1 Addition of Partial Participation Option for Dispatchable Demand Resource Jim Price Lead Engineering Specialist, Market & Product Development Demand Response Working Group Dec. 12, 2008

2 Past Working Group and Stakeholder Process Has Produced Two DR Models to Add to MRTU MRTU Release 1 places Participating Load in Custom LAP for DA energy scheduling, and pseudo-generator to bid non-spinning reserve. Dispatchable Demand Resource (DDR) adds to MRTU PL: RT as well as DA energy, co-optimization of energy & AS, market functionality for spinning reserve & regulation, and recognition of operating characteristics (min. and max. durations of load adjustments, start-up times, minimum curtailment, min. & max. energy limits, etc.) Advantages: (1) locational price for load adjustments, (2) co-optimization, and (3) recognizing some operational characteristics that PDR cannot. Proxy Demand Resource (PDR) simplifies administration of Custom LAPs in initial DR integration into MRTU and migration of small loads. Schedule load at Default LAP and dispatch Proxy Generators at local levels, Settlement done as adjustment to Default LAP load. Advantages: simpler administration of end-use customer participation, and less required coordination of Custom LAP with separate Curtailment Service Provider (CSP) from Load Serving Entity (LSE). Slide 2

3 Stakeholder Advocacy Has a Range of Opinions about MRTU s Use of Custom LAPs The use of Custom LAPs for Participating Load in MRTU Release 1 resulted from strong advocacy by the only existing Participating Load, which is CDWR. FERC ordered CAISO to schedule and settle all Participating Load at nodal location. Recent concern is that some Participating Loads will face excessive costs by needing to schedule all of their load using a Custom LAP. Concern: Load may not receive more as savings for DR than will be charged for losses. Also, uncertainty about the success of CRRs for hedging congestion costs. Slide 3

4 To Resolve New Concerns, CAISO is Considering Partial Participation Option in DDR Partial Participation option in DDR design would allow customers to designate the amount of their total load that is Participating Load. Only the designated portion of aggregated load would be placed in the Custom LAP, with separate Resource ID, and the remainder would be scheduled at the Default LAP. Energy and AS bids would be eligible as Participating Load only up to the designated amount. Participant could declare that all of its load is Participating Load (full participation), or just a fraction of its load. SC would be responsible for separating the metered demand between the Participating Load and its Default LAP. Because load in partial participation is a designated amount, uninstructed energy (final metered demand, minus DA schedule and RT dispatch) would be non-participating, settled at Default LAP price. If non-participating portion drops to zero, uninstructed deviation would be assigned to Participating Load. Similar option not needed for PDR, since load already settles at DLAP. Slide 4

5 CAISO Seeks Input on Details of Partial Participation Should Participating Load portion of total load be designated as MW amount or percentage? MW amount seems easier for managing Custom LAP, scheduling, and reporting energy usage for settlement. How often should participation level be updated? Master file updates are less frequent than daily. CAISO suggests monthly updates. A maximum percentage limit may be needed on the Partial Participation portion of the participating customers total load (maybe 50%) to avoid gaming in settlements. If the resource is not 100% Participating Load, hourly variations in load could cause positive and negative uninstructed deviations to vary strategically between Default LAP and Custom LAP prices. (Until non-participating portion reaches zero, uninstructed energy settles at Default LAP. When non-participating portion reaches zero, uninstructed energy settles at Custom LAP.) Slide 5

Demand Response Working Group and Stakeholder Meeting Agenda January 15, 2009

Demand Response Working Group and Stakeholder Meeting Agenda January 15, 2009 Demand Response Working Group and Stakeholder Meeting Agenda January 15, 2009 Time 11:00 11:10 11:10 11:40 11:40 12:00 12:00 12:45 12:45 2:15 2:15 2:30 2:30 3:30 3:30 4:30 4:30 5:00 Topic Introduction

More information

CAISO-IOU Technical Design Session

CAISO-IOU Technical Design Session CAISO-IOU Technical Design Session Farrokh Rahimi, Ph.D. Vice President, Market Design and Consulting Open Access Technology International, Inc. (OATI) John Goodin Lead, Demand Response California ISO

More information

Straw Proposal. Post-Release 1 MRTU Functionality for Demand Response

Straw Proposal. Post-Release 1 MRTU Functionality for Demand Response California Independent System Operator Corporation Executive Summary Straw Proposal Post-Release 1 MRTU Functionality for Demand Response The (CAISO) has a goal of helping to develop demand response resources

More information

Load Granularity Refinements Pricing Analysis Study

Load Granularity Refinements Pricing Analysis Study August 8, 2013 Table of Contents I. Introduction... 3 II. Comparison of DLAP and SLAP prices... 3 A. Overview of SLAP and DLAP price differences... 4 B. PG&E price differences... 10 C. SCE price differences...

