1 TOWN OF MILTON Transit Master Plan MOVING MILTON FORWARD Summary Document February 2013

2

3 Town of Milton Moving Milton Forward Transit Master Plan February 2013 Summary Document TABLE OF CONTENTS Page 1.0 INTRODUCTION LONG TERM STRATEGY, MOBILITY HUB AND TRANSIT FACILITY CONVENTIONAL TRANSIT SERVICE PLAN 2013 TO PARATRANSIT SERVICE PLAN 2013 TO TRANSIT INTELLIGENT TRANSPORTATION SYSTEMS (ITS) MARKETING, COMMUNICATIONS AND STAFFING SUMMARY OF RECOMMENDATIONS List of Figures Page Figure 1 Long-Term Transit Network... 5 Figure 2 5 (2017) Service Plan List of Tables Page Table 1 5 (2017) Service Plan Table 2 Projected Transit Ridership and Financial Performance Table 3 Menu of Conventional Transit Service Improvements Table 4 Fleet Peak and Spare Requirements (5-year Plan) Table 5 Fleet Replacement and Growth Costs Table 6 Paratransit 5- Service Summary (Family of Services Plan) List of Working Papers Appendix A Public Consultation Working Paper Appendix B - Strategic Plan Working Paper Appendix C Milton Mobility Hub Working Paper Appendix D Transit Facility Working Paper Appendix E Conventional Transit 5- Plan Working Paper Appendix F Paratransit 5- Plan Working Paper Appendix G Transit Technology Working Paper Appendix H Marketing and Communications Working Paper Dillon Consulting Limited in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily, and Roy Duncan Page i

4 February 2013 Town of Milton Moving Milton Forward Transit Master Plan Summary Document Page ii Dillon Consulting Limited in association with Schmied Communications, Bill Cunningham Consulting Dr. Brendon Hemily, and Roy Duncan

5 Town of Milton Moving Milton Forward Transit Master Plan February 2013 Summary Document 1.0 INTRODUCTION Moving Milton Forward is a Transit Master Plan for the Town of Milton. The purpose of the plan is to review Milton s conventional and specialized transit services in context of planned growth and the broader goals and objectives of the community and recommend a strategy that will take Milton Transit to the next level. Milton is one of Canada s fastest growing municipalities. By 2021, Milton s population is projected to grow to 161,750 residents, from 84,362 in With this doubling of population and associated employment growth, Milton will be a very different community tomorrow than it is today and the transportation and transit system must respond to ensure the community continues to be accessible with effective mobility options available to all. Milton will be home to a University campus, a more diverse workforce (in the Derry Green Business Park), an expanded downtown area along Main Street (from Martin to Thompson), intensification centred around the Milton GO Station (Mobility Hub), more community and retail facilities and will ultimately receive two-way, all day GO Train service. The local transit system currently operates a good reliable service, five days a week, with a focus on school trips, persons with disabilities and commuters. In recent years, Milton Transit has experienced award winning ridership growth of 66 percent (2011 vs. 2010); improved its fleet with modern fully accessible transit buses; implemented various innovations such as Community Bus, GO Drop-Off service and Trans-Cab (i.e. demand-responsive service); and greatly improved the availability and efficiency of its paratransit service. Development in Milton has also become more transit supportive in response to a proactive effort by the Town to create a more sustainable community that can accommodate greater mobility options. This is reflected in Milton s Official Plan policies and Transit Supportive Development Guidelines. As Milton continues to grow, new developments in the Boyne Secondary Plan Area, the Derry Green Business Park and Education Village; as well as intensification corridors and nodes such as Main Street and the Milton GO Station Mobility Hub will enhance the effectiveness of transit and increase ridership by increasing the market share of potential riders within a short walking distance of a transit route. This higher density and pedestrian friendly urban form strategically planned along key corridors and nodes will ultimately allow Milton Transit to cost effectively improve the level of service and increase ridership using less resources (i.e. service hours, fleet requirements) than many of its peers. Despite these significant improvements made over the past five years, Milton Transit is still relatively young and the system will need to significantly grow to meet the demands of a growing community. Given the unique characteristics of the Town and the significant level of growth required, a Made in Milton approach to service planning and delivery was undertaken to ensure that ridership growth, mobility and quality of life goals that are achieved through the implementation of the Master Plan are done so in a cost effective manner. 1 Based on Region of Halton Best Planning Estimates Dillon Consulting Limited Page 1 in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily, and Roy Duncan

6 February 2013 Town of Milton Moving Milton Forward Transit Master Plan Conventional Transit 5- Plan Working Paper Dillon Consulting Limited (Dillon) was engaged to assist the Town in developing a Transit Master Plan for the period 2012 through The Plan, themed Moving Milton Forward is a progressive approach to enhance the Milton Transit system through a series of strategies and recommendations that are based on the following themes: 1. Ridership Growth: To maintain a high quality of life in Milton in light of the rapid growth, there must be a strong emphasis on Milton Transit contributing to the high transit mode share targets for local, regional and inter-regional travel. To achieve a higher mode share for transit, more local transit and a higher level of service is required. 2. Strategic Investments: Given funding limitations, the planning and expansion of the transit network must be strategic and must achieve maximum ridership for investment made, while focusing investment on intensification corridors and nodes and identifying appropriate service delivery strategies in areas that are not as supportive of transit use. 3. Seamless Regional and Inter-regional Travel: Local transit must be very responsive to the interregional nature of travel that occurs to/from Milton, including providing effective connections to the GO Transit rail and bus services. 4. Mobility Management: To be effective, Milton must be a broker of services, expanding the types of services provided and increasing demand-oriented strategies. This will help realize the themes of ridership growth and strategic investment. 5. Technology, Productivity and Customer Service: Customer service must be a key component of how transit operates. A key will be to implement Intelligent Transit Systems (ITS) to help meet customer expectations (give passengers what they want) as well as improve system productivity. 6. Accessible Services: The new AODA legislation will require a number of changes to how services are provided and moving Milton further towards a full family of services will benefit the mobility needs of all members of the community. These six themes formed the basis of the recommendations developed in the Transit Master Plan as a method of meeting broader community objectives. The Transit Master Plan is presented in a series of working papers which follow this Summary Document and provide the detail to support the many recommendations in this strategy. Some highlights from the working papers are captured under the following topics. A complete summary of recommendations is also included in Section 7.0 of this Summary Document. Page 2 Dillon Consulting Limited in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily and Roy Duncan

7 Town of Milton Moving Milton Forward Transit Master Plan February 2013 Summary Document 2.0 LONG TERM STRATEGY, MOBILITY HUB AND TRANSIT FACILITY The Vision for Milton Transit over the next ten years is to be an essential part of the way Milton moves and grows. This means that Milton Transit will not only provide an attractive travel option to residents, employees and visitors of Milton, but it will also be instrumental in shaping how the community develops and be a significant influence in meeting the goals of the Town s Strategic Plan. This Vision is supported by an updated service standards document that guides the design of service, sets targets for performance (effectiveness, efficiency and service quality) and allows periodic monitoring of results. To guide the development of a 5-year service plan for both conventional and paratransit services, it was important first to understand this long-term vision for Milton and Milton Transit through the development of a Strategic Transit Plan. Over a ten year period, the vision is for Milton Transit to grow to a seven day a week operation supporting all travel needs within the Urban Service Area for both conventional and paratransit services. The trend of more students, seniors and people living and working in Milton using the system will continue to grow and these residents will require more flexibility in their travel options 2. As housing prices in Milton continue to rise, the ability for families to purchase the home they desire may also be dependent on the ability to reduce the number of private vehicles in their households. Providing the ability to use transit on weekends and evenings will help families make this decision and will also increase peak period ridership. The service will maintain its strong orientation to the Mobility Hub at the central Milton GO Station, develop new routes to serve residential growth areas, provide two-way transit service along arterial corridors and support the Education Village node as it develops. Peak period employment routes and off-peak specials (through partnerships with key businesses) will provide residents with transit access to both the Highway 401 Industrial Park and the new Derry Green Corporate Park. In addition to GO Bus services, cross boundary transit routes linking Milton Transit with Mississauga/Brampton and Oakville/Burlington systems will be developed in response to demand. With an interchange at Highway 401 and Tremaine Road opening in 2017, the opportunity to construct a new Tremaine GO Station as the western terminus of the Milton line should be supported and pursued by Metrolinx to promote improved transit access to Education Village, the Velodrome and the Kelso/Glen Eden four seasons recreation area as well as to provide greater convenience for residents who are GO Transit commuters living on the west side of Milton. Implementing this station and a new Trafalgar GO Station will be keys to reducing the parking requirements at Milton central GO Station while unlocking the full potential for intensification around this Mobility Hub. All three GO rail stations 2 The 2012 Onboard Transit Survey noted 59 percent of respondent used Milton Transit for work trips, down from 71 percent in This suggests a more diverse customer base that desires more flexibility in their travel. Dillon Consulting Limited Page 3 in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily, and Roy Duncan

