Project Deliverable 4.1.3a Individual City Report - City of Claremont

Similar documents
INTELLIGENT TRANSPORTATION SYSTEMS APPENDIX

Comparison of I-210 and I-710 as Potential ICM Corridors

Connected Corridors. I-210 Pilot Project. Advancing Traffic Control through Big Data & Connectivity. IPAM Program UCLA.

Project Deliverable Concept of Operations and Area Architecture Report

U.S. 101 / San Mateo County Smart Corridor Project

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Connected Corridors I-210 Pilot Project. California Highway Patrol

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

III. ENVIRONMENTAL IMPACT ANALYSIS F. TRAFFIC

Intelligent Transportation Systems

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

Connected Corridors: I-210 Pilot Integrated Corridor Management System. Corridor Description, System Inventory and Needs Assessment

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS

Chapter 10. Intelligent Transportation Systems. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan

MANAGING EXISTING SYSTEMS EFFICIENTLY

I-80 Integrated Corridor Mobility (ICM) Project Corridor System Management Plan (CSMP)

State Route 710 North Environmental Study Update Online Media Briefing July 12, 2013

Richard Clarke Executive Director Program Management. Capital Program Management

Active Traffic Management in Michigan. Patrick Johnson, P.E. HNTB Michigan Inc.

Nashville Area. Regional ITS Architecture. Regional ITS Deployment Plan. June Prepared by:

Strategic Transportation Plan. Presented to: ECO-Rapid Transit Board of Directors Presented by: Gill V. Hicks, Cambridge Systematics, Inc.

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

5.3 Traffic and Circulation

Chapter 4: Transportation and Circulation

10.0 Congestion Management Process

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

Goleta Ramp Metering Study

5.4.1 METHODOLOGY AND PERFORMANCE CRITERIA

San Francisco Freeway Corridor Management Study (SF FCMS)

Strategic Transportation Plan FOCUS ON TRANSIT

King County Intelligent Transportation Systems

City of Lake Forest SERRANO SUMMIT (IRWD SITE) Traffic Study. April 2010

2016/2017 Organizational Chart. Effective 7/1/2016 Budgeted 29 FTE Positions Budgeted 1 Part-Time Position Budgeted 4 Intern Positions

GOLD LEVEL AWARD WINNER. City of Pomona Sustainability Best Practices Activities

Interstate 10/605 Transition Connector from SB I-605 to EB I-10

US 75 Integrated Corridor Management

THANK YOU TO ALL THE I-210 PILOT STAKEHOLDERS FOR YOUR COMMITMENT TO THE PROJECT

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

Chapter 3 FREEWAY CORRIDOR TRAFFIC MANAGEMENT

City of Berkeley. Guidelines for Development of Traffic Impact Reports

Intelligent Transportation Systems Master Plan

3.6 GROUND TRANSPORTATION

ELEMENT M GROWTH MANAGEMENT

Final Land Use and Development Opportunities Report 5.0 Environmental Impact/Environmental Consequences

Appendix O Congestion Management Program REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY

3.14 TRANSPORTATION AND TRAFFIC

Final Congestion Management Process

UPTOWN TRAFFIC IMPACT ANALYSIS

Atherton Street Traffic Signal & ITS Improvements

Connected Corridors I-210 Pilot Project. User Needs Workshop

Truck Parking Information Management System (TPIMS) Glossary

Final Environmental Impact Report Student Housing Replacement

Appendix O Level of Service Standard and Measurements

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

ITS NEWS. Building Southern California s Goods Movement System for the Next Century. Gateway Cities. I-710 Zero Emissions Freight Corridor

SILVER LEVEL AWARD WINNER. City of Pomona Sustainability Best Practices Activities

Vicinity Map. Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County

North I-75 Master Plan Summary

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines

Puget Sound Regional ITS Architecture Update. Why does the region need an ITS Architecture?