More information

Payment Acceleration Meter Data Estimation

Payment Acceleration Meter Data Estimation Payment Acceleration Meter Data Estimation Jill Powers Manager, Operations Data and Compliance Stakeholder Conference Call September 18, 2008 Purpose of Today s Meeting Clarify where we are at in the process

More information

Business Requirements Specification

Business Requirements Specification Business s Specification Energy Storage and Distributed Energy Resources Phase 3 (ESDER 3) Current Version Date: 2/1/2019 Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 22 Disclaimer All information contained in

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: August 29, 2018 Re: Decision on the

More information

Fixed / Price Sensitive Demand Bids, Load Response, Virtual Bidding & Pump Storage Optimizer in the Day Ahead Market

Fixed / Price Sensitive Demand Bids, Load Response, Virtual Bidding & Pump Storage Optimizer in the Day Ahead Market Fixed / Price Sensitive Demand Bids, Load Response, Virtual Bidding & Pump Storage Optimizer in the Day Ahead Market Keyur Patel - Sr. Lead Engineer, Day-Ahead Market Operations Stefan Starkov - Engineer,

More information

Load Granularity Refinements. Pricing Study Description and Implementation Costs Information Request

Load Granularity Refinements. Pricing Study Description and Implementation Costs Information Request Pricing Study Description and Implementation Costs Information Request October 28, 2014 Table of Contents I. Introduction... 3 II. Background... 3 III. Stakeholder Process and Next Steps... 4 IV. Pricing

More information

SAN DIEGO GAS & ELECTRIC COMPANY

SAN DIEGO GAS & ELECTRIC COMPANY SAN DIEGO GAS & ELECTRIC COMPANY REPORT ON DEMAND RESPONSE INTEGRATION INTO CAISO WHOLESALE MARKETS January 31, 2011 Contents 1. Executive Summary... 3 2. Status of Program Transition to Wholesale Market

More information

Issue Paper. Direct Participation of Demand Response Resources in CAISO Electricity Markets. December 22, CAISO JEP / BDC/ JDG 12/22/08, page 1

Issue Paper. Direct Participation of Demand Response Resources in CAISO Electricity Markets. December 22, CAISO JEP / BDC/ JDG 12/22/08, page 1 Issue Paper Direct Participation of Demand Response Resources in CAISO Electricity Markets December 22, 2008 CAISO JEP / BDC/ JDG 12/22/08, page 1 Direct Participation of DR Resources Table of Contents

More information

Energy Imbalance Market Overview

Energy Imbalance Market Overview Energy Imbalance Market Overview Presentation to: Portland General Electric EIM OATT Stakeholder Meeting David Timson Account Manager CAISO Strategic Alliances October 14, 2016 Topics for Discussion ISO

More information

Energy Storage and Distributed Energy Resources Phase 3

Energy Storage and Distributed Energy Resources Phase 3 Energy Storage and Distributed Energy Resources Phase 3 Draft Final Proposal July 11, 2018 Market & Infrastructure Policy Table of Contents 1 Introduction... 3 2 Stakeholder Process... 4 3 Energy Imbalance

More information

FERC Order 764 Implementation

FERC Order 764 Implementation FERC Order 764 Implementation What is FERC Order 764? On June 22, 2012, FERC approved the order to remove barriers to the integration of variable energy resources (VERs) For the CAISO, this meant the major

More information

FERC Order 764 Settlements

FERC Order 764 Settlements FERC Order 764 Settlements Spring Release 2014 The information contained in these materials is provided for general information only and does not constitute legal or regulatory advice. The ultimate responsibility

More information

Volume II Market Redesign & Technology Upgrade

Volume II Market Redesign & Technology Upgrade Application No.: Exhibit No.: Witnesses: A.0-0-001 SCE- L. Oliva (U -E) Volume II Market Redesign & Technology Upgrade Before the Public Utilities Commission of the State of California Law-# Rosemead,

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specification Energy Storage and Distributed Energy Resources Phase 3 (ESDER 3) Current Version Date: 3/18/2019 Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 30 Disclaimer All information