8 February 2013 Town of Milton Moving Milton Forward Transit Master Plan Conventional Transit 5- Plan Working Paper will be strongly supported by Milton Transit feeder services, including the use of innovative commuter shuttle strategies. Figure 1 illustrates a 10-year service concept that is recommended, with reference to the Strategic Plan and Conventional Transit 5- Plan Working Paper outlining triggers for initiating the various service enhancements. The 10-year plan includes a progression to seven day a week operation and introduction of higher frequency service on routes connecting Education Village and the Milton GO Station. While Milton s population is youthful, reflecting the inflow of many young families, the number of seniors and persons with disabilities will continue to grow. A comprehensive family of services approach involving conventional bus, Community Bus, door-to-door paratransit service and travel training programs will be required to effectively and efficiently meet the travel needs of these important markets. More detail on the Vision for Milton Transit can be obtained through the Strategic Plan Working Paper. Two working papers, including preliminary design concepts, are provided for the medium-term capacity improvements required at the current bus terminal, the long term development of the Mobility Hub and the potential development of a Town-owned transit facility to be used for servicing, storing and maintenance of the transit fleet. There is a strong emphasis to encourage the development of the Mobility Hub at the Milton central GO Station as a means to enhance local transit ridership cost effectively and meet other community quality of life goals. In the short-term, modifications to the existing terminal will need to be made to accommodate the expansion of routes required to service growing areas in Milton. The preferred service delivery strategy remains as a contracted operation while a new transit facility is recommended to accommodate the projected growth in fleet and allow for indoor storage of vehicles (which can significantly enhance operations). A Town-owned facility will also lead to a more competitive rate from the contractor in bidding for the operation of the service. The recommendation is to modify the existing facility at the former public works yard on Nipissing Road, subject to further technical engineering feasibility study. More detail background information supporting the recommendations for the Mobility Hub and proposed Maintenance Facility can be obtained through the Milton Mobility Hub and Transit Facility Working Papers. Page 4 Dillon Consulting Limited in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily and Roy Duncan

9 %Ð NO 5 SIDE ROAD KELSO ROAD REGIONAL ROAD 25 BOSTON CHURCH ROAD ESQUESING LINE TOWN OF MILTON MILTON TRANSIT MASTER PLAN I2 PERU ROAD!H JAMES SNOW PARKWAY LAWSON ROAD MILTON TRANSIT 2023 STRATEGIC SERVICE PLAN FIGURE 1 APPLEBY LINE BELL SCHOOL LINE NO 14 SIDE ROAD ^ TREMAINE ROAD BRONTE STREET no BRITANNIA ROAD AM Southbound REGIONAL ROAD 25 ONTARIO STREET!H STEELES AVENUE PM Northbound LOUIS ST LAURENT AVENUE THOMPSON ROAD I2 AM Northbound PM Southbound FOURTH LINE JAMES SNOW PARKWAY Route 22-7AM serves before 7AM FIFTH LINE %Ð DERRY ROAD BRITANNIA ROAD SIXTH LINE ^ High School Velodrome Highway Road GO Rail Regional Network (GO Bus) Education Village Transit Routes Combined Population & Employment per Hectare Kilometers MAP DRAWING INFORMATION: DATA PROVIDED BY TOWN OF MILTON MAP CREATED BY: JJA MAP CHECKED BY: DK MAP PROJECTION: NAD 1983 UTM Zone 17N FILE LOCATION: I:\GIS\ Milton TMP\Mapping\ Final\2023 Strategic Service Plan.MXD Regional Network (GO Rail) Regional Network (GO Rail Extension) Employee Partnership (2) Bronte / Crossroads (3) Trudeau (4) Thompson/Clark (5) Yates (6) Scott (7) Harrison (8) Willmott (9) Laurier!H!H Target to Replace Zellers v Hospital I2 I2 Target Distribution Facility GO Station Potential GO Station Employment Specials Derry Green Corporate Business Park (10) Boyne (11) Education Village Express West Employment Special East Employment Special Kelso / Glen Eden* Edu. Village Express *Drop off / pick up service outside conventional transit hours SCALE 1:36,000 PROJECT: STATUS: FINAL DATE: 08/07/12 ²

10 February 2013 Town of Milton Moving Milton Forward Transit Master Plan Conventional Transit 5- Plan Working Paper 3.0 CONVENTIONAL TRANSIT SERVICE PLAN 2013 TO 2017 Based on the review of existing services, input from the public consultation strategy (details provided in Public Consultation Working Paper), guidance from the Strategic Plan, and the development of policies and service standards, a 5- transit service strategy was developed. The strategy identifies easy to implement quick-wins that can be completed in the short-term and responds to pressures from the rapid rate of growth. While the service plan is reported by year for budgetary planning purposes, the implementation of the plan, including various components of the plan, shall be based on the timing and pace of development and performance targets being met. Therefore, in addition to meeting proposed development targets, a list of performance triggers have been identified and included that will determine the precise timing of service level enhancements and expansion of transit coverage areas. Early in the study a need was identified for two new routes to serve residential development in the south west area of the Town and these routes were designed and implemented in September This resulted in an annualized transit service level increase to approximately 23,000 revenue bus hours. In December 2012 a shuttle service to Kelso/Glen Eden was introduced as a new partnership initiative to accommodate the Glen Eden workforce (mainly Milton students) and some visitors. This service and its cost recovery strategy provides an effective example of the type of partnership approach that Milton will be pursuing for employment specials to the Highway 401 Industrial Park and future Derry Green Business Park. Moving forward over the next five years, the objectives of the transit service strategy are to: 1. Expand into growing neighbourhoods. 2. Expand the hours of service to include weekends and weekday evenings. 3. Provide improved connections to meet all GO Train arrivals and departures. 4. Provide service to the growing employment areas. The following provides a sequence of improvements if projections and targets are met. This proposed service strategy along with projected increases in ridership and revenue are translated into a financial plan and capital plan. More detail is provided in the Conventional Transit 5- Plan Working Paper. 1 (2013) In 1 (2013), the Town will continue to grow primarily in the southwest (Sherwood Survey Area). The Boyne Survey will also begin to break new ground, with new residential development in the area south of Louis St. Laurent Avenue and east of Bronte Street. A new High School is also scheduled to open in this area in September, which will be serviced by the current Route 8 Willmott. Saturday service and extended weekday evening service is recommended as Milton Transit continues to mature, addressing the full range of community travel needs. This improvement should be considered a Page 6 Dillon Consulting Limited in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily and Roy Duncan

11 Town of Milton Moving Milton Forward Transit Master Plan February 2013 Summary Document priority with the existing population and should not be contingent on how quickly future growth occurs. Current riders have a strong preference for extension of service hours and this will also facilitate ridership growth during the current hours of operation in addition to increased customer loyalty. Depending on the pace of development, 2013 should also see an expansion of the Trans-Cab service for growing areas. Minor adjustments are also made to the base routes based on new road extensions and expansion of population. The introduction of employment services is also planned to provide effective and efficient transit service to Milton s growing business community. Peak period service on weekdays should be a priority to service an existing need and is not dependent on the pace of further growth in the Highway 401 Industrial and Business Area. A summary of 1 service improvements is identified below (provided triggers are met): Modify Routes 1 and 3 to improve directness of service and coverage; Introduce weekday peak period employment routes for the Highway 401 Industrial Park; Provide the ability for employers to participate in an off-peak employee shuttle, provided a financial partnership is reached; Extend service on weekday evenings for all base routes to 10:00pm Monday to Thursday and Midnight on Fridays (60 minute frequency) to better accommodate evening travel requirements; Introduce Saturday transit service on all base routes from 8:00am to 7:00pm operating at a 60 minute frequency to address the increasing diversity of travel needs; Expand the current GO Drop off-service to connect with three additional GO Train arrivals. This will allow Milton Transit to connect to all PM peak GO Trains; Expand the service to Kelso/Glen Eden during the summer period provided a suitable financial partnership is achieved; Expand the Kelso service on Saturdays during the winter season based on the financial partnership approach. Provide a new Trans-Cab service in the Boyne Secondary Plan Area as a precursor to fixed route service; and Extend the Community Bus service by one hour to better accommodate the needs of seniors and persons with disabilities. 2 (2014) In 2 (2014), the Town will grow primarily in the southwest (Boyne Survey Area). Existing communities in Milton will continue to mature, including in the Sherwood Survey Area. Intensification planned along Main Street will help increase transit ridership along this corridor. If development occurs as planned, the major expansion will be in residential communities south of Louis St. Laurent Avenue on both the east and west side of Bronte Street. As these communities become more established, this area should have enough density to convert from a Trans-Cab zone to a fixed route service. If this density Dillon Consulting Limited Page 7 in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily, and Roy Duncan

12 February 2013 Town of Milton Moving Milton Forward Transit Master Plan Conventional Transit 5- Plan Working Paper does not materialize, Trans-Cab service should continue to be in place until the population is high enough to support fixed route service (based on service standards). Employer Partnerships are assumed to continue with the expansion of the Kelso service during the summer season (this is based on Kelso s willingness to continue the pilot). The special GO feeder service should be expanded to the AM Peak period (GO Pick-up service) provided minimum performance targets are met for the PM GO Drop-Off service. This will allow Milton Transit to market itself as being able to connect residents efficiently and affordably to all GO Train arrivals and departures. Expansion of the Community Bus will be important to keep up with the rising demands of an aging population. A summary of 2 service improvements is identified below (provided triggers are met): Implement a new route to expanding residential areas along Bronte Road south of Derry Road. This will be a two-way corridor service using Main Street and Bronte Road, connecting to a number of key activity generators; Modify Route 2 as a result of the new route to avoid duplication of service; Modify Route 5 to provide two-way service on Childs Drive once transit priority measures are in place to ensure reliable running time; Begin the introduction of special GO Pick-Up services during the AM peak period to provide connections to all GO Train departures not served with the existing base route schedule; Include an additional day of service for Community Bus provided performance targets are met; and Expand the Kelso service on Saturdays during the summer season based on the financial partnership approach. 3 (2015) In 3 (2015), existing communities will continue to mature, however, the majority of growth is anticipated to occur in residential communities south of Louis St. Laurent Avenue on both the east and west side of Bronte Street. Introduction of Sunday service is recommended as Milton Transit continues to mature into an established diverse system. This should be triggered by the success of Saturday service in achieving its performance targets as well as the increase in sales of monthly passes. A summary of 3 service improvements is identified below (provided triggers are met): Introduce a new route to the growing residential area in the Boyne Survey provided population targets are met. The route will initially connect to a new terminal at Thompson Road and Derry Road; Introduce hourly transit service on Sundays for all base routes, operating from 10:00am to 6:00pm; Include an additional day of service for Community Bus provided performance targets are met; and Extend the Kelso service on Sunday s during the winter season based on the financial partnership approach. Page 8 Dillon Consulting Limited in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily and Roy Duncan