6.2.2 Environmental Consequences and Mitigation Measures

South Bay Measure R Highway Program (SBHP) Strategic Transportation Element. Planning & Programming Committee Meeting

Future Build Alternative Traffic Forecasts and Level of Service Analysis

Connected Corridors: I-210 Pilot Integrated Corridor Management System

Los Angeles County Congestion Reduction Demonstration Project

CHAPTER 3 - FREEWAY CORRIDOR TRAFFIC MANAGEMENT

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

INTERCHANGE MODIFICATION REPORT

Countywide Comprehensive Transportation Plan

2. OMNITRANS SYSTEM. 2.3 Omnitrans Services. 2.1 Background. 2.4 Traditional Fixed Route Service. 2.2 Omnitrans Mission TRANSIT DESIGN GUIDELINES

4.11 TRANSPORTATION AND CIRCULATION

The I-80 Integrated Corridor Mobility (ICM) Project

VIII. LAND USE ISSUES

Woodburn Interchange Project Transportation Technical Report

EIGHT PLANNING FACTORS

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

Traffic and Parking. Introduction. 3G.2 Environmental Setting. Description of Key Roadways

Chapter 2 Transportation Element Goals, Objectives and Policies

APPENDIX H: TRAVEL DEMAND MODEL VALIDATION AND ANALYSIS

CITY OF SAN MATEO GENERAL PLAN MITIGATION MONITORING AND REPORTING PROGRAM

Intelligent Transportation Systems (ITS) Concept of Operations for Freeway Traffic Management

Connected/Autonomous Vehicles in a

Chapter 3 Transportation System Management & Operations and Travel Demand Management

ITS Projects. Page 1 of 5. Project Name Project Status Timeframe Project Description

CHAPTER 8 TRANSPORTATION ELEMENT

EXECUTIVE SUMMARY. 1. Introduction

SR 710 Environmental Study

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS

Five Year Capital Improvement Program

Funding Intelligent Transportation Systems in the Los Angeles Region

TRANSPORTATION IMPACT ANALYSISGUIDELINES

Gateway Cities Traffic Signal Synchronization and Bus Speed Improvement Project I-5/Telegraph Road Corridor. Deliverable 3.1.2

CONCEPT OF OPERATIONS REGIONAL TRANSIT SIGNAL PRIORITY IMPLEMENTATION PROGRAM (RTSPIP) FOR THE DEVELOPED FOR:

Ramp Metering District

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

Appendix F 2008 Travel Demand Modeling

Estimating Work Zone Performance Measures on Signalized Arterial Arterials

NORTH I-75 MASTER PLAN Summary Report

GENERAL PLAN UPDATE. Joint Study Session April 13, 2017

Decision Support Systems for FDOT District 4 TSM&O

Transcription:

Pomona Valley ITS Project Project Deliverable 4.1.3a Individual City Report - City of Claremont Prepared by: May 1, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc

TABLE OF CONTENTS INDIVIDUAL CITY REPORT - PROJECT DESCRIPTION... 1 PURPOSE OF REPORT... 1 1.0 STUDY AREA CHARACTERISTICS... 2 1.1 STUDY ARTERIALS... 2 1.2 CONGESTED INTERSECTIONS AND ARTERIAL SEGMENTS... 4 2.0 TRAFFIC CONTROL AND MONITORING SYSTEM... 5 3.0 OPERATIONS AND MAINTENANCE ISSUES... 7 4.0 INTERAGENCY AND LOCAL CITY ISSUES... 8 5.0 NEXT STEPS... 9 Appendix A - Figures Appendix B - Traffic Signal Equipment Within Claremont 099017000 Individual City Report Claremont PVITS 413a Claremont 050102 10/03/2001

