IR-release: Q4 and FY 2015 Operational Overview

Size: px
Start display at page:

Download "IR-release: Q4 and FY 2015 Operational Overview"

Transcription

1 IR-release: Q4 and FY Operational Overview 28 January 2016

2 Disclaimer 2 The below applies to the presentation (the Presentation ) following this important notice, and you are therefore advised to read this important notice carefully before reading, accessing or making any other use of this Presentation. This Presentation contains statements about future events and expectations that are forward-looking statements. Any statement herein (including, without limitation, a statement regarding our financial position, strategy, management plans and future objectives) that is not a statement of historical fact is a forward-looking statement that involves known and unknown risks, uncertainties and other factors which may cause ALROSA s actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Past performance should not be taken as an indication or guarantee of future results, and no representation or warranty, express or implied, is made regarding the future performance. The information and opinions contained in this document are provided as at the date hereof (unless indicated otherwise) and are subject to change without notice. ALROSA assumes no obligation to update, supplement or revise the forward-looking statements contained herein to reflect actual results, changes in assumptions or changes in factors affecting these statements. The diamond resources and reserves estimates provided in this Presentation have been prepared and presented in accordance with the standards and classifications of the JORC Code (the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves as promulgated by the Australasian Joint Ore Reserves Committee), which differ in significant respects from the standards and classifications applicable to the disclosure of mineral resources and reserves under the laws and regulations of certain other jurisdictions, including the regulations of the U.S. Securities Exchange Commission (the SEC ) with respect to registration statements and other documents filed with the SEC. Among other things, in accordance with the JORC Code, this Presentation provides certain mineral resources estimates classified as inferred, indicated or measured, which differ in significant respects from probable and proven mineral reserves estimates and are not disclosed in certain jurisdictions, including in SEC filings. There can be significant uncertainty as to whether mineral resources can ever be feasibly and commercially mined. For further explanation of the JORC Code, see the JORC website at This Presentation does not constitute or form part of and should not be construed as, an offer to sell or issue or the solicitation of an offer to buy or acquire any securities in any jurisdiction or an inducement to enter into any investment activity. The contents hereof should not be construed as investment, legal, tax, accounting or other advice, and investors and prospective investors in securities of any issuer mentioned herein are required to make their own independent investigation and appraisal of the business and financial condition of such issuer and the nature of the securities and consult their own advisers as to legal, financial, tax and other related matters. This Presentation has not been independently verified. No representation or warranty or undertaking, express or implied, is made as to the accuracy, completeness or fairness of the information or opinions contained in this Presentation. None of ALROSA nor any of its shareholders, directors, officers or employees, affiliates, advisors, representatives nor any other person accepts any liability whatsoever for any loss howsoever arising from any use of this Presentation or its contents or otherwise arising in connection therewith. No reliance may be placed for any purpose whatsoever on the information contained in this Presentation or on its completeness, accuracy or fairness. This Presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or other jurisdiction where such distribution, publication, availability or use would be contrary to law or regulation or which would require any registration or licensing within such jurisdiction. Persons in whose possession this Presentation and/or such information may come are required to inform themselves about and to observe such restrictions. Some numerical figures included in this Presentation have been subject to rounding adjustments. By reviewing and/or attending this Presentation you acknowledge and agree to be bound by the foregoing.

3 Operational of ALROSA 3 Diamond production +6% 36.2 mln cts 35.9 mln t 1.01 cpt 38.3 mln cts 37.1 mln t 1.03 cpt Diamonds produced (mln cts) Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore and gravels processed (mln t) Grade (cpt) results diamond production totalled 38.3 million carats, an increase of 6% y-o-y Production results were driven by the following factors: - launch of Botuobinskaya pipe, - diamond output growth at Karpinskogo-1 pipe of Lomonosov deposit (Severalmaz), - growth in diamond production at the Mir underground mine as a result of measures to stabilize its hydrogeological conditions, - the Udachny underground mine development

4 ALROSA s production footprint 4 Mining methods: Underground mining (25%) Arkhangelsk Region (5%) Lomonosov Division (5%) Arkhangelskaya pipe (2%) Open-pit mining (55%) Alluvial mining (21%) Russia Arkhangelsk Karpinskogo-1 pipe (3%) Russia Republic of Sakha (Yakutia) (95%) Almazy Anabara (9%) Nizhne-Lenskoye (5%) Republic of Sakha (Yakutia) Udachny Division (11%) Aikhal Division (32%) Jubilee pipe (25%) Aikhal pipe (7%) Komsomolskaya pipe (less than 1%) Mirny Division (18%) Mir pipe (6%) Udachny Aikhal Nyurba Mirny Yakutsk Udachnaya pipe (10%) Zarnitsa pipe (less than 1%) Alluvial deposits (less than 1%) Nyurba Division (20%) Nyurbinskaya pipe (13%) International pipe (11%) Alluvial deposits (2%) Botuobinskaya pipe (2%) Alluvial deposits (5%) Note: percentage in brackets indicates the share of region/division/pipe in ALROSA diamond production

5 AIKHAL DIVISION 5

6 Aikhal Division 6 Division structure Processing Plant No. 8 Aikhal pipe Komsomolskaya pipe Processing Plant No. 14 Jubilee pipe Location of operations Komsomolskaya pipe 8 km Processing Plant No. 14 Capacity: 10 mln t annually 18 km Share in ALROSA production: 32% Jubilee pipe 1 km Processing Plant No. 8 Capacity: 1.7 mln t annually Mining methods: Aikhal pipe Underground mining Open-pit mining Results vs. Diamonds produced 12,322 (2%) Almazy Anabara Ore processed 9,141 (4%) Nizhne-Lenskoye Tonnage Resources inclusive of reserves* Tonnage Reserves* Grade (cpt) Grade (cpt) Contained diamonds 117, ,578 Contained diamonds 215, ,694 * according to JORC Code (as of ) km Udachny Division Aikhal Division Udachny Aikhal Nyurba Division Nyurba Mirny Division Mirny Yakutsk

7 Operational of Aikhal Division 7 Diamond production (2%) 12, cts 9, t 1.33 cpt 12, cts 9, t 1.35 cpt Diamonds produced 3,000 2,368 2,981 4,216 2,596 2,676 3,849 3,201 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed 2,436 2,244 2,168 2,630 2,203 2,249 2,069 2,620 Grade (cpt) results diamond production was 12,322 thousand carats, down by 2% y-o-y Lower diamond output was a result of lower production at the Aikhal underground mine, driven by longer than planned maintenance works at Processing Plant No. 8

8 Jubilee pipe 8 Mining method: Open-pit mining current mining area Commissioned: m surface Current open pit depth: 370 m -370 m current open pit depth eastern lobe central lobe western lobe Resources inclusive of reserves (as of ) according to JORC Code Tonnage Grade (cpt) Indicated Contained diamonds 129, ,166 Inferred 65, ,594 Total 194, ,760 Indicated resources Inferred resources Resources not classified in accordance with JORC Code* * potential resources according to the Russian State Commission for Mineral Reserves classification -720 m target open pit depth; boundary of indicated resources -1,100 m boundary of inferred resources -1,300 m boundary of exploration

9 Jubilee pipe: production 9 25% Share in ALROSA production Increase in diamond production in by 3% y-o-y was driven by mining of higher grade ore from the pipe s central lobe +3% 9, cts 8, t 1.07 cpt 2,325 2,357 2,141 2,298 9, cts 8, t 1.13 cpt 2,383 2,381 2,416 2,225 Diamonds produced Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed 2,225 2,215 1,783 2,283 2,174 2,190 1,721 2,270 Grade (cpt)