More information

Energy Storage and Distributed Energy Resources Phase 3

Energy Storage and Distributed Energy Resources Phase 3 Energy Storage and Distributed Energy Resources Phase 3 Revised Straw Proposal April 30, 2018 Market & Infrastructure Policy Table of Contents 1 Introduction... 3 2 Stakeholder Process... 4 3 Energy Imbalance

More information

Stakeholder Meeting on Supplement to Dynamic Transfers Straw Proposal

Stakeholder Meeting on Supplement to Dynamic Transfers Straw Proposal Stakeholder Meeting on Supplement to Dynamic Transfers Straw Proposal May 6, 2010 11:00 AM 4:00 PM, California ISO Presenters: Mark Rothleder Jim Price Kyle Hoffman Don Tretheway Agenda Time Topic Presenter

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 30. Bid And Self-Schedule Submission For All CAISO Markets... 2 30.1 Bids, Including Self-Schedules... 2 30.1.1 Day-Ahead Market... 2 30.1.2 Real-Time Market... 2 30.2 Bid Types... 3

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 30. Bid and Self-Schedule Submission for all CAISO Markets... 2 30.1 Bids, Including Self-Schedules... 2 30.1.1 Day-Ahead Market... 2 30.1.2 Real-Time Market... 2 30.2 Bid Types... 3

More information

ISO Course Outline. Market Transactions Class

ISO Course Outline. Market Transactions Class ISO Course Outline Purpose Market Transactions Class This two-day training class is intended to be one of the cornerstones of the market training program and is designed to review the market concepts and

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 30. Bid and Self-Schedule Submission for all CAISO Markets... 2 30.1 Bids, Including Self-Schedules... 2 30.1.1 Day-Ahead Market... 2 30.1.2 Real-Time Market... 2 30.2 Bid Types... 3

More information

Overview of Congestion Revenue Rights In the New California Energy Market

Overview of Congestion Revenue Rights In the New California Energy Market Overview of Congestion Revenue Rights In the New California Energy Market Scott A. Jercich, P.E., MBA Lead for CRR Implementation California Independent System Operator sjercich@caiso.com Presented at

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 30. Bid And Self-Schedule Submission For All CAISO Markets... 2 30.1 Bids, Including Self-Schedules... 2 30.1.1 Day-Ahead Market... 2 30.1.2 Real-Time Market... 2 30.2 Bid Types... 3

More information

RDRP Stakeholder Initiative

RDRP Stakeholder Initiative Reliability Demand Response Product RDRP Stakeholder Initiative Draft Final Proposal Review Stakeholder Conference Call September 13, 2010 Reliability Demand Response Product (RDRP) 1 2 3 We are here Project

More information

Flexible Ramping Products

Flexible Ramping Products Flexible Ramping Products Revised Draft Final Proposal August 16, 2012 Lin Xu, Ph.D. Senior Market Development Engineer Don Tretheway Senior Market Design and Policy Specialist Agenda Time Topic Presenter

More information

Congestion Revenue Rights (CRR) Auction Efficiency Track 1A

Congestion Revenue Rights (CRR) Auction Efficiency Track 1A Congestion Revenue Rights (CRR) Auction Efficiency Track 1A Pre-Market Simulation Webinar September 13, 2018 Radha Madrigal External Training and Readiness The information contained in these materials

More information

EIM Settlements Load Customer Training September 13, 2016

EIM Settlements Load Customer Training September 13, 2016 EIM Settlements Load Customer Training September 13, 2016 EIM Settlements Customer Training Review EIM 101 EIM terminology Participating / Non-Participating Base Schedules and etags Settlements and Disputes

More information

SUMMARY OF MRTU STAKEHOLDER PROCESS

SUMMARY OF MRTU STAKEHOLDER PROCESS SUMMARY OF MRTU STAKEHOLDER PROCESS Since January 2002, the CAISO has conducted an extensive stakeholder process to guide the Market Redesign & Technology Upgrade ( MRTU ) effort. 1 In fact, from January

More information

Load Granularity Refinements Issue Paper

Load Granularity Refinements Issue Paper Load Granularity Refinements Issue Paper September 22, 2014 Table of Contents I. Introduction... 3 II. Background... 3 III. Scope of Initiative and Plan for Stakeholder Engagement... 4 IV. FERC s Reasons