PROJECT DESCRIPTION The County of Los Angeles, in cooperation with the cities within the Pomona Valley, has determined that development of an Intelligent Transportation System (ITS) in the Pomona Valley would help to reduce congestion, enhance mobility, provide traveler information during non-recurring and event traffic congestion, and manage event traffic. The Pomona Valley Intelligent Transportation Systems (PVITS) project was conceived as a recommendation from the Pomona Valley Feasibility Study completed by the MTA in 1995. The ultimate objectives of the Project are to: Improve mobility by optimizing traffic management on arterials and freeways; Enhance Route 60 capacity by better coordinating freeway traffic with parallel arterials; Improve agency efficiency by coordinating management of operations and maintenance efforts among and between agencies; and Increase agency staff productivity by providing low-maintenance, high-quality communications and computational tools to assist in daily management and coordination activities. PURPOSE OF REPORT The Conceptual Design of the Pomona Valley ITS project includes the preparation of a Stakeholder Operational Objectives Report that summarizes each project stakeholder's needs, objectives, and issues to consider in the planning, design, and implementation of advanced technologies for traffic control, traffic management, and traveler information systems. This Individual City Report document provides a summary of existing, planned (already approved), and desired transportation projects and policies within the City of Claremont. This summary is based upon information in the 1995 Pomona Valley Forum Signal Synchronization Study, with updates to the information based upon city input from recent surveys and coordination meetings. Separate reports of data summaries and stakeholder objectives have been created for each City within the Pomona Valley project area. This report provides the following information for the City of Claremont: Section 1.0: Definition and overview of the study area Section 2.0: Existing, planned, and desired traffic control and communications infrastructure Section 3.0: Current issues and desired aspects of operations and maintenance Section 4.0: Current issues and desired aspects of interagency coordination Figures illustrating the locations of existing and planned traffic control equipment and congestion issues are included in Appendix A. A list of all existing and proposed signalized intersections on study arterials within the City is included in Appendix B. The Stakeholders Operational Objectives Report (Deliverable 4.1.2) is a separate document that will be developed as part of this project. It will provide more specific detail on the ideal operational characteristics of the PVITS equipment and user interfaces. PVITS 413a Claremont 050102 Page 1 10/03/2001

1.0 STUDY AREA CHARACTERISTICS The study area for Claremont was based upon the definition of roadway "significance" in the 1995 Pomona Valley Forum Signal Synchronization Study. This determination of roadway significance utilized roadway Average Daily Traffic (ADT) levels and Level of Service (LOS) ratings, along with other factors such as roadway inclusion in the Congestion Management Program (CMP), the number of transit routes utilizing the roadway, and local agency preference. 1.1 Study Arterials Table 1 on the next page provides a summary of the arterials considered as "regionally significant" within Claremont, along with the major factors for prioritization that were utilized in the 1995 Synchronization Study. Based upon discussions with City staff during project coordination meetings, and based upon the city questionnaire, there are no additional roadways within Claremont that will be analyzed as part of this project. The location of the regionally significant arterials and other prominent roadways in the City are illustrated in Figure 1 of Appendix A. Indian Hill Blvd TABLE 1: STUDY AREA ARTERIAL SIGNIFICANCE SUMMARY Street Average Daily Traffic 12,400 32,481 Number of Transit Routes CMP Arterial 3 Yes Towne Avenue 17,000 1 Yes Foothill Boulevard 36,500 41,500 3 Yes Arrow Highway 26,100 1 Yes Baseline Road Source: Kimley-Horn and Associates, Inc., 2001 17,200 21,600 1 Yes Transit Availability Table 1 also indicates transit availability along the city study arterials. A total of six transit lines serve Claremont, with all service provided by Foothill Transit. Many of these lines serve the Claremont Transit Center on First Street, east of Indian Hill Boulevard. This Center is also served by the Metrolink San Bernardino Line commuter trains. PVITS 413a Claremont 050102 Page 2 10/03/2001

