1 LLW Repository Ltd Low Level Waste Repository Standard Waste Loading Plan LLWRJSWLP/0019/C Page 1 of 7 Title- Loading Plan Reference No. LLWRJSWLP/O01 9/C Issue 3 Date of Issue - o? Calculation ref: Palletised Drums Up To 200kg on Curtain Sider Trailer CN /M ECH/00005/B Prepared by: t Date: 1 Zø 1 Checked by: Date: b\\ 1 Approved by: Date: 1, I 7

2 Page 2 of 7 1. INTRODUCTION This Standard Waste Loading Plan (SWLP) provides all the information necessary to comply with the requirements of TCSC 1006 (Ref. 1) & BS EN (Ref. 2) within the scope of the European Agreement concerning the International Carriage of Dangerous Goods by Road (ADR) Class 7 for restraining the following payload: Palletised Drums (max individual gross weight of 200kg) onto a conveyance (typically a 40ft tautliner) manufactured to Code XL (BS EN 12642:2006). This SWLP is suitable for a journey undertaken by a road vehicle, excluding a journey with a sea leg. If you require any assistance or have any questions regarding this Standard Waste Loading Plan, please contact the Transport and Logistics Team, by transportandlogistics@llwrsite.com or by telephone: (019467) When used, this Standard Waste Loading Plan should be referenced on all the Waste Loading Plan Information forms submitted to the LLWR Customer Team. 2. EQUIPMENT TO BE USED Trailer A Code XL (Ref. 3) 40ft curtain sider trailer fitted with an external rail/anchor point system rated to a minimum of 2500daN (2500kg) per anchor point and having anchor points spaced at sufficient intervals to allow the loading arrangement as shown in Figure 2 (minimum of 4 per 1200mm) and rated to a minimum of 5000daN per metre. Minimum headboard capacity of 13.5 tonnes. Restraining Devices Ratchet tension straps to BS EN (Ref. 4) with: o Strap width of 50mm o Lashing Capacity (LC) 2500daN o Standard Tension Force (S TF ) of 350daN Friction matting material with a coefficient of at least 0.6 (BS EN :2010, Table B.1). These are widely available Metal or plastic banding with a minimum capacity of 700kg (for securing drums to the pallets). Pallets for palletizing the load with a minimum dynamic rating of 2500kg (plastic pallets are recommended). Ratchet strap protection (to prevent damage and fraying to straps over sharp corners) Load restraining boards (suitably sized pallets may be used in place of a proprietary load restraining board) Edge Protection Beam: minimum size of 75x75x6 equal-leg angle section To BS EN (Ref. 9). Alternatively a plastic pallet with a dynamic rating of 2500kg can be used.

3 Page 3 of 7 3. PAYLOAD INFORMATION Drums 210 litre drums: UN Steel Drums (Ref. 5) or LLWR Ltd. TC14 & TC19 Packages Restricted to a maximum gross mass of 200kg All drums are to be palletised (as shown in Figure 1) prior to attachment to the conveyance Drums are to be inspected prior to loading on to the pallets (for integrity and tightening of closures) Palletized Drums Drums are to be loaded 4 to a pallet and secured as shown in Figure 1 below, using banding rated to at least 700kg. Drums are to be banded together using nylon or metallic tapes Edge support beams are to be used to prevent damage/slippage of the banding and the lashing securing the load. Each pallet should measure 1.2m x 1.2m. Pallets are to be inspected for integrity, with no loose sections and no protrusions are permitted. Note: Plastic pallets (with lips) are recommended Edge support Figure 1: Palletized load of 4 Drums, showing the drum-banding configuration (for illustrative purposes only)

4 4. METHOD 4.1 Restraint Method Page 4 of 7 Palletised drums are to be loaded onto the vehicle as shown in Figure 2. Friction matting material with a coefficient (μ) of at least 0.6 should be placed between each pallet and the load platform (conveyance deck) at the corners of each pallet, ensuring that the load platform is free from ice, snow, grease or oil. Each row of 2 pallets is to be loaded adjacent to the row in front with no visible gap. The first row (Row 1) should be placed tight against the headboard leaving no visible gap also. Each row shall be positioned as centrally on the trailer bed as possible. Pallets are to be loaded from the front headboard to the rear of the vehicle. Pallets are to be off-loaded in the reverse order (i.e. from the rear to the front). A restraining board shall be fitted between the fourth and fifth rows and also against the last row, as seen in Figure 2 (pallets may be used for this purpose). The restraining board against the last row requires two spring lashings, whereas the other restraining board needs only one. The spring lashings shall have a lashing capacity (LC) not less than 2500daN and be fitted at an angle not greater than 45 to the load platform. Each consignment shall comprise no more than eleven rows of pallets, and each row shall be restrained by three top-over frictional lashings. The angle of the straps over the drums shall be as near vertical as practicable, and in any case no less than 81º from the horizontal plane of the vehicle load platform The frictional lashings over each row shall be evenly spaced with edge support/protection (see Figure 2) of sufficient strength to resist the tension force of the lashings. An edge protection beam is required on each side where the web straps over-top the palletised load. A plastic pallet, with a dynamic rating of 2500kg, is a permissible alternative to an edge protection beam. The lashings should be equally spaced over the top surface of the palletised drums in order to equally distribute the lashing force between the drums. Lashings should be tightened to produce an S TF of 350daN. 4.2 Operational Controls It is recommended that the tension of the lashing straps is checked after a few miles (less than 30 miles) and after heavy braking or any other abnormal situation during driving and retightened as required. This recommendation is noted in the European Best Practice Guidelines on Cargo Securing for Road Transport (Ref. 6) as one of the ten most important commandments for cargo securing. BS EN (Ref. 2) also recommends retightening after short travelling Only one strap is permitted to be attached to one anchor. If two straps are attached to the same anchor point this will invalidate the use of this SWLP and a separate WLP will be required. The trailer bed should be clear from any snow, ice, grease or oil, or any substance which will significantly reduce the friction between the load and the trailer bed. Checks for damage to the drums and pallets following tightening and transport operations should also be carried out.