13 Town of Milton Moving Milton Forward Transit Master Plan February 2013 Summary Document 4 (2016) In 4 (2016), the majority of growth will occur south of Louis St. Laurent Avenue on both the east and west side of Bronte Street. The 401 Industrial and Business Park will expand further towards the west and the Derry Green Corporate Business Park development will begin to break ground east of James Snow Parkway and north of Derry Road. As development continues to occur, an employer shuttle is introduced to the Derry Green Corporate Business Park. The Kelso Service and other Employer Partnerships continue to expand capitalizing on improvements in the base route network and service levels. A summary of 4 service improvements is identified below (provided triggers are met): Introduce weekday peak period employment area special into the Derry Green Business Park; Provide the ability for employers to participate in an off-peak employee shuttles, provided an financial partnership is in place; Extend weekday evening service Monday to Thursday until midnight (same as Fridays); Include an additional day of service for Community Bus provided performance targets are met; and Expand the Kelso service on Sundays during the summer season based on the financial partnership approach. 5 (2017) In 5 (2017), the Town is projected to grow mainly in the 401 Industrial and Business Park in the north and the eastern fringe of the urban area including the Derry Green Corporate Business Park. Residential growth in the Boyne Survey Secondary Plan Area has slowed while significant intensification in the existing urban area is beginning to occur including the Main Street corridor, supported by the Milton Mobility Hub. A summary of 5 service improvements is identified below (provided triggers are met): Extend the route in the Boyne Survey Area as the population continues to grow from the subterminal at Thompson Road and Derry Road directly to the Milton GO Station via Thompson Road; Modify Route 4 to reduce overlap on Thompson Road and extend coverage to Derry Road based on the change above; and Extend Saturday service to 9:00pm to better service the needs of a more diverse Milton Transit customer base. Summary If all service improvements are implemented based on the identified triggers, Milton Transit will grow to a seven day a week operation servicing a number of new residential and employment areas, with improved service for GO Train commuters and for seniors and persons with disabilities. The 5 Dillon Consulting Limited Page 9 in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily, and Roy Duncan

14 February 2013 Town of Milton Moving Milton Forward Transit Master Plan Conventional Transit 5- Plan Working Paper service strategy is illustrated in Figure 2 and the service plan (frequency and hours) is included in Table 1. The 5-year service plan represents a Made in Milton approach that uses a combination of fixed route base services, partnerships with employers, targeted specials (e.g. Community Bus and GO Shuttles) and demand responsive services to low demand areas. The strategy also recognizes the need to enhance the level of service that will take Milton to a level more in line with its peers, to address the needs of a more diverse customer base, to increase transit s overall share of trips and to prepare for the next level of ridership growth that will occur with the opening of Education Village. This is done through a phased approach that places the right type and level of service based on certain triggers being achieved. This will help mitigate the rate of capital and operating cost growth and enhance revenue through ridership growth to off-set significant increases in municipal investment over a short period of time. Page 10 Dillon Consulting Limited in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily and Roy Duncan

15 %Ð NO 5 SIDE ROAD School Special Service KELSO ROAD PERU ROAD REGIONAL ROAD 25 BOSTON CHURCH ROAD!H LAWSON ROAD ESQUESING LINE TOWN OF MILTON MILTON TRANSIT MASTER PLAN YEAR 5 (2017) SERVICE PLAN FIGURE 2 APPLEBY LINE GO Pick-Up and Drop Off Service NO 14 SIDE ROAD TREMAINE ROAD AM Southbound nm!h nm STEELES AVENUE PM Northbound I2 AM Northbound PM Southbound nm Route 22-7AM serves before 7AM MAIN STREET %Ð nm nm High School High School Opening v Hospital I2 Highway Railway Employee Partnership (Off peak) TransCab or Shuttle Area (Off peak) Transit Routes (2) Bronte / Crossroads (3) Trudeau (4) Thompson/Clark (5) Yates (6) Scott (7) Harrison (8) Willmott!H!H Target Distribution Facility Target to Replace Zellers GO Station Combined Population & Employment per Hectare Road Employment Special Derry Green Corporate Business Park (9) Laurier (10) Boyne West Employment Special East Employment Special Kelso / Glen Eden* *Drop off / pick up service outside conventional transit hours BELL SCHOOL LINE BRONTE STREET nm no REGIONAL ROAD 25 ONTARIO STREET LOUIS ST LAURENT AVENUE BRITANNIA ROAD THOMPSON ROAD nm FOURTH LINE JAMES SNOW PARKWAY DERRY ROAD BRITANNIA ROAD SIXTH LINE Kilometers MAP DRAWING INFORMATION: DATA PROVIDED BY TOWN OF MILTON MAP CREATED BY: JJA MAP CHECKED BY: TH & DK MAP PROJECTION: NAD 1983 UTM Zone 17N FILE LOCATION: I:\GIS\ Milton TMP\Mapping\Final\ Figure Service Plan.MXD SCALE 1:36,000 PROJECT: STATUS: DRAFT DATE: 03/04/13 ²

16 February 2013 Town of Milton Moving Milton Forward Transit Master Plan Summary Document Route Peak Buses Weekday Hours Start End AM (start to 9:00am) Table 1 5 (2017) Service Plan Midday (9:00am - 3:00pm) Frequency PM (3:00pm - 7:00pm) Evening (7:00pm to end) Daily Weekday Hours Saturday Service Sunday Service Hours Frequency Hours Frequency West Emp Shuttle 3 1 5:40am 7:40pm Route 2 East 1 5:46am 12:15pm Route 2 West 1 5:40am 12:15pm Route 3 1 5:40am 12:15pm Route 4 1 5:40am 12:15pm Route 5 1 5:40am 12:15pm Route 6 1 5:41am 12:15pm Route 7 1 5:43am 12:15pm Route 8 1 5:47am 12:15pm Route 9 2 5:40am 12:15pm Route :40am 12:15pm Route :00am 8:30pm 3.58 Route :00am 8:30pm 3.58 Route :00am 8:30pm 3.58 School Special 0 2:45pm 3:06pm 0.50 Community Bus 6 0 8:22am 4:40:pm Kelso Winter 7 1 3:40pm 10:30pm / /45 Kelso Summer 0 10:00am 4:00pm East Emp Shuttle 0 7:10am 5:00pm DG Emp Shuttle 1 5:40am 5:00pm TOTAL Operates between 5:40am and 9:00am and again from 2:00pm to 7:40pm 4 This is service hours for School Days. Service hours on non-school days when the School Special is not operating is Route 30,31,32 each operates between 6:00am and 7:50am and again between 5:30pm and 6:45pm with one last run at 8:00pm. 6 Operates 5 days a week 7.There are two drop off services operating from 9:00pm to 10pm on Saturdays and 6:00pm to 10pm on Sundays. Page 12 Dillon Consulting Limited in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily and Roy Duncan

17 Town of Milton Moving Milton Forward Transit Master Plan Summary Document February 2013 Beyond 2017 (Education Village) Sometime beyond 2017, it is anticipated that Education Village will open with a post-secondary campus west of Tremaine Road. In order to service this high demand node and support the implementation of a very desirable U-Pass program, it will be important that the transit service in Milton will be at a level to support the needs of students, staff and employees. With Education Village in place and an enrolment of 5,000 to 10,000 undergraduates, there will be a number of students also living in adjacent municipalities and hence the introduction of Milton s first cross-boundary express service is recommended. In time this will include service to both Mississauga/Brampton and South Halton with operation by GO Bus or a linkage of municipal transit routes in the adjacent municipalities. Service frequency and hours on the base system should also improve, particularly on weekends and evenings. A new express route should be considered to improve access to Education Village from the north (near Scott Boulevard). The Conventional Transit 5- Plan identifies a list of recommended service improvements that should be in place with the opening of Education Village. These can be phased in over time and based on performance targets being achieved. A new transit hub is recommended within Education Village connecting these and other new services that are destined to this area. If Education Village opens before 2017, some of these improvements should also be phased in earlier. Fare Strategy To help pay for the major service improvements in the five year plan, a series of annual fare increases is proposed. Innovations such as a Student Freedom pass, Corporate (employee discount) passes, extended time transfer and increased promotion of the Metrolinx/GO Transit Integration program as well as Halton Region s SPLIT Pass program (addressing transit affordability) will help increase ridership and revenue. Financial and Implementation Plan When the proposed service plan is fully implemented in 5, Milton Transit is projected to achieve 1.1 million annual rides and an R/C ratio of 37 percent (up from 229,000 rides and 23 percent R/C in 2011). A summary of ridership and financial performance is represented in Table 2. While this is a considerable amount of growth over the next five years, the plan looks to implement improvements that are cost effective and based on triggers being achieved. As such, service improvements that make up the five year plan have also been presented as a menu that can be reprioritized, as triggers and performance targets are reached. While it should be noted that many of the recommendations within the Master Plan work as a system, use of Table 3 below will allow staff and Council to better understand the cost, ridership and revenue of each proposed improvement and when the improvement should be implemented. Dillon Consulting Limited Page 13 in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily, and Roy Duncan