Line 187 serves Foothill Boulevard throughout its extents within Claremont. The line also serves points in Claremont and Montclair to the east, and cities to the west including Pasadena. Line 195 provides peak-period service on Indian Hill Boulevard, from Holt Avenue in Pomona to Baseline Road on the north side of Claremont. Line 292/294 provides circulator service between Claremont and Pomona, serving segments of Indian Hill Boulevard, Mountain Avenue, Towne Avenue, and Foothill Boulevard. Line 479 provides service along Arrow Highway, on its route between Montclair, the Claremont Transit Center, Fairplex, and the Cal Poly campus. Line 480 provides service along Indian Hill Boulevard, south of First Street, on its route between Montclair, the Claremont Transit Center, Pomona, West Covina, and downtown Los Angeles. Line 690 provides limited-stop service along Foothill Boulevard and Indian Hill Boulevard on its route between Montclair, Claremont, and downtown Pasadena. Roadway Descriptions The following paragraphs summarize the characteristics of each of study area arterial within Claremont Indian Hill Blvd: This four-lane roadway provides north-south access within Claremont. Between First Street and Foothill Blvd, the roadway includes only one lane in each direction. It provides access to all of the major east-west roadways in Claremont, and provides full access to the I-10. Foothill Blvd.: This state highway (Historic Route 66) provides the main east-west access through the city study area. The roadway intersects with the study arterials of Indian Hill Blvd. at the center of the city and with Towne Avenue on the west side of the city. To the west, the roadway provides direct access to the current eastern terminus of the SR 30 (soon to be SR 210) freeway. Outside of the city study area, the roadway provides access into San Bernardino County and the Inland Empire, and to the west the roadway provides access to the foothill cities of the San Gabriel Valley. Arrow Highway: This local highway provides major east-west access through the south side of the city study area. It intersects with Indian Hill Blvd. at its mid-points in the study area. Outside of the study area, the roadway provides full access to the I-210 freeway in San Dimas. Baseline Road: This local highway provides east-west access through the north side of the city study area. It parallels the route of the SR 210 freeway, currently under construction. Existing truck route designations within the city are illustrated in Figure 2 of Appendix A. PVITS 413a Claremont 050102 Page 3 10/03/2001

1.2 Traffic Congestion This section provides an overview of congestion issues for the city study area arterials and intersections. Figure 3 in Appendix A illustrates the Average Daily Traffic levels of the regionally significant arterials within Claremont and the Level of Service (LOS) at selected intersections. Supplemental traffic counts were made at congested points within Claremont in order to update the intersection LOS. Table 2 indicates the peak-hour LOS at selected intersections. TABLE 2: LEVEL OF SERVICE (LOS) OF SELECTED INTERSECTIONS, STUDY AREA AM Peak PM Peak Intersection Period LOS Period LOS Foothill Boulevard / Towne Avenue C E Foothill Boulevard / Indian Hill Boulevard F F Indian Hill Boulevard / Arrow Highway C C Indian Hill Boulevard / I-10 eastbound ramps D D Indian Hill Boulevard / I-10 westbound ramps D D LOS values are based upon intersection turn movement counts conducted during the week of June 25, 2001. Data was analyzed utilizing the 1997 Highway Capacity Manual method. The intersections identified in Table 2 are based on June, 2001 traffic counts and supplement input from City staff. The table indicates that only the Indian Hill Boulevard/Arrow Highway intersection operates at acceptable LOS during both peak periods. Figure 4 in Appendix A illustrates the congested areas in the city as verified by the City of Claremont during project coordination meetings. The worst-case LOS of an intersection or arterial defines its performance. Therefore, the corridors defined in Figure 4 as congested will continue to be noted as congested for the purposes of this project. The information below provides a summary of congestion issues in Claremont as indicated by City staff during project coordination meetings and correspondence. The highest levels of congestion in the City are located at the Indian Hill Boulevard intersections with Foothill Boulevard, Arrow Highway, and the I-10 freeway ramps. The SR 30 (now SR 210) opening is anticipated to reduce traffic elsewhere in the City. The City expects that the bottleneck on Baseline will be mitigated by the SR 30 opening. There is an existing radius problem at the First Street/Indian Hill Boulevard, along the City's transit corridor. The intersection is planned for improvement to widen the First Street eastbound lanes and change the split phase of the traffic signal timing. There are seven Claremont Colleges, with a total current enrollment of over 5000 students. Parking overflow from the colleges is an issue, especially on residential streets. PVITS 413a Claremont 050102 Page 4 10/03/2001

