1 RFQ 2002 : Complete delivery of welded tanks for the project Energy use of condensates in Biocel Paskov a.s. SCOPE OF SUPPLY AND CONDITIONS OF DELIVERY 1 SELLER'S SCOPE OF SUPPLY 1.1 Tank B11, B12, B22, B13, B23, B15, B14, The Seller has to ensure the complete and timely supply of all materials and auxiliary materials. Supplier s scope of supply includes: B11 Buffer Tank B12 Neutralization Tank B22 Neutralization Tank B13 ECSB Reactor Tank B23 ECSB Reactor Tank B15 Biomass Storage Tank B14 Flash Aeration Tank The tanks will be installed in PS Anaerobic waste water treatment plant. Tanks will be installed on a concrete foundation outside of building. Neutralization /22 tanks shall be fabricated in the workshop and delivered as one piece to site. All other tanks will be pre-fabricate in the workshop and finalized on site due to large diameter. Seller has to pay attention for a proper tank fabrication area in and outside the EUOCBP in accordance to lay out. The attached drawings for the tanks are the basis for the design and scope of the supply. In particular, Seller's scope of supply includes: Detail Engineering as tank drawings, part lists, stress and static calculation Detail Engineering as calculations and drawings for settler support and hold down system. Complete delivery of tanks, installed on site, tested and ready for operation Assembling and welding of each tank to one piece Complete delivery of support and hold down systems for settlers. Page 1 of 14

2 1.1.1 Platforms Mounting of settler system in the reactor tanks B13/B23 under supervision of settler supplier (Hydrothane). On site welding of flanges after mounting of settler system. Erection of the field-erected tanks at job site Tanks shell, bottom, roof Skirt or support structure Nozzles with flanges Stiffener plates for nozzles Bolts, nuts and washers, gaskets Manholes, complete with covers, gaskets, bolts and davits Lifting lugs or trunnions for erection Grounding lugs Nameplate Platforms (as specified) All other parts specified on the drawings Prefabrication, assembling and welding Pickling and passivation of all stainless steel parts incl. all necessary preventive actions to ensure environmental conditions Surface protection of carbon steel parts Anchor bolts in stainless steel (material A4) Blind flanges, gaskets and bolting material required for hydrostatic testing Scaffolding for fabrication & installation All equipment and devices for prefabrication/fabrication Preparation of area for prefabrication (if necessary) Cranes and trucks Sellers's scope of supply shall contain all service platforms, handrails and stairs, complete with accessories in accordance to standard. Material Supports, Handrails, ladders Gratings All platforms are covered with anti-slip type gratings. The gratings have to be supplied with bending bars. Necessary cut-outs for pipes, cables etc. have to be surrounded with minimum 130 mm high foot protection board before galvanizing. In case of cut-outs no load reduction is allowed. If modifications (e.g. cutting, drilling, welding, etc.) will be done after galvanization the gratings have to be galvanized again. All gratings have to be fixed at least with four galvanized grating fasteners. Bearing bars have a minimum dimension of TS 30 / 3 mm. Standard sizes of gratings shall be used. It is not allowed to use quadratic gratings. Load for main platforms 300 kg/m² Page 2 of 14

3 Material Acceptable sag 1/200 of span width, however at maximum 4 mm for wandering single loads up to 2,3 kn on an area of 200 x 200mm at unfavourable positions. The widest clear span for the substructure of gratings has to be considered in accordance to the valid norm and the values named above. General instructions are defined in EN ISO / -3. Technical details see Lenzing standard 15 / S203, S204 and S205 Hand rails and skirting board All platforms and stairs have to be equipped with handrails. In the area of erection openings removable hand rails (e.g. pluggable) are installed. The hand rail has to be designed continuously (no interruption at steel beams). Material Form round bars (pipe) Measurements: Hand rail Ø 48,3 x 3,2 mm Stud Ø 48,3 x 3,2 mm Knee rail Ø 26,9 x 2 mm General instructions are defined in EN ISO Technical details see Lenzing standard 15 / S207 (type 04, 06, 10, 12) Ladders, Safety Rails Material General instructions are defined in EN ISO For more details see Lenzing standard 15 / S201 (type 02, 04, 06, 08) and S202 (type 05, 06, 07, 08) and for anchoring detail S Coating & Corrosion protection If applicable in general the corrosion protection will be in accordance to Lenzing Biocel Standard defined in the attachment Surface Protection Chapter 12.2 B. Description of corrosion protection: Sandblasting SA 2,5 Corrosion protection has to be done according to Surface Protection Chapter 12.2.B Layer thickness will be as follows: Page 3 of 14

4 - 1 x 70 µm two-component epoxy primer - 1 x 110 µm two-component epoxy intermediate coat with ferrous mica - 1 x 60 µm two-component polyurethane finishing coat The total nominal thickness of coating system (NDFT) shall amount 240 µm (see DIN EN ISO table A4). Each layer has to be made in a different colour. BUYER will have possibility to go to SELLER s workshop and make sample measurements of each layer by company Videfkor. The colour on the top coating shall be declared by LBP. The different strokes with painting shall have different colours. Defects caused by welding or assembling shall be given the same corrosion protection by as coating described above. Other painting systems are not allowed unless approved by LBP. Top coat colour Steel structure / supports RAL6021 Final top coat colour will be fixed before order. 1.2 Installation Seller's scope of supply shall contain the installation of all tanks, as well as all related co-ordination work. Such installation and work comprise, inter alia: Erection of tanks and their accessories Erection of platforms, ladders, handrails Provision of all erection materials Provision of scaffolding Provision of all erection tools, including heavy erection equipment (e.g. cranes, trucks) Supervision of erection, co-ordination of sub-suppliers 1.3 Inspections and Testing Sellers's scope of supply shall contain the required inspections TÜV and tests for all his supplies as well as all related co-ordination work. Such testing comprises, inter alia: Inspections at sub-suppliers' premises, if any Visual testing VT 100% Page 4 of 14