More information

ISO Smart Grid Use Case

ISO Smart Grid Use Case Smart Grid Roadmap DRAFT Consumption in Response to ISO Dispatch Instructions IC-1 Demand Response Providers Adjust Consumers Energy Consumption in Response to ISO Dispatch Instructions ISO Smart Grid

More information

Day Ahead Market Enhancements: Issue Paper/Straw Proposal

Day Ahead Market Enhancements: Issue Paper/Straw Proposal Day Ahead Market Enhancements: Issue Paper/Straw Proposal Don Tretheway Senior Advisor, Market Design Policy Megan Poage Senior Market Design & Regulatory Policy Developer March 7, 2018 Agenda Time Topic

More information

Convergence Bidding Working Group 9/03/09

Convergence Bidding Working Group 9/03/09 Convergence Bidding Working Group 9/03/09 Teleconference Information Dial-in Number: (800) 401-8436 International Dial-in: (612) 332-0418 There is no conference ID number. Web Conference Information Web

More information

Generation Desk Logging

Generation Desk Logging 1. Provides guidelines for the different logging scenarios used by the Generation Dispatcher. Caution: Since Settlements reconciles and/or is supported by data from these entries, accurate and detailed

More information

Energy Storage and Distributed Energy Resources Phase 3

Energy Storage and Distributed Energy Resources Phase 3 Energy Storage and Distributed Energy Resources Phase 3 Straw Proposal February 15, 2018 Market & Infrastructure Policy Table of Contents 1 Introduction... 3 2 Stakeholder Process... 4 3 Energy Imbalance

More information

Energy Storage and Distributed Energy Resources Phase 3 ( ESDER 3 ) Issue Paper

Energy Storage and Distributed Energy Resources Phase 3 ( ESDER 3 ) Issue Paper Energy Storage and Distributed Energy Resources Phase 3 ( ESDER 3 ) Issue Paper Stakeholder Conference Call October 12, 2017 3:00 p.m. 5:00 p.m. (Pacific Time) Agenda Time Item Speaker 3:00-3:10 Stakeholder

More information

The entities that engage in the operation of the CAISO Markets are described in the following subsections.

The entities that engage in the operation of the CAISO Markets are described in the following subsections. 2.1 Market Entities The entities that engage in the operation of the CAISO Markets are described in the following subsections. 2.1.1 CAISO CAISO is a non-profit public benefit corporation that: Has Operational

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Electric Storage Participation in ) Markets Operated by Regional ) Docket Nos. RM16-23; AD16-20 Transmission Organizations and )

More information

Energy Imbalance Market Design Straw Proposal and Issue Paper. Stakeholder Meeting April 11, 2013

Energy Imbalance Market Design Straw Proposal and Issue Paper. Stakeholder Meeting April 11, 2013 Energy Imbalance Market Design Straw Proposal and Issue Paper Stakeholder Meeting April 11, 2013 Agenda Time Topic Presenter 10:00 10:10 Introduction Mercy Parker-Helget 10:10 10:45 Opening Remarks Don

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System Operator Corporation Docket No. ER06-615-041 COMMENTS OF SOUTHERN CALIFORNIA EDISON COMPANY ON THE

More information

Business Practice Manual for Compliance Monitoring

Business Practice Manual for Compliance Monitoring Style Definition: TOC 3: Left Business Practice Manual for Compliance Monitoring Version 45 Last Revised: August 4, 2010April 19, 2013 Approval Date: August 10, 2010 Effective Date: August 10, 2010July

More information

Expanding Metering and Telemetry Options Technical Stakeholder Initiative Phase II

Expanding Metering and Telemetry Options Technical Stakeholder Initiative Phase II Expanding Metering and Telemetry Options Technical Stakeholder Initiative Phase II Distributed Energy Resource Provider Straw Proposal November 13th, 2014 8:00 a.m. 10:00 a.m. (Pacific Time) Todays Agenda

More information

Reliability Demand Response Product

Reliability Demand Response Product Reliability Demand Response Product CAISO Response to Stakeholder Comments on the RDRP Straw Proposal Prepared for The Reliability Demand Response Product Stakeholder Initiative September 1, 2010 Comments

More information

3. Overview of Market Instruments

3. Overview of Market Instruments 3. Overview of Market Instruments 3.2 Ancillary Services Bids Four types of Ancillary Services are used by CAISO in its markets Regulation Up, Regulation Down, Spinning Reserve, and Non-Spinning Reserve.