2.0 TRAFFIC CONTROL AND MONITORING SYSTEM This section provides an overview of the existing and planned traffic signal equipment, and related communications and monitoring equipment. This represents the core infrastructure from which an ITS system can be conceptualized. The remaining sections of the document provide an overview of traffic operations, and system operations and institutional issues. Claremont is primarily a developed community with established traffic patterns. No major development projects are currently planned, outside of the current redevelopment of the west side of the downtown area. This area lies to the west of Indian Hill Boulevard, north of First Street. Figure 5 in Appendix A indicates the 24 existing traffic signal control equipment locations on the study area arterials within Claremont. Appendix B provides a list of the locations of these traffic signals. Issues concerning the City's existing traffic signals, and its objectives for planned (and desired but not funded) equipment, including a communications system, are provided in the following lists: Existing System All current traffic signals utilize Type-170 controllers. The City does not have a Communication Master Plan. Signal coordination is done via fixed time plans at each controller. Signal timing efforts are contracted out. Arrow Highway currently has WWV equipment. There is a fiber optic conduit, owned by GST Telecom, that extends the whole length of this arterial within the City. Vehicle detection is done by an advanced vehicle loop detection system. Bicycle detection loops are installed at the intersection of Bonita Avenue / Indian Hill Boulevard Baseline signalized intersections are controlled by Caltrans Foothill Boulevard signalized intersections are controlled by Caltrans. Recent Roadway Improvements The City received grant funding to design and build roundabouts in the City; but the grant will not be used after negative citizen reaction to a recent demonstration project. Caltrans widened Indian Hill/I-10 ramp to add stacking capacity. The County of Los Angeles completed the synchronization of traffic signals on Arrow Highway. The County proposed a lane-addition to the Arrow Highway corridor through Claremont as part of the synchronization project, but the City did not support the additional lane, and it was not constructed. According to the City, Caltrans proposed to re-stripe the Foothill Boulevard intersection at Indian Hill Boulevard, which operates poorly. No re-striping has been done, due to opposition from City staff and residents. The I-10 HOV projects are estimated to be completed within 2 years. This project included additional ramp capacity. Los Angeles County proposed re-striping Foothill Boulevard for three lanes. The City did not support the proposal. PVITS 413a Claremont 050102 Page 5 10/03/2001

Planned Improvements The City is planning a new traffic signal to Indian Hill Boulevard at Second Street in the future; Synchronization of this section of Indian Hill Boulevard is crucial to the City. Signals along Indian Hill Blvd. will be synchronized between American Avenue and Bonita Avenue as part of a previous MTA Call For Projects. The Indian Hill Blvd. synchronization will also need to be coordinated with Arrow Highway traffic volumes. The City s short-range fiber optic plan gives priority to lines to all schools and public buildings. The technology companies in the Business District and the Claremont Colleges would benefit from the higher bandwidth of fiber optic cable. The City s long-term fiber optic plan includes provisions of lines to all buildings. If the PVITS project installs fiber in the City of Claremont, one option is to attach it to the Edison poles above ground if available. This would save installation trenching costs The City s Cable TV infrastructure is likely to be upgraded, as AT&T Broadband recently purchased the City system. Desired Improvements Monitoring and control of the Indian Hill/Bonita intersection. Monitoring and control of the Indian Hill/Arrow Highway intersection. Monitoring and control of Indian Hill Blvd. signals at I-10 ramps, and at American Avenue to the south Coordination on Indian Hill is desired with City of Pomona traffic signals to the south. It is desired to have improved traffic flow at Indian Hill Boulevard / Arrow Highway to facilitate movement of transit vehicles to and from the Claremont TransCenter to the north. The City has some knowledge of adaptive traffic signal control systems, that adapt to actual traffic conditions to optimize system performance. The City would consider implementing such a system, with more knowledge of its benefits. The City feels that an adaptive control system would improve traffic flow, and would automate the generation of signal timing plans. Closed-Circuit Television (CCTV) surveillance and video detection (VIDs) would be desirable for queue monitoring (primarily), as well as surveillance, incident verification, congestion monitoring, equipment status monitoring, and traffic counting. Red light enforcement cameras would need to go through the commission and City Council process prior to use. It is understood that the CCTV and VIDs being proposed are not for red-light enforcement. The City would like to have full video capabilities (pan/tilt/zoom) at Indian Hill/Arrow Highway. A CCTV system would be desirable for such functions at the Indian Hill intersections of Arrow Highway, the I-10 ramps, and signals near the downtown village area. Equipment location planning should consider that street lighting is spaced at 150-foot intervals. There is no anticipated public resistance to cameras. Changeable Message Sign (CMS) Objectives The City will have concerns over the aesthetic effects of CMS on its roadways. The location and size of the sign would need to be reviewed prior to placement. The City is reluctant to allow or encourage freeway traffic to use local streets as alternate routes. PVITS 413a Claremont 050102 Page 6 10/03/2001