10 Aikhal pipe 10 Period of open-pit mining: current mining area Open pit depth: 305 m 0 m surface Mining method: Underground mine Start of underground mining operations: m open pit depth south-western ore body -500 m boundary of indicated resources north-eastern ore body Resources inclusive of reserves (as of ) according to JORC Code -700 m boundary of inferred resources of southwestern ore body Tonnage Grade (cpt) Contained diamonds western lobe eastern lobe Indicated 7, ,159 Inferred 8, ,967 Total 15, ,126 Indicated resources Inferred resources Resources not classified in accordance with JORC Code* * potential resources according to the Russian State Commission for Mineral Reserves classification -900 m boundary of exploration

11 Aikhal pipe: production 11 7% Share in ALROSA production Decrease in diamond output in by 14% y-o-y was a result of lower production, driven by longer than planned maintenance works at Processing Plant No. 8 in (14%) 3, cts t 5.59 cpt 1,910 2, cts t 5.40 cpt 1,406 Diamonds produced Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed Grade (cpt)

12 Komsomolskaya pipe 12 Mining method: Open-pit mining Commissioned: 2000 Current open pit depth: 337 m current mining area 0 m surface -337 m current open pit depth Resources inclusive of reserves (as of ) according to JORC Code Tonnage Grade (cpt) Indicated Contained diamonds 4, ,808 Total 4, ,808 Indicated resources -460 m target open pit depth; boundary of indicated resources

13 Komsomolskaya pipe: production 13 less than 1% Share in ALROSA production Decrease in diamond production in by 50% y-o-y was driven by planned maintenance works at Processing Plant No. 8 from mid-january to June (50%) cts t 0.40 cpt cts t 0.30 cpt Diamonds produced Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed Grade (cpt)

14 MIRNY DIVISION 14

15 Mirny Division 15 Division structure Processing Plant No. 3 Mir pipe International pipe Vodorazdelnye Galechniki placer Tailings of Processing Plant No. 5 Dredges No. 201, 202, 203 Irelyakhskaya placer Gornoye placer Location of operations Vodorazdelnye Galechniki placer 10 km Share in ALROSA production: 18% 16 km Processing Plant No. 3 Capacity: 2 mln t annually 4 km Dredges No. 201, 202, 203 Capacity: 4 mln t annually International pipe Mir pipe Irelyakhskaya placer Gornoye placer Mining methods: Underground mining Alluvial mining Results vs. Diamonds produced 6, % Ore and gravels processed, incl.: 5, % Processing Plant No.3 2, % Almazy Anabara Nizhne-Lenskoye Dredges No. 201, 202, 203 3, % Tonnage Tonnage Reserves* Grade (cpt) Resources inclusive of reserves* Grade (cpt) Contained diamonds 34, ,815 Contained diamonds 45, , km Udachny Division Udachny Aikhal Division Aikhal Nyurba Division Nyurba Mirny Division Mirny Yakutsk * according to JORC Code (as of )

16 Operational of Mirny Division 16 Diamond production +13% 6, cts 6, cts 5, t 1.21 cpt 4, t 1.24 cpt Diamonds produced 1,477 1,553 2,438 1,941 1,922 1,509 1, Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore and gravels processed 469 1,325 1,479 1, ,693 1,918 1,609 Grade (cpt) results diamond production totalled 6,908 thousand carats, an increase of 13% y-o-y Growth in diamond production was due to a 50% increase in output at the Mir underground mine, which resulted from measures to decrease water inflow in the mine detected in Q1

17 International pipe 17 Period of open-pit mining: m surface Period of open pit development: Open pit depth: 315 m -315 m open pit depth Mining method: Underground mining current mining area Start of underground mining operations: 1999 Resources inclusive of reserves (as of ) according to JORC Code Tonnage Grade (cpt) Indicated Contained diamonds 4, ,739 Inferred 1, ,304 Total 5, ,043 Indicated resources Inferred resources Resources not classified in accordance with JORC Code* * potential resources according to the Russian State Commission for Mineral Reserves classification -1,085 m boundary of indicated resources -1,215 m boundary of inferred resources -1,475 m boundary of exploration

18 International pipe: production 18 11% Share in ALROSA production Increase in diamond production in by 4% y-o-y was driven by longer than planned maintenance works at Processing Plant No. 3 in and the replacement of a number of the underground mine s skip shaft components in May July +4% Diamonds produced 3, cts t 8.68 cpt 1, ,534 4, cts t 8.29 cpt 1,397 1, Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed Grade (cpt)

19 Mir pipe 19 Period of open-pit mining: current mining area Open pit depth: 525 m 0 m surface Mining method: Underground mining Start of underground mining operations: m open pit depth -545 m upper boundary of indicated resources dry shutdown Resources inclusive of reserves (as of ) according to JORC Code Tonnage Grade (cpt) Contained diamonds -950 m boundary of indicated resources Indicated 29, ,782 Inferred 10, ,940 Total 40, ,722 Indicated resources Inferred resources -1,235 m boundary of exploration

20 Mir pipe: production 20 6% Share in ALROSA production Growth in diamond production in by 50% y-o-y resulted from measures to mitigate the increased water inflow in the underground mine detected in Q1, as well as from higher grade ore processing +50% Diamonds produced 1, cts t 3.04 cpt , cts t 3.40 cpt Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed Grade (cpt)

21 Alluvial and technogenic deposits 21 Deposits Vodorazdelnye Galechniki placer Irelyakhskaya placer Gornoye placer Tailings of Processing Plant No. 5 2% Share in ALROSA production Decrease in diamond production in by 10% y-o-y was driven by processing of lower grade gravels from tailings of Processing Plant No. 5 and placers (10%) cts 3, t 0.19 cpt cts 4, t 0.15 cpt Diamonds produced Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Gravels processed 298 1,087 1,394 1, ,378 1,658 1,369 Grade (cpt) Gravels processed Results Grade (cpt) Diamonds produced 4, Resources and reserves of Mirny Division alluvial placers were not included into JORC Code valuation

22 UDACHNY DIVISION 22

23 Udacnhy Division 23 Division structure Processing Plant No. 12 Udachnaya pipe Zarnitsa pipe Delluvialny placer Ruchey Piropovy placer Location of operations Udachnaya pipe 2 km Zarnitsa pipe 21 km Share in ALROSA production: 11% Processing Plant No. 12 Capacity: 12 mln t annually Delluvialny placer Ruchey Piropovy placer Mining method Underground mining Open-pit mining Alluvial mining Results vs. Diamonds produced 4, % Almazy Anabara Ore processed 5, % Nizhne-Lenskoye Tonnage Tonnage Reserves* Grade (cpt) Resources inclusive of reserves* Grade (cpt) * according to JORC Code (as of ) Contained diamonds 150, ,358 Contained diamonds 223, ,771 Udachny Division Udachny Aikhal Division Aikhal Nyurba Division Nyurba Mirny Division Mirny km Yakutsk

24 Operational of Udachny Division 24 Diamond production +17% 4, cts 3, cts 5, t 0.80 cpt 4, t 0.76 cpt Diamonds produced 1,117 1,039 1,229 1,349 1,454 1, Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore and gravels processed 1,570 1, ,563 1,575 1, ,649 Grade (cpt) results diamond production was 4,297 thousand carats, up by 17% y-o-y Growth in diamond production was due to the launch of production at the Udachny underground mine and new placers Dellyuvialnaya and Ruchei Piropovy, as well as increased planned processing of higher grade stockpiles from the western ore lobe of the Udachnaya pipe

25 Udachnaya pipe 25 Mining method: Open-pit and underground mining Commissioned: 1971 current mining area Ore stockpile (measured resources) Current open pit depth: 640 m Start of underground mining operations: -640 m current open pit depth -890 m boundary of indicated resources Resources inclusive of reserves (as of ) according to JORC Code western lobe Tonnage Grade (cpt) Contained diamonds eastern lobe Measured 4, ,329 Indicated 82, ,278 Inferred 78, ,157 Total 165, ,764 Measured resources Indicated resources Inferred resources -1,390 m boundary of inferred resources