More information

Parameter Tuning for Uneconomic Adjustments. Lorenzo Kristov, Principal Market Architect

Parameter Tuning for Uneconomic Adjustments. Lorenzo Kristov, Principal Market Architect Parameter Tuning for Uneconomic Adjustments Lorenzo Kristov, Principal Market Architect Stakeholder Meeting May 13, 2008 Topics for Discussion Objectives of Current Parameter Tuning Effort Parameter Tuning

More information

Renewable Integration: Market & Product Review Phase 1

Renewable Integration: Market & Product Review Phase 1 Renewable Integration: Market & Product Review Phase 1 Margaret Miller Manager, Market Design & Regulatory Policy Gillian Biedler Senior Market Design & Policy Specialist Cindy Hinman Senior Market Design

More information

Eligible Intermittent Resource Dispatch Operating Target EIR DOT

Eligible Intermittent Resource Dispatch Operating Target EIR DOT Eligible Intermittent Resource Dispatch Operating Target EIR DOT CSSA Training August 2018 Stakeholder Learning Objectives Explain the difference between an Operating Instruction and a Dispatch Instruction

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 40. Resource Adequacy Demonstration for all SCs in the CAISO BAA... 3 40.1 Applicability... 3 40.1.1 [Not Used]... 3 40.2 Information Requirements for Resource Adequacy Programs... 3

More information

Day Ahead Market Enhancements: Revised Straw Proposal. April 18, 2018

Day Ahead Market Enhancements: Revised Straw Proposal. April 18, 2018 Day Ahead Market Enhancements: Revised Straw Proposal April 18, 2018 Agenda Time Topic Presenter 10:00 10:15 Welcome and Introductions Kristina Osborne 10:15 11:00 General Overview Megan Poage 11:00 12:00

More information

Load Granularity Refinements. Pricing Study Results and Implementation Costs and Benefits Discussion

Load Granularity Refinements. Pricing Study Results and Implementation Costs and Benefits Discussion Pricing Study Results and Implementation Costs and Benefits Discussion January 14, 2015 Table of Contents I. Executive Summary... 3 II. Introduction... 3 III. Stakeholder Process... 4 IV. Pricing Study

More information

The DAM consists of the following functions performed in sequence: the MPM-RRD, IFM, and RUC.

The DAM consists of the following functions performed in sequence: the MPM-RRD, IFM, and RUC. FERC ELECTRIC TARIFF First Revised Sheet No. 589 FOURTH REPLACEMENT VOLUME NO. I Superseding Original Sheet No. 589 31 Day-Ahead Market. The DAM consists of the following functions performed in sequence:

More information

Template for Submission of Comments on 5-Year Market Initiatives Roadmap

Template for Submission of Comments on 5-Year Market Initiatives Roadmap Template for Submission of Comments on 5-Year Market Initiatives The CAISO is requesting that Stakeholders submit the following comments to the 5-Year Market Initiatives using this stakeholder comments

More information

Flexible Ramping Product Cost Allocation Straw Proposal

Flexible Ramping Product Cost Allocation Straw Proposal Flexible Ramping Product Cost Allocation Straw Proposal March 15, 2012 Flexible Ramping Product Cost Allocation Straw Proposal Table of Contents 1 Introduction... 3 2 Prior discussion on Flexible Ramping

More information

Bid cost recovery and variable energy resource settlement Straw proposal

Bid cost recovery and variable energy resource settlement Straw proposal Bid cost recovery and variable energy resource settlement Straw proposal April 9, 2015 Table of Contents 1. Background... 3 2. Schedule for policy stakeholder engagement... 3 3. Initiative scope... 3 4.

More information

CRR Educational Material Overview

CRR Educational Material Overview MRTU CRR Educational Material Overview CRR Educational Class #1 CAISO Market Operations Contents Why is the CAISO providing CRR educational material The fundamental components of the CRR allocation/auction

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specification Energy Storage and Distributed Energy Resources Phase -2 Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 18 Disclaimer All information contained in this draft Business Requirements

More information

Congestion Revenue Rights (CRRs) Associated with Integrated Balancing Authority Areas (IBAAs)

Congestion Revenue Rights (CRRs) Associated with Integrated Balancing Authority Areas (IBAAs) Issue Paper and Straw Proposal Congestion Revenue Rights (CRRs) Associated with Integrated Balancing Authority Areas (IBAAs) February 20, 2008 CAISO 2/21/08, page 1 Congestion Revenue Rights (CRRs) Associated