5 5. SUPPORTING CALCULATIONS Page 5 of 7 Restraint calculations have been prepared and are detailed in the supporting calculation document (CA/ /MECH/00005/B) (Ref. 7). Supporting calculations for the maximum load of an edge protection beam have been prepared and are detailed in the supporting calculation document (CA/ /MECH/00006/A) (Ref. 8). 6. AMENDMENT HISTORY Issue Date Comments Issue 1 19/07/2016 First Issue Issue 2 29/07/2016 Issue 3 July 2017 Amendments to Figure 1 & 2. Clarifications on S TF. Section 2- addition of headboard capacity for trailer. Section 2- clarification on palletizing and edge protection pallets. Section 2- addition of Edge Protection Beam clarification. Section4.1 4 th Para- Requirement of a spring lashing between sixth & seventh row changed to the fourth and fifth row. Section4.1 7 th Para- amendment to the reference of figure 1 and 2. Section th Paraclarification on edge protection. Section 5- inclusion of edge protection calculations. Section 7- addition of reference 8 and 9. Amendment to contact phone number in Introduction. Clarification of the second bullet point in Section 3- Palletized Drums. Sentence regarding checking for damage moved from section 4.1 to 4.2. Clarification regarding use of plastic pallets in Figure REFERENCES 1. Transport Container Standardisation Committee. TCSC 1006 September 2014 Transport of Radioactive Material Code of Practice, Guide to the Securing/Retention of Radioactive Material Payloads and Packages During Transport. 2. British Standard BS EN :2010 (Incorporating corrigenda July 2013 and March 2014) Load restraining on Road Vehicles Safety. Part 1 - Calculation of Securing Forces. 3. BS EN 12642:2007 Securing of cargo on road vehicles - Body structure of commercial vehicles - Minimum requirements

6 4. BS EN :2001 Page 6 of 7 Load Restraint Assemblies on Road Vehicles - Safety - Part 2: Web Lashing Made from Man-Made Fibres - CORR 15863: March BS EN ISO :2008 Packaging Steel drums Part 1: Removable head (open head) drums with a minimum total capacity of 208 l, 210 l and 216,5 l 6. European Best Practice Guidelines on Cargo Securing for Road Transport (2014) 7. CA/ /MECH/00005/B Supporting calculations, waste loading plan 210 litre steel drums on a code XL conveyance. 8. CA/ /MECH/00006/A Supporting calculations for max load of drum edge protection 9. BS EN :1999 Structural Steel Equal and Unequal Leg Angles - Part 1: Dimensions

7 Figure 2: Loading of Palletised Drums Up To 200kg on a Curtain Sided Trailer Using S TF of 350daN (For illustrative purposes only) Page 7 of 7 = Spring Lashing (Minimum Lashing Capacity 2500daN) Headboard Capacity minimum 13.5 tonnes Row 1 Row 2 = Frictional Lashing (Standard Tension Force 350daN) Row 4 Row 3 Row 5 Row 6 Row 8 Row 7 3 x Frictional Lashings per Row (33 Frictional Lashings in Total) Row 10 Row 9 1 x Spring Lashings between Row 4 and Row 5 (Maximum Spring lashing angle of 45 ) Row 11 Restraining Boards between Row 4 and Row 5 Edge Protection Beam for Webbing Straps (min. 75x75x6 Angle Section) The use of plastic pallets (with a dynamic rating of 2500kg) is permitted in place of edge protection beams (as shown below) Friction mats used between pallets and trailer bed 2 x Spring Lashings end of Row 11 (Maximum Spring lashing angle of 45 ) Restraining Boards end of Row 11

LLW Repository Ltd. Loading Plan. Low Level Waste Repository Standard Waste Loading Plan LLWRJSWLP/0018/C

LLW Repository Ltd. Loading Plan. Low Level Waste Repository Standard Waste Loading Plan LLWRJSWLP/0018/C LLW Repository Ltd Low Level Waste Repository Standard Waste Loading Plan LLWRJSWLP/0018/C Page 1 of 6 Title Loading Plan Palletised Drums Up To 100kg on Curtain Sider. Trailer Reference No. LLWRJSWLP/001

More information

Load security for. Sheeted paper Paper reels. Stand: Feb. 2012

Load security for. Sheeted paper Paper reels. Stand: Feb. 2012 Load security for Sheeted paper Paper reels Stand: Feb. 2012 Content: Table of contents General Part 1 Introduction and scope, STVO (German road traffic regulations) 22 Loading Part 2 Basic rules and principles

More information

SECTION 20 LOADING AND SECURING OF LOADS

SECTION 20 LOADING AND SECURING OF LOADS SECTION 20 LOADING AND SECURING OF LOADS ROA MANUAL SCHEDULE OF AMENDMENTS SECTION 20 AMENDMENT NUMBER PAGES AMENDED AMENDMENT SUMMARY DATE ISSUED CONTENTS Section Description Page 20.1 Scope 20-1 20.2