26 Udachnaya pipe: production 26 9% Share in ALROSA production Growth in diamond production in by 4% y-o-y was a result of increased planned processing of higher grade stockpiles from the western ore lobe +4% 3, cts 3, t 0.91 cpt 1,055 1,012 1,065 3, cts 3, t 1.08 cpt 1,290 1,378 Diamonds produced Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed ,170 1,234 1, Grade (cpt)

27 Udachny underground mine: production 27 1% Share in ALROSA production The Udachny underground mine is developing in line with the Company s plan; for, the plan implied processing of 262 thousand tonnes of ore and production of 413 thousand carats of diamonds 3.6x cts t 1.28 cpt cts t 1.58 cpt 336 Diamonds produced Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed Grade (cpt)

28 Zarnitsa pipe 28 Mining method: Open-pit mining current mining area Commissioned: 1999 Current open pit depth: 90 m 0 m surface -90 m current open pit depth -200 m boundary of indicated resources; target open pit depth Resources inclusive of reserves (as of ) according to JORC Code Tonnage Grade (cpt) Contained diamonds -700 m boundary of exploration Indicated 58, ,007 Total 58, ,007 Indicated resources Resources not classified in accordance with JORC Code* * potential resources according to the Russian State Commission for Mineral Reserves classification

29 Zarnitsa pipe: production 29 less than 1% Share in ALROSA production Increase in diamond production in by 28% y-o-y was due to processing of higher grade ore +28% Diamonds produced cts 1, t 0.17 cpt cts t 0.23 cpt Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed Grade (cpt)

30 Alluvial placers 30 Deposits Dellyuvialnaya placer Ruchei Piropovy placer less than 1% Share in ALROSA production In Q1, mining at new alluvial placers in the Udachniy Division was launched In Q3, no gravels were proccessed in line with the Company's production plan cts t 0.17 cpt 106 Diamonds produced Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Gravels processed Grade (cpt)

31 м 31 NYURBA DIVISION

32 Nyurba Division 32 Division structure Location of operations Processing Plant No. 15 Nyurbinskaya placer Botuobinskaya placer* Processing Plant No. 16 Nyurbinskaya pipe Botuobinskaya pipe Nyurbinskaya placer * pre-construction activities and waste stripping are in progress 5 km Processing Plant No. 15 Capacity: 0.5 mln t annually Processing Plant No. 16 Capacity: 1.4 mln t annually 2 km Share in ALROSA production: 20% Botuobinskaya placer Nyurbinskaya pipe Mining methods: Botuobinskaya pipe Nyurbinskaya placer Open-pit mining Alluvial mining Results vs Diamonds produced 7,510 +2% Almazy Anabara Ore and gravels processed 2,040 +2% Nizhne-Lenskoye Tonnage Tonnage Reserves** Grade (cpt) Resources inclusive of reserves** Grade (cpt) Contained diamonds 30, ,178 Contained diamonds 47, , km Udachny Division Udachny Aikhal Division Aikhal Nyurba Division Nyurba Mirny Division Mirny Yakutsk ** according to JORC Code (as of )

33 Operational of Nyurba Division 33 Diamond production +2% 7, cts 2, t 3.68 cpt 7, cts 2, t 3.68 cpt Diamonds produced 2, ,264 2,184 2,084 1,152 2,064 2,245 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed Grade (cpt) results Diamond production in was 7,510 thousand carats, up 2% y-o-y Increase in diamond production was caused by the launch of production at the Botuobinskaya pipe and by processing of higher grade gravels

34 Nyurbinskaya pipe 34 Mining method: Open-pit mining Commissioned: 2001 Current open pit depth: 300 m current mining area 0 m surface -300 m current open pit depth -450 m target open pit depth Resources inclusive of reserves (as of ) according to JORC Code -570 m boundary of indicated resources Tonnage Grade (cpt) Indicated Contained diamonds 12, ,661 Inferred 1, ,465 Total 13, ,126 Indicated resources Inferred resources Resources not classified in accordance with JORC Code* * potential resources according to the Russian State Commission for Mineral Reserves classification -750 m boundary of exploration; boundary of inferred resources

35 Nyurbinskaya pipe: production 35 13% Share in ALROSA production Decrease in diamond production in by 26% y-o-y was in line with loading of Processing Plant No. 16 with ore from the Botuobinskaya pipe and sands from the Nyurbinskaya placer (26%) Diamonds produced 6, cts 1, t 5.21 cpt 2, ,776 2,144 4, cts t 4.92 cpt 1, ,008 1,539 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed Grade (cpt)

36 Botuobinskaya pipe 36 Current open pit depth: 92 m current mining area Commencement of waste stripping: December m surface -92 m current open pit depth overburden -580 m target open pit depth; boundary of indicated resources Resources inclusive of reserves (as of ) according to JORC Code Tonnage Grade (cpt) Indicated Contained diamonds 13, ,044 Inferred 2, ,790 Total 16, ,834 Indicated resources Inferred resources Resources not classified in accordance with JORC Code* * potential resources according to the Russian State Commission for Mineral Reserves classification -780 m boundary of inferred resources -980 m boundary of exploration

37 Botuobinskaya pipe: production 37 2% Share in ALROSA production On 10 March ALROSA started ore mining at the Botuobinskaya pipe In Q1, Processing Plant No. 16 handled the first round of ore from the Botuobinskaya pipe cts t 6.98 cpt Diamonds produced Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed Grade (cpt)

38 Alluvial deposits 38 Deposits Nyurbinskaya placer Botuobinskaya placer 5% Share in ALROSA production Increase in diamond production in by 2.1 times y-o-y was due to the planned processing of higher grade gravels 2.1x 1, cts Diamonds produced cts t 1.10 cpt t 1.90 cpt , Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Gravels processed Grade (cpt) Resources inclusive of reserves (as of ) according to JORC Code Tonnage Grade (cpt) Contained diamonds 13, ,989

39 СЕВЕРАЛМАЗ 39 LOMONOSOV DIVISION (SEVERALMAZ)

40 Lomonosov Division (Severalmaz) 40 Division structure Processing Plant No. 1 Arkhangelskaya pipe Karpinskogo-1 pipe Location of operations Karpinskogo-1 pipe 2 km Processing Plant No. 1 Share in ALROSA production: 5% Module No. 2 Capacity: 3 mln t annually Arkhangelskaya pipe 3 km Module No. 1 Capacity: 1 mln t annually Mining method: Open-pit mining Results vs. Diamonds produced 1, % Ore processed 3, % Tonnage Reserves* Grade (cpt) Contained diamonds 75, ,107 Arkhangelsk Lomonosov Division Tonnage Resources inclusive of reserves* Grade (cpt) * according to JORC Code (as of ) Contained diamonds 125, , km

41 Operational of Lomonosov Division 41 Diamond production +19% 1, cts 1, cts 3, t 0.49 cpt 3, t 0.50 cpt Diamonds produced Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed , ,021 1,079 1,003 Grade (cpt) results In, production totalled 1,950 thousand carats, up 19% y-o-y Diamond production growth was due to higher volumes of ore processed after the processing plant's second module was launched and diamond production at Karpinskogo-1 pipe commenced

42 Arkhangelskaya pipe 42 Mining method: Open-pit mining Commissioned: 2005 Current open pit depth: 135 m current mining area 0 m surface -135 m current open pit depth -324 m target open pit depth -460 m boundary of indicated resources Resources inclusive of reserves (as of ) according to JORC Code Tonnage Grade (cpt) Contained diamonds Indicated 56, ,406 Inferred 39, ,623 Total 95, ,029 Indicated resources Inferred resources -940 m boundary of inferred resources

43 Arkhangelskaya pipe: production 43 2% Share in ALROSA production Diamond production slowdown in by 37% y-o-y was caused by the planned reduction of ore processing as a result of the launch of Karpinskogo-1 pipe and processing of lower grade ore (37%) Diamonds produced 1, cts 2, t 0.49 cpt cts 1, t 0.45 cpt Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed , Grade (cpt)

