BUFAB Supplier Manual 2.0

Similar documents
Bufab document Page 0/11 Date Version 1.1 BUFAB SUPPLIER MANUAL

Inox Mare shipping and packaging instructions compliance

General Forwarding Instructions

Supplier Policies & Procedures

Transport and packaging instructions for suppliers

Åhléns Delivery Instructions Private Label

SHIPPING INSTRUCTIONS ISPOR 2013 The Convention Centre Dublin 2 nd 6 th November 2013

Logistics Agreement Version 2

LIMITED STORAGE CAPACITY

Supplier Resource Guide

TERMS OF SALE FOR COMPANIES

Shipping Instruction

PRODUCT SPECIFIC TERMS AND CONDITIONS

Greenlee Logistics Guide June 2018

Delivery Delivery Obstacles Deviations from the Specified Quantity of Goods Consignment Note...

Greenlee Logistics Guide June /1/18 rev.

Please ensure this information is forwarded to the appropriate personnel within your organization.

Graco USA Inbound Routing Guide 2018

General Packaging and Shipping Standards

Delivery Delivery Obstacles Deviations from the Specified Quantity of Goods Consignment Note...

PRODUCT SPECIFIC TERMS AND CONDITIONS DHL PAKET EXPORT DHL PARCEL CONNECT

LOGISTICS GUIDE. Guidelines and procedures relating to deliveries made to Indeks Retail.

To: All GHSP suppliers. Subject: Freight Routing Standards and Guidelines

NEW DEAL LLC. [dba AGAINST ALL ODDS] VENDOR COMPLIANCE GUIDE

Work Instructions / Delivery Regulations

Swan Purchase Order Acceptance Policy

Logistics instructions

Delivery Regulation. Delivery Policy for Companies of the HARTING Technology Group. HARTING Delivery Regulation Status:

SHIPPING GUIDELINES VIV EUROPE 2018 UTRECHT ROYAL DUTCH JAARBEURS THE NETHERLANDS CONTENTS: GENERAL INFORMATION page 2

Logistical requirements for delivering goods

Shipping instructions and tariff We are pleased to advise that Hermes Exhibitions & Projects is logistics contractor for Codhy Israel

Huskvarna Manufacturing

General Terms of Delivery

MATERIAL HANDLING & RATES

Supplier International Shipping Instructions

INTERNATIONAL & DOMESTIC SHIPPING INSTRUCTIONS

Laws and Regulations. Valuation. Assists

SAGSE Gaming & Amusement Buenos Aires 2018 Centro Costa Salguero Buenos Aires - Argentina September 11 13, Instruction Letter

Midwest Dental Routing Guide

Expiration Date $0.00 QUOTE TOTAL $45.00

SUPPLIERS SHIPPING GUIDE TABLE OF CONTENTS

SUPPLIER ROUTING GUIDE

Please direct all questions to the Distribution Center s Vendor Compliance Specialist listed in page 1-1. (715)

Packaging Instructions

SUPPLIER PAPERWORK QUALITY REQUIREMENTS. Packing Slips, Invoices, Bill of Ladings

Supplier Compliance and Freight Routing Guide

Supplier Logistics Manual

DB Schenker Terms and Conditions of Transport (Sweden) for Air Freight transport. June For updated version visit us at dbschenker.

All vendors are required to comply with each section of the Vendor Standards Manual unless instructed otherwise by a FLE Purchase Order.

FMP Group (Australia) Pty Ltd Supplier Packaging and Shipping Standard. Document No: PS13 Issue No: 05 Date: 2 July 2015

MCE DEEPWATER DEVELOPMENT, APRIL 2016, PAU, FRANCE

Dokumentenart/document type Prozess/Process Version Seite/page. Guideline S / 15

INA PAACE AUTOMECHANIKA MEXICO 2018 CENTRO CITIBANAMEX Julio 11-13, 2018 Mexico City. Instructions Letter

Canada Milton Service Centre

Shipping Instructions

DHL Product Specific Assignment Domestic

LOGISTICS GUIDELINE. MAHLE Behr global

LOGISTICS GUIDE. Guidelines and procedures relating to deliveries made to Indeks Retail.