5 Non-destructive testing NDT 100% Tightness test (water filling) X-ray testing - T-connections 100% - Longitudinal seams 10% All other tests and inspections required by code and local regulations All testing instruments and other testing equipment for inspections and tests are to be provided by Seller at his own cost and responsibility. 1.4 Tank Identification All tanks have to be equipped with a name plate in accordance to LBP requirements, as minimum: Position number e.g B11 Manufacturer Volume Design temperature Design pressure Max pressure Construction regulation Fluid identity Weight empty Year of fabrication 2 DESIGN, FABRICATION AND ERECTION 2.1 Attached Specifications, Drawings and Data Sheets Supplier's design of all tanks must comply with the particular specifications, drawings and/or data sheets attached. All positions of nozzles are preliminary. Final positions of nozzles will be advised at later date during detail engineering. 2.2 Design, Performance and Quality Requirements Design and fabrication standards SUPPLIER s design of the vessel must comply with the requirements of all applicable codes and standards as well as all applicable laws and regulations. In any case the latest edition of the respective standard or code, valid at the date of issue of the purchase order by LBP, applies. Vessels are designed according to: Relevant standards are for - All tanks EN with lower testing amount Page 5 of 14

6 (testing acc. to EN group 3b) Eurocode (as EN , EN ,.) and related codes and standard Czech laws, regulations and statutes, EN standards Mechanical engineering including manufacturing and erection Static calculation shall consider - Nature elements according Czech regulations (wind, snow, earth quake, etc.) - Loads caused from pipe supports, service platforms, ladders, cable trays, etc. - Loads from internals - Other loads during erection, supervision, start-up and test operation - Nozzle connection loads Delivery conditions for flat products made of steels for pressure EN , surface 2B respectively 1D Material certificate according to EN Tolerances for construction of vessels DIN and EN ISO Welding Basic welded joint details in steel for pressurized components DIN EN ; joint penetrations have to be back-welded. Quality levels for imperfections of welding joints will be done according to DIN EN ISO 5817 group B Quality requirements for fusion welding of metallic materials - EN ISO Tolerances for welded constructions, dimensions for lengths and angels; shape and position of welding according to DIN EN ISO B and F Stainless steel parts are inert gas welded with argon. All stainless steel parts have to be pickled and passivated. To prevent crevice corrosion gaps are not allowed. After pickling welding temper colours are not acceptable. With random video-endoscope test defect free has to be demonstrated by the supplier if necessary. Before start of on-site welding a welder test, test plate and RT EN 1435B, EN Class 1 is required. Surface protection of carbon steel parts shall be provided according to Biocel standard LBP Mill Standards The Supplier is obliged to refer to and use the available LBP Mill Standards whenever they are applicable. A set of the most relevant LBP Mill Standards is enclosed to this RFQ Standard of Care The Supplier agrees to perform all work and services with all reasonable skill, care and diligence and to carry out all his responsibilities in accordance with state-of-the-art techniques and recognised professional standards, in order to ensure personal safety and plant safety of LBP's plant as well as appropriate lifetime of the supplied equipment. Page 6 of 14

7 In case that the Supplier realises any error or deficiency, whether technical or legal, in documents or information which are placed at his disposal by LT or LBP, he has to immediately notify LT or LBP, stating the specific details in writing Quality Assurance All Supplier s work shall be subjected to quality assurance and interdisciplinary quality control techniques presently available at his company. At the start all involved parties have to do a quality assurance meeting with LBP General information The vessels have to be designed for the maximal pressure/temperature (PS/TS). The SUPPLIER is required to specify whether a vessel is shop fabricated or field erected. Please observe: Assembling and welding to one piece shall be preferable done at SUPPLIER s workshop unless size does not allow transportation in one piece. In case of field erected vessels, the plates shall be pre-bent and edges shall be prepared for welding at site. Also other prefabrication shall be done in the workshop to the largest extent possibility. Hydrostatic test for shop fabricated vessels have to be done at SUPPLIER s workshop. Site fabricated on site. Accessories for adjusting the shell during field erection are in the scope of supply of the SUPPLIER. These accessories have to be removed before painting, insulation or start-up of the equipment. Locations of removed accessories have to be crack tested. SUPPLIER has to provide appropriate measures if the weather conditions (low temperature, rain, heavy wind, etc.) for welding at field erection are not acceptable. Welding factor 0,85 has to be used. Supporting plates on the vessel for the steel support structure has to be made in stainless steel. On-site measurement has to be done by the supplier. All nozzles, manholes, insulation holders, reinforcement and external rings have to be made in stainless steel. Inside reinforcement rings are not allowed. All equipment has to be equipped with vent and drain nozzles including blind flanges, gaskets and bolting material. Lifting lugs or trunnions for erection have been provided. Page 7 of 14

8 Blind flanges, gaskets and bolting material required for hydrostatic testing is included in the scope of supply. All testing instruments and other testing equipment for inspections and tests, including mechanical tests, cold / hot tests, and performance test, are to be provided by SUPPLIER at his own cost and responsibility. After careful cleaning of the vessels or pre-fabricated parts they shall be packed for transportation. All nozzles and other opening will be closed with rubber gaskets and/or wooden covers. The vessels shall be equipped with wooden saddles for transport. Loose and miscellaneous parts must be packed in separate closed boxes Wall thickness Minimum wall thickness Shell, bottom Roof 4 mm 4 mm Nozzles All nozzles shall be equipped with weld neck flanges PN10 according to DIN EN , type 11. Nozzles DN80 and equal and smaller are equipped with stiffening plates. Manholes have to be designed according to DIN A stainless steel davit has to be provided for manholes, blind flanges or covers over 40 kg. Manholes in horizontal position have to be equipped inside the vessel with a handhold located 300mm above the manhole. If necessary also step supports shall be installed below the manhole. For safety a removable grid on top manhole has to be installed. Minimum nozzle wall thickness DN 15 to 80 3 mm DN 100 to mm DN 150 to mm DN 400 to mm DN 600 to mm Nozzle Loads Below shown table shall be applied for nozzle loads as minimum load. Detail figures about nozzle forces and loads will be given when appropriate piping drawings and stress calculations are available. Page 8 of 14

