / 29

RtCC_CGMM-v2_as_of_2017_05_23_1000h 1 / 29 RtCC_CGMM-v2_as_of_2017_05_23_1000h 1 / 29 Response to Consultation Comments (RtCC): CGMM-v2 The present file constitutes the RtCC for the public consultation on the Common Grid Model Methodology pursuant

More information

Nordic Grid Development Plan 2017

Nordic Grid Development Plan 2017 Nordic Grid Development Plan 2017 June 2017 Content Introduction 3 1 The Nordic grid planning process 2 Regional drivers for grid development 5 3 3.1 Reinvestments 6 Status for Nordic projects 7.1 Nordic

More information

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for a common set of requirements, in accordance with Article

More information

The most popular European Model: the Ownership Unbundling (OU) But not the only way

The most popular European Model: the Ownership Unbundling (OU) But not the only way The most popular European Model: the Ownership Unbundling (OU) Totally separated companies (generation and supply activities not compatible with transmission) No common shareholders between generation/supply

More information

DSR follow on final presentation

DSR follow on final presentation DSR follow on final presentation A presentation to DECC Andrew Nind, Oliver Pearce, Kostas Theodoropoulos 4 April 2011 Agenda 1. Objectives 2. Scenario assumptions 3. Scenario results 4. Next steps 2 Objectives

More information

Seminar on Renewable Energy Technology implementation in Thailand Experience transfer from Europe

Seminar on Renewable Energy Technology implementation in Thailand Experience transfer from Europe Seminar on Renewable Energy Technology implementation in Thailand Experience transfer from Europe co-organised by the Delegation of the European Union to Thailand and the Department of Alternative Energy

More information

RES forecasting from a TSO perspective

RES forecasting from a TSO perspective Dr. Alejandro J. Gesino Market Design Renewable Energy TenneT TSO EWEA Technology Workshop: Wind Power Forecasting Rotterdam, The Netherlands. December 4 th 2013 Agenda 1. Role of the German TSOs. 2. TenneT

More information

The Internal Energy Market

The Internal Energy Market The Internal Energy Market A Eurogas Position Paper January 2013 Eurogas is the association representing the European gas wholesale, retail and distribution sector. Founded in 1990, its members are some

More information

Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network FG-2011-G August 2011

Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network FG-2011-G August 2011 Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network FG-2011-G-001 3 August 2011 Agency for the Cooperation of Energy Regulators Trg Republike 3 1000 Ljubljana

More information

FINDING THE VALUE IN DEMAND SIDE RESPONSE 22 May Stephen Woodhouse

FINDING THE VALUE IN DEMAND SIDE RESPONSE 22 May Stephen Woodhouse FINDING THE VALUE IN DEMAND SIDE RESPONSE 22 May 2015 Stephen Woodhouse THE NEED FOR FLEXIBILITY IS GROWING With new forms of generation, prices and dispatch patterns will be dictated by wind and solar

More information

Atlantic Wind Connection Project Update. Mohamed M. El Gasseir, PhD. Alternating Current Transmission Systems Conference.

Atlantic Wind Connection Project Update. Mohamed M. El Gasseir, PhD. Alternating Current Transmission Systems Conference. Atlantic Wind Connection Project Update Mohamed M. El Gasseir, PhD High Voltage Direct Current & Flexible Alternating Current Transmission Systems Conference EPRI, Alto August 30, 2011 Agenda Background:

More information

By to: Rachel Clark Programme Director, Switching Programme Ofgem 9 Millbank London SW1P 3GE.

By  to: Rachel Clark Programme Director, Switching Programme Ofgem 9 Millbank London SW1P 3GE. By e-mail to: switchingprogramme@ofgem.gov.uk Rachel Clark Programme Director, Switching Programme Ofgem 9 Millbank London SW1P 3GE 3 November 2017 Dear Rachel, We welcome the opportunity to comment on

More information

A European Electricity Market Design Fit for the Energy Transition

A European Electricity Market Design Fit for the Energy Transition Brussels, June 2015 A European Electricity Market Design Fit for the Energy Transition CEDEC Position Paper Key Points The integration of European intra-day and balancing markets needs to be accelerated

More information

The Global Grid. Spyros Chatzivasileiadis, Damien Ernst and Göran Andersson ETH Zürich and Université de Liège

The Global Grid. Spyros Chatzivasileiadis, Damien Ernst and Göran Andersson ETH Zürich and Université de Liège Renewable Energy (57) 2013, doi: 10.1016/j.renene.2013.01.032 The Global Grid Spyros Chatzivasileiadis, Damien Ernst and Göran Andersson ETH Zürich and Université de Liège Towards a 100% Renewable Energy

More information

DECISION 1 SCOPE AND CONSIDERATIONS... 2

DECISION 1 SCOPE AND CONSIDERATIONS... 2 MEMORANDUM TO Windfarm developers FROM TenneT TSO SUBJECT Overplanting - version: Hollandse Kust (zuid) DECISION FOR INFORMATION ONLY QUALITY CONTROL Prepared: Daniël Vree Reviewed: Frank de Vries 19.09.2017

More information

Flexibility choices for distribution networks

Flexibility choices for distribution networks Flexibility choices for distribution networks New roles and tasks for the DSOs to facilitate markets Energiforsk- EFORIS Conference Evolving the market matching the future needs Stockholm, November 23,

More information

15 January FCR Cooperation Draft Proposal

15 January FCR Cooperation Draft Proposal Proposal for the establishment of common and harmonised rules and processes for the exchange and procurement of Frequency Containment Reserve (FCR) in accordance with Art. 33 of COMMISSION REGULATION (EU)

More information

An Analysis of Offshore Grid Connection at Kriegers Flak in the Baltic Sea

An Analysis of Offshore Grid Connection at Kriegers Flak in the Baltic Sea An Analysis of Offshore Grid Connection at Kriegers Flak in the Baltic Sea Joint Pre-feasibility Study By Energinet.dk Svenska Kraftnät Vattenfall Europe Transmission May 2009 1. Executive Summary 3 2.

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 15.7.2015 COM(2015) 340 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

Regulatory Challenges to Energy Storage Deployment

Regulatory Challenges to Energy Storage Deployment Regulatory Challenges to Energy Storage Deployment An Overview of the UK Market Realising Energy Storage Technologies in Low-carbon Energy Systems Working Paper 1 Giorgio Castagneto-Gissey and Paul E.

More information

We appreciate your feedback

We appreciate your feedback Publishing date: 22/09/2014 Document title: We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document ACER Trg Republike 3 1000 Ljubljana

More information

SmartNet project: TSO-DSO interaction architectures to enable DER participation in ancillary services markets

SmartNet project: TSO-DSO interaction architectures to enable DER participation in ancillary services markets Smart TSO-DSO interaction schemes, market architectures and ICT Solutions for the integration of ancillary services from demand side management and distributed generation ENA Open Networks Advisory Board

More information

Are the 2020 renewables targets (for electricity and heat) achievable? If not, why not?

Are the 2020 renewables targets (for electricity and heat) achievable? If not, why not? SUBMISSION BY NATIONAL GRID PLC Introduction to National Grid National Grid owns and operates the high voltage electricity transmission system in England and Wales and, as National Electricity Transmission

More information