18 February 2013 Town of Milton Moving Milton Forward Transit Master Plan Summary Document Table 2 Projected Transit Ridership and Financial Performance System Performance (Effectiveness) 2011 Base Population 85,000 88,605 95, , , , ,039 Revenue Service Hours 21,193 23,624 32,710 44,125 53,835 61,396 67,885 Ridership 228, , , , , ,947 1,109,088 Ridership per Capita Ridership per Hour Financial Performance 2011 Base Passenger Revenue 484, , ,489 1,240,362 1,792,455 2,279,840 2,722,627 Non-Farebox Revenue 47,698 55, , , , , ,257 Provincial Gas Tax $524,839 $524,839 $524,839 $524,839 $524,839 $524,839 $734,775 Operating Cost - Operator $1,796,300 $2,081,609 $3,034,406 $4,309,486 $5,535,571 $5,981,717 $6,963,208 Operating Cost - Administration $505,378 $562,856 $676,492 $715,328 $751,470 $784,174 $815,268 Transfers 1 $235,060 $335,800 $470,120 $503,700 $537,280 $570,860 $604,440 Operating Cost - Total $2,536,738 $2,980,264 $4,181,018 $5,528,513 $6,824,322 $7,336,751 $8,382,916 Revenue/Cost Ratio 23% 25% 26% 28% 31% 36% 37% Municipal Subsidy (Investment) $1,244,517 $1,465,144 $2,206,171 $3,106,690 $3,814,137 $3,773,833 $4,130,818 Municipal Investment per `Hour $58.7 $62.0 $67.4 $70.4 $70.8 $61.5 $60.9 Municipal Investment per Capita $14.6 $16.5 $23.0 $30.1 $34.6 $32.1 $33.0 Municipal Investment per Trip $5.4 $5.2 $5.5 $5.6 $5.0 $3.9 $3.7 Change in Municipal Investment $220,627 $741,027 $900,519 $707,447 -$40,304 $356,985 1 Reserve Transfer for Equipment Replacement Page 14 Dillon Consulting Limited in association with Schmied Communications, Bill Cunningham Consulting Dr. Brendon Hemily, and Roy Duncan

19 Town of Milton Moving Milton Forward Transit Master Plan Summary Document February 2013 Table 3 Menu of Conventional Transit Service Improvements Route/ Service Service Description Rationale Trigger for Implementation Anticipated Implementation New Service Hours New Ridership Operating Revenue Operating Cost Net Municipal Investment Route 1 / West 401 Industrial Park Employer Shuttle Convert to the West 401 Industrial and Business Park Shuttle with flexible routing in the 401 Industrial Park Shuttle. Trans-Cab service remains in the midday. Route 1 is not performing well. Change will help tailor service to the needs to the employees in the 401 Industrial and Business Park while improving coverage to residents. None Required to meet coverage target in Service Standard document ,600 11,000 $5,700 $24,000 $15,500 $46,400 $9,800 $22,400 Route 2 Change first three morning runs to provide service to east side of the 401 Industrial and Business Park instead of the Milton Crossroads shopping node (before 7:10am). The Crossroads Centre does not open until 9:00am and ridership to this area before 7:10am is limited. Provides more cost effective service to Employment Area. Implementation of West 401 Industrial Park Shuttle ,800 $2,000 $8,300 ($11,400) ($34,300) ($13,400) ($42,600) Route 3 Modify service with opening of Laurier Avenue extension. Provides more direct service to existing customers, additional coverage to the developing residential community and will reduce the overall trip time. Extension of Laurier Avenue ,500 $1,700 $7,700 $0 $0 ($1,700) ($7,700) GO Drop-Off Service (Route 30, 31, 32) Additional runs added to provide better connections to four PM GO Train arrivals at 4:58pm, 5:28pm, 5:48pm, 6:23pm. Provide connection to all PM Peak GO Train arrivals not serviced by Base service (improves flexibility for GO commuters). None - cost effective measure to increase system ridership ,700 5,800 25,000 $12,700 $54,700 $52,600 $157,700 $39,900 $103,000 Kelso Summer Weekday and Winter Saturday Service New summer seasonal weekday service in July and August (10:00am to 4:00pm). Extend Winter seasonal service to Saturdays (8:00am to 10:00pm). Access to 30 staff and over 1,000 daily visitors in the Summer. Saturday Winter service services a market of approximately 250 daily staff and about 600 daily visitors from the Town. Partnership program triggered by the Employer (maximum R/C to the Town is 67%) ,300 3,500 $5,000 $7,700 $42,200 $44,100 $13,900 $14,600 Dillon Consulting Limited Page 15 in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily, and Roy Duncan

20 February 2013 Town of Milton Moving Milton Forward Transit Master Plan Summary Document Route/ Service Service Description Rationale Trigger for Implementation Anticipated Implementation New Service Hours New Ridership Operating Revenue Operating Cost Net Municipal Investment Community Bus Extend service to 4:30pm on both days of operation. The community bus ends early and should be extended. May reduce demand for paratransit trips. Will also improve operating efficiency as driver transitions to the new GO Drop-off service. Six (6) months after reservation function is provided by a third party organization. Minimum 3 pass/hour on existing service ,600 $900 $3,500 $6,200 $18,600 $5,300 $15,100 East 401 Industrial Park Shuttle Provide service in east area of Highway 401 Industrial Park during the weekday AM and PM peak periods. Expands transit coverage in the 401 Industrial and Business Park in peak travel times. None Required to meet coverage target in Service Standard document ,200 3,700 16,000 $8,100 $35,000 $37,100 $111,300 $29,000 $76,300 Employment Partnership Contingency Provide 1,500 annual hours of off-peak employer partnership service on request to employer in the Hwy 401 Industrial Park. Provides a cost effective method of delivering service to a low demand area/ period that is tailored to participating employers. Partnership program triggered by the Employer (maximum R/C to the Town is 67%) ,500 2,500 10,500 $5,500 $23,000 $46,400 $139,200 $15,300 $45,900 Trans-Cab Two new Trans-Cab areas in Boyne Secondary Plan Area (connect to the nearest bus stops along Route 7 and 8). Allows Milton Transit to condition two growing residential markets where ridership does not justify fixed route services. Minimum of 250 dwelling units in place, not within walking distance of a transit route ,200 5,000 $3,200 $13,400 $8,400 $35,000 $5,200 $21,600 Extended Evening Service Expand weekday evening services by two hours to 9:45pm Monday-Thursday and by four and half hours to 12:15am on Friday. Enhances mobility options for residents and employees, reflecting the needs of a more diverse Milton Transit customer. None Required to grow system wide ridership and improve accessibility for customers ,600 5,800 25,000 $12,700 $54,700 $80,400 $241,200 $67,700 $186,500 Saturday Service Provide on all base routes from 8:00am until 7:00pm at 60 minute frequency (Route 2 at 30 minutes). Enhances mobility options for residents and employees, reflecting the needs of a more diverse Milton Transit customer. None Required to grow system wide ridership and improve accessibility for customers ,800 7,500 32,000 $16,400 $70,000 $86,600 $259,700 $70,200 $189,700 Route 2 East Split Route from Route 2 West (of Milton GO Station). Change due to proposed change in west portion of the route. Introduction of Route $0 $0 $0 $0 $0 $0 Page 16 Dillon Consulting Limited in association with Schmied Communications, Bill Cunningham Consulting Dr. Brendon Hemily, and Roy Duncan

21 Town of Milton Moving Milton Forward Transit Master Plan Summary Document February 2013 Route/ Service Service Description Rationale Trigger for Implementation Anticipated Implementation New Service Hours New Ridership Operating Revenue Operating Cost Net Municipal Investment Route 2 West Modify route to provide two-way service on Woodward Avenue, Ontario Street and services the residential area west on Ontario Street along Laurier Avenue and Heslop Road. Adjust off-peak frequency to every 60 minutes. Avoids duplication with the introduction of Route 9 (a new corridor service along Main Street and Bronte Road connecting to the future Education Village. Opportunity to focus Route 2 West on the residential area and expand coverage to Woodward Avenue. Introduction of Route ,500-3,000-10,000 ($6,700) ($22,500) ($48,800) ($146,500) ($42,100) ($124,000) Route 5 Modify route to operate in both directions on Childs Drive between Ontario Street and the Milton GO Station. Provide more direct service in both directions on Childs Drive. Reduces duplication on Main Street. Improve the proximity to transit service to the growing residential area south of Derry Road. Transit signal priority in place to allow route to continue to achieve targeted on-time performance ,100 4,500 $2,500 $10,100 $0 $0 ($2,500) ($10,100) Route 8 Modify to penetrate a larger portion of the neighbourhood south of Derry Road. Reduce service duplication on Bronte Road with the introduction of Route 9. Implementation of Route 9. Growth in residential area south of Derry Road ,500 $1,800 $7,900 $0 $0 ($1,800) ($7,900) Route 9 Implement new route connecting the south west portion of the Boyne Survey area with the Milton GO Station with two-way service along Bronte Road and Main Street. Service growing residential area in Boyne Survey and provide more direct two-way service on Bronte (intensification corridor). This route can better support off-peak 30 minute frequency service than the existing portion of Route 2 west of the Milton GO Station. Development south of Louis St. Laurent, west of Bronte Road (minimum of 1,500 households in this neighbourhood) ,167 9,500 37, ,000 $83,800 $359,500 $309,300 $927,800 $225,500 $568,300 GO Pick-up / Drop off (Routes 30,31,32) Begin to operate a GO Pick- Up service during the AM peak period, connecting to three AM GO Train departures at 6:23am, 7:23am and 7:53am. Provides a cost effective connection to all AM GO Trains for Milton Transit passengers (increase ridership for commuters). Success of Evening Drop off-service (achieve minimum of 8 boardings per revenue vehicle hour) average for all routes ,000 2,900 12,500 $6,500 $28,100 $32,500 $97,700 $26,000 $69,600 Dillon Consulting Limited Page 17 in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily, and Roy Duncan