44 Karpinskogo-1 pipe 44 Current open pit depth: 98 m current mining area Commencement of waste stripping: m surface -98 m current open pit depth overburden -262 m target open pit depth -462 m boundary of indicated resources Resources inclusive of reserves (as of ) according to JORC Code -662 m boundary of inferred resources Tonnage Grade (cpt) Contained diamonds Indicated 24, ,960 Inferred 5, ,512 Total 30, ,472 Indicated resources Inferred resources Resources not classified in accordance with JORC Code* * potential resources according to the Russian State Commission for Mineral Reserves classification -942 m boundary of exploration

45 Karpinskogo-1 pipe: production 45 3% Share in ALROSA production On 6 October, Severalmaz launched production at Karpinskogo-1 pipe In line with the pipe development plan, 2.1 thousand tonnes of ore was processed and 1.1 thousand carats of diamonds was produced in 4.1x cts t 0.51 cpt 1, cts 2, t 0.52 cpt Diamonds produced Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ore processed Grade (cpt)

46 ALMAZY ANABARA

47 Almazy Anabara 47 Deposits Morgogor placer Istok placer Holomolokh placer Ebelyakh placer Gusinaya placer Ruchey 41 placer Kurung-Yuryakh placer 9% Share in ALROSA production In Q1 and Q4, no gravels were proccessed due to seasonality of gravel mining Diamond production growth in by 8% y-o-y resulted from processing of higher grade gravels from Gusinaya and Ebelyakh placers +8% Diamonds produced (mln cts) cts t 0,55 cpt 1,239 1, cts t 0,63 cpt 1,386 1,923 Diamonds produced Gravels processed Results vs. 3,309 +8% 5,222 (7%) Gravels processed (mln t) Grade (cpt) Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 0 2,200 3, ,898 3, Tonnage Reserves* Grade (cpt) Contained diamonds 36, ,749 Resources inclusive of reserves* Tonnage Grade (cpt) Contained diamonds 36, ,597 * according to JORC Code (as of )

48 НИЖНЕ-ЛЕНСКОЕ 48 NIZHNE-LENSKOYE

49 Nizhne-Lenskoye 49 Deposits Molodo placer Billyakh placer Ruchey Shlihovoy placer 5% Share in ALROSA production In Q1 and Q4, no gravels were proccessed due to seasonality of gravel mining Diamond production growth in by 8% y-o-y resulted from processing of higher grade gravels +8% 1, cts 5, t 0.31 cpt 1,234 1, cts 5, t 0.35 cpt 1,413 Diamonds produced (mln cts) Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Gravels processed (mln t) 0 2,080 3, ,888 3,752 0 Grade (cpt) Diamonds produced Gravels processed Results vs. 1,964 +8% 5,640 (3%)

50 Appendix 50

51 Diamond production cts Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Aikhal Division 12,565 12,322 3,000 2,368 2,981 4,216 2,596 2,676 3,849 3,201 Jubilee pipe 9,122 9,405 2,325 2,357 2,141 2,298 2,383 2,381 2,416 2,225 Aikhal underground mine 3,292 2, , , Komsomolskaya pipe Mirny Division 6,088 6,908 1,477 1, ,438 1,941 1,922 1,509 1,536 International underground mine 3,862 4,024 1, ,534 1,397 1, Mir underground mine 1,463 2, Alluvial and technogenic deposits Udachny Division 3,679 4,297 1,117 1, ,229 1,349 1, ,132 Udachnaya pipe 3,390 3,515 1,055 1, ,065 1,290 1, Udachnaya underground mine Zarnitsa pipe Alluvial deposits Nyurba Division 7,363 7,510 2, ,264 2,184 2,048 1,152 2,064 2,245 Nyurbinskaya pipe 6,542 4,809 2, ,766 2,144 1, ,008 1,539 Botuobinskaya pipe Alluvial deposits 821 1, , Lomonosov Division (Severalmaz) 1,639 1, Arkhangelskaya pipe 1, Karpinskogo-1 pipe 266 1, Almazy Anabara 3,059 3, ,239 1, ,386 1,923 0 Nizhne-Lenskoye 1,818 1, , ,413 0 Total 36,212 38,260 7,894 8,033 9,736 10,555 8,385 9,629 11,635 8,612

52 Ore and sands processing t Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Aikhal Division 9,478 9,141 2,436 2,244 2,168 2,630 2,203 2,249 2,069 2,620 Jubilee pipe 8,506 8,355 2,225 2,215 1,783 2,283 2,174 2,190 1,721 2,270 Aikhal underground mine Komsomolskaya pipe Mirny Division 4,903 5, ,325 1,479 1, ,693 1,918 1,609 International underground mine Mir underground mine Alluvial and technogenic deposits 3,978 4, ,087 1,394 1, ,378 1,658 1,369 Udachny Division 4,814 5,377 1,570 1, ,563 1,575 1, ,649 Udachnaya pipe 3,710 3,250 1,180 1, ,170 1,234 1, Udachnaya underground mine Zarnitsa pipe 1, Alluvial deposits Nyurba Division 2,000 2, Nyurbinskaya pipe 1, Botuobinskaya pipe Alluvial deposits Lomonosov Division (Severalmaz) 3,309 3, , ,021 1,079 1,003 Arkhangelskaya pipe 2,793 1, , Karpinskogo-1 pipe 516 2, Almazy Anabara 5,604 5, ,200 3, ,898 3,324 0 Nizhne-Lenskoye 5,814 5, ,080 3, ,888 3,752 0 Total 35,922 37,114 5,366 10,258 13,024 7,274 5,500 10,775 13,487 7,351

53 Thank you! Corporate Finance and Analytics Investor Relations 1-st Kazachy Per., Moscow Russia Tel.:

IR-release: Q3 and 9M 2014 Operational Overview. October 20, 2014

IR-release: Q3 and 9M 2014 Operational Overview. October 20, 2014 IR-release: Q3 and 9M 2014 Operational Overview October 20, 2014 Disclaimer 2 The below applies to the presentation (the Presentation ) following this important notice, and you are therefore advised to

More information

IR-release: Q Operational Overview. 20 April 2017

IR-release: Q Operational Overview. 20 April 2017 IR-release: Q1 2017 Operational Overview 20 April 2017 Disclaimer 2 The below applies to the presentation (the Presentation ) following this important notice, and you are therefore advised to read this

More information

IR-release: Q3 and 9M 2017 Operational Overview. 23 October 2017

IR-release: Q3 and 9M 2017 Operational Overview. 23 October 2017 IR-release: and Operational Overview 23 October Disclaimer 2 The below applies to the presentation (the Presentation ) following this important notice, and you are therefore advised to read this important

More information

Q and 9M 2018 Operating results

Q and 9M 2018 Operating results and 9M Operating results Moscow, 22 October ALROSA, a global leader in diamond production, reports its and 9M production and sales update. Key highlights: diamond production grew by 23% (up 2% ) to 10.5

More information

SOCIAL AND ENVIRONMENTAL REPORT 2015

SOCIAL AND ENVIRONMENTAL REPORT 2015 SOCIAL AND ENVIRONMENTAL REPORT 2015 ALROSA* is a Russian Group of diamond mining companies that occupies a leading position in the industry and has the largest rough diamond reserves in the world. The

More information

ALROSA. When your conditions are extreme

ALROSA. When your conditions are extreme ALROSA When your conditions are extreme The Republic Of Sakha (Yakutia) 000 km More than 40% of Yakutia lies beyond the Arctic circle Capital Yakutsk Population Under Mio people Population density 0.3

More information

Strengthening the experience and embracing the shift

Strengthening the experience and embracing the shift Strengthening the experience and embracing the shift THIS PRESENTATION IS NOT AN OFFER OR SOLICITATION OF AN OFFER TO BUY OR SELL SECURITIES. IT IS SOLELY FOR USE AT A CAPITAL MARKETS EVENT AND IS PROVIDED