More information

Third Generation California Electricity Market Design

Third Generation California Electricity Market Design Third Generation California Electricity Market Design Dr. Chris Mensah-Bonsu Senior Market Design Engineer California ISO San Francisco Chapter Meeting IEEE Power Engineering Society San Francisco, California,

More information

Flexible Ramping Products and Cost Allocation

Flexible Ramping Products and Cost Allocation Flexible Ramping Products and Cost Allocation Revised Straw Proposal, December 5, 2011 Lin Xu, Ph.D. Senior Market Development Engineer and Donald Tretheway Senior Market Design and Policy Specialist Agenda

More information

Reliability Demand Response Product

Reliability Demand Response Product Reliability Demand Response Product Straw Proposal Prepared for The Reliability Demand Response Product Stakeholder Initiative July 12, 2010 Table of Contents 1 Executive Summary... 1 2 Background... 3

More information

Convergence Bidding. Brian Theaker, Regional Governmental Affairs Manager The Williams Companies, Inc. All rights reserved.

Convergence Bidding. Brian Theaker, Regional Governmental Affairs Manager The Williams Companies, Inc. All rights reserved. Convergence Bidding Brian Theaker, Regional Governmental Affairs Manager 2006 The Williams Companies, Inc. All rights reserved. Benefits of Convergence Bidding Promotes convergence of Day-Ahead and Real-Time

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 30. Bid and Self-Schedule Submission for all CAISO Markets... 2 30.1 Bids, Including Self-Schedules... 2 30.1.1 Day-Ahead Market... 2 30.1.2 Real-Time Market... 2 30.2 Bid Types... 3

More information

Surrogate Aggregation Points: Example and Issues

Surrogate Aggregation Points: Example and Issues Surrogate Aggregation Points: Example and Issues CRR Stakeholder Meeting April 13, 2004 CAISO Market Operations Background In CRR Study 1, the CAISO used surrogate aggregation points to breakdown the large

More information

Market Simulation Independent 2018 & Spring 2019 Releases

Market Simulation Independent 2018 & Spring 2019 Releases Market Simulation Independent 2018 & Spring 2019 Releases Trang Deluca Sr. Change & Release Planner December 17, 2018 Recordings Calls and webinars are recorded for stakeholder convenience, allowing those

More information

Market Simulation Independent 2018 & Spring 2019 Releases

Market Simulation Independent 2018 & Spring 2019 Releases Market Simulation Independent 2018 & Spring 2019 Releases Trang Deluca Sr. Change & Release Planner December 27, 2018 Recordings Calls and webinars are recorded for stakeholder convenience, allowing those

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ELECTRIC STORAGE PARTICIPATION ) IN REGIONS WITH ORGANIZED ) DOCKET NO. AD16-20-000 WHOLESALE ELECTRIC MARKETS ) ) RESPONSE OF THE

More information

Advancing Renewable Alternatives

Advancing Renewable Alternatives Advancing Renewable Alternatives FERC/RTO Training Session Institute for Policy Integrity New York University School of Law June 15, 2011 Abigail Krich President, Boreas Renewables About Boreas Renewables

More information

Impact of Convergence Bidding on Interties. Draft Final Proposal

Impact of Convergence Bidding on Interties. Draft Final Proposal Impact of Convergence Bidding on Interties Draft Final Proposal July 29, 2011 Impact of Convergence Bidding on Interties Table of Contents 1 Introduction... 3 2 Plan for Stakeholder Engagement... 3 3 Issue

More information

California ISO. Draft Final Proposal. Renewable Integration: Market and Product Review Phase 1

California ISO. Draft Final Proposal. Renewable Integration: Market and Product Review Phase 1 Draft Final Proposal Phase 1 November 4, 2011 Draft Final Proposal - Phase 1 Table of Contents 1 Executive Summary... 3 2 Participating Intermittent Resource Program (PIRP)... 4 2.1 Introduction... 4 2.2

More information

Business Practice Manual for Market Operations

Business Practice Manual for Market Operations Business Practice Manual for Market Operations Version 4748 Revised: July 19, 2016September 1, 2016 Page 1 of 326 Approval History Approval Date: March 23, 2009 Effective Date: March 31, 2009 BPM Owner:

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Udi Helman, Principal Market Economist Anjali Sheffrin, Chief Economist / Director, Market and Product Development