The main decision-making points, ideal for CMS placement, are the intersections of Arrow Highway / Claremont Boulevard, Indian Hill Boulevard / Arrow Highway, and Indian Hill Boulevard / I-10. Information Kiosk Objectives The City is currently in the process of obtaining a Foothill Transit Kiosk at the Claremont Depot (on First Street, east of Indian Hill Boulevard, within the Village). Note: This has been postponed indefinitely at this time. The Foothill Transit Kiosk will be linked to the Foothill Transit and City of Claremont web sites to provide transit scheduling and fare information, as well as tourism and special event information. Note: see above. There is an Automated Traveler Information System (ATIS) currently being developed for the Metrolink trainsets, and the Claremont Depot passenger platform. Foothill Transit is currently developing a real-time GPS; next bus information is planned to be included in information provided at several electronic kiosks on the campuses of the Claremont Colleges. The City Council wants to establish high-speed internet access at City Hall which could be utilized for a kiosk link. A kiosk may be installed in the City Hall lobby so that residents would be able to view map information and possibly video images. It would be very desirable to have traveler information on the web. 3.0 OPERATIONS AND MAINTENANCE ISSUES The City of Claremont has identified specific system operations and maintenance issues regarding PVITS implementation within the City. The issues discussed during project coordination meetings included resources and staffing for maintenance of the current traffic control system, monitoring of traffic, and traffic data collection. Also discussed were operations and maintenance issues of an ITS system, and all of its related components. Operational Objectives A local city control site could be developed around the Local Area Network that currently connects City Hall with the Police Department. The City would like the local city control site to be located at the engineering department, with an additional workstation at the police department for viewing intersection congestion. Future traffic control systems would need to integrate signal operations, in order to ensure proper operation of the planned synchronization along Indian Hill Boulevard. Data collected from the traffic management system could be shared with Claremont planning personnel, local transit operators, emergency services agencies, and the Claremont Police Department. Subregional control of local signals would be acceptable to City under limited conditions, where such control makes sense to all agencies involved and when local traffic is not negatively impacted. PVITS 413a Claremont 050102 Page 7 10/03/2001

The City would be willing to dedicate one-quarter of a full-time staff person s time to operate an automated traffic management system. Installation of equipment that requires trenching in street right-of-way is limited by two-year moratorium on pavement modification to newly paved streets. Placement of aerial equipment needs to be in compliance with the City s antenna height limitations. The City would continue to contract out troubleshooting and maintenance of problem equipment. Desired Improvements The current traffic control system used by the City of Claremont is not capable of the following features, but the City desires to have such functions in future system upgrades: Remote monitoring and control of specific traffic signals Remote data retrieval of phase indication, timing, traffic volume and speed Centralized special event management Centralized seasonal traffic management Centralized emergency management and disaster operations Current Maintenance Issues Current maintenance is performed by contract only. The annual cost for maintenance of the city traffic control system is approximately $25,000. Problems with traffic control equipment are reported, in roughly equal percentages, by public call-in, police call-in, city traffic staff observations, and maintenance contractor observations. The City s ability to identify current traffic control equipment problems is adequate. The City has a signal maintenance contract with SMI at approximately $1100 per year per signal. The City s ability to respond to such problems is poor, as all maintenance work is contracted out. A call must be made by the City (or Police Department during non-business) hours for repair work. 4.0 INTERAGENCY AND LOCAL CITY ISSUES The following list documents issues of communication, cooperation, and agreement between internal city, and other local and regional agencies. The City feels that there should be improved daily communication among the Pomona Forum cities regarding traffic issues. The City is willing to share with other jurisdictions crucial data such as phase indication, timing, traffic volume and speed, and occupancy. The City would like to receive this same data, in turn, from neighboring local jurisdictions. The City would not support the creation of pre-determined timing strategies by a sub-regional entity, such as the project TMC. The only major known developments that will occur within Claremont in the next five years is a new college on Foothill of approximately 80 students and Claremont Hills. Councilperson Al Leiga represents the San Gabriel Valley Council of Governments on the Gold Line Construction Authority Board. PVITS 413a Claremont 050102 Page 8 10/03/2001