9 P M L =M N M [N] [Nm] [Nm] DN DN DN DN DN DN DN DN DN DN DN DN DN DN Notation P Radial force [N] M L Longitudinal moment [Nm] M C Tangential moment [Nm] M Moment in sphere [Nm] 2.3 Erection Conditions The tanks will be implemented into the PS Anaerobic waste water treatment plant. Supplier is responsible to fully observe the existing installations and circumstances. Furthermore, Supplier has to consider that parallel works will be done at the same time. Disturbances of the plant operation during the erection phase must be avoided Site Conditions The design is to be based on the specifications listed below: Elevation Climate 262 m above sea level moderate with cold winters Ambient temperatures: Dry bulb, outdoor -25 C up to +35 C Dry bulb, indoor +5 C up to +35 C Annual average pressure Wind region Wind load Page 9 of hpa II, ground category II 0,60 kn/m²

10 Snow region Snow load III 300 kg/m² Earth quake zone Czech Standard 7 acceleration of foundation soil agr = 0,12g Special risks occasional thunderstorms with lightning Safety For static calculation the design values according to Czech Standard for Paskov have to be used. For all personnel working on LBP s premises, a safety information course arranged by LBP is compulsory Offices and Storage Rooms Supplier has to bring his own office and storage containers Sanitary Facilities Supplier has to bring his own facilities (has to be clarified during negotiation, if existing facilities could be used) Lay-down and Rigging Areas Utility Supply Specified in Technical conditions of tender documentation. Power and water supplied by LBP free of charge; connection points to be advised by LBP Page 10 of 14

11 3 SHIPPING, PACKING AND MARKING INSTRUCTIONS The delivery is DDP (Incoterms 2000) BIOCEL s Works Paskov. Shipping instructions and advice of the dispatch 3.1 Correspondence Any correspondence and delivery of the subject of the contract are to be sent or advised to the address as follows: Biocel Paskov a.s. Ing. Pavel Kupka Zahradni 762 CZ Paskov Czech Republic In case that the shipping instructions from the SUPPLIER are not observed, any extra costs arisen because of a traffic diversion or other reasons are to be paid by him. The Seller is obliged to advise the dispatch to the LBP 3 days in advance (by fax possibly). The Seller is obliged to advise the LBP of the dispatch of the goods and documents by fax within two working days after the consignment was handed over to the forwarding agent. The advice of the dispatch should contain: Date of the dispatch Place of the dispatch Code No.... LBP Contract number (= LBP order and position number) Project number Marking of the goods Value of the consignment Gross and net weights Dimension ( L x W x H ) of each package Total number of packages Total invoice value of each part-shipments Estimated time of arrival at LBP s works in Paskov Instructions for storage 3.2 Shipping Documents Of each shipment, the Seller shall issue to LBP following documents: Customs Invoice in duplicate marked-up with Shippers invoice declaration, (replacing the EUR 1 certificate). Advice Note Page 11 of 14

12 Packing List Certificate of Origin Truck Way Bill (The original goes with the consignment) All documents must show Buyers complete contract number. 3.3 Transportation and Storage Seller s scope of supply shall contain all transportation, which is necessary for getting his deliveries to the erection site and into their final place in the plant. Transportation and storage comprise, inter alia: Transportation of all delivered parts to Paskov site Transportation to the erection site Receipt and unloading of arriving deliveries Handling of formalities 4 DOCUMENTATION TO DELIVERY OF WORKS 4.1 General Documentation packages are to be delivered in six (6) sets of paper copies, A4 holes punched, and in electronic form on disk. Engineering tools: Drawings AutoCAD 2010 Lists (data base) MS Office 2003 (Excel) Text documents MS Office 2003 (Word) Each documentation package shall be accompanied by a listing of the documents contained. Revised documents shall clearly show the modifications made since the previous revision. Number and delivery of documentation packages Seller has to transmit each documentation package in the form of paper copies to LBP and Lenzing Technik in due time, so that it arrives at the agreed date. LBP Lenzing Technik 5 sets in paper + electronic 1 set in paper + electronic Documentation Language If no special agreement, drawings and documents have to be in English language except operation & maintenance manual in Cz language. Page 12 of 14

13 4.2 Design Documentation for Approval (before fabrication release) Three (3) weeks after execution of agreement on delivery of works the Seller shall supply the following documents: Quality inspection plan (QIP) Risk analysis and hazard assessment Workshop drawings and part lists Wall thickness calculation Stress and stability calculation Welding and testing plans Detailed fabrication and testing time schedule Workshop drawings and part list for platforms incl. ladders,handrails aso. Static calculation for platforms Welding procedure specification WPS EN ISO Specification and qualification of welding procedures for metallic materials WPQR EN ISO (not older than 2 years) Qualification test of welders EN Qualification for IWE welding supervision engineer EN Qualification for NDT-testing EN 473 level 2 For vessels delivered in parts also the documentation for the work executed on site has to be supplied. 4.3 Final documentation (As-Built) - before release for shipment to site After the hydrostatic test the Supplier shall supply the Final Documentation within three (3) weeks, which has to include all documents and certificates necessary to obtain operating permission for the plant items included in his scope of supply. As a minimum, the Final Documentation shall contain as-built versions of: All workshop drawings, calculations, part lists Wall thickness and nozzle calculation Stress and stability calculation Material test certificates 3.1B including welding consumables TÜV Test and inspection reports (welding, visual testing (VT), non destructive testing (NDT), pressure testing (PT), measurements, etc.) Welder qualification and welding procedure qualification reports according to code Welding plan Any other certificates or records necessary to prove that the item is manufactured in full compliance with the requirements of the purchase order and any applicable codes and standards Material certificates EN including welding consumables Static calculations for platforms CE certificate according EN or manufacturer statement Wear and spare part list Maintenance manuals Page 13 of 14