22 February 2013 Town of Milton Moving Milton Forward Transit Master Plan Summary Document Route/ Service Service Description Rationale Trigger for Implementation Anticipated Implementation New Service Hours New Ridership Operating Revenue Operating Cost Net Municipal Investment Kelso Service Expand the summer weekday fixed route service to Saturdays. The summer weekend season has about 250 staff and about 1,000 daily visitors from Milton. Partnership program triggered by the Employer (maximum R/C to the Town is 67%) $900 $900 $7,300 $7,300 $2,400 $2,400 Community Bus Include an additional day of service. An extra day of service will provide additional travel options to the growing Community Bus market and reduce demand for paratransit service. Existing Community Bus service achieving a minimum of 5 boardings per revenue vehicle hour ,500 $1,800 $7,900 $14,600 $43,900 $12,800 $36,000 Trans-Cab Remove Boyne area Trans- Cab and replace with Route 9 and modified Route 8 service. Remove Trans-Cab around Woodward Avenue with the modification of Route 2 West. Neighbourhoods serviced by fixed route transit. Introduction of Route 9 and realignment of Route 2 West and Route ,400-4,800 ($3,800) ($13,200) ($26,600) ($33,600) ($22,800) ($20,400) Route 10 Introduce new route in the Boyne Survey starting at Bronte Road and Britannia Road and connecting to a transfer point at the Bentall Plaza at Louis St. Laurent Avenue and Thompson Road. Provide a direct east-west connection through the middle of the Boyne Survey area and provide coverage to the expanding community. Continued development south of Louis St. Laurent east of Bronte Road. A minimum of 1,500 households in this neighbourhood ,167 3,800 14,000 60,000 $33,000 $141,600 $325,600 $371,100 $292,600 $229,500 Kelso Service Extend Winter service on Sundays with service from 8:00am to 10:00pm. Provides Milton Transit access to about 250 staff and about 600 daily visitors from the Town. Partnership program triggered by the Employer (maximum R/C to the Town is 67%) ,200 $200 $5,200 $1,100 $25,400 $400 $8,400 Community Bus Include an additional day of service (4 days a week). An extra day of service will provide additional travel options to the growing community bus market and reduce demand for paratransit service. Existing Community Bus service achieving a minimum of 5 boardings per revenue vehicle hour ,100 $1,700 $7,300 $15,400 $43,900 $13,700 $36,600 Page 18 Dillon Consulting Limited in association with Schmied Communications, Bill Cunningham Consulting Dr. Brendon Hemily, and Roy Duncan

23 Town of Milton Moving Milton Forward Transit Master Plan Summary Document February 2013 Route/ Service Service Description Rationale Trigger for Implementation Anticipated Implementation New Service Hours New Ridership Operating Revenue Operating Cost Net Municipal Investment Sunday Service Provide Sunday Service on all base routes (10:00am until 6:00pm - 60 minute frequency (Route 2 still 30 minutes). Expands mobility options for transit customers and a draw to increase overall ridership. Saturday service achieves minimum of passengers per hour (system wide) ,167 3,500 9,300 40,000 $21,900 $94,400 $120,000 $341,800 $98,100 $247,400 Weekday Evening Service Expand Monday-Thursday evening service to 12:15am on all base routes. Expands mobility options for transit customers and a draw to increase overall ridership Last two early evening runs achieving a minimum of 8-10 passengers per revenue vehicle hour ,167 3,500 5,800 25,000 $13,700 $59,000 $113,700 $341,000 $100,000 $282,000 Kelso Service Provide Summer service on Sundays with service from 10:00am to 6:00pm. Expansion of the service into Sundays gives Milton Transit access to about 250 staff and about 1,000 daily visitors from Milton. Partnership program triggered by the Employer (maximum R/C to the Town is 67%) $900 $1,200 $7,300 $7,300 $2,400 $2,400 Community Bus Include an additional day of service. An extra day of service will provide additional travel options to the growing community bus market and reduce demand for paratransit service. Existing Community Bus service achieving a minimum of 6 boardings per revenue vehicle hour ,100 $1,700 $7,300 $13,000 $39,000 $11,300 $31,700 Derry Green Employer Shuttle Introduce the Derry Green Corporate Business Park Shuttle during the weekday AM and PM peak periods. Provide peak period service to a growing employment area in Milton. Discussions with local businesses and ability to achieve minimum utilization targets (12-18 passengers per revenue vehicle hour) ,600 4,700 20,000 $11,100 $47,200 $51,900 $155,900 $40,800 $108,700 Employment Partnership Contingency Introduce an additional 1,500 contingency hours to Derry Green Employment Area. Provide Milton Transit a pool of service hours that can be used to provide additional off-peak transit service to employers as needed. Employers desire to expand service based on the partnership model (maximum R/C to the Town is 67%) ,500 2,300 10,000 $5,400 $23,600 $48,700 $146,100 $16,100 $48,200 Dillon Consulting Limited Page 19 in association with Schmied Communications, Bill Cunningham Consulting, Dr. Brendon Hemily, and Roy Duncan

TOWN OF MILTON. Transit Master Plan MOVING MILTON FORWARD

TOWN OF MILTON. Transit Master Plan MOVING MILTON FORWARD TOWN OF MILTON Transit Master Plan 2013-2017 MOVING MILTON FORWARD Appendix B - Strategic Plan Working Paper February 2013 Town of Milton Moving Milton Forward Transit Master Plan Strategic Plan Working

More information

2018 transit accessibility plan DRAFT

2018 transit accessibility plan DRAFT 2018 transit accessibility plan Table of Contents Section 1 Executive Summary 3 Section 2 Milton Transit Services Profile 4 Conventional Service 2017 Service Profile 4 Specialized Service 2017 Service

More information

Transit Service Guidelines

Transit Service Guidelines G R E AT E R VA N CO U V E R T R A N S P O RTAT I O N A U T H O R I T Y Transit Service Guidelines PUBLIC SUMMARY REPORT JUNE 2004 Greater Vancouver Transportation Authority TRANSIT SERVICE GUIDELINES

More information

Transit, Intercity Bus, Taxi 8-1

Transit, Intercity Bus, Taxi 8-1 8-1 Introduction Public transit is a critical element of any transportation system. It both provides an alternative form of transportation to the traditional use of the automobile and provides mobility

More information

VICTORIA REGIONAL TRANSIT SYSTEM

VICTORIA REGIONAL TRANSIT SYSTEM VICTORIA REGIONAL TRANSIT SYSTEM WESTSHORE: LOCAL AREA TRANSIT PLAN Aligns transit investments with community develoent Better matches existing service to demand with service to new neighbourhoods and

More information

PUBLIC TRANSPORTATION PLAN

PUBLIC TRANSPORTATION PLAN PUBLIC TRANSPORTATION PLAN Introduction Public transportation is a vital element of the total transportation services provided within a metropolitan area. Not only does public transportation provide options

More information

Transit Implementation Guidelines for Small Canadian Municipalities

Transit Implementation Guidelines for Small Canadian Municipalities Transit Implementation Guidelines for Small Canadian Municipalities TRANSIT IMPLEMENTATION GUIDELINES FOR SMALL CANADIAN MUNICIPALITIES This Study has been produced with the assistance of the Green Municipal

More information

ARLINGTON COUNTY TRANSIT DEVELOPMENT PLAN

ARLINGTON COUNTY TRANSIT DEVELOPMENT PLAN p EXECUTIVE SUMMARY Report Prepared by: ARLINGTON COUNTY TRANSIT DEVELOPMENT PLAN The Arlington County Transit Development Plan (TDP) is an effort to evaluate and assess the performance, connectivity,

More information

City of Brantford Chapter 3 TABLE OF CONTENTS

City of Brantford Chapter 3 TABLE OF CONTENTS Chapter 3 The Land Use & Transportation Connection TABLE OF CONTENTS 3.1 THE LAND USE & TRANSPORTATION LINK... 1 3.2 POPULATION & EMPLOYMENT GROWTH FORECASTS... 3 3.2.1 Proposed Places to Grow Plan Forecasts

More information

3. STATION SPACING AND SITING GUIDELINES

3. STATION SPACING AND SITING GUIDELINES 3. STATION SPACING AND SITING GUIDELINES The station spacing and siting guidelines are summarized in Table 3-1. Table 3-1 also includes benchmark information for local transit service and express bus as

More information

1 RICHMOND HILL CENTRE / LANGSTAFF URBAN GROWTH CENTRE - TRANSPORTATION STUDY

1 RICHMOND HILL CENTRE / LANGSTAFF URBAN GROWTH CENTRE - TRANSPORTATION STUDY Report No. 4 of the Transportation Services Committee Regional Council Meeting of April 22, 2010 1 RICHMOND HILL CENTRE / LANGSTAFF URBAN GROWTH CENTRE - TRANSPORTATION STUDY The Transportation Services

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED STAFF REPORT ACTION REQUIRED Date: June 15, 2017 To: From: TTC Board Chief Executive Officer Summary This report responds to a TTC Board motion on March 26, 2014 that directed TTC staff to report back

More information

TRANSIT future. Transit Future Plan

TRANSIT future. Transit Future Plan TRANSIT future Transit Future Plan CHILLIWACK AREA May 2012 Acknowledgements This plan was made possible by participation from provincial and local government, key stakeholders and the public. BC Transit

More information

Caltrain Fare Study Update

Caltrain Fare Study Update Caltrain Fare Study Update Board of Directors December 7, 2017 Agenda Item 10 Overview Study overview Key findings from Existing Conditions and Peer Comparison Reports Fare Study Rider Survey highlights

More information

GO RAIL NIAGARA SERVICE EXTENSION

GO RAIL NIAGARA SERVICE EXTENSION Business Case: Finch Avenue West Rapid Transit GO RAIL NIAGARA SERVICE EXTENSION INITIAL BUSINESS CASE Date: November, 2014 NOVEMBER 2015 Page 1 TABLE OF CONTENTS 1.0 Executive Summary...p.5 2.0 Introduction....p.6

More information

Chapter 4: Transportation and Land Use

Chapter 4: Transportation and Land Use Chapter 4: Transportation and Land Use Transportation and land use together make possible the wide range of destination opportunities in the region. Transportation provides the connections, and, in turn,

More information

Kent County Transit Needs Assessment Scope of Work

Kent County Transit Needs Assessment Scope of Work Kent County Transit Needs Assessment Scope of Work Introduction In May, 2009, the Grand Valley Metropolitan Council (GVMC), in cooperation with Kent County and the Interurban Transit Partnership (ITP)/The

More information

FUTURE BUS RAPID TRANSIT PLANS

FUTURE BUS RAPID TRANSIT PLANS ATTACHMENT 1 Preferred Configuration Saskatoon Bus Rapid Transit - Preferred Configuration FUTURE BUS RAPID TRANSIT PLANS Plan For Growth Transportation Plan BRT Plan October 2017 saskatoon.ca/engage 1