5.0 NEXT STEPS The information summarized within this document will be utilized to formulate the Stakeholders and Operational Objectives Report (Deliverable 4.1.2). This document will provide a project-wide evaluation of stakeholder needs and wishes, and provide a basis for the Requirements Analysis under Task 5 of this project. The Stakeholders and Operational Objectives Report will provide the following analyses of PVITS project implementation, from information summarized in the Individual City Reports: Anticipated benefits to stakeholders Potential cost implications to stakeholders Potential impacts on local agency staffing and operation Potential impacts on local agency management and maintenance costs Deliverables from the Addendum Report, Route 60 Feasibility Study, and the Fairplex Traffic Management Plan efforts will also be incorporated into the Requirements Analysis task, and into tasks beyond this, such as the Concept of Operations and Alternatives Analysis. PVITS 413a Claremont 050102 Page 9 10/03/2001

Appendix A Figure 1: Regionally Significant Arterials Figure 2: Existing Truck Routes on Regionally Significant Arterials Figure 3: Average Daily Traffic and Level of Service (LOS) at Selected Locations on Regionally Significant Arterials Figure 4: Traffic Congestion Locations on Regionally Significant Arterials Figure 5: Traffic Signal and Control Equipment Locations on Regionally Significant Arterials PVITS 413a Claremont 050102 10/03/2001

MONTE VISTA AVE MOUNTAIN AVE GAREY AVE N DARTMOUTH AVE TOWNE AVE COLLEGE AVE BASELINE RD 30 SR 210 EXTENSION SCRIPPS DR RANCHO SANTA ANA BOTANIC GARDEN GOLF COURSE N FOOTHILL BLVD 66 BLVD NTS HARRISON AVE 6TH ST BONITA AVE 2ND AVE COLLEGES ARROW HWY 1ST AVE LEGEND STUDY ARTERIALS SAN JOSE AVE FIGURE 1 : - REGIONALLY SIGNIFICANT ARTERIALS 10 OTHER ROADWAYS FREEWAYS SR - 210 FREEWAY (under construction) CITY LIMITS

MONTE VISTA AVE MOUNTAIN AVE GAREY AVE N DARTMOUTH AVE TOWNE AVE COLLEGE AVE BASELINE RD 30 SR 210 EXTENSION SCRIPPS DR RANCHO SANTA ANA BOTANIC GARDEN GOLF COURSE N FOOTHILL BLVD 66 BLVD NTS HARRISON AVE 6TH ST BONITA AVE 2ND AVE COLLEGES ARROW HWY SAN JOSE AVE 1ST AVE FIGURE 2 : - EXISTING TRUCK ROUTES ON REGIONALLY SIGNIFICANT ARTERIALS 10 LEGEND STUDY ARTERIALS OTHER ARTERIALS FREEWAYS SR - 210 FREEWAY (under construction) CITY LIMITS TRUCK ROUTES

MONTE VISTA AVE MOUNTAIN AVE GAREY AVE N DARTMOUTH AVE TOWNE AVE COLLEGE AVE 5,098 SR 210 EXTENSION 17,200 BASELINE RD 12,400 30 21,500 21,600 SCRIPPS DR RANCHO SANTA ANA BOTANIC GARDEN GOLF COURSE N NTS C/E 17,000 16,200 FOOTHILL BLVD 37,300 HARRISON AVE BONITA AVE 22,500 ARROW HWY 66 F/F 6TH ST 1ST AVE 26,100 41,500 2ND AVE COLLEGES BLVD 36,500 LEGEND STUDY ARTERIALS OTHER ROADWAYS FREEWAYS SR - 210 FREEWAY (under construction) C/C SAN JOSE AVE D/D FIGURE 3 : - AVERAGE DAILY TRAFFIC AND LEVEL OF SERVICE (LOS) AT SELECTED LOCATIONS ON REGIONALLY SIGNIFICANT ARTERIALS 32,481 D/D 10 177,000 31,238 A D CITY LIMITS FREEWAY ADT ARTERIAL ADT LEVEL OF SERVICE AM/PM