14 Manufacturer declaration 5 GENERAL TERMS AND CONDITIONS 5.1 Terms and Conditions Terms and Conditions are specified in tender documentation Abreviations: LT Lenzing Technik LBP Lenzing Biocel Paskov LAG Lenzing AG EUOCBP Energy use of condensates in Biocel Paskov a.s. Page 14 of 14

1.0 INTRODUCTION GENERAL SUPPLIER S RESPONSIBILITY CODES AND STANDARDS... 4

1.0 INTRODUCTION GENERAL SUPPLIER S RESPONSIBILITY CODES AND STANDARDS... 4 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 1.1 GENERAL... 3 1.2 SUPPLIER S RESPONSIBILITY... 3 2.0 CODES AND STANDARDS... 4 2.1 CODES, STANDARDS AND REGULATIONS... 4 2.2 NEPTUNE ENERGY NETHERLANDS B.V. SPECIFICATIONS...

More information

Contents EN 14015:2004 (E) page

Contents EN 14015:2004 (E) page Contents page Foreword... 11 1 Scope... 12 2 Normative references... 13 3 Terms, definitions, symbols and abbreviations... 15 3.1 Terms and definitions... 15 3.2 Symbols... 19 3.3 Abbreviations... 21 4

More information

SECTION GROUND STORAGE TANK

SECTION GROUND STORAGE TANK SECTION 13210 GROUND STORAGE TANK PART 1 GENERAL 1.01 Summary A. Section Includes: Provision for welded steel storage tank design, fabrication, construction and erection, including tank accessories. B.

More information

SECTION GROUND WATER STORAGE TANKS

SECTION GROUND WATER STORAGE TANKS SECTION 33 16 13 GROUND WATER STORAGE TANKS PART 1: GENERAL 1.01 SCOPE A. Section includes requirements for designing, fabricating, and erecting a welded steel ground storage tank. 1.02 SYSTEM DESCRIPTION

More information

SPECIFICATION FOR SPHERICAL VESSELS (PROJECT STANDARDS AND SPECIFICATIONS)

SPECIFICATION FOR SPHERICAL VESSELS (PROJECT STANDARDS AND SPECIFICATIONS) Page : 1 of 1 April 01 #03-1 Block Aronia, TABLE OF CONTENTS 1. GENERAL 1.1 Scope. DESIGN.1 Shell Design. Support Column Design.3 Opening Reinforcement. Nozzles and Manholes.5 Internals and Externals.

More information

Keuka Studios May 2008 SECTION {05720} CABLE RAILING SYSTEM {CABLE RAILING SYSTEM} Display hidden text for Specifier Notes.

Keuka Studios May 2008 SECTION {05720} CABLE RAILING SYSTEM {CABLE RAILING SYSTEM} Display hidden text for Specifier Notes. SECTION 05 73 16 {05720} CABLE RAILING SYSTEM {CABLE RAILING SYSTEM} Display hidden text for Specifier Notes. PART 1 GENERAL 1.1 SUMMARY A. Section includes cable railing system, with architectural metal

More information

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns. PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

A-BEAM W Erection Manual 2

A-BEAM W Erection Manual 2 2 BEAM W Revision 6/2017 Finland 3 TABLE OF CONTENTS 1 ERECTION INSTRUCTIONS... 4 1.1 A-BEAM W... 4 1.2 Codes and standards to be followed during erection... 4 1.3 Documents to be followed in erection

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

Tender specification KLAUS Multiparking MultiBase 2072 outdoor installation EB MultiBase 2072 outdoor installation DB

Tender specification KLAUS Multiparking MultiBase 2072 outdoor installation EB MultiBase 2072 outdoor installation DB Preliminary technical remarks 1. Basis for the design are 1.1 the garage regulations (GaVo) according to the building regulations in the latest version, 1.2 the EC Machinery Directive 2006/42/EC, Appendix

More information

Tender specification KLAUS Multiparking MultiBase U1 EB / MultiBase U1 DB

Tender specification KLAUS Multiparking MultiBase U1 EB / MultiBase U1 DB Preliminary technical remarks 1. Basis for the design are 1.1 the garage regulations (GaVo) according to the building regulations in the latest version, 1.2 the EC Machinery Directive 2006/42/EC, Appendix

More information

SECTION SLUDGE HOLDING TANK DEWATERING

SECTION SLUDGE HOLDING TANK DEWATERING SECTION 13215 SLUDGE HOLDING TANK DEWATERING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Dewatering and cleaning of sludge holding tank and sludge disposal. Contractor shall pay for all sludge removal,

More information

Contents EN :2008+A1:2011 (E) Page

Contents EN :2008+A1:2011 (E) Page Contents Page Foreword... 9 Introduction... 10 1 Scope... 11 2 Normative references... 12 2.1 General... 12 2.2 Constituent products... 12 2.2.1 Steels... 12 2.2.2 Steel castings... 14 2.2.3 Welding consumables...

More information

STATEMENT OF SPECIAL INSPECTION FORM

STATEMENT OF SPECIAL INSPECTION FORM Project Title: Permit #: Project Address: STATEMENT OF SPECIAL INSPECTION FORM This Statement of Special Inspections is submitted in fulfillment of the requirements of CBC Sections 1704 and 1705. Special

More information

.1 American Institute of Steel Construction (AISC) Specifications for Steel Buildings AISC

.1 American Institute of Steel Construction (AISC) Specifications for Steel Buildings AISC 05 12 00 STRUCTURAL STEEL FRAMING Page 1 of 3 1 General 1.1 SECTION INCLUDES.1 Structural steel framing and support members 1.2 RELATED SECTIONS.1 Section 05 50 00 Metal Fabrications 1.3 REFERENCES.1 American

More information

ITEM 442 METALS FOR STRUCTURES

ITEM 442 METALS FOR STRUCTURES AFTER NOVEMBER 1, 2008 ITEM 442 METALS FOR STRUCTURES 442.1 Description. These specifications shall govern for materials such as structural steel, wrought iron, bronze, and other metals used in structures,