Bill Receiver Instructions Page 1

AQM Guideline Myanmar

Ingram Micro Delivery Guidelines

Shipping Informations & Handling Rates. IB Global Conference 2018

Import Service And Procedure Outline

Canada Milton Service Centre

DAFA supplier manual

Dispatch and packing instructions

Vendor Compliance. General Requirements

GNOTEC AB and its subsidiaries

Shaw's Supermarkets, Inc. Vendor Supply Chain Guide: Original Date: Effective February 19, rd Update : Effective March 6, 2011

INTERNATIONAL & DOMESTIC SHIPPING INSTRUCTIONS

Shipping Informations & Handling Rates. European Congress on Obesity 2018

General packaging instructions_en

SPONSOR SHIPPING MANUAL AMSTERDAM, RAI

GENERAL SHIPPING INSTRUCTIONS FOR PGW SUPPLIERS INTERNATIONAL SHIPMENTS PITTSBURGH GLASS WORKS, LLC

Logistics and Packing Instructions. for Suppliers of Kiepe Electric GmbH

Transport and Packaginq Requirements Ludwiq Beck AG Munich

OCEAN MANUAL. General Considerations

Accounts Payable-Vendor Partnership

Introduction to OneFreight POM System. for. Shippers. Hecny Group - Chain Global

Ege Fren SUPPLIER MANUAL D017

Packaging and Shipping Instructions

International Air, Ocean, Ground & Customs Clearance Services International Shipping Instructions

All documents, such as Bill of Lading or Air Waybill must show the consignee as indicated above.

Product Terms for Contract Customers in Domestic Goods Transport

JCPENNEY RETAIL USER GUIDE A GUIDE TO ALL JCPENNEY RETAIL WEBFORMS DOCUMENTS

DHL Product specific assignment terms Domestic

SPORTSMAN S GUIDE (SG)

The purpose of this document is to provide a clear understanding of the return process used by Bosch when processing a credit for our account holders.

Issued: July 2017 Page 1 of 5

Customer Packaging Guidelines

Key Elements Procedure 7 (KEP 7), Logistics Requirements

EWEA OFFSHORE th 21 st November 2013 Frankfurt. International Shipping Instructions and Tariff

Cross Dock. Cross Dock Methods. Cross Dock Criteria and Benefits. Vendor Requirements for Vendor Prepared Cross Dock

STARK's supplier manual

Dear exhibitor and dear standbuilder,

International goods transport product terms for contract customers

DATE: April 15, Kellwood Suppliers. Kellwood Distribution. SUBJECT: Charge-backs for Violation of Packaging, Routing and Documentation Standards

Freight Forwarders: (Agente Transitario) The International Bank IMPORTER-EXPORTER FREIGHT FORWARDER IT- 2: PARTIES INVOLVED IN INTERNATIONAL TRADE.

Transcription:

Page 1/11 BUFAB Supplier Manual 2.0

Page 2/11 Table of contents Flowchart order handling... 2 Order handling... 3 Packing instructions... 4 General... 4 Labels... 5 Pallets... 5-6 Packing pallets... 6 Delivery note... 6 Packing list... 6 Additional regulations... 7 Quality... 8 Invoicing... 9 Invoices... 9 Original documents... 9 Forwarding agent... 9 Logistic... 10 Fundamental principles... 10 Supplementary documents... 10 Consignment documentation... 10 Apendix...11 Appendix B : Confirmation... B1