More information

2015 Stakeholder Initiatives Catalog

2015 Stakeholder Initiatives Catalog 2015 Stakeholder Initiatives Catalog January 23, 2015 Prepared by Market and Infrastructure Development CAISO/M&ID Table of Contents 1 Introduction... 7 1.1 Changes From Last Version... 9 1.2 Initiative

More information

Day-Ahead Market Enhancements Phase 1: Fifteen-Minute Granularity. Second Revised Straw Proposal

Day-Ahead Market Enhancements Phase 1: Fifteen-Minute Granularity. Second Revised Straw Proposal Day-Ahead Market Enhancements Phase 1: Fifteen-Minute Granularity August 27, 2018 Intentionally left blank D.Tretheway, M.Poage, E.Nethercutt Page 2 August 27, 2018 Day-Ahead Market Enhancements Phase

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 31. Day-Ahead Market... 2 31.1 Bid Submission and Validation in the Day-Ahead Market... 2 31.2 Day-Ahead MPM Process... 2 31.2.1 The Market Power Mitigation Process... 3 31.2.2 Bid Mitigation

More information

Business Practice Manual for Market Operations

Business Practice Manual for Market Operations Business Practice Manual for Market Operations Version 5354 Revised: July 13October 30, 2017 Page 1 of 345 Approval History Approval Date: March 23, 2009 Effective Date: March 31, 2009 BPM Owner: David

More information

APS Stakeholder Meeting. September 9 th 2016

APS Stakeholder Meeting. September 9 th 2016 APS Stakeholder Meeting September 9 th 2016 APS: EIM Implementation & Customer Impact Review 9/9/2016 Emerging Market Opportunity CAISO: Energy Imbalance Market Existing Markets 3 Changing Electrical Grid

More information

Reliability Demand Response Product Draft Final Proposal Version 1.0

Reliability Demand Response Product Draft Final Proposal Version 1.0 Reliability Demand Response Product Draft Final Proposal Version 1.0 Prepared for The Reliability Demand Response Product Stakeholder Initiative September 1, 2010 Version 1.0 Date 08/02/10 to 09/01/10

More information

Energy Imbalance Market Update

Energy Imbalance Market Update Energy Imbalance Market Update Topics Covered: Background Implementation Update & Timeline Operational Overview Settlements Overview Appendix A - Charge Codes & Allocation Method Appendix B Information

More information

NEW YORK INDEPENDENT SYSTEM OPERATOR

NEW YORK INDEPENDENT SYSTEM OPERATOR Rate Schedule 1 Study Status Update Review of Other ISO/RTO s March 2011 TABLE OF CONTENTS 1.0 RATE STRUCTURES AT OTHER ISO S/RTO S...1 1.1 PJM...1 1.2 ISO-New England...3 1.3 California ISO...6 1.4 Midwest

More information

Demand Response Triggers

Demand Response Triggers Demand Response Triggers (DR Triggers) Project: Conclusion and Next Steps Enabling Technologies Development Workshop Berkeley, CA September 14, 2010 Angela Chuang Principal Investigator Electric Power

More information

Comments of Northern California Power Agency CAISO Load Granularity Refinements Issue Paper. September 20, 2010

Comments of Northern California Power Agency CAISO Load Granularity Refinements Issue Paper. September 20, 2010 651 Commerce Drive Roseville, CA 95678 phone (916) 781-3636 fax (916) 783-7693 web www.ncpa.com Comments of Northern California Power Agency CAISO Load Granularity Refinements Issue Paper September 20,

More information

Energy Imbalance Market Year 1 Enhancements. Issue Paper and Straw Proposal

Energy Imbalance Market Year 1 Enhancements. Issue Paper and Straw Proposal Energy Imbalance Market Year 1 Enhancements Issue Paper and Straw Proposal November 10, 2014 Energy Imbalance Market Year 1 Enhancements Issue Paper and Straw Proposal Table of Contents 1 Introduction...

More information

Stakeholder Comments Template. Subject: SCE Comments on Dynamic Transfer Revised Final Draft 2/18/11

Stakeholder Comments Template. Subject: SCE Comments on Dynamic Transfer Revised Final Draft 2/18/11 Stakeholder Comments Template Subject: SCE Comments on Dynamic Transfer Revised Final Draft 2/18/11 Submitted by Company Date Submitted Rich Mettling 626.302.9712 rich.mettling@sce.com SCE Mar 15, 2011