More information

Amman Transportation Strategy

Amman Transportation Strategy Amman Transportation Strategy from Planning to Implementation Ayman Smadi Regional Conference on Sustainable Urban Transport Damascus (Syria), April 11-13, 2010 Outline Background and introduction Current

More information

NEW ORLEANS REGION TRANSIT COMPREHENSIVE OPERATIONS ANALYSIS SCOPE OF SERVICES. RPC Project LA90X361

NEW ORLEANS REGION TRANSIT COMPREHENSIVE OPERATIONS ANALYSIS SCOPE OF SERVICES. RPC Project LA90X361 NEW ORLEANS REGION TRANSIT COMPREHENSIVE OPERATIONS ANALYSIS SCOPE OF SERVICES RPC Project LA90X361 Overview Summary The purpose of the Comprehensive Operations Analysis (COA) is to provide detailed review

More information

Integrating Frequent Transit Service & Corridor-based Transit Supportive Environments in the Metro Vancouver Region. July 2009

Integrating Frequent Transit Service & Corridor-based Transit Supportive Environments in the Metro Vancouver Region. July 2009 South Coast British Columbia Transportation Authority Integrating Frequent Transit Service & Corridor-based Transit Supportive Environments in the Metro Vancouver Region July 2009 By: Lyle Walker, Transportation

More information

3.6 GROUND TRANSPORTATION

3.6 GROUND TRANSPORTATION 3.6.1 Environmental Setting 3.6.1.1 Area of Influence The area of influence for ground transportation consists of the streets and intersections that could be affected by automobile or truck traffic to

More information

EXECUTIVE SUMMARY. What is the RCTP?

EXECUTIVE SUMMARY. What is the RCTP? EXECUTIVE SUMMARY This Executive Summary presents a very brief overview of the key findings and recommendations that are included in the Updated Regionally Coordinated Transportation Plan (RCTP) for the

More information

TRANSIT SERVICE GUIDELINES

TRANSIT SERVICE GUIDELINES CHATHAM AREA TRANSIT AUTHORITY FEBRUARY 2014 Table of Contents 1. PURPOSE... 3 2. CAT SERVICE GUIDELINES... 3 3. TRAVEL MARKETS... 4 4. TRANSIT COVERAGE... 4 5. TRANSIT ACCESS... 4 6. BUS STOP SPACING

More information

Fairmount Line Feasibility Study

Fairmount Line Feasibility Study Executive Summary Wednesday October 16, 2002 Prepared for Massachusetts Bay Transportation Authority Planning Department Prepared by KKO and Associates, L.L.C. Two Dundee Park Andover, Massachusetts 01810

More information

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY? WHAT IS AN INTERMODAL TRANSIT FACILITY? An intermodal transit facility gathers many modes of transportation together and is strategically located to increase destination alternatives. Intermodal facilities

More information

Appendix M PART & HART BUS ROUTES AND TRUCK TEMPORAL DISTRIBUTION

Appendix M PART & HART BUS ROUTES AND TRUCK TEMPORAL DISTRIBUTION Appendix M PART & HART BUS ROUTES AND TRUCK TEMPORAL DISTRIBUTION Site Brewster Shuttle and HART Route 3 Figure M-1: Existing PART/HART Bus Routes Stateline Retail Center Town of Southeast, Putnam County,

More information

EDMONTON S TRANSIT STRATEGY

EDMONTON S TRANSIT STRATEGY EDMONTON S TRANSIT STRATEGY This strategy acknowledges that our transit system, and indeed all of our transportation network, is situated on the traditional land of Treaty No. 6 First Nations and the

More information

Niagara s Transportation Strategy 1. Introduction:

Niagara s Transportation Strategy 1. Introduction: Niagara s Transportation Strategy May 8, 2002 Niagara s Transportation Strategy 1. Introduction: Transportation is of pivotal importance in the development of Niagara. This, Niagara s first comprehensive

More information

Calgary Transit Funding and Fare Strategy Calgary Transit 2011 June

Calgary Transit Funding and Fare Strategy Calgary Transit 2011 June Calgary Transit Funding and Fare Strategy Calgary Transit 2011 June LPT2011-xx Overview of Calgary Transit Fares.docx Page 1 of 37 LPT2011-xx Overview of Calgary Transit Fares.docx Page 2 of 37 Calgary

More information

Transportation Report to SPC on Transportation and Transit 2017 March 15. ISC: UNRESTRICTED TT Page 1 of 7 ROUTEAHEAD UPDATE

Transportation Report to SPC on Transportation and Transit 2017 March 15. ISC: UNRESTRICTED TT Page 1 of 7 ROUTEAHEAD UPDATE Page 1 of 7 EXECUTIVE SUMMARY This report provides Council with an update on the status of implementation of RouteAhead, a 30-year strategic plan for public transit in Calgary. The report also highlights

More information

1.0 INTRODUCTION. Athens Transit System Transit Development Plan 1.0 Introduction. 1.1 System Overview

1.0 INTRODUCTION. Athens Transit System Transit Development Plan 1.0 Introduction. 1.1 System Overview 1.0 INTRODUCTION 1.1 System Overview Athens Transit System (ATS) is the public transportation provider for Athens-Clarke County Georgia. ATS bus transit services consist of 18 fixed routes (referred to

More information

- FACT SHEET - THE GUIDING PRINCIPLES

- FACT SHEET - THE GUIDING PRINCIPLES THE GUIDING PRINCIPLES The General Plan begins with seven ideas that together create a vision for the City s future. When the City approved the General Plan in 1994, these idea were dubbed the Seven Guiding

More information

Metro s Guide to Accessibility and Independence

Metro s Guide to Accessibility and Independence Metro s Guide to Accessibility and Independence 1 We Care All Metro services MetroBus, MetroLink and Metro Call-A-Ride are accessible. At Metro, we re committed to providing high quality, accessible travel

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Fuel Crisis Contingency Plan Update. Staff Report

ORANGE COUNTY TRANSPORTATION AUTHORITY. Fuel Crisis Contingency Plan Update. Staff Report ORANGE COUNTY TRANSPORTATION AUTHORITY Fuel Crisis Contingency Plan Update Staff Report March 14, 2013 To: From: Subject: Transit Committee Darrell Johnson, Chief Executive Officer Fuel Crisis Contingency

More information

Transportation Concurrency

Transportation Concurrency 2015 Frequently Asked Questions About. Transportation Concurrency Q. What is Transportation Concurrency? A. Transportation Concurrency is both a State law requirement and a City pre-application development

More information

ADVERTISING 2016 INFORMATION & RATES. Kim Britton, Marketing Director

ADVERTISING 2016 INFORMATION & RATES. Kim Britton, Marketing Director ADVERTISING 2016 INFORMATION & RATES Kim Britton, Marketing Director 469-474-2371 Marketing@STARtransit.org About Founded in 1980, STAR Transit s mission is to provide affordable and convenient transportation

More information

Draft Noise Abatement Guidelines

Draft Noise Abatement Guidelines Document under Separate Cover refer to IMLC01-13 Draft Noise Abatement Guidelines April 2013 Legislative & Planning Services Table of Contents 1.0 Introduction...1 1.1 Key Definitions...1 2.0 Existing

More information

SERVICE IMPROVEMENT STRATEGIES AND SCENARIOS

SERVICE IMPROVEMENT STRATEGIES AND SCENARIOS SERVICE IMPROVEMENT STRATEGIES AND SCENARIOS The Hartford region has seen significant improvements in terms of intermodal connectivity and mode choice. Recent investments include the new CTfastrak bus

More information

To provide an update on the progress of the Peel Goods Movement Task Force and the Peel Goods Movement Strategic Plan.

To provide an update on the progress of the Peel Goods Movement Task Force and the Peel Goods Movement Strategic Plan. 9.2-1 REPORT Meeting Date: 2015-11-26 Regional Council For Information DATE: November 10, 2015 REPORT TITLE: REGION OF PEEL GOODS MOVEMENT STRATEGIC PLAN - 2015 STATUS UPDATE FROM: Dan Labrecque, Commissioner

More information

University Area Transit Circulator Study

University Area Transit Circulator Study , June 2013 Hillsborough County Metropolitan Planning Organization P.O. Box 1110, 18 th Floor Tampa, Florida 33601-1110 813.272.5940 www.hillsboroughmpo.org June 2013 1.0 Introduction... 1 1.1 Study Area...

More information

TRANSIT SERVICES Business Plan

TRANSIT SERVICES Business Plan TRANSIT SERVICES 2015-2018 Business Plan TABLE OF CONTENTS Vision 1 Operating Philosophy 1 Key Services 1 Focus One: Optimizing Exisiting Resources 2 Focus Two: Exploring New Directions 4 Focus Three:

More information

Rail & Transit Alternatives Analysis. NH Capitol Corridor. Public Scoping Meeting. March 5, 2014

Rail & Transit Alternatives Analysis. NH Capitol Corridor. Public Scoping Meeting. March 5, 2014 NH Capitol Corridor Rail & Transit Alternatives Analysis Public Scoping Meeting March 5, 2014 Agenda Study overview National Environmental Policy Act Preliminary alternatives: rail, bus, stations, layover

More information

May April 2016 DRAFT. London s Rapid Transit Initiative. Business Case

May April 2016 DRAFT. London s Rapid Transit Initiative. Business Case May April 2016 London s Rapid Transit Initiative Business Case DRAFT Table of Contents EXECUTIVE SUMMARY...i Economic Environmental Scan iii Key Benefits of London s Rapid Transit Initiative iii Plan

More information

Lethbridge Transit Master Plan. Final Report Presentation July 17, 2017

Lethbridge Transit Master Plan. Final Report Presentation July 17, 2017 Lethbridge Transit Master Plan Final Report Presentation July 17, 2017 Agenda CONVENTIONAL TRANSIT 1. Master Plan Process 2. Existing System Evaluation 3. Community Engagement 4. Vision and Value Statements