Page 3/11

Page 4/11 Order handling Inquiry/offer Always use our inquiry number when offering. Please be very accurate and clear when you submit your quotation. Any differences or variations from the requirements in our inquiry have to be clearly explained in the offer, (production remarks). Order Please note that our order identification number consists of seven figures, where the three first figures identify the Bufab buyer and the rest is a running sequence. If you haven t advised any production alternations, we expect a shipment confirming exactly to our order. Time of delivery stated on our purchase order = time of dispatch. Quantity variations must be agreed prior to shipment. Sales confirmation Please send your sales confirmation with reference to our order number by e-mail. Sales confirmation must content the following: - BUFAB P/O Number - QTY; Price; QTY/box - Delivery time - Payment term / Delivery term - Your reference number Transport Please be aware of our instructions concerning shipment. Always use the Forwarding Agent we have stated, if nothing else has been agreed. If you run into problems concerning shipment - Please contact our Freight Department. Invoice/Payment On the day of shipping, please send the invoice by e-mail to us in order that we can be aware of the shipment content. Delivery delays Always tell our Delivery Department about any problems that may cause delays (Do not wait until they have to ask you!) Always advise new delivery times for outstanding order balances.

Page 5/11 Packing instructions General Bufab requires all your cargo to be delivered on wooden pallets. The pallets, collors or cartons used must be strong enough to resist long distance transportation and storing. If not using collars, the package must be securely wraped with tensil plastic. Bufab have the right to invoice all cost which is caused by not fulfilling instructions according to this document. Bufab will refuse any claims caused by not fulfilling this document. For items with odd products size, shape tec. Where it s not possible to follow this document there shall be a written agreement with Bufab. Packing regulations Cardboard packaging material for products For all shipments appropriate packing material are to be chosen. Small dimension parts (Washers/nuts/screws <6mm) must be packed in a polythene bag within the cardboard box. Selection of the cartons shoud be to save space and reduce empty space inside the box. (to prevent broken or damaged boxes during shipments and storing) The box must close firmly when packed. Prefered is to have the box secured with glue or teijp to prevent boxes to open during transport. Prodcts treated with oil or similar substances muste be packed in extra polythene bags to prevent package material to become weakened during transport and storage. Packing regulations according to environmental rules must be followed. Damaged packages during loading and transport caused by insufficient packaging that is not accepted by insuring companies must be covered by the supplier. Packing units given in our purchase orders must be strictly followed. Deviations must be approved by the purchasing department in Bufab. Bulk goods must generally be delivered in packaged units in stable cartons maximum weight 15 kg with information on the number of units and the content (see label information below)

Page 6/11 Labels For articles with expiration date, that date must be stated on the label. Labels must be easy to understand and read. The flowing information is a minimum according to Bufab Standard. (75mm x 52mm) BUFAB LOGO ( see below example black and white logo is accepted) DIN/ISO standard number Bufab P/N (according to our order) Order No (according to our order) Description (according to our order) Supplier No Material strength class Surface treatment as appropriate Dimensions Packaging volume Country of origin Batch number Manufacturing date Pallets All packages are to be loaded onto undamaged and technically intact EURO pallets according to standard UIC (data sheet 435-2) dimensions 800 x 1200mm. Wood humidity of maximum 18% is accepted. Packages are to be loaded compact and secured. Packing should be planed to prevent slipping and with no protrusion parts outside the pallet. Maximum height of palletized units including pallet is 800mm. Total weight of a single palletized unit may not exceed 950kg.

Page 7/11 Packing pallets Articles may not be divided, into part loads between several pallets and packages. Articles with a weight of more than 100kg are to be packed singly onto a pallet. Articles with less weight than 100kg are accepted onto a mixed pallet. Number of mixed pallets should be keept to a minimum. The parts must be well divided and clearly marked for easy identifycation when arrived to our warehouse. Piling pallets is only allowed when it is 100% guaranteed that the goods and the delivered packaging will not be damaged. Delivery note Every shipment must content both goods and original delivery notes. The document must be visible and easy to read. The delivery note must must include the following information: Our Purchase order number Supplier number Bufab part number Country of origin All this information is to be found in all our purchase orders. Pack list When a delivery consists of several packages or pallets the delivery note for each shipment must have a packing list including the following order information: Order number

Page 8/11 Package or/and pallet number Bufab Part number Quantity Number and content of each individual package Each unit (package / pallet) must also have a pack list/content list Additional regulations: Additional our to the regulations above our goods-in depart will control and report shipments if: missing or incorrect order number missing or incorrect article number delivery of incorrect goods missing required test certificate missing delivery note over and under delivery of more than 10% Deviations will be reported and will reflect back on our supplier assessment.