More information

Final Flexible Capacity Needs Assessment for 2018

Final Flexible Capacity Needs Assessment for 2018 Final Flexible Capacity Needs Assessment for 2018 April 28, 2017 1 Table of Contents 1. Introduction... 3 2. Summary... 3 3. Defining the ISO System-Wide Flexible Capacity Need... 5 4. Forecasting Minute-by-Minute

More information

2018 Draft Policy Initiatives Roadmap. Market and Infrastructure Policy December 7, 2017

2018 Draft Policy Initiatives Roadmap. Market and Infrastructure Policy December 7, 2017 2018 Draft Policy Initiatives Roadmap Market and Infrastructure Policy December 7, 2017 Primary drivers of proposed three-year roadmap Recent grid operations challenges pointing to need for day-ahead market

More information

June 23, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

June 23, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 June 23, 2016 Re: California Independent

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff. Appendix A. Master Definition Supplement

California Independent System Operator Corporation Fifth Replacement Electronic Tariff. Appendix A. Master Definition Supplement Appendix A Master Definition Supplement - Access Charge A charge paid by all Utility Distribution Companies, Small Utility Distribution Companies, and MSS Operators with Gross Load in a PTO Service Territory,

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 34. Real-Time Market... 3 34.1 Inputs To The Real-Time Market... 3 34.1.1 Day-Ahead Market Results as Inputs to the Real-Time Market... 3 34.1.2 Market Model and System Information...

More information

Virtual Bidding and Scheduling Requirements in MRTU

Virtual Bidding and Scheduling Requirements in MRTU Virtual Bidding and Scheduling Requirements in MRTU Gary A. Stern, Ph.D. Director of Market Southern California Edison Virtual Bidding SCE s Position Virtual bidding (VB) should not be implemented in California

More information

ATTACHMENT M-2 (BGE) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE

ATTACHMENT M-2 (BGE) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE ATTACHMENT M-2 (BGE) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE This document outlines the process by which BGE determines Capacity

More information

Final Scenario Assumptions

Final Scenario Assumptions CRR Study 2 Final Scenario Assumptions By July 19, 2004 CAISO/MktOps/SJercich, RTreinen Page 1 of 25 7/19/04 Table of Contents 1. Introduction... 3 1.1. CRR Study 2 Objectives... 3 1.2. CRR Study 2 Scenarios...

More information

Southern California Edison Stakeholder Comments. PacifiCorp s Energy Imbalance Market (EIM) Entity Proposal Dated October 18, 2013

Southern California Edison Stakeholder Comments. PacifiCorp s Energy Imbalance Market (EIM) Entity Proposal Dated October 18, 2013 Stakeholder Comments PacifiCorp s Energy Imbalance Market (EIM) Entity Proposal Dated October 18, 2013 Submitted by Company Date Submitted Paul Nelson (626) 302-4814 Jeff Nelson (626) 302-4834 Southern

More information

2.1.1 Market Power Mitigation & Reliability Requirements Determination Market Power Mitigation & Reliability Requirements Determination

2.1.1 Market Power Mitigation & Reliability Requirements Determination Market Power Mitigation & Reliability Requirements Determination 2.1.1 Market Power Mitigation & Reliability Requirements Determination The Market Power Mitigation and Reliability Requirements Determination (MPM-RRD) function consists of two processes. The MPM is to

More information

ENERGY IMBALANCE MARKET BUSINESS PRACTICE ( EIM BP ) TABLE OF CONTENTS 1. Introduction 2. Communication with the PSEI EIM Entity 3.

ENERGY IMBALANCE MARKET BUSINESS PRACTICE ( EIM BP ) TABLE OF CONTENTS 1. Introduction 2. Communication with the PSEI EIM Entity 3. ENERGY IMBALANCE MARKET BUSINESS PRACTICE ( EIM BP ) TABLE OF CONTENTS 1. Introduction 2. Communication with the PSEI EIM Entity 3. PSEI EIM Participating Resource Application and Processing 3.1 Application

More information

10.1 Scope of CMRI Reports available to SCs

10.1 Scope of CMRI Reports available to SCs 10.1 Scope of CMRI Reports available to SCs Exhibit 10-1.1 summarizes the reports that are available to SCs through the CAISO Market Results Interface (CMRI). Details of the report contents are provided

More information

Introduction to the Energy Imbalance Market (EIM Module 1)

Introduction to the Energy Imbalance Market (EIM Module 1) Introduction to the Energy Imbalance Market (EIM Module 1) Cynthia Hinman Lead Client Trainer Webinar July 25, 2013 The information contained in these materials is provided for general information only

More information