More information

LOAD RESTRAINT GUIDE

LOAD RESTRAINT GUIDE NATIONAL TRANSPORT COMMISSION & ROADS & TRAFFIC AUTHORITY NSW I n t r o d u c t i o n LOAD RESTRAINT GUIDE Guidelines and Performance Standards for the Safe Carriage of Loads on Road Vehicles SECOND EDITION

More information

International Guidelines on Safe Load Securing for Road Transport

International Guidelines on Safe Load Securing for Road Transport International Guidelines on Safe Load Securing for Road Transport WORKING TOGETHER FOR A BETTER FUTURE International Guidelines on Safe Load Securing for Road Transport 2014 IRU I-0323 (en) Edition: IRU_CIT-2014

More information

Check on the suitability of two different load securing systems for the transport of Oktatainer with the aid of horizontal impact tests

Check on the suitability of two different load securing systems for the transport of Oktatainer with the aid of horizontal impact tests Test Report No. 2007002 for Smurfit Kappa GmbH Wellpappenwerk GmbH Check on the suitability of two different load securing systems for the transport of Oktatainer with the aid of horizontal impact tests

More information

Cotton Australia Bale Restraint Guide 2013

Cotton Australia Bale Restraint Guide 2013 Cotton Australia Bale Restraint Guide 2013 Last Updated: January 2013 INTRODUCTION The safe loading and transport of cotton bales and cotton modules is vitally important in preventing injury to people

More information

PARIS 12 October 2011

PARIS 12 October 2011 Rail/road combined transport How to fasten a load 1. Current prescriptions for fastening ( safe loading in accordance with regulations) 2. Fastenings in the field PARIS 12 October 2011 ( non-compliant

More information

Double-Decking-System for curtain-sider

Double-Decking-System for curtain-sider Double-Decking-System for curtain-sider Double-Decking-System for curtain-sider with 5 pairs of pillars System components for 13.62m standard semi-trailer (other dimensions on request): Designation Standard

More information

Industry guidance for the safe operation of tilt-tray vehicles

Industry guidance for the safe operation of tilt-tray vehicles Industry guidance for the safe operation of tilt-tray vehicles This document provides practical advice on meeting the Duty of Care requirements of the Occupational Safety and Health Act 1984 (the Act)

More information

European Best Practice Guidelines on Cargo Securing for Road Transport

European Best Practice Guidelines on Cargo Securing for Road Transport European Best Practice Guidelines on Cargo Securing for Road Transport EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT Preface by Mr Jacques Barrot, Vice-President of the European Commission,

More information

Erstellt durch: by order of. VRL_Wuppermann_eng V 01/2017 GB

Erstellt durch: by order of. VRL_Wuppermann_eng V 01/2017 GB Erstellt durch: 1 Table of content General part Specific loading guidelines Legal note 03 General principles Vehicle requirements 04 Lashing points 05 Coil trough 06 Length of stanchions 07 Report on vehicle

More information

Teacher s Manual: Cargo Securing at Rail Transport

Teacher s Manual: Cargo Securing at Rail Transport [Slide Rail 1] 2013-08-12 Page 1 (51) [Slide Rail 2 & 3] Introduction to rail transport The core area of rail freight transport includes the commercial transport services with freight trains. Apart from

More information

Beach Energy - SPECIFICATION FOR PACKING, MARKING, LABELLING

Beach Energy - SPECIFICATION FOR PACKING, MARKING, LABELLING Beach Energy - SPECIFICATION FOR PACKING, MARKING, LABELLING Introduction: This specification (the "Specification") details the minimum requirements for the preservation, packing, marking and documentation

More information

General Information Series No. 768

General Information Series No. 768 Gearboxes Mounted on Sleds in 20 ft. Long ISO Containers Approved by DAMAGE PREVENTION & FREIGHT CLAIM COMMITTEE Association of American Railroads Issued September 2017 Published by Association of American

More information

Requirements for the construction and testing of packagings for class 6.2 infectious substances of category A

Requirements for the construction and testing of packagings for class 6.2 infectious substances of category A Chapter 6.3 6.3.1 General Requirements for the construction and testing of packagings for class 6. infectious substances of category A NOTE: The requirements of this Chapter don't apply to packagings used

More information

Vereinigtes Königreich

Vereinigtes Königreich Vereinigtes Königreich Regulations for delivery and collection by truck Facilities within Distribution Main Land Europe (D MLE) 1. General safety regulations and rules 1.1 Introduction Within D MLE, workplace

More information

BoSS Climalite Camera and lighting tower

BoSS Climalite Camera and lighting tower Contents Safety First Safety First Quantity Schedules Toeboard 2 9 13 33 INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also

More information

ifix INSTALLATION MANUAL PV flat roof installation system Version

ifix INSTALLATION MANUAL PV flat roof installation system Version ifix PV flat roof installation system INSTALLATION MANUAL Version 2012-09-06 ifix Installation Manual Version 2012-09-06 Seite 1 Table of contents Table of contents... 1 Special characteristics of ifix...

More information

The entire document shall be read and understood before proceeding with a test.

The entire document shall be read and understood before proceeding with a test. Packaged-Products Over 150 lb (68 kg) 1B2 0 0 1 ISTA 1 Series Non-Simulation Integrity Performance Test Procedure ISTA, Your Alliance in Transport Packaging, is the world leader in Performance Tests for

More information

No other walling system can be installed as quickly. Allows easy cleaning and unloading. No protruding toe to get caught on.