More information

SECTION 2 DIVISION 05 METALS

SECTION 2 DIVISION 05 METALS SECTION 2 DIVISION 05 METALS DIVISION 5 - METALS Note: This is a guide for Designers only. Contents shall not be used in lieu of specifications as part of the Designer s Contract Documents. GENERAL DESIGN:

More information

A-BEAM S Erection Manual 2

A-BEAM S Erection Manual 2 2 A-BEAM S Revision 6/2017 Finland 3 TABLE OF CONTENTS 1 ERECTION INSTRUCTIONS... 4 1.1 A-BEAM S... 4 1.2 Codes and standards to be followed during erection work... 4 1.3 Structural plans to be followed

More information

SECTION PREFABRICATED PIPE BRIDGE(s)

SECTION PREFABRICATED PIPE BRIDGE(s) SECTION 13135 - PREFABRICATED PIPE BRIDGE(s) PART 1 - GENERAL 1.01 Scope A. The Contractor is responsible for all engineering design, detailing, fabricating, installation including foundations for the

More information

REINFORCED CONCRETE MASONRY SECTION

REINFORCED CONCRETE MASONRY SECTION SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Stainless Steel Aeration Equipment Specification

Stainless Steel Aeration Equipment Specification Section 15 Stainless Steel Aeration Equipment Specification Part 1 - General 1.01 Description A. Scope of Work 1. Furnish, install and test aeration system including air mains, drop pipes, valves, expansion

More information

23-HA-101. Regeneration Gas Heater. A. Wolters T.-T. Nguyen. T.-T. Nguyen PREPARED CHECKED APPROVED. REVIEW Statoil REV.

23-HA-101. Regeneration Gas Heater. A. Wolters T.-T. Nguyen. T.-T. Nguyen PREPARED CHECKED APPROVED. REVIEW Statoil REV. of 0 -HA-0 CONTENTS GENERAL DATA REMARKS ELEMENT DATA NOZZLE DATA LAYOUT FLANGE DATA 0 REMARKS.. Revision as marked T.-T. Nguyen A. Wolters T.-T. Nguyen 0.0. Revision as marked A.Wolters T.-T. Nguyen Ehrnsperger

More information

PTFE BELLOWS POLY FLUORO LTD. POLY FLUORO LTD.260A. Bommasandra Industrial Area, Hosur Road, Bangalore TECHNICAL SPECIFICATION

PTFE BELLOWS POLY FLUORO LTD. POLY FLUORO LTD.260A. Bommasandra Industrial Area, Hosur Road, Bangalore TECHNICAL SPECIFICATION PTFE BELLOWS TECHNICAL SPECIFICATION 1. MATERIALS 1.1 PTFE Only virgin (not reprocessed) PTFE conforming to ASTM D 1457, type III, IV or V shall be used for the production of bellows; the PTFE raw material

More information

Section 4. Annex to IAEA Request for Proposal STATEMENT OF WORK. Primary/Secondary cooling water Heat Exchangers

Section 4. Annex to IAEA Request for Proposal STATEMENT OF WORK. Primary/Secondary cooling water Heat Exchangers Section 4 Annex to IAEA Request for Proposal 25919 STATEMENT OF WORK Primary/Secondary cooling water Heat Exchangers WWR-SM Research Reactor, UZBEKISTAN Page 1 of 17 1. Scope 1.1 This Statement of Work

More information

SUPPLIER QUALITY SCOPE AND FACILITY QUESTIONNAIRE. Bantrel Co. Project #:

SUPPLIER QUALITY SCOPE AND FACILITY QUESTIONNAIRE. Bantrel Co. Project #: Bantrel Co. Project #: COMPLETED BY: DATE: SUPPLIER NAME: D & B NUMBER: CONTENTS 1.0 GENERAL INFORMATION 2.0 PERSONNEL 3.0 QUALITY PROGRAM 4.0 SUPPLIER / CONTRACTOR INFORMATION 5.0 SCOPE OF FABRICATION

More information

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 13686.00 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529-1 SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 1.1 SUMMARY A. Section Includes: 1. Metal pipe hangers and supports.

More information

SECTION COLD-FORMED METAL TRUSSES

SECTION COLD-FORMED METAL TRUSSES SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

CHAPTER 16 - GANTRIES

CHAPTER 16 - GANTRIES CHAPTER 16 - GANTRIES DS Temple 16.1 SCOPE This section covers the inspection of Sign Gantries as specified in the applicable chapter of the Specifications. It also covers the special attention which must

More information

STRUCTURAL STEEL FRAMING

STRUCTURAL STEEL FRAMING SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical

More information

TABLE OF CONTENTS INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS... 3

TABLE OF CONTENTS INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS... 3 TITLE SPECIFICATION FOR STEEL DISTRIBUTION POLES REFERENCE REV CP_TSSPEC_033 1 DATE: NOVEMBER 2014 PAGE: 1 OF 16 TABLE OF CONTENTS Page INTRODUCTION... 2 1 SCOPE... 2 2 NORMATIVE REFERENCES... 2 3 DEFINITIONS

More information

Product Guide Specification

Product Guide Specification ALGRIP Manufactured by April 2017 104 North Maple Avenue P.O. Box 646 Leola, Pennsylvania 17540 Toll Free 800-345-8170 Fax 717-656-2041 Website www.algrip.com / www.rosstechnology.com E-mail sales@rosstechnology.com

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B SECTION 05 5213 - PIPE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

ITEM 442 METAL FOR STRUCTURES

ITEM 442 METAL FOR STRUCTURES ITEM 442 METAL FOR STRUCTURES 442.1. Description. This Item shall govern for all structural steel, high strength bolts, forgings, steel castings, iron castings, wrought iron, bronze, steel pipe and tubing,