More information

Bald Hill Delivers Excellent Metallurgical Test Work Results

Bald Hill Delivers Excellent Metallurgical Test Work Results 6 September 2017 Bald Hill Delivers Excellent Metallurgical Test Work Results Tawana Resources NL (TAW:ASX) (Tawana) and Alliance Mineral Assets Limited (SGX:AMA) (AMAL) are pleased to announce encouraging

More information

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030 12 NOVEMBER 2018 Underground Ore Reserve growth at Prominent Hill extends mine life to 2030 Prominent Hill underground Ore Reserve increased to 40Mt @ 1.7% copper equivalent i with a 50% increase in Proved

More information

February 2018 KURUÇAY ZINC PROJECT

February 2018 KURUÇAY ZINC PROJECT February 2018 KURUÇAY ZINC PROJECT Disclaimer: The economic analysis contained in this presentation is based, in part, on inferred resources, and is preliminary in nature for the Kuruçay Zinc Project («Project»)

More information

PATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014

PATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014 BEER & CO - SECOND ANNUAL TIN CONFERENCE WEDNESDAY, 5 NOVEMBER, 2014 PATRICK SCOTT - DIRECTOR SCOTT@AUSTRALIA.ROHSTOFF.DE Disclaimer This presentation has been prepared by and issued by Tin International

More information

4 th Drilling Rig Mobilised to drill High- Grade Pipes at SPD Vanadium Project

4 th Drilling Rig Mobilised to drill High- Grade Pipes at SPD Vanadium Project 23 November 2018 4 th Drilling Rig Mobilised to drill High- Grade Pipes at SPD Vanadium Project Figure 1. Drilling equipment being slung into place. Tando Resources (ASX: TNO, Tando or the Company) is

More information

For personal use only. Mining the Territory. Korab Resources Limited NT RESOURCES WEEK ASX: KOR. Andrej K. Karpinski Executive Chairman

For personal use only. Mining the Territory. Korab Resources Limited NT RESOURCES WEEK ASX: KOR. Andrej K. Karpinski Executive Chairman Korab Resources Limited Mining the Territory NT WEEK Andrej K. Karpinski Executive Chairman Diversified International Minerals Company Precious metals, agricultural and industrial commodities Magnesium

More information

T S X : R M X N Y S E. M K T : R B Y

T S X : R M X N Y S E. M K T : R B Y T S X : R M X N Y S E. M K T : R B Y News Release A p r i l 1 4, 2015 Rubicon s Phoenix Gold Project Commences Mill Commissioning and Remains on Schedule for Mid-2015 Projected Initial Production TORONTO,

More information

Rosneft the Leader of the Russian Oil Industry. Eduard Khudainatov President of Rosneft New York, April 18, 2012

Rosneft the Leader of the Russian Oil Industry. Eduard Khudainatov President of Rosneft New York, April 18, 2012 Rosneft the Leader of the Russian Oil Industry Eduard Khudainatov President of Rosneft New York, April 18, 2012 Post-IPO Dynamics (2006-2011) Reserve replacement Well above the industry average Discovery

More information

5 th Asian Bauxite & Alumina Conference

5 th Asian Bauxite & Alumina Conference 5 th Asian Bauxite & Alumina Conference October 2015 Bauxite Hills Project Deliberate Focus ASX : MMI CORPORATE SNAPSHOT Shareholders 0.140 0.120 MMI Share Price (A$) Other 47% NetWealth Investments 5%

More information

Focused on delivery of high-value metals critical to energy revolution. Peter Williams, CEO Noosa Mining & Exploration Conference July 2018

Focused on delivery of high-value metals critical to energy revolution. Peter Williams, CEO Noosa Mining & Exploration Conference July 2018 Focused on delivery of high-value metals critical to energy revolution Peter Williams, CEO Noosa Mining & Exploration Conference July 2018 Important Information Forward Looking Statement This presentation

More information

SARACEN MINERAL HOLDINGS LTD

SARACEN MINERAL HOLDINGS LTD Saracen Mineral Holdings Limited Australian Gold Producer ASX:SAR SARACEN MINERAL HOLDINGS LTD Guido Staltari, Executive Chairman Raleigh Finlayson, Chief Operating Officer Diggers n Dealers Conference

More information

November 24, Recent acquisitions by Astral Poly Technik Ltd.

November 24, Recent acquisitions by Astral Poly Technik Ltd. November 24, 2014 Recent acquisitions by Astral Poly Technik Ltd. Disclaimer The information in this presentation has been prepared for use in presentations by Astral Poly Technik Limited (the Company

More information

Investment projects. Verkhne-Munskoe ore field. Company profile. Gas assets. Bourevestnik

Investment projects. Verkhne-Munskoe ore field. Company profile. Gas assets. Bourevestnik Investment projects Company profile Verkhne-Munskoe ore field Company profile ALROSA is a Russian Group of diamond mining companies that occupies a leading position in the industry and has the largest

More information

Grange Resources Australia s leading magnetite producer

Grange Resources Australia s leading magnetite producer Grange Resources Australia s leading magnetite producer Grange Resources Limited (GRR) Level 11, 200 St Georges Terrace Perth, WA 6000, Australia Phone + 61 8 9321 1118 Fax + 61 8 9321 1523 www.grangeresources.com.au

More information

Piper Jaffray Clean Technology & Renewables Conference. Samuel Yang, Chief Executive Officer

Piper Jaffray Clean Technology & Renewables Conference. Samuel Yang, Chief Executive Officer Piper Jaffray Clean Technology & Renewables Conference Samuel Yang, Chief Executive Officer February 20, 2008 Disclaimer This presentation does not constitute an offer to sell or issue or the solicitation

More information

Carbon Energy Low cost, low emission energy has arrived

Carbon Energy Low cost, low emission energy has arrived Carbon Energy Low cost, low emission energy has arrived Investor Presentation Andrew Dash Managing Director Australian Securities Exchange Spotlight Conference London 10th March 2011 Important Statements

More information

Valence Industries. Australia s Only Graphite Producer. Asia Pacific I Europe I North America. Manufacturing Our Carbon Future TM.

Valence Industries. Australia s Only Graphite Producer. Asia Pacific I Europe I North America. Manufacturing Our Carbon Future TM. Valence Industries Australia s Only Graphite Producer Asia Pacific I Europe I North America December 2014 Manufacturing Our Carbon Future TM Valence (noun). the combining power of an element, especially

More information

N E W S R E L E A S E

N E W S R E L E A S E ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604) 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 www.avino.com February 21, 2018 N E W S R E L E A S E AVINO

More information

Indium facility at the Auby smelter

Indium facility at the Auby smelter Indium facility at the Auby smelter 20 September 2012 Xavier Constant Technology Manager, Auby smelter Important Notice This presentation has been prepared by the management of Nyrstar NV (the "Company").