No other walling system can be installed as quickly. Allows easy cleaning and unloading. No protruding toe to get caught on. I r i s hmanuf ac t ur er s : Al f abl oci r el and Vi s i t :ht t p: / /www. al f abl oc i r el and. c om Alpha Bloc NEW A4 pp 9/5/05 12:32 pm Page 3 Alfabloc The unique Alfabloc walling system is only

More information

Lattice Beam User Guide USG001-

Lattice Beam User Guide USG001- Lattice Beam User Guide Foreword DESSA offers efficient lightweight temporary roofing, encapsulation solutions, aluminium lattice girders and safety products. DESSA s unique and distinctive aluminium

More information

Workplace Safety and Health Guidelines. Safe Loading on Vehicles

Workplace Safety and Health Guidelines. Safe Loading on Vehicles Workplace Safety and Health Guidelines Safe Loading on Vehicles Contents Preface 2 1. Introduction 3 1.1 Scope 3 1.2 Roles and Responsibilities 4 1.3 Basic Principles of Transporting 5 1.4 Transport Packaging

More information

Customer Packaging Guidelines

Customer Packaging Guidelines Customer Packaging Guidelines Customer Packaging Guidelines 05.02.16 v1 CONTENTS Introduction Packaging Tips: Parcels Envelopes Packaging Tips: Pallets Crates Drums Pipes Spools & Reels Packaging Tips:

More information

Aircraft Load Securing

Aircraft Load Securing Network Airside Europe/O. Tamm Aircraft Load Securing Leipzig, 20th November 2013 Agenda Chapter 1: Forces in Flight Chapter 2: Aircraft Structure and ULDS Chapter 3: Build Up Material Chapter 4: Build

More information

Solutions for Airport Logistics. Terminal Equipment TECHNOLOGY IN MOTION

Solutions for Airport Logistics. Terminal Equipment TECHNOLOGY IN MOTION Solutions for Airport Logistics Terminal Equipment TECHNOLOGY IN MOTION Headline1 Headline2 Air Sea Road Intralogistics Lödige Industries - Technology in Motion The core competence of the Lödige Industries

More information

Introduction to Shipping

Introduction to Shipping Introduction to Shipping Shipping is one of the most important areas where you, as a supplier, can help the mill. The safety of the load is our number-one focus. This section will cover the following aspects

More information

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge Assembly Manual 8x9 PATENTS ARE PENDING Approximate Size 7640303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth

More information

Mechanical Loading Dock Levelers

Mechanical Loading Dock Levelers Mechanical Loading Dock Levelers With over 30 years of experience manufacturing quality loading dock equipment, Pentalift is your single-source supplier for loading dock levelers, dock lifts, dock seals

More information

Chapter 53. Stowage of Breakbulk Cargo (General Cargo)

Chapter 53. Stowage of Breakbulk Cargo (General Cargo) Chapter 53 Stowage of Breakbulk Cargo (General Cargo) In recent years, there has been a general decline of standards in the stowage of breakbulk cargo, resulting in cargo damage and claims. The Committee

More information

High Piled Combustible Storage Guideline

High Piled Combustible Storage Guideline Moreno Valley High Piled Combustible Storage Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: May 5, 2017 Rev: 7-28-16 City of Moreno Valley Fire Department Page 1 of 19 High Piled Storage

More information

HM-Series. Dock Leveler. Owner s/user s Manual

HM-Series. Dock Leveler. Owner s/user s Manual HM-Series Dock Leveler Owner s/user s Manual POWERAMP Division of Systems, Inc. W194 N11481 McCormick Drive Germantown, WI 53022 800.643.5424 fax: 262.257.7349 www.docksystemsinc.com techservices@docksystemsinc.com

More information

PACKAGING STANDARD FOR USED LEAD ACID BATTERIES (ULAB)

PACKAGING STANDARD FOR USED LEAD ACID BATTERIES (ULAB) PACKAGING STANDARD FOR USED LEAD ACID BATTERIES (ULAB) ProjecT SPONSORED BY: Club Assist www.clubassist.com.au (03) 9797 8600 PACKAGING STANDARD FOR USED LEAD ACID BATTERIES (ULAB) CONTENTS 1. Introduction

More information

GypLyner (walls) Metal framed wall lining system. GypLyner.

GypLyner (walls) Metal framed wall lining system. GypLyner. GypLyner GypLyner (walls) Metal framed wall lining system GypLyner is a cost-effective, virtually independent metal frame drylining system for lining walls. General purpose and suitable for all internal

More information

General Pricelist Swissport Cargo Services Deutschland GmbH. Station Hamburg. Effective: This pricelist replaces all previous versions

General Pricelist Swissport Cargo Services Deutschland GmbH. Station Hamburg. Effective: This pricelist replaces all previous versions General Pricelist Effective: 01.01.2018 This pricelist replaces all previous versions Hamburg Airport Cargo Center Weg beim Jäger 200, Building 392 D-22335 Hamburg Telephon: +49 40 75 66 49 100 Telefax:

More information

KENYA STANDARD KS 574:2017. Steel fabric for reinforcement of concrete Specification

KENYA STANDARD KS 574:2017. Steel fabric for reinforcement of concrete Specification KENYA STANDARD KS 574:2017 Steel fabric for reinforcement of concrete Specification KEBS 2017 FifthEdition 2017 KS 574:2017 TECHNICAL COMMITTEE REPRESENTATION The following organizations were represented

More information

Outline NBS Specification. Protec System to PVC Single Ply (Waterproofing Only)