More information

Sustainability. Sustainability Principles. 1. Framework. Spokane Transit s definition of Sustainability is:

Sustainability. Sustainability Principles. 1. Framework. Spokane Transit s definition of Sustainability is: Sustainability Spokane Transit s definition of Sustainability is: Sustainability at Spokane Transit is about providing services in ways that optimize our ability to meet the needs of present and future

More information

Mobility Pricing Conference: Perspectives on Transit, Equity, and Fare Policy / Setting. Brendon Hemily, PhD

Mobility Pricing Conference: Perspectives on Transit, Equity, and Fare Policy / Setting. Brendon Hemily, PhD Mobility Pricing Conference: Perspectives on Transit, Equity, and Fare Policy / Setting Brendon Hemily, PhD Presentation Outline Reality Check Equity and Transit Subsidy Framework

More information

Los Angeles County Congestion Reduction Demonstration Project

Los Angeles County Congestion Reduction Demonstration Project Los Angeles County Congestion Reduction Demonstration Project frequently asked questions update #1 /august 2008 Los Angeles County Metropolitan Transportation Authority (Metro), California Department of

More information

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014 2040 Transportation Policy Plan Conversion to Performance Based Planning Basis 25 th Annual CTS Transportation Research Conference May 21, 2014 1 About the plan Long-range transportation plan for the Twin

More information

Rapid Transit in Winnipeg. Winnipeg TOD Summit November 17, 2014

Rapid Transit in Winnipeg. Winnipeg TOD Summit November 17, 2014 Rapid Transit in Winnipeg Winnipeg TOD Summit November 17, 2014 Presentation Overview Rapid Transit (RT) in Winnipeg What is RT? What are our RT plans? Near term Longer term Comments re: TOD OurWinnipeg

More information

CAPITAL AREA TRANSIT PLANNING SERVICE STANDARDS AND PROCESS. Planning Department

CAPITAL AREA TRANSIT PLANNING SERVICE STANDARDS AND PROCESS. Planning Department CAPITAL AREA TRANSIT PLANNING SERVICE STANDARDS AND PROCESS Planning Department January 2016 INTRODUCTION Transit Service Standards are public rules and guidelines used to make decisions about where transit

More information

To provide an update on the progress of the Peel Goods Movement Task Force and Peel Goods Movement Strategic Plan.

To provide an update on the progress of the Peel Goods Movement Task Force and Peel Goods Movement Strategic Plan. 8.4-1 REPORT Meeting Date: 2014-06-26 Regional Council For Information DATE: June 17, 2014 REPORT TITLE: PEEL GOODS MOVEMENT STRATEGIC PLAN UPDATE 2014 FROM: Dan Labrecque, Commissioner of Public Works

More information

US & USRC Track Capacity Study Train Capacity Analysis Present to Maximum Capacity and Beyond

US & USRC Track Capacity Study Train Capacity Analysis Present to Maximum Capacity and Beyond Transportation Metrolinx US & USRC Track Capacity Study Prepared by: AECOM 5080 Commerce Boulevard 905 238 0007 tel Mississauga, ON, Canada L4W 4P2 905 238 0038 fax www.aecom.com AECOM Project Number:

More information

Transit Demand Analysis

Transit Demand Analysis Transit Demand Analysis Purpose To determine impact on ridership and revenues of any change in service policy. Need to know how demand estimates will be used. May not require an elaborate analysis in many

More information

Service Standards and Policies

Service Standards and Policies Planning, Development & Transportation Transfort/Dial-A-Ride 6570 Portner Road P.O. Box 580 Fort Collins, CO 80522.0580 970.224.6161 970.221.6285 - fax fcgov.com/transfort Service Standards and Policies

More information

Re: EX16.1. Developing Toronto's Transit Network Plan to Attachment 6

Re: EX16.1. Developing Toronto's Transit Network Plan to Attachment 6 Re: EX16.1 Developing Toronto's Transit Network Plan to 2031 1 Contents 1. Executive Summary... 3 2. Background and Context... 7 Problem Statement:... 7 Decision History on Options Development... 8 Relief

More information

Public Hearing for April 2018 Major Service Changes. January 4, 2018

Public Hearing for April 2018 Major Service Changes. January 4, 2018 Public Hearing for April 2018 Major Service Changes January 4, 2018 Agenda Circulator System Overview 2017 Transit Development Plan Major Service Changes Explanation of Public Hearing Process 2 What is

More information

Master Plan. Summary

Master Plan. Summary R e g i o n a l Tr a n s p ortat i o n Master Plan Summary Executive Summary With an increasing population and changing demographics, Waterloo Region must ensure that growth is both sustainable and affordable.

More information

SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE. Sustainable Communities & Transportation Planning

SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE. Sustainable Communities & Transportation Planning SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE Draft Regional Climate Action Plan Sustainable Communities & Transportation Planning SP-1 Develop criteria in collaboration with municipal and county planning

More information

3.0 REVIEW OF PREVIOUS STUDIES

3.0 REVIEW OF PREVIOUS STUDIES 3.0 REVIEW OF PREVIOUS STUDIES This section of the highlights the significant features from previous plans and studies that could impact the development of the I-20 East Transit Initiative. Much of the

More information

3. SYSTEM ANALYSIS Future (2031) AADT and SADT Estimates

3. SYSTEM ANALYSIS Future (2031) AADT and SADT Estimates 3. SYSTEM ANALYSIS 3.1 Congestion Analysis As indicated in Section 2.1, a key component of the GTAW Corridor Planning and Environmental Assessment Study is the assessment of the inter-regional travel demands

More information

Ottawa Transportation Master Plan 2013

Ottawa Transportation Master Plan 2013 Introduction Ottawa s 2013 Transportation Master Plan (TMP) update sets a new standard for sustainable transportation planning in Canada. The plan, unanimously approved by Ottawa City Council, sets forward

More information

TASK 4.1 DRAFT DEVELOPMENT OF BUS SERVICE GUIDELINES. Connecticut DOT 2800 Berlin Turnpike Newington, CT 06111

TASK 4.1 DRAFT DEVELOPMENT OF BUS SERVICE GUIDELINES. Connecticut DOT 2800 Berlin Turnpike Newington, CT 06111 TASK 4.1 DRAFT DEVELOPMENT OF BUS SERVICE GUIDELINES Draft Bus Service Guidelines PREPARED FOR Connecticut DOT 2800 Berlin Turnpike Newington, CT 06111 PREPARED BY 100 Great Meadow Road, Suite 200 Wethersfield,

More information

2. OMNITRANS SYSTEM. 2.3 Omnitrans Services. 2.1 Background. 2.4 Traditional Fixed Route Service. 2.2 Omnitrans Mission TRANSIT DESIGN GUIDELINES

2. OMNITRANS SYSTEM. 2.3 Omnitrans Services. 2.1 Background. 2.4 Traditional Fixed Route Service. 2.2 Omnitrans Mission TRANSIT DESIGN GUIDELINES 2. OMNITRANS SYSTEM 2.1 Background Omnitrans was founded in 1976 under a Joint Powers Agreement to provide public transportation service to the San Bernardino Valley. Omnitrans is the major public transportation

More information

Mobility on Demand for Improving Business Profits and User Satisfaction

Mobility on Demand for Improving Business Profits and User Satisfaction Mobility on Demand for Improving Business Profits and User Satisfaction Takuro Ikeda Takushi Fujita Moshe E. Ben-Akiva For a sustainable society, we need to design a mobility management system that does

More information

VEHICLES MILES TRAVELED (VMT) TRAFFIC IMPACT METRIC

VEHICLES MILES TRAVELED (VMT) TRAFFIC IMPACT METRIC VEHICLES MILES TRAVELED (VMT) TRAFFIC IMPACT METRIC A project-specific quantified analysis of the MGA Campus has been undertaken to compare BAU to the project including the project s VMT reduction program

More information

Section 9 Implementation

Section 9 Implementation Section 9 Implementation 9 Section 9: Implementation 9.1 Overview The primary role of Your Bright Future is to provide a community sustainability based framework to direct the future growth and development

More information

store for Buckshaw Village and Euxton

store for Buckshaw Village and Euxton A new Aldi food store for Buckshaw Village Aldi, the premium discount food retailer, with local developer Primrose Holdings, is proposing to develop land off Ordnance Road,. The site is currently vacant

More information

Transit Fare Strategy Draft Recommendations

Transit Fare Strategy Draft Recommendations 0 Transit Fare Strategy Draft Recommendations Prepared for Strathcona County Transit Department March 2015 Associates Table of Contents Executive Summary... 1 1. Introduction... 6 2. Methodology... 7 3.

More information

Request for Proposals (RFP): Transportation Study for On Demand Service for People with Disabilities in the Valley Region

Request for Proposals (RFP): Transportation Study for On Demand Service for People with Disabilities in the Valley Region Introduction Request for Proposals (RFP): Transportation Study for On Demand Service for People with Disabilities in the Valley Region The Kennedy Center, Inc. December 2014 The Kennedy Center, Inc. is

More information

Minutes of the OZAUKEE COUNTY TRANSIT DEVELOPMENT PLAN ADVISORY COMMITTEE

Minutes of the OZAUKEE COUNTY TRANSIT DEVELOPMENT PLAN ADVISORY COMMITTEE Minutes of the OZAUKEE COUNTY TRANSIT DEVELOPMENT PLAN ADVISORY COMMITTEE DATE: December 20, 2016 TIME: PLACE: 10:00 a.m. Auditorium Ozaukee County Administration Center 121 W Main Street Port Washington,

More information

1.1 Purpose of the Project

1.1 Purpose of the Project Chapter 1 Purpose and Need for East Link Project 1.1 Purpose of the Project The purpose of the East Link Project is to expand the Sound Transit Link light rail system from Seattle to Mercer Island, Bellevue

More information

Sounder Extension to DuPont

Sounder Extension to DuPont Subarea Pierce Primary Mode Commuter Rail Facility Type Station Length 7.8 miles Version Draft ST3 Plan Date Last Modified March 28, 2016 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION

More information

Fairfax County Countywide Transit Network Study

Fairfax County Countywide Transit Network Study Fairfax County Countywide Transit Network Study Proposed High Quality Transit Network Concept Metropolitan Washington Council of Governments Travel Forecasting Subcommittee September 20, 2013 1 Presentation

More information

Niagara Region Transportation Master Plan Niagara-Hamilton Trade Corridor Technical Paper

Niagara Region Transportation Master Plan Niagara-Hamilton Trade Corridor Technical Paper Niagara-Hamilton Trade Corridor Technical Paper 1. Purpose In the report to Council on the Regional Council Strategic Priorities Implementation Plan, pursuing Provincial commitment for the Niagara to Greater

More information

Comprehensive Operations Analysis (COA)

Comprehensive Operations Analysis (COA) Comprehensive Operations Analysis (COA) Toledo Area Regional Transit Authority (TARTA) NELSON DEVELOPMENT LTD Margarita De León Community Relations Consultant Today s Agenda TARTA COA What led to the COA?