More information

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO Grange Resources Australia s leading magnetite producer Grange Resources Limited (GRR) Level 11, 200 St Georges Terrace Perth, WA 6000, Australia Phone + 61 8 9321 1118 Fax + 61 8 9321 1523 www.grangeresources.com.au

More information

For personal use only

For personal use only MetroCoal Limited (ASX:MTE) and Developing a Multi Commodity Company Presentation to Annual General Meeting 25 November 2014 1 METROCOAL AT YEAR END 2014 MetroCoal Holds >90% of Cape Alumina Commenced

More information

FIRST QUARTER RESULTS 2016 INVESTOR PRESENTATION

FIRST QUARTER RESULTS 2016 INVESTOR PRESENTATION FIRST QUARTER RESULTS 2016 INVESTOR PRESENTATION THREE MONTH RESULTS 21 APRIL 2016 Highlights and key figures Operating and financial review Outlook and priorities Appendix FIRST QUARTER RESULTS 21 APRIL

More information

N E W S R E L E A S E

N E W S R E L E A S E ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604) 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 www.avino.com February 21, 2018 N E W S R E L E A S E AVINO

More information

Meknes Drilling Update

Meknes Drilling Update Kasbah Resources Limited ASX : KAS Meknes Drilling Update 1 DISCLAIMER Certain oral and written statements contained or incorporated by reference in this presentation, including information as to the future

More information

H&M group capital markets day Stockholm 2018 H&M GROUP CAPITAL MARKETS DAY 2018

H&M group capital markets day Stockholm 2018 H&M GROUP CAPITAL MARKETS DAY 2018 H&M group capital markets day Stockholm 2018 Disclaimer THIS PRESENTATION IS NOT AN OFFER OR SOLICITATION OF AN OFFER TO BUY OR SELL SECURITIES. IT IS SOLELY FOR USE AT A CAPITAL MARKETS EVENT AND IS PROVIDED

More information

FIRST GOLD ORE DISPATCHED FROM ULYSSES

FIRST GOLD ORE DISPATCHED FROM ULYSSES Genesis Minerals Limited (ASX: GMD) ASX Announcement 14 November 2016 FIRST GOLD ORE DISPATCHED FROM ULYSSES Genesis poised for first cash-flow as first parcel of ore departs for Paddington gold plant

More information

Reorganisation & Revised Segmental Reporting. November 2016

Reorganisation & Revised Segmental Reporting. November 2016 Reorganisation & Revised Segmental Reporting November 2016 Disclaimer This document has been prepared by the Company solely for purpose of communicating the change to the Company s Segmental Reporting

More information

Future Matters US Disclosure

Future Matters US Disclosure Disclaimer This presentation has been prepared by Samsung Electronics Co., Ltd. (the "Company"). It does not purport to contain all the information that a prospective investor may require in connection

More information

Sunrise Communications AG. Sunrise ONE versus Swisscom inone - High level comparison

Sunrise Communications AG. Sunrise ONE versus Swisscom inone - High level comparison unrise Communications AG unrise ONE versus wisscom inone - High level comparison unrise ONE - Everything unlimited aunch andline & obile in ONE package New fully convergent high-end product, complementing

More information

BOLD STRATEGY ROADMAP. Christophe De Hauwer, Chief Strategy and Development Officer

BOLD STRATEGY ROADMAP. Christophe De Hauwer, Chief Strategy and Development Officer BOLD STRATEGY ROADMAP Christophe De Hauwer, Chief Strategy and Development Officer Employing an Adaptive Strategy Roadmap Placing Customer-centricity at the core Developing an optimised and flexible technology

More information

Investor Presentation. Carbon Energy. May 2009

Investor Presentation. Carbon Energy. May 2009 Investor Presentation Carbon Energy May 2009 Disclaimer The information contained in this presentation is given without any liability whatsoever to Carbon Energy Ltd or any of its related entities or their

More information

AVINO SILVER & GOLD MINES LTD.

AVINO SILVER & GOLD MINES LTD. April 13, AVINO SILVER & GOLD MINES LTD. T 604.682.3701 Suite 900, 570 Granville Street ir@avino.com F 604.682.3600 Vancouver, BC V6C 3P1 www.avino.com NYSE-MKT: ASM TSX-V: ASM FSE: GV6 AVINO ANNOUNCES

More information

For personal use only

For personal use only The Future of TV is Personal Linius patented Video Virtualization Engine is designed to convert cumbersome, legacy video into interactive, virtual video, enabling Artificial Intelligence, personalization,

More information

INVESTOR PRESENTATION Keith Allaun Executive Chairman

INVESTOR PRESENTATION Keith Allaun Executive Chairman INVESTOR PRESENTATION Keith Allaun Executive Chairman P O W E R H O U S E E N E R G Y INTRODUCTION AIM listed PowerHouse Energy Group plc has fully commissioned its new G3-UHt Gasification System (G3 System)

More information

For personal use only

For personal use only BIGTINCAN HOLDINGS LIMITED FULL YEAR RESULTS PRESENTATION AUGUST 2018 1 2017 BIGTINCAN 2018 BIGTINCAN I SEPTEMBER 11, 2017 FY18 Financial Highlights ARR* $15.4m REVENUE $13.1m LOSS ($6.8m) 41% 42% 15%

More information

Future Matters US Disclosure

Future Matters US Disclosure Disclaimer This presentation has been prepared by Samsung Electronics Co., Ltd. (the "Company"). It does not purport to contain all the information that a prospective investor may require in connection

More information

Mining s innovation imperative

Mining s innovation imperative Mining s innovation imperative Chris Salisbury Chief executive Iron Ore Cautionary statements This presentation has been prepared by Rio Tinto plc and Rio Tinto Limited ( Rio Tinto ). By accessing/attending

More information

DEVELOPING FERTILISER PROJECTS TO MEET THE GROWING DEMAND IN BRAZIL AND THE WORLD

DEVELOPING FERTILISER PROJECTS TO MEET THE GROWING DEMAND IN BRAZIL AND THE WORLD EST MINE HARVEST MINERALS Developing Fertiliser Projects DEVELOPING FERTILISER PROJECTS TO MEET THE GROWING DEMAND IN BRAZIL AND THE WORLD Corporate advisor: Investor Presentation July 2015 ASX: HMI www.harvestminerals.net

More information

For personal use only

For personal use only ASX:ELT For further information please contact Chris Creagh Chief Executive Officer Email cc@elementos.com.au Level 10, 110 Mary St Brisbane, QLD Australia 4000 +617 3221 7770 www.elementos.com.au Board

More information

Pan American Silver Mineral Reserves Increase to 288 Million Ounces

Pan American Silver Mineral Reserves Increase to 288 Million Ounces Suite 1500-625 Howe St. Vancouver, BC Canada, V6C 2T6 604-684-1175 www.panamericansilver.com Pan American Silver Mineral Reserves Increase to 288 Million Ounces All financial figures are expressed in US$

More information

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015 T S X : R M X N Y S E. M K T : R B Y News Release D e c e m b e r 1 8, 2014 Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015 TORONTO, Ontario Rubicon Minerals Corporation

More information

AFC Energy plc AGM Presentation. 25 April 2017

AFC Energy plc AGM Presentation. 25 April 2017 AFC Energy plc AGM Presentation 25 April 2017 1 Disclaimer This presentation has been prepared by AFC Energy plc (the Company ). By attending this presentation and/or reviewing the slides you agree to

More information

ELEMENTOS. For personal use only. Asia Tin Summit 2017 Progressing the Development of the Cleveland Project. (ASX:ELT) September 2017

ELEMENTOS. For personal use only. Asia Tin Summit 2017 Progressing the Development of the Cleveland Project. (ASX:ELT) September 2017 ELEMENTOS (ASX:ELT) September 2017 Asia Tin Summit 2017 Progressing the Development of the Cleveland Project ASX:ELT For further information please contact Chris Creagh Chief Executive Officer Email cc@elementos.com.au

More information

ELEMENTOS LTD ASX:ELT summary

ELEMENTOS LTD ASX:ELT summary ELEMENTOS LIMITED ASX:ELT For further information please contact Chris Creagh Chief Executive Officer Email cc@elementos.com.au ELEMENTOS LIMITED Level 10, 110 Mary St Brisbane, QLD Australia 4000 +617

More information

The Industrial Application of Ultrafiltation and Reverse Osmosis for the Recovery of Cu, Ag and CN from Gold Leach Liquors.