Outline NBS Specification. Protec System to PVC Single Ply (Waterproofing Only) Outline NBS Specification Protec System to PVC Single Ply (Waterproofing Only) This document is a guide to assist in the production of tender documents only and is not project specific. A site survey is

More information

HM-Series. Dock Leveler. Owner s/user s Manual

HM-Series. Dock Leveler. Owner s/user s Manual HM-Series Dock Leveler Owner s/user s Manual POWERAMP Division of Systems, Inc. W194 N11481 McCormick Drive Germantown, WI 53022 800.643.5424 fax: 262.257.7349 www.docksystemsinc.com techservices@docksystemsinc.com

More information

FIRE PROTECTION. GTEC Shaftwall systems 244 GTEC Shaftwall Stairwell systems 248 GTEC Horizontal Shaftwall systems 249 GTEC Encasement systems 250

FIRE PROTECTION. GTEC Shaftwall systems 244 GTEC Shaftwall Stairwell systems 248 GTEC Horizontal Shaftwall systems 249 GTEC Encasement systems 250 FIRE PROTECTION GTEC Shaftwall range uses a specially designed system to protect voids and shafts in buildings. It resists pressure changes and enables installation from one side of the shaft only. GTEC

More information

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7 Safety Manual Page 1 of 7 Scaffolds 1. Purpose This policy establishes the basic safety requirements and safe work practices for the erection, use, inspection, movement, and dismantling of scaffolding.

More information

IATA Dangerous Goods Regulations. 46 th Edition (English) Effective 1 January ADDENDUM Posted January 2005

IATA Dangerous Goods Regulations. 46 th Edition (English) Effective 1 January ADDENDUM Posted January 2005 46 th Edition (English) Effective 1 January 2005 Posted January 2005 Users of the IATA Dangerous Goods Regulations are asked to note the following amendments and corrections to the 46 th Edition, effective

More information

General Pricelist Swissport Cargo Services Deutschland GmbH. Station Frankfurt. Effective: This pricelist replaces all previous versions

General Pricelist Swissport Cargo Services Deutschland GmbH. Station Frankfurt. Effective: This pricelist replaces all previous versions General Pricelist Effective: 01.01.2018 This pricelist replaces all previous versions Cargo City Süd,Building 558 C D-60549 Frankfurt Telephone: +49 69 219797-145 Telefax: +49 69 219797-28 email: fra.ssc@swissport.com

More information

Huskvarna Manufacturing

Huskvarna Manufacturing Management system Quality & Environment Title: Rev no: 11 Doc no: ESAT-86UCW7 Author Approver Sera Akincilar Marcus Sennevik Date: 2017-10-02 Type: Routine R0221-Packaging instructions for suppliers to

More information

SALOG Aerospace & Aviation Logistics

SALOG Aerospace & Aviation Logistics Helicopter Transportation and Aircraft Parts require specialised care of freight Forwarders. At SALOG, we offer you best transit times, excellent cargo care, state-of-the art equipment, and a partnership

More information

Section 1 Applicability

Section 1 Applicability Section 1 Applicability 1.4 Operator s Responsibility 1.4.2 Information to Operator Employees (DGB/101, S01-01, Rev. 1) 1.4.2.2 In addition to the above, it is recommended that the operator s operations

More information

Walco Equipment has grown into a successful Canadian manufacturing & distribution Company.

Walco Equipment has grown into a successful Canadian manufacturing & distribution Company. WALCO CARGO CONTROL COMPONENTS WINCHES H.D. Small Frame ------Page 1 Portable-----------------Page 1 Loose Frame -----------Page 1 Weld-on ----------------Page 1 Low Profile -------------Page 2 Three Bar

More information

PACKAGING AND LABELLING OF HAZARDOUS WASTE

PACKAGING AND LABELLING OF HAZARDOUS WASTE PACKAGING AND LABELLING OF HAZARDOUS WASTE This guide has been produced to provide you with an overview of the basic steps to be taken when preparing waste for movement off your site. TABLE OF CONTENTS

More information

ELECTRO-FENCE. Fence Protection System. System Manual. EF_System_V1.1

ELECTRO-FENCE. Fence Protection System. System Manual. EF_System_V1.1 ELECTRO-FENCE Fence Protection System System Manual EF_System_V1.1 Advanced Perimeter Systems Ltd., 16 Cunningham Road, Springkerse Industrial Estate, Stirling, FK7 7TP Tel: +44 (0) 1786 479862 Fax: +44

More information

TAKING YOU TO NEW HEIGHTS IN SAFETY... kwikstage

TAKING YOU TO NEW HEIGHTS IN SAFETY... kwikstage limited one bay kwikstage stair unit user guide One Bay Stair Tower used in conjunction with Kwikstage System Scaffolding and designed to conform to all current British and European Standards. With only

More information

SAMPLE TC6K Elevator Design Summary. Order No PO-47201

SAMPLE TC6K Elevator Design Summary. Order No PO-47201 SAMPLE TC6K Elevator Design Summary 900 RR 620 S., Ste C206 Austin TX 78734 (512) 266-6200 voice (512) 266-6210 fax SAMPLE CCR TC6K Elevator Design Summary - Elevator System Design Parameters Nominal Height

More information

F10. BRICK/BLOCK WALLING To be read with Preliminaries/General conditions. TYPES(S) OF WALLING 110 CLAY FACING BRICKWORK SHALL BE:

F10. BRICK/BLOCK WALLING To be read with Preliminaries/General conditions. TYPES(S) OF WALLING 110 CLAY FACING BRICKWORK SHALL BE: F10 BRICK/BLOCK WALLING To be read with Preliminaries/General conditions. TYPES(S) OF WALLING 110 CLAY FACING BRICKWORK SHALL BE: Product Name: Pre War Common Size: 215x102x65mm Manufacturer and reference:

More information

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use Mobile access and working towers in accordance with: HD 1004; DIN 4422, Part 1 (Version 8/92) Working platform 2.8 x 2.8 m and 2.8 x 1.95 m Max. working height: in closed rooms 13.95 m, outdoors 10.0 m

More information

THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING. D H Chisholm 1

THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING. D H Chisholm 1 THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING D H Chisholm 1 ABSTRACT In a typical residential concrete floor slab, the cast in strip footings on the slab perimeter

More information

BRE Global Ltd Watford, Herts WD25 9XX. d+b facades (UK) Ltd. The Packway, Larkhill, Salisbury, SP4 8PY. Customer Services

BRE Global Ltd Watford, Herts WD25 9XX. d+b facades (UK) Ltd. The Packway, Larkhill, Salisbury, SP4 8PY. Customer Services BRE Global Test Report BS 8414-1:2015 + A1:2017 test on d+b facades rain screen cladding system with 100mm-thick Rockwool insulation and aluminium cassette panels. Prepared for: d+b facades (UK) Ltd. Date:

More information

DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE

DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE DGP-WG/09-IP/1 30/3/09 DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE Auckland, New Zealand, 4 to 8 May 2009 Agenda Item 6: Other business DEVELOPMENT OF STANDARDS FOR ELECTRONIC

More information

Leach Testing of Materials for Waste Acceptance

Leach Testing of Materials for Waste Acceptance Leach Testing of Materials for Waste Acceptance Presentation to: LLWR Customer Forum 2014 Date: 21st May 2014 Dr Frank Taylor - ESC Technical Manager Overview Introduction Waste Acceptance Criteria Levels

More information

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT SAMPLE GUIDE FOR RESIDENTIAL DECKS revised 7 16 Call before you dig! 1 800 272 1000 New Jersey One Call. Utility Mark Out. THIS GENERIC GUIDE IS NOT ALL INCLUSIVE

More information

Construction. S-Vap 5000E SA Self-adhesive Vapour Barrier. Product Description

Construction. S-Vap 5000E SA Self-adhesive Vapour Barrier. Product Description Roofing Product Data Sheet Edition 11.2014 / xtra UK Identification no. 02 09 45 05 100 0 000019 Version no. 03 S-Vap 5000E SA Self-adhesive Vapour Barrier Product Description S-Vap 5000E SA is a multi-layer

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Loading Dock Buyers Guide

Loading Dock Buyers Guide Loading Dock Buyers Guide Basic Trailer Unloading Mobile Ramp Fixed Position Loading Dock Portable Loading Docks Portable Loading Dock Railcar Unload Implements Utility Vehicles Mobile Loading Dock Specialty

More information

User Guide. Scaffold Trolley

User Guide. Scaffold Trolley User Guide Scaffold Trolley Permaquip Ltd Brierley Industrial Park, Stanton Hill, Sutton-In-Ashfield, Nottinghamshire, NG17 3JZ Tel: +44 (0) 1623 513349 Fax: +44 (0) 1623 517742 E-mail: sales@permaquip.co.uk

More information

General Pricelist Swissport Cargo Services Deutschland GmbH. Station Munich. Effective: This pricelist replaces all previous versions

General Pricelist Swissport Cargo Services Deutschland GmbH. Station Munich. Effective: This pricelist replaces all previous versions General Pricelist Effective: 01.01.2018 This pricelist replaces all previous versions Frachtterminal Modul F, Room F115 D-85356 Munich Telephone: +49 89 9759 42 20 Telefax: +49 89 9759 4226 email: muc.cargo@swissport.com

More information

SEPTEMBER construction type cavity barriers. SP Firestop Systems. The purpose-made solution for cavity fire stopping

SEPTEMBER construction type cavity barriers. SP Firestop Systems. The purpose-made solution for cavity fire stopping SP Firestop Systems The purpose-made solution for cavity fire stopping SP Firestop Systems The purpose-made solution for cavity fire stopping As part of the comprehensive FIREPRO range of fire protection

More information

ELEVATORS & SERVICE LIFTS FREIGHT HOIST MAST LIFTS FREIGHT HOIST SCISSOR LIFTS ELEVATING DOCK SCISSOR LIFTS DOCK LEVELLERS

ELEVATORS & SERVICE LIFTS FREIGHT HOIST MAST LIFTS FREIGHT HOIST SCISSOR LIFTS ELEVATING DOCK SCISSOR LIFTS DOCK LEVELLERS ELEVATORS & SERVICE LIFTS FREIGHT HOIST MAST LIFTS FREIGHT HOIST SCISSOR LIFTS ELEVATING DOCK SCISSOR LIFTS DOCK LEVELLERS McGrath Industries Ltd. 2017. All rights reserved. Ed04, CJM. ELEVATORS SERVICE

More information

ThePeople s RepublicofChina

ThePeople s RepublicofChina ThePeople s RepublicofChina EDICTOFGOVERNMENT± Inordertopromotepubliceducationandpublicsafety,equaljusticefor al,abeterinformedcitizenry,theruleoflaw,worldtradeandworld peace,thislegaldocumentisherebymadeavailableonanoncommercial

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council ECE/TRANS/WP.15/AC.1/148/Add.1 Distr.: General 20 October 2017 English Original: English and French Economic Commission for Europe Inland Transport Committee