More information

SPECIFICATION SS-20 / 4 STEEL STRUCTURES FOR SUBSTATION AND SWITCHING STATION MATERIAL

SPECIFICATION SS-20 / 4 STEEL STRUCTURES FOR SUBSTATION AND SWITCHING STATION MATERIAL 1 JULY 2009 SPECIFICATION SS-20 / 4 STEEL STRUCTURES FOR SUBSTATION AND SWITCHING STATION MATERIAL I. SCOPE This Specification covers the technical characteristics, the manufacturing and testing of steel

More information

SECTION METAL FLOOR PLATE STAIRS

SECTION METAL FLOOR PLATE STAIRS SECTION 05513 - METAL FLOOR PLATE STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

" RISKS ASSOCIATED WITH THE INSTALLATION OF THE SYSTEM

 RISKS ASSOCIATED WITH THE INSTALLATION OF THE SYSTEM PALLET RACK 85-110 installation, use and maintenance instructions Shelving made entirely of first grade certified steel sheet and cold-profiled steel with galvanized steel according to SENDZIMIR process

More information

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work. SECTION 055116 - METAL FLOOR PLATE STAIRS PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

AMERICAN NATIONAL STANDARD ANSI/NAAMM STANDARD. Maximum Bearing Bar Depth / 2 (63.5 mm)

AMERICAN NATIONAL STANDARD ANSI/NAAMM STANDARD. Maximum Bearing Bar Depth / 2 (63.5 mm) METAL BAR GRATING AMERICAN NATIONAL STANDARD ANSI/NAAMM STANDARD MBG 531-17 GRATINGS 5 ANSI/NAAMM MBG 531-17 SEPTEMBER 7, 2017 METAL BAR GRATING MANUAL EIGHTH EDITION Maximum Bearing Bar Depth... 2 1 /

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05510 METAL STAIRS PART 1 GENERAL 1.01 SECTION INCLUDES A. Stairs with concrete treads. B. Stairs with metal treads. C. Structural steel stair framing and supports. D. Handrails and guards. 1.02

More information

UNITED INDUSTRIES GROUP INC.

UNITED INDUSTRIES GROUP INC. SECTION 13205 AWWA D100-05 WELDED STEEL RESERVOIR SPECIFICATIONS REFERENCE SPECIFICATIONS, CODES AND STANDARDS. Commercial Standards: AWWA/ANSI D100-05 Welded Steel Tanks for Water Storage ASTM A36-01

More information

SECTION WELDED STEEL WATER STORAGE TANKS

SECTION WELDED STEEL WATER STORAGE TANKS SECTION 33 16 20 WELDED STEEL WATER STORAGE TANKS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Elevated tanks. 2. Appurtenances and accessories. B. Related Sections: 1. Section 03 31 20 - Concrete

More information

SPECIFICATION FOR SIMPLEX SWITCHBOARDS

SPECIFICATION FOR SIMPLEX SWITCHBOARDS SPECIFICATION FOR SIMPLEX SWITCHBOARDS 1.0 SCOPE This specification presents general guidelines, design criteria, and construction requirements for AZZ ENCLOSURE SYSTEMS SIMPLEX PANELS for providing control

More information

Product Guide Specification

Product Guide Specification HALFEN USA Inc. March 2012 8521 FM 1976 P.O. Box 547 Converse, TX 78109 Toll Free 800-423-9140 Fax 888-277-1695 Website www.halfenusa.com E-mail info@halfenusa.com Product Guide Specification Specifier

More information

SECTION PRE-ENGINEERED METAL BUILDING

SECTION PRE-ENGINEERED METAL BUILDING SECTION 13121 PRE-ENGINEERED METAL BUILDING PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required to design, fabricate, deliver to project site, and erect

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 055113 - METAL PAN STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Preassembled steel stairs with concrete-filled treads.

Preassembled steel stairs with concrete-filled treads. SECTION 055113 - PART 1 - GENERAL 1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and

More information

TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs

TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs Photovoltaic mounting systems Assembly Instructions TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs 1 Table of contents 1 Introduction 1.1 Intended use 3 1.2 About the document

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM): SECTION 05120 STRUCTURAL STEEL PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03342 - Insulating Cellular Concrete. 2. 05210 - Steel Joists. 3. 09900 - Painting. 1.02 REFERENCES A. America Society

More information

7. New railings for existing buildings shall be designed to match any existing railings unless there is a compelling reason for change.

7. New railings for existing buildings shall be designed to match any existing railings unless there is a compelling reason for change. Division 05. Metals 05 50 00. Metal Fabrications 05 50 00. Roof - Fall Protection The contractor shall provide a horizontal cable lifeline system on steel posts complying with applicable regulatory requirements.

More information

Specification for the Fabrication of Tower Structures

Specification for the Fabrication of Tower Structures Ergon Energy Corporation Limited Specification for the Fabrication of Tower Structures This material is made available on the basis that it may be necessary for a Registered Professional Engineer of Queensland

More information

PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping

PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping July 2017 Piping PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice

More information

MASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.

MASTERSPEC - SHORT FORM. B. See Division 5 Section Metal Stairs for steel tube railings associated with metal stairs. SECTION 05721 - ORNAMENTAL RAILINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Glass supported railings. B. See Division 5 Section "Metal Stairs" for steel tube railings associated

More information

Roofing. Polymeric sheet for roof waterproofing. Product Description. Tests. Product Data Sheet Edition _1

Roofing. Polymeric sheet for roof waterproofing. Product Description. Tests. Product Data Sheet Edition _1 Product Data Sheet Edition 2014-09_1 Polymeric sheet for roof waterproofing Product Description (thickness 1.5 mm) is a Polyester reinforced, multi-layer, synthetic roof waterproofing sheet based on premium-quality

More information

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5.

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5. SECTION 05 1200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.01 SUMMARY A. Extent of structural steel work is shown on drawings, including schedules, notes and details to show size and location of members,

More information

Fabricate and Install metal alternating tread stair assemblies in accordance with the requirements set forth in this section.