The Industrial Application of Ultrafiltation and Reverse Osmosis for the Recovery of Cu, Ag and CN from Gold Leach Liquors. The Industrial Application of Ultrafiltation and Reverse Osmosis for the Recovery of Cu, Ag and CN from Gold Leach Liquors. A.J. Monhemius Anglo Asian Mining plc 1 Disclaimer The information in this document

More information

Fortuna provides update on the Lindero gold Project in Argentina

Fortuna provides update on the Lindero gold Project in Argentina Fortuna provides update on the Lindero gold Project in Argentina Vancouver, March 22, 2017-- Fortuna Silver Mines Inc. (NYSE: FSM) (TSX: FVI) is pleased to present an update of preliminary results of the

More information

Valence Industries Australia s Only Graphite Producer

Valence Industries Australia s Only Graphite Producer Valence Industries Australia s Only Graphite Producer Asia Pacific I Europe I North America December 2014 Christopher S. Darby MD & CEO SAEM Conference Adelaide Manufacturing Our Carbon Future TM Valence

More information

OJSC Polyus Gold. The Board approves the first stage of construction of Natalka mine

OJSC Polyus Gold. The Board approves the first stage of construction of Natalka mine OJSC Polyus Gold The Board approves the first stage of construction of Natalka mine Cautionary statements The information contained herein has been prepared using information available to Polyus Gold Group

More information

INVESTOR PRESENTATION

INVESTOR PRESENTATION INVESTOR PRESENTATION SWISS EQUITIES CONFERENCE BAADER HELVEA R. ERNI, CFO BAD RAGAZ 12 JANUARY 2018 Panalpina Biz Model / Strategy Achievements and key figures Operating and financial review Appendix

More information

HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION

HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION CHEUVREUX GERMAN CORPORATE CONFERENCE FRANKFURT, 20 JANUARY 2010 Hamburger Hafen und Logistik AG DISCLAIMER The facts and information contained herein

More information

ASTARTA. Extending Value Chain and Increasing Diversification. Initiating Soybean Processing Project

ASTARTA. Extending Value Chain and Increasing Diversification. Initiating Soybean Processing Project ASTARTA Extending Value Chain and Increasing Diversification Initiating Soybean Processing Project June 2012 Disclaimer This presentation is being provided to you solely for your information and may not

More information

HPS vs. LED Indoor Cannabis Cultivation. Lasse Schulze (Ph.D.)

HPS vs. LED Indoor Cannabis Cultivation. Lasse Schulze (Ph.D.) HPS vs. LED Indoor Cannabis Cultivation Lasse Schulze (Ph.D.) Disclaimers & Cautionary Statements The information found herein, and any other materials provided by Cronos Group (the Company ), are intended

More information

ACQUISTION OF WORLD CLASS SPD VANADIUM PROJECT. March 2018

ACQUISTION OF WORLD CLASS SPD VANADIUM PROJECT. March 2018 ACQUISTION OF WORLD CLASS SPD VANADIUM PROJECT March 2018 Transaction Highlights 2 High Grade Vanadium in Drilling Significant Whole Rock Results include1: 9m at 1.34% V2O5 + 10.5% TiO2 from 9m (SFR019)

More information

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase NEWS RELEASE NYSE: NEM newmont.com Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase DENVER, February 21, 2018 Newmont Mining Corporation (NYSE: NEM)

More information

Appendix 5A. Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code)

Appendix 5A. Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code) Appendix 5A Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The ) Introduced 1/7/96. Origin: Appendix 17. Amended 1/9/99, 17/12/2004 A U S T R A L I A N I N

More information

DELIVERING SUSTAINED AND PROFITABLE GROWTH. Karim Michel Sabbagh, President and CEO

DELIVERING SUSTAINED AND PROFITABLE GROWTH. Karim Michel Sabbagh, President and CEO DELIVERING SUSTAINED AND PROFITABLE GROWTH Karim Michel Sabbagh, President and CEO World s Leading Satellite-enabled Solutions Provider Covering 99.99% of the globe and world s population Serving customers

More information

Creating a high-value, multi project tin company ASX : ELT

Creating a high-value, multi project tin company ASX : ELT Creating a high-value, multi project tin company ASX : ELT Investor Presentation March 2019 Australian Energy & Minerals Conference, Brisbane Cautionary Statements Forward-looking statements This document

More information

Carbon Energy UCG Projects update. UCG Association London March 2011

Carbon Energy UCG Projects update. UCG Association London March 2011 Carbon Energy UCG Projects update UCG Association London March 2011 Cliff Mallett Technical Director Important Statements Disclaimer The information contained in this presentation is given without any

More information

Shape your water future. Our Green Bond Framework

Shape your water future. Our Green Bond Framework Shape your water future Our Green Bond Framework Introduction We are the UK s largest water and wastewater services provider, serving 15 million customers across the South East of England. As well as being

More information

Focused on delivery of high-value metals critical to energy revolution. Annual General Meeting 20 November 2018

Focused on delivery of high-value metals critical to energy revolution. Annual General Meeting 20 November 2018 Focused on delivery of high-value metals critical to energy revolution Annual General Meeting 20 November 2018 Important Information Forward Looking Statement This presentation may contain certain statements

More information

Diamond Guidelines Tania R Marshall

Diamond Guidelines Tania R Marshall Diamond Guidelines Tania R Marshall SAMCODE Companion Volume Conference, May 2016 marshall.tania@gmail.com SAMREC Code Diamonds are Different SAMREC Code 2000/2007/2009 SAMREC Code diamond specific clauses

More information

STRATEGIC UPDATE 20 DECEMBER 2017

STRATEGIC UPDATE 20 DECEMBER 2017 STRATEGIC UPDATE 20 DECEMBER 2017 DISCLAIMER - This presentation is intended to constitute a summary of certain information about Synlait Milk Limited ( Synlait ). It should be read in conjunction with,

More information

NIUMINCO GROUP LIMITED PNG MINING & PETROLEUM INVESTMENT CONFERENCE DECEMBER 2014

NIUMINCO GROUP LIMITED PNG MINING & PETROLEUM INVESTMENT CONFERENCE DECEMBER 2014 NIUMINCO GROUP LIMITED PNG MINING & PETROLEUM INVESTMENT CONFERENCE DECEMBER 2014 Important Information This presentation is not a prospectus nor an offer of securities for subscription or sale in any

More information

For personal use only

For personal use only Renascor Resources Limited ASX code: RNU Investor Presentation Sourcing High-Tonnage Graphite in Australia 14 December 2015 Our graphite projects Recent acquisitions offer immediate opportunities to define

More information

Investor Presentation Sourcing High-Tonnage Graphite in Australia

Investor Presentation Sourcing High-Tonnage Graphite in Australia Renascor Resources Limited ASX code: RNU Investor Presentation Sourcing High-Tonnage Graphite in Australia 14 December 2015 Our graphite projects Recent acquisitions offer immediate opportunities to define

More information

Our pursuit of continuous improvement

Our pursuit of continuous improvement Western Australia Iron Ore Our pursuit of continuous improvement Mike Henry President HSE, Marketing and Technology 27 October 2014 Disclaimer Forward-looking statements This presentation contains forward-looking

More information

Molybdenum- The New Battery Metal 2018

Molybdenum- The New Battery Metal 2018 Molybdenum- The New Battery Metal 2018 Why Hammer Why Molybdenum? 2018 Molybdenum has been one of the best price performing metals traded on the London Metals Exchange (LME) up 62.5% in the first 4 months

More information

18,000+ ACTIVE USERS. AGM PRESENTATION November 2017 $600M+ TRANSACTION VALUE

18,000+ ACTIVE USERS. AGM PRESENTATION November 2017 $600M+ TRANSACTION VALUE 18,000+ ACTIVE USERS AGM PRESENTATION November 2017 $600M+ TRANSACTION VALUE A Leading Payment Solutions & Technology Partner In Asia-Pacific SOUTH EAST ASIA 2 Our Markets $120B Singapore retail & online

More information

For personal use only 18,000+ ACTIVE USERS $600M+ TRANSACTION VALUE. AGM PRESENTATION November 2017

For personal use only 18,000+ ACTIVE USERS $600M+ TRANSACTION VALUE. AGM PRESENTATION November 2017 18,000+ ACTIVE USERS AGM PRESENTATION November 2017 $600M+ TRANSACTION VALUE A Leading Payment Solutions & Technology Partner In Asia-Pacific SOUTH EAST ASIA 2 Our Markets $120B Singapore retail & online

More information

Potash is the main source of fertiliser in the world. Potash demand is expected to be underpinned by a rapidly growing world population.