More information

Application Guidelines

Application Guidelines Application Guidelines 1.0 SCOPE This document contains general instructions and recommended practices for the application of the SERVIWRAP cold applied tape coating system. The various coating grades

More information

COMPRESSION SEAL EXPANSION JOINT SYSTEM ( IRC:SP:69:2005 & MORTH Interior specification )

COMPRESSION SEAL EXPANSION JOINT SYSTEM ( IRC:SP:69:2005 & MORTH Interior specification ) COMPRESSION SEAL EXPANSION JOINT SYSTEM ( IRC:SP:69:2005 & MORTH Interior specification ) KANTAFLEX (INDIAN) PRIVATE LIMITED DESIGN OFFICE FACTORY ELASTOMER UNIT #9,VASU STREET, II FLOOR, KILPAUK, CHENNAI-600010

More information

Terminal Operation Version: 1.1

Terminal Operation Version: 1.1 Introduction: This leaflet Important Inspections on Loading Units ation is addressed to you as customers of TX Logistik as well as in the role of intermodal terminals who are handling loading units on

More information

BISON PRECAST FLOORING SPECIFICATION

BISON PRECAST FLOORING SPECIFICATION BISON PRECAST FLOORING SPECIFICATION 1.0 SCOPE OF THE SPECIFICATION 1.01 Relates to: This specification covers the design, manufacture and associated site work of the following types of floors:- Hollowcore

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL SPECIFICATION SPÉCIFICATION TECHNIQUE TECHNISCHE SPEZIFIKATION CEN/TS 13853 December 2003 ICS 55.180.10 English version Swap bodies for combined transport Stackable swap bodies type C 745-S16

More information

Terminal Operation Version: 1.1.5

Terminal Operation Version: 1.1.5 Introduction: This leaflet Important Inspections on Loading Units ation is addressed to you as customers of TX Logistik as well as in the role of intermodal terminals who are handling loading units on

More information

User s Manual Installation, Operations, Maintenance and Parts. Mechanical Dock Levelers Models CM, WL and WS with HYDRA-CAM Lip Extension

User s Manual Installation, Operations, Maintenance and Parts. Mechanical Dock Levelers Models CM, WL and WS with HYDRA-CAM Lip Extension Mechanical Dock Levelers Models CM, WL and WS with HYDRA-CAM Lip Extension This manual applies to dock levelers manufactured beginning November 2013 with the serial numbers 61095303 and higher Do not install,

More information

Batteries and Battery Fluids by Road

Batteries and Battery Fluids by Road Dangerous Goods and Rail Safety A Technical Publication from the Co-ordination and Information Centre Batteries and Battery Fluids by Road July 2017 - 2 - This material is meant as a guide to certain parts

More information

Procedure and Specification for the Construction of Vehicle Access Crossings over Footways and Verges April 2016

Procedure and Specification for the Construction of Vehicle Access Crossings over Footways and Verges April 2016 Procedure and Specification for the Construction of Vehicle Access Crossings over Footways and Verges April 2016 (1) Authorisation to work in the Highway Persons wishing to construct a vehicular crossing

More information

DANGEROUS GOODS PANEL (DGP)

DANGEROUS GOODS PANEL (DGP) International Civil Aviation Organization DGP/22-WP/68 17/8/09 WORKING PAPER DANGEROUS GOODS PANEL (DGP) TWENTY-SECOND MEETING Montréal, 5 to 16 October 2009 Agenda Item 2: Development of recommendations

More information

MGF TECHNICAL FILE MGF 400 SERIES STRUT. Description. Product Notes.

MGF TECHNICAL FILE MGF 400 SERIES STRUT. Description. Product Notes. Description Highly versatile, simple to assemble, heavy duty, modular bracing strut system designed primarily to be used as intermediate struts with MGF hydraulic bracing systems. The system can also be

More information

GUIDE TO CARGO TRANSPORTATION BY ROAD

GUIDE TO CARGO TRANSPORTATION BY ROAD CJA Marine Services - Singapore & Thailand Singapore Tel : (65) 62811986 / 7 Thailand Tel: (66) 02 6811793-5 Singapore Fax : (65) 62811966 Thailand Fax : (66) 02 6811796 Mobile : +65 96815992 Mobile :

More information

Private IMDG - Receival and Delivery Procedures Adelaide Container Terminal

Private IMDG - Receival and Delivery Procedures Adelaide Container Terminal IMDG - Receival and Delivery Procedures Adelaide Container Terminal This document reproduces in part (less than 10%) AS 3846 1998 and is produced exclusively for in house usage. No commercial benefit or

More information

OVERVIEW OF PROCEDURE 2B

OVERVIEW OF PROCEDURE 2B Packaged-Products Over 150 lb (68 kg) 2B 2 008 ISTA 2 Series Partial Simulation Performance Test Procedure VERSION DATE Last TECHNICAL Change: JANUARY 2008 Last EDITORIAL Change: JANUARY 2008 For complete

More information

Loss Prevention Standard

Loss Prevention Standard Loss Prevention Standard LPS 1208: Issue 2.2 This Loss Prevention Standard is the property of BRE Global Ltd. and is made publicly available for information purposes only. Its use for testing, assessment,

More information

Basic Suspension Systems

Basic Suspension Systems CEILING & WALL SYSTEMS Commercial Ceilings and Walls Solutions Guide Installing Armstrong Suspended Ceilings The ceiling system is made up of Armstrong panels which are supported by a suspension system

More information

AAR Open Top Loading Rules Manual

AAR Open Top Loading Rules Manual Fig. 850 (New 01/06) (oncluded) HASSIS, GOOSNK 20 FT TO 40 FT LONG, FOUR-HIGH ON ONTAINR SHIPPING UNIT Notes and Additional Requirements (concluded): 11. Secure the chassis to the SU using all three Item

More information

Configuration. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES

Configuration. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES Configuration User Guide Version: 2018.0 Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES Contents Introduction... 1 Create a new project... 2 Open the configuration...