MONTE VISTA AVE MOUNTAIN AVE GAREY AVE N DARTMOUTH AVE TOWNE AVE COLLEGE AVE BASELINE RD 30 SR 210 EXTENSION SCRIPPS DR RANCHO SANTA ANA BOTANIC GARDEN GOLF COURSE N FOOTHILL BLVD 66 BLVD NTS HARRISON AVE 6TH ST BONITA AVE ARROW HWY SAN JOSE AVE 1ST AVE 2ND AVE COLLEGES FIGURE 4 : - TRAFFIC CONGESTION LOCATIONS ON REGIONALLY SIGNIFICANT ARTERIALS 10 LEGEND STUDY ARTERIALS OTHER ROADWAYS FREEWAYS SR - 210 FREEWAY (under construction) CITY LIMITS CONGESTED INTERSECTION CONGESTED ARTERIAL

MONTE VISTA AVE MOUNTAIN AVE GAREY AVE N DARTMOUTH AVE TOWNE AVE COLLEGE AVE BASELINE RD 30 SR 210 EXTENSION SCRIPPS DR RANCHO SANTA ANA BOTANIC GARDEN GOLF COURSE N FOOTHILL BLVD 66 BLVD NTS HARRISON AVE BONITA AVE ARROW HWY SAN JOSE AVE 1ST AVE 2ND AVE COLLEGES FIGURE 5 : - TRAFFIC SIGNAL AND CONTROL EQUIPMENT LOCATIONS ON REGIONALLY SIGNIFICANT ARTERIALS 6TH ST OAK PARK 10 LEGEND STUDY ARTERIALS OTHER ROADWAYS INTERCONNECT CONDUIT FREEWAYS SR - 210 FREEWAY (under construction) CITY LIMITS TRAFFIC SIGNALS PLANNED TRAFFIC SIGNALS DESIRED CCTV LOCATIONS

Appendix B TRAFFIC SIGNAL EQUIPMENT ON REGIONALLY SIGNIFICANT ARTERIALS WITHIN Signalized Intersection Phases Ownership Arrow Highway / Mountain Avenue 2 Cities of Claremont & Pomona Arrow Highway / Indian Hill Blvd. 8 City of Claremont Arrow Highway / Cambridge Avenue 2 Cities of Claremont & Pomona Arrow Highway / College Avenue 2 City of Claremont Arrow Highway / Mills Avenue 3 City of Claremont Baseline Road / Towne Avenue 5 Caltrans Baseline Road / Mountain Avenue 4 Caltrans Baseline Road / Indian Hill Blvd. 4 Caltrans Baseline Road / Mills Avenue 4 Caltrans Baseline Road / Monte Vista Avenue 6 Caltrans Foothill Blvd. / Dartmouth Avenue 2 Caltrans Foothill Blvd. / Towne Avenue 4 City of Claremont & Pomona Foothill Blvd. / Mountain Avenue 4 City of Claremont Foothill Blvd. / Indian Hill Blvd. 8 Caltrans Foothill Blvd. / Mills Avenue 4 City of Claremont Foothill Blvd. / Claremont Blvd. 8 Caltrans Indian Hill Blvd./ American Avenue 4 Cities of Claremont & Pomona Indian Hill Blvd./ Eastbound I-10 Ramps 4 Caltrans Indian Hill Blvd./ Westbound I-10 Ramps 4 Caltrans Indian Hill Blvd./ San Jose Avenue 6 City of Claremont Indian Hill Blvd./ 1 st Street 6 City of Claremont Indian Hill Blvd./ Bonita Avenue 6 City of Claremont Indian Hill Blvd./ Harrison Avenue 4 City of Claremont Indian Hill Blvd./ Claremont High School 4 City of Claremont Indian Hill Blvd./ Cinderella Drive Oak Park 2 City of Claremont Indian Hill Blvd. / 2 nd St. [PLANNED] NOTE: All current and planned signal equipment utilizes Type-170 controllers. PVITS 413a Claremont 050102 10/03/2001