Potash is the main source of fertiliser in the world. Potash demand is expected to be underpinned by a rapidly growing world population. WHY POTASH? As the world s population increases, issues of food security are becoming more and more prominent. The amount of arable land is decreasing and what remains is being depleted of nutrients from

More information

Element 25 Limited Investor Update

Element 25 Limited Investor Update Element 25 Limited Investor Update Transitioning from a diversified explorer to the developer of a world class high purity manganese project to supply the battery revolution. - August 2018 Disclaimer This

More information

AVINO ANNOUNCES FOURTH QUARTER AND FULL YEAR 2017 PRODUCTION RESULTS FROM ITS AVINO PROPERTY

AVINO ANNOUNCES FOURTH QUARTER AND FULL YEAR 2017 PRODUCTION RESULTS FROM ITS AVINO PROPERTY ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 avino.com January 16, 2018 AVINO ANNOUNCES FOURTH QUARTER AND

More information

INNOVATING SES S TECHNOLOGY SOLUTIONS. Martin Halliwell, Chief Technology Officer

INNOVATING SES S TECHNOLOGY SOLUTIONS. Martin Halliwell, Chief Technology Officer INNOVATING SES S TECHNOLOGY SOLUTIONS Martin Halliwell, Chief Technology Officer Innovating SES s Technology Solutions Expanding flexibility and scalability of SES s global network and capabilities Delivering

More information

Future Matters US Disclosure

Future Matters US Disclosure Disclaimer This presentation has been prepared by Samsung Electronics Co., Ltd. (the "Company"). It does not purport to contain all the information that a prospective investor may require in connection

More information

Update on Strategy and Market Segments Felix Frank Vice President, AutoScout24

Update on Strategy and Market Segments Felix Frank Vice President, AutoScout24 AutoScout24 Update on Strategy and Market Segments Felix Frank Vice President, AutoScout24 Christian Gisy CFO, Scout24 AG Scout24 Capital Markets Day, November 2017 We are the Largest EU Automotive Digital

More information

MORANBAH NORTH MINE. Analyst & Investor Site Visit Australia 28 October 2011

MORANBAH NORTH MINE. Analyst & Investor Site Visit Australia 28 October 2011 MORANBAH NORTH MINE Analyst & Investor Site Visit Australia 28 October 2011 DISCLAIMER Disclaimer: This presentation has been prepared by Anglo American plc ( Anglo American ) and comprises the written

More information

OAO QUADRA. London September 2011

OAO QUADRA. London September 2011 OAO QUADRA London September 2011 Disclaimer The information contained herein has been prepared by the Company. The opinions presented herein are based on general information gathered at the time of writing

More information

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource

More information

Arafura Resources Limited

Arafura Resources Limited Arafura Resources Limited Up and coming supplier of NdPr to permanent magnets used in the growing clean energy industry Corporate Presentation Disclaimer 2 Important Notice This presentation has been prepared

More information

Disciplined Growth From Back-to-Basics Focus

Disciplined Growth From Back-to-Basics Focus Disciplined Growth From Back-to-Basics Focus Stephan DuCharme, CEO X5 Capital Markets Day 2014 Moscow, Russian Federation 29 October 2014 X5 RETAIL GROUP INTRODUCTION 2 CURRENT X5 CONTEXT Effective multi-format

More information

Australia s New Nickel

Australia s New Nickel Australia s New Nickel Proactive Investors Forum, Sydney David Singleton, MD & CEO 9 July 2014 Agenda The Windarra Nickel Mine Black Swan Processing Plant & Mine Nickel Market Boom developing 2 2 Windarra

More information

SA Mining and Exploration Conference Adelaide Convention Centre 11 DECEMBER 2015

SA Mining and Exploration Conference Adelaide Convention Centre 11 DECEMBER 2015 SA Mining and Exploration Conference Adelaide Convention Centre 11 DECEMBER 2015 Disclaimer This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written materials/slides

More information

LITHIUM & BATTERY METALS KORAB RESOURCES LIMITED. For personal use only. Perth, Western Australia March 2018

LITHIUM & BATTERY METALS KORAB RESOURCES LIMITED. For personal use only. Perth, Western Australia March 2018 LITHIUM & BATTERY METALS Perth, Western Australia 21-22 March 2018 KORAB RESOURCES LIMITED Andrej K. Karpinski Executive Chairman Tel: (08) 9474 6166 How Green is Green? 1 21 Why all the Fuss? 2 21 Why

More information

Richmont Mines Provides a Status Update on an Expansion Case Preliminary Economic Assessment for the Island Gold Mine

Richmont Mines Provides a Status Update on an Expansion Case Preliminary Economic Assessment for the Island Gold Mine NEWS RELEASE Richmont Mines Provides a Status Update on an Expansion Case Preliminary Economic Assessment for the Island Gold Mine 11/1/2016 Potential for Increased Production to 1,100 Tonnes per Day with

More information

For personal use only

For personal use only ASX Announcement 1st March 2018 Balama Central Graphite Project Scoping Study shows outstanding economics Battery Minerals Limited (ASX:BAT) is pleased to report it has completed a Scoping Study on the

More information

ASX Announcement 1st March 2018 Balama Central Graphite Project Scoping Study shows outstanding economics

ASX Announcement 1st March 2018 Balama Central Graphite Project Scoping Study shows outstanding economics ASX Announcement 1st March 2018 Balama Central Graphite Project Scoping Study shows outstanding economics Battery Minerals Limited (ASX:BAT) is pleased to report it has completed a Scoping Study on the

More information

For personal use only

For personal use only ABN 64 123 993 233 ASX Announcement 21 March ABN 2016 64 123 993 233 Leigh Creek Magnesite - Project Study Highlights The Study examines possible open pit mining and processing options and provides a strong

More information

HELPING TO PROTECT PROFITS WITH POWERFUL INSIGHT

HELPING TO PROTECT PROFITS WITH POWERFUL INSIGHT HELPING TO PROTECT PROFITS WITH POWERFUL INSIGHT moving money for better CASH MANAGEMENT Contents International opportunity brings financial complexity Page 3 Leverage insight to improve cash flow Page

More information

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation October, 2017

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation October, 2017 Copper Silver Gold TSX-V, Nasdaq First North: FIL filo-mining.com Corporate Presentation October, 2017 CAUTIONARY STATEMENT All information included in this presentation, including any information as to

More information

Operational excellence and organic growth. Mikael Staffas, President Boliden Mines Capital Markets Day November

Operational excellence and organic growth. Mikael Staffas, President Boliden Mines Capital Markets Day November Operational excellence and organic growth Mikael Staffas, President Boliden Mines Capital Markets Day 2017 21 November Disclaimer This presentation has been prepared by Boliden for information purposes

More information

DOING BUSINESS IN CHINA 27 OCTOBER 2017

DOING BUSINESS IN CHINA 27 OCTOBER 2017 DOING BUSINESS IN CHINA 27 OCTOBER 2017 DISCLAIMER - This presentation is intended to constitute a summary of certain information about Synlait Milk Limited (Synlait). It should be read in conjunction

More information

Australasian Code for Reporting of Mineral Resources and Ore Reserves

Australasian Code for Reporting of Mineral Resources and Ore Reserves 1999 Edition Australasian Code for Reporting of Mineral Resources and Ore Reserves (The JORC Code) Prepared by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian

More information

DISCLAIMER. Nothing in this presentation should be construed as either an

DISCLAIMER. Nothing in this presentation should be construed as either an ASX EPM DISCLAIMER Statements contained in this material, particularly those regarding possible or assumed future performance, costs, dividends, production levels or rates, prices reserves or potential

More information