Fabricate and Install metal alternating tread stair assemblies in accordance with the requirements set forth in this section. SECTION - ALTERNATING TREAD STEEL STAIRS PART 1 - GENERAL 1.1 SCOPE OF WORK Fabricate and Install metal alternating tread stair assemblies in accordance with the requirements set forth in this section.

More information

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section. SECTION 10 5300 ALUMINUM WALKWAY COVERS Part 1 General 1.01 Related Documents A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.02 References A. International

More information

DECORATIVE METAL RAILINGS

DECORATIVE METAL RAILINGS SECTION 057300 - DECORATIVE METAL RAILINGS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Steel and iron decorative railings. 1.2 PERFORMANCE REQUIREMENTS A. Delegated Design: Design railings, including

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR PAN SYSTEM PART 1 GENERAL 1.1

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Special Provision No. 915S03 December References, Materials, Construction, and Quality Assurance for Sign Support Structures

Special Provision No. 915S03 December References, Materials, Construction, and Quality Assurance for Sign Support Structures STEEL MONOTUBE OVERHEAD SIGN SUPPORT STRUCTURES - Item No. STEEL COLUMN BREAKAWAY SIGN SUPPORT STRUCTURES - Item No. STEEL COLUMN NON-BREAKAWAY SIGN SUPPORT STRUCTURES - Item No. CANTILEVER STATIC SIGN

More information

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS - June 2013 Addendum GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS SUBSECTION "A" : GENERAL RULES SUBSECTION "B" : CLASS 1 COMPONENTS SUBSECTION "C" : CLASS 2 COMPONENTS SUBSECTION "D" : CLASS

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT SECTION 230548 - VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

. SECTION HANGERS AND SUPPORTS

. SECTION HANGERS AND SUPPORTS . SECTION 230529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division I Specification

More information

INSTRUCTIONS FOR THE MANUFACTURE AND THE INSPECTION OF WELDED STEEL ASSEMBLIES

INSTRUCTIONS FOR THE MANUFACTURE AND THE INSPECTION OF WELDED STEEL ASSEMBLIES INSTRUCTIONS FOR THE MANUFACTURE AND THE 1. OBJECT AND FIELD OF APPLICATION 3 2. SUPPLIER 3 3. SUBCONTRACTING 3 4. WELDING 4 4.1 Welding documentation 4 4.2 Welding procedure specifications (WPS) 4 4.3

More information

SECTION METAL STAIRS

SECTION METAL STAIRS Tender SECTION 05510 METAL STAIRS PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes internal and external shop fabricated pre assembled steel stairs with integral handrails and ballustrades

More information

Fixed & Tilt-Over Cabinet Base TC & TCTO Range

Fixed & Tilt-Over Cabinet Base TC & TCTO Range TC & TCTO Range Technical Specification All dimensions in mm unless otherwise stated Standards Applicable - Structural Steelwork: BS EN 10210-1:1994, BS EN 10210-2:1997 - General Steelwork: BS1449:1991,

More information

USER S MANUAL HAKI UNIVERSAL

USER S MANUAL HAKI UNIVERSAL USER S MANUAL HAKI UNIVERSAL Suspended scaffolding HAKI AB 2012 Important information HAKI s product liability and erection instructions apply only to scaffolds that are entirely composed of components

More information

NUCLEAR POWER CORPORATION OF INDIA LTD TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 REV NO : 0 DATA SHEET A

NUCLEAR POWER CORPORATION OF INDIA LTD TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 REV NO : 0 DATA SHEET A TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 DATA SHEET A ANNEXURE - A Sr. Item Description Sr. Item Description A. GENERAL DATA B. PUMP DUTY PARAMETERS 1. System Name 1. Rated capacity,

More information

TECHNICAL SPECIFICATION DANTECO HERMANNS. CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device

TECHNICAL SPECIFICATION DANTECO HERMANNS. CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device TECHNICAL SPECIFICATION DANTECO HERMANNS CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device 6058(20') x 2438(8') x 2591(8'6") MODEL NO. : CX09-20SNX1 SPEC. NO : CX09-20SNX1-S3

More information

MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES

MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 2471 November 2016 MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES TABLE OF CONTENTS 2471.01 SCOPE 2471.02 REFERENCES 2471.03

More information

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.

More information

Reinforced Thermoset Plastic Corrosion-Resistant Equipment

Reinforced Thermoset Plastic Corrosion-Resistant Equipment ASME RTP-1 2007 (Revision of ASME RTP-1 2005) Reinforced Thermoset Plastic Corrosion-Resistant Equipment AN AMERICAN NATIONAL STANDARD Three Park Avenue New York, NY 10016 Date of Issuance: April 9, 2008

More information

Item 442 Metal for Structures

Item 442 Metal for Structures Item 442 Metal for Structures 1. DESCRIPTION 2. MATERIALS Provide structural steel, high-strength bolts, forgings, steel castings, iron castings, wrought iron, steel pipe and tubing, aluminum castings

More information

A. Atlantic Railing Series with Mushroom Top and Square Pickets

A. Atlantic Railing Series with Mushroom Top and Square Pickets 100 Series-A1-A10 PART 1 General 1.1 SECTION INCLUDES A. Atlantic Railing Series with Mushroom Top and Square Pickets 1.2 RELATED SECTIONS A. Section 05510-Metal Stairs: Metal Handrails other than those

More information

SPECIFICATION FOR PERMANENT BEAM GRANDSTAND WITH INTERLOCK WELDED DECK SYSTEM

SPECIFICATION FOR PERMANENT BEAM GRANDSTAND WITH INTERLOCK WELDED DECK SYSTEM E & D SPECIALTY STANDS, INC. MANUFACTURERS OF QUALITY STANDS AND SEATING 2081 FRANKLIN STREET - P.O. BOX 700 - NORTH COLLINS, NEW YORK 14111 716-337-0161-1-800-525-8515 FAX 716-337-2903 - SALES FAX 716-337-3436