More information

Terminal Handling Charges 2018

Terminal Handling Charges 2018 Terminal Handling Charges 2018 Swissport Cargo Services the Netherlands B.V. Building T11 Anchoragelaan 30, 1118 LD Schiphol South East Building T9 Anchoragelaan 36, 1118 LD Schiphol South East 1 Import:

More information

D O C K L E V E L E R S. Designed for today s dock environment

D O C K L E V E L E R S. Designed for today s dock environment D O C K L E V E L E R S Designed for today s dock environment Improving industrial safety and productivity through quality and innovation. Continued Evolution Continuing a long history of innovation, Rite-Hite

More information

RAIL SAFETY AND STANDARDS BOARD

RAIL SAFETY AND STANDARDS BOARD RAIL SAFETY AND STANDARDS BOARD Railway Group Standard WORKING MANUAL FOR RAIL STAFF FREIGHT OPERATIONS Working Manual for Rail Staff Freight Train Operations Page i Railway Group Standard Issue Two Date

More information

Informal document EG GPC No. 5 (2011)

Informal document EG GPC No. 5 (2011) Distr.: Restricted 26 August 2011 Original: English Group of Experts for the revision of the IMO/ILO/UNECE Guidelines for Packing of Cargo Transport Units First session Geneva, 6 7 October 2011 Item 6

More information

Subpart G Emergency Response Information

Subpart G Emergency Response Information Pipeline and Hazardous Materials Safety Admin., DOT 172.602 (b) In addition to conformance with 172.519, the background on the CLASS 9 placard must be white with seven black vertical stripes on the top

More information

EVT DTIC FOUR UNITS HIGH MIL-STD TEST OF PA 116 WOOD PALLET WITH TOP LIFT ASSEMBLY DRAWING (Final.

EVT DTIC FOUR UNITS HIGH MIL-STD TEST OF PA 116 WOOD PALLET WITH TOP LIFT ASSEMBLY DRAWING (Final. 0 (Final I Report May 1989 EVT 21-89. MIL-STD- 1660 TEST OF PA 116 WOOD PALLET WITH TOP LIFT ASSEMBLY DRAWING -807 DTIC FOUR UNITS HIGH Distribution Unlimited PREPARED FOR: U.S. Army Armament Research,

More information

Can Process Scrap Specification

Can Process Scrap Specification Rev 3 February 2018 Can Process Scrap Specification Document Manager: Kerry Ward Approved by: Michael Anderson Note: This is considered an uncontrolled document unless it is being viewed on-line from the

More information

ISO INTERNATIONAL STANDARD. Air cargo equipment Air cargo pallets Utilization guidelines

ISO INTERNATIONAL STANDARD. Air cargo equipment Air cargo pallets Utilization guidelines INTERNATIONAL STANDARD ISO 16412 First edition 2005-05-01 Air cargo equipment Air cargo pallets Utilization guidelines Equipement de fret aérien Palettes de fret aérien Directives d'utilisation Reference

More information

TEMPORARY FACILITIES

TEMPORARY FACILITIES 04.A GENERAL SECTION 4 TEMPORARY FACILITIES 04.A.01 Plans for the layout of temporary construction buildings, facilities, fencing, and access routes and anchoring systems for temporary structures shall

More information

2600SEG135 SAFETY STANDARD FOR INDUSTRIAL LADDERS AND STAIRCASES IN BUILDINGS

2600SEG135 SAFETY STANDARD FOR INDUSTRIAL LADDERS AND STAIRCASES IN BUILDINGS 1.0 OBJECTIVE The purpose of this standard is to establish the minimum requirements applicable to standard ladders and staircases of general use in buildings and industrial installations of the Panama

More information

3H1/Y1.9/200/17 B/

3H1/Y1.9/200/17 B/ January 2017 DOSSIER: UN mark on packaging Much too often, we see UN marks on packaging of which the accuracy look far away, hence it is time to dedicate an article to this item. All packaging approved

More information

KENNECOTT UTAH COPPER

KENNECOTT UTAH COPPER 14.5.1 INTRODUCTION 14.51.1 This standard specifies the safety controls associated with freight / cargo loading operations at KUC properties and presents working references supporting KUC standards and

More information

ISO INTERNATIONAL STANDARD. Air cargo equipment Air cargo pallets Utilization guidelines

ISO INTERNATIONAL STANDARD. Air cargo equipment Air cargo pallets Utilization guidelines INTERNATIONAL STANDARD ISO 16412 First edition 2005-05-01 Air cargo equipment Air cargo pallets Utilization guidelines Equipement de fret aérien Palettes de fret aérien Directives d'utilisation Reference

More information

Management Instruction

Management Instruction Management Instruction Date March 15, 2006 Internal Use and Transport of Pallets Effective March 15, 2006 Number PO-570-2006-1 Obsoletes N/A Unit Logistics Policy This management instruction (MI) establishes

More information

ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS for the vehicle barrier system KREMSBARRIER 2 RH2B for pile-drivable subgrades Performance class in accordance with EN 1317-2: Containment level: Impact severity level: Working width:

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information