More information

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION PLANNING ORGANIZATIO BOSTON REGION MPO NMETROPOLITAN BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair Karl H. Quackenbush, Executive Director,

More information

LYNX Flexible Services

LYNX Flexible Services LYNX Flexible Services FPTA October 27, 2014 Andrea Ostrodka Director of Planning & Development Central Florida Regional Transportation Authority LYNX & Central Florida Service Area: Orange, Osceola and

More information

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION Vireak Hinh, P.Eng. R.V. Anderson Associates Ltd., Toronto, Canada Jennifer Trimble Region of Halton, Oakville, Canada

More information

Subject 2015 MiWay Customer Satisfaction Survey Results. Recommendation

Subject 2015 MiWay Customer Satisfaction Survey Results. Recommendation Date: 2016/04/13 Originator s files: To: Chair and Members of General Committee From: Geoff Wright, P. Eng, MBA, Commissioner of Transportation and Works Meeting date: 2016/06/01 Subject 2015 MiWay Customer

More information

Content of the module

Content of the module Content of the module Methodology approach Planning process Definition of working area Population and territorial context Supply Infrastructure Transport service Demand On board / at the stations or bus

More information

SUBJECT: Draft New Official Plan: Public Consultation and Engagement Summary

SUBJECT: Draft New Official Plan: Public Consultation and Engagement Summary Page 1 of Report PB-47-17 SUBJECT: Draft New Official Plan: Public Consultation and Engagement Summary TO: FROM: Planning and Development Committee Planning and Building Department Report Number: PB-47-17

More information

CITY OF CLOVIS Traffic Impact Study Guidelines

CITY OF CLOVIS Traffic Impact Study Guidelines CITY OF CLOVIS Traffic Impact Study Guidelines CLOVIS, A WAY OF LIFE Approved August 25, 2014 City Council Resolution 2014-79 Prepared by City of Clovis Engineering Division Steve White, City Engineer

More information

Bonnie Doon Grade Separation

Bonnie Doon Grade Separation 6. 2 Bonnie Doon Grade Separation Recommendation: That the April 18, 2017, Integrated Infrastructure Services report CR_4461, be received for information. Report Summary This report provides information

More information

UNION PEARSON EXPRESS UNION STATION PLATFORM AND WAITING LOUNGE CANADIAN CONSULTING ENGINEERING AWARDS Photo credit: Tom Arban Photography

UNION PEARSON EXPRESS UNION STATION PLATFORM AND WAITING LOUNGE CANADIAN CONSULTING ENGINEERING AWARDS Photo credit: Tom Arban Photography UNION PEARSON EXPRESS UNION STATION PLATFORM AND WAITING LOUNGE CANADIAN CONSULTING ENGINEERING AWARDS 2016 1 PROJECT OUTLINE The Union Pearson Express is a significant urban transportation project that

More information

2 YORK REGION TRANSIT GREATER TORONTO AREA FARE SYSTEM (PRESTO) PROGRESS REPORT

2 YORK REGION TRANSIT GREATER TORONTO AREA FARE SYSTEM (PRESTO) PROGRESS REPORT 2 YORK REGION TRANSIT GREATER TORONTO AREA FARE SYSTEM (PRESTO) PROGRESS REPORT The Transit Committee recommends that Council adopt the recommendation contained in the following report dated December 17,

More information

TravelSmart: Planning for Sustainable Urban Transportation

TravelSmart: Planning for Sustainable Urban Transportation Case Studies in Sustainable Transportation KAMLOOPS, BRITISH COLUMBIA CASE STUDY 3 TravelSmart: Planning for Sustainable Urban Transportation Organization City of Kamloops Transportation Department, Community

More information

Collaborative, sustainable & holistic: Integrated transport and land-use planning in Hume

Collaborative, sustainable & holistic: Integrated transport and land-use planning in Hume Collaborative, sustainable & holistic: Integrated transport and land-use planning in Hume Janet Rice Senior Strategic Transport Planner Hume City Council GAMUT Outer Metropolitan Transport Forum 21 July

More information

DART s Role in Transit - Oriented Development. Jack Wierzenski,, Director Economic Development & Planning Dallas Area Rapid Transit

DART s Role in Transit - Oriented Development. Jack Wierzenski,, Director Economic Development & Planning Dallas Area Rapid Transit DART s Role in Transit - Oriented Development Jack Wierzenski,, Director Economic Development & Planning Dallas Area Rapid Transit The DART System Established in 1983 13 Member Cities Local Funding: $.01

More information

E X E C U T I V E S U M M A R Y BUSINESS CASE. - June CAMBRIDGE ON THE GO BUSINESS CASE page 1

E X E C U T I V E S U M M A R Y BUSINESS CASE. - June CAMBRIDGE ON THE GO BUSINESS CASE page 1 E X E C U T I V E S U M M A R Y BUSINESS CASE - June 2015 CAMBRIDGE ON THE GO BUSINESS CASE page 1 E X E C U E T X I E V C E U S T U I V M E M S A U R M Y M A R Y EXECUTIVE SUMMARY The partnering communities

More information

Calgary Transportation Plan. Adopted by Council September calgary.ca call 3-1-1

Calgary Transportation Plan. Adopted by Council September calgary.ca call 3-1-1 Calgary Transportation Plan Adopted by Council September 2009 calgary.ca call 3-1-1 Document Updates: Date Report Description 2012 January 10 C2012-03 Delete and replace Maps 1, 2, 5, 6 and 7 to relfect

More information

Item No Halifax Regional Council June 20, 2017

Item No Halifax Regional Council June 20, 2017 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 14.2.2 Halifax Regional Council June 20, 2017 TO: Mayor Savage and Members of Halifax Regional Council Original Signed SUBMITTED BY: Councillor

More information

1.201 / / ESD.210 Transportation Systems Analysis: Demand and Economics. Assignment 2

1.201 / / ESD.210 Transportation Systems Analysis: Demand and Economics. Assignment 2 1.201 / 11.545 / ESD.210 Transportation Systems Analysis: Demand and Economics Assignment 2 Question 1 Elasticities and Consumer Surplus In April of 1973, the Massachusetts Bay Transportation Authority

More information

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012 2030 Transportation Policy Plan SUMMARY PRESENTATION Land Use Advisory Committee November 15, 2012 Today s Topics Transportation Policy Plan (TPP) Requirements and Background Current TPP Policies, Issues

More information

Improving Urban Mobility Through Urban Analytics Using Electronic Smart Card Data

Improving Urban Mobility Through Urban Analytics Using Electronic Smart Card Data Improving Urban Mobility Through Urban Analytics Using Electronic Smart Card Data Mayuree Binjolkar, Daniel Dylewsky, Andrew Ju, Wenonah Zhang, Mark Hallenbeck Data Science for Social Good-2017,University

More information

Peter Klitz Senior Planner Transit Network Management TransLink (Metro Vancouver)

Peter Klitz Senior Planner Transit Network Management TransLink (Metro Vancouver) Opening the Black Box to Shed Light on TransLink s Network Management Process Peter Klitz Senior Planner Transit Network Management TransLink (Metro Vancouver) Metro Vancouver s Transportation System Bus

More information

COMPREHENSIVE SYSTEM ANALYSIS

COMPREHENSIVE SYSTEM ANALYSIS COMPREHENSIVE SYSTEM ANALYSIS Volume II: Service Plan December 2013 Nelson\Nygaard Consulting Associates Inc. i Table of Contents Page 1 Introduction...1-1 Community Outreach... 1-2 2 Vision, Goals, and

More information

RER New Stations Initial Business Case BRESLAU STATION. Kitchener Corridor. July Draft

RER New Stations Initial Business Case BRESLAU STATION. Kitchener Corridor. July Draft RER New Stations Initial Business Case BRESLAU STATION Kitchener Corridor July 2016 Draft Draft: v1.2 Metrolinx RER New Stations Initial Business Case BRESLAU Draft Prepared by: IBI Group 55 St. Clair

More information

34 th Street SBS Community Advisory Committee Meeting #6. March 28, 2012

34 th Street SBS Community Advisory Committee Meeting #6. March 28, 2012 34 th Street SBS Community Advisory Committee Meeting #6 March 28, 2012 Agenda I. Project Update II. Loading Zone Curb Regulations Options III. Loading Zone Curb Regulation Small Group Discussion IV. Project

More information

Shannon Noonan, City of Cambridge Don Drackley, IBI Group Scott Johnson, IBI Group PTSL

Shannon Noonan, City of Cambridge Don Drackley, IBI Group Scott Johnson, IBI Group PTSL 100 175 Galaxy Boulevard Toronto ON M9W 0C9 Canada tel 416 679 1930 fax 416 675 4620 ibigroup.com Memorandum To/Attention From cc Shannon Noonan, City of Cambridge Don Drackley, IBI Group Scott Johnson,

More information