Page 9/11 Quality As a supplier to Bufab we expect that you: Assist with technical knowledge to help us and our customers in the purchasing from you. Make a review of product related requirements prior to starting production and ensure that your organization has the ability to meet the defined requirements. Test and approve every batch prior to release them for delivery to us. In case we ask for it this approval must be sent to us by e-mail. Implement a written internal control plan for each and every item. Specify every special requirement such as machine sorting, PPAP, packings etc. in your sales confirmation. Send quality documents such as product certificates, PPAP, Initial sample reports etc. by e-mail to us acc. to our instructions. We don t accept any sending by fax or paper copies by post no longer. Information of how and where to send the documents by e-mail is given separately. Choose sub suppliers (e.g. for raw material or outsourced processes) that fulfill the expectations from Bufab as a worldwide company. Evaluate your sub suppliers continuously in order to be sure they still fulfill your (our) requirements. Bufab are allowed to conduct a process audid at any time agreed together with the supplier. Have a traceability system for the products that ensure that you can find the material charge used as well as when, where, how the product is manufactured. Mark the labels with our PO number and/or your number as the search key for the traceability of each batch. Maintain the drawings and standards in a system to be sure no one will be able to use wrong issue by mistake. Handle the products in an environment and with equipments that minimize the risk of damages. Only ship parts with deviations if you have got a written Deviation Approval from us. In case of quality claims from Bufab always answer with the Root Cause and your Corrective Action Plan in writing. Use 5Y (five why) analysis to find the real Root Cause. PPAP:s must always be in english and follow the requirements in the international PPAP manual plus, in case, our extra specified requirements. Initial samples with test report, must always be reported on Bufab document and cover all requirements in drawing/standard.

Page 10/11 Invoicing Invoices Please state clearly our order number and your bank details. Always send invoices with e-mail to the each Bufab company invoicing e-mail. Original documents Please send the original documents according to each Bufab company according to purchase order. (See appendix regarding contact information) 4 Commercial Invoices 2 Packing list 4 Bill of lading 2 Certificate of origin (GSP) 2 Insurance Policy Forwarding agent Use our forwarding agent according to our routing order.

Page 11/11 Logistics The following transport and packaging regulations are independent of the Incoterms used, and our purchasing conditions in general. Fundamental principles Packages up to 35kg are to be sent as postal package (Post-Paket) or by private parcel service (e.g. TNT, UPS, etc.). Packages over 35 kg are to be carried by contractual forwarders. In general the shipping method with lowest cost/kg is to be chosen. Missing freight documents will make us refuse the goods. Costs incurred due to this will be at suppliers account. All deliveries to Bufab are to be executed in accordance with the agreed delivery conditions. This will not affect the risk-aspect according to our purchasing conditions. Notification of higher transportation costs due to the use of express-services, such as Air-freight, Express parcels, courier services, etc., need to be communicated in advance. Extra costs can only be accepted if in advance approved by Bufab personnel. Returned goods is to be booked by instruction from supplier. Delivery from Bufab will be on EXWbasis, and pick-up deadline after goods is ready will be: 14 days (Within Europe) 30 days (Outside Europe) Pallets that deviate from the European pallet standard (EUR-pallets, EPAL), will not be accepted. Repacking-costs that arise because of wrong -or poor quality pallets, will be at suppliers expenses. Supplementary documents The entire freight and belonging documentation should be handed over to the assigned forwarder in accordance with the contract. Consignment documentation Every shipment is to be handed over to the forwarder with a transport order. This one is to include: Consignor (supplier) address Consignee address Commercial Invoice Complete Packing list Number of packages in delivery Total weight of consignment GSP certificate (if applicable) Contact logistics@bufab.com