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

BUREAU OF INDIAN STANDARDS. Draft Indian Standard

BUREAU OF INDIAN STANDARDS. Draft Indian Standard For official use only BUREAU OF INDIAN STANDARDS Draft Indian Standard DOC: WRD 12(575)C November 2011 RECOMMENDATIONS FOR INSPECTION, TESTING AND MAINTENANCE OF RADIAL GATES AND ROPE DRUM HOISTS PART

More information

05510: TAPERED STEEL TROLLEY POLES AND ACCESSORIES

05510: TAPERED STEEL TROLLEY POLES AND ACCESSORIES PART 1 GENERAL 1.01 DESCRIPTION A. The Vendor shall fabricate, furnish, test and deliver tapered steel trolley poles, including base plates, reinforced hand holes, anchor bolts, nuts and washers, and accessories

More information

METAL LADDERS (LADDER SAFETY GATE FALL PROTECTION)

METAL LADDERS (LADDER SAFETY GATE FALL PROTECTION) Page 1 of 6 SECTION 05515 METAL LADDERS (LADDER SAFETY GATE FALL PROTECTION) PART 1 - GENERAL 1.1 SECTION INCLUDES A. Specialty custom designed, spring assisted, self-closing LADDER SAFETY GATE (LSG) for

More information

Operating Instructions in compliance with Pressure Equipment Directive 2014/68/EU. FAS Welding and Solder Flange

Operating Instructions in compliance with Pressure Equipment Directive 2014/68/EU. FAS Welding and Solder Flange Operating Instructions in compliance with Pressure Equipment Directive 2014/68/EU FAS Welding and Solder Flange Please read these operating instructions carefully to ensure a safe operation and keep the

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

SECTION ALTERNATING TREAD STEEL STAIRS

SECTION ALTERNATING TREAD STEEL STAIRS SECTION 05 51 33.23 - ALTERNATING TREAD STEEL STAIRS PART 1 - GENERAL 1.1 SCOPE OF WORK Fabricate and install carbon steel or stainless steel alternating tread stair assemblies in accordance with the requirements

More information

Construction. Sarnafil TS Polymeric membrane for roof waterproofing. Product Description

Construction. Sarnafil TS Polymeric membrane for roof waterproofing. Product Description January, 2009 Sarnafil TS 77-15 Polymeric membrane for roof waterproofing Construction Product Description Uses Characteristics / Advantages Approval / Standards Sarnafil TS 77-15 (thickness 1.5 mm) is

More information

METAL FABRICATION..1 General Conditions and Division 1 shall govern Work of this section.

METAL FABRICATION..1 General Conditions and Division 1 shall govern Work of this section. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 05500-1 PART 1 GENERAL 1.1 Description of Work.1 General Conditions and Division 1 shall govern Work of this section. 1.2 Quality Assurance.1 Personnel:.1

More information

SECTION MISCELLANEOUS METALS

SECTION MISCELLANEOUS METALS PART 1 GENERAL 1.1 WORK OF THIS SECTION A. Contractor shall provide all labor, materials, equipment and incidentals as shown, specified and required to furnish and install all miscellaneous metal fabrications

More information

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS Combisafe International AB CTS Combisafe International AB Contents Safety instructions... 3 Important... 4 General... 4 Data... 5 Safety posts 4140/4145/4150...

More information

Overall considerations/benefits of metallic silos

Overall considerations/benefits of metallic silos Overall considerations/benefits of metallic silos Mr. Peter Tatlow 1 ; Mr. Paolo Biagini 2 ; Mr. Francesco Selva 3 1. International Sales Manager. FRAME srl (Engineer, 40 years in the silo/post-harvest

More information

A EN ROUND STORAGE SILO. Ø480cm, Ø560cm, Ø640cm, Ø720cm ASSEMBLY AND USER MANUAL. ARSKAMETALLI LTD

A EN ROUND STORAGE SILO. Ø480cm, Ø560cm, Ø640cm, Ø720cm ASSEMBLY AND USER MANUAL. ARSKAMETALLI LTD A70-1001-EN-201805 ROUND STORAGE SILO Ø480cm, Ø560cm, Ø640cm, Ø720cm ASSEMBLY AND USER MANUAL ARSKAMETALLI LTD www.arskametalli.fi CONTENTS Introduction Delivery information EU Declaration of Conformity

More information

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

Model # 800SM-PS3. 8/3/2016 Page 1 of 8 Model # 800SM-PS3 8/3/2016 Page 1 of 8 /3/2016 Page 2 of 8 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004: Instructions for ssembly and Use Mobile working platforms according to DIN EN 00:00-03 Working platform 0.7 x.8 m max. working height: indoors.3 m outdoors.3 m Rolling Towers Load bearing capacity.0 kn/m

More information

Power IT Compact Secondary Substations, CSS. Technical catalogue for sheet steel substations

Power IT Compact Secondary Substations, CSS. Technical catalogue for sheet steel substations Power IT Compact Secondary Substations, CSS Technical catalogue for sheet steel substations The New Standard for Individual Solutions The new CSS substations represent a unique concept, which is introducing

More information

QUALITY ASSURANCE PROTOCOL (QAP)

QUALITY ASSURANCE PROTOCOL (QAP) PREFACE This Standard details the level of documentation that PVT.LTD (IET) will provide during a contract for fabricating tank(s) or portable equipment s. Extensive documentation is required for this

More information

DIVISION 5 METALS SECTION STRUCTURAL STEEL

DIVISION 5 METALS SECTION STRUCTURAL STEEL DIVISION 5 METALS SECTION 05 12 00 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: All labor and materials required to furnish and install the structural steel shown on the Drawings and required by these

More information

DIVISION 5 METALS COLD FORMED METAL FRAMING Structural Metal Stud Framing

DIVISION 5 METALS COLD FORMED METAL FRAMING Structural Metal Stud Framing 05 40 00 COLD FORMED METAL FRAMING 05 41 00 Structural Metal Stud Framing 05 50 00 METAL FABRICATIONS 05 51 00 Metal Stairs 05 51 13 Metal Pan Stairs 05 52 00 Metal Railings 05 52 13 Pipe and Tube Railings

More information