Taxiways P and P7 Drainage Improvements Re-bid CONTRACT NO ADDENDUM NUMBER ONE

Similar documents
ADDENDUM NUMBER FOUR

2018 Roadway Erosion Control CONTRACT NO ADDENDUM NUMBER TWO

2019 Annual Airfield Pavement Rehabilitation CONTRACT NO ADDENDUM NUMBER ONE

CITY AND COUNTY OF DENVER

TABULATION OF BIDS DENVER INTERNATIONAL AIRPORT. Denver, Colorado CONTRACT NO. CE CONCOURSE C EAST APRON EXPANSION BID SUMMARY

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE,

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

Today s Date: April 15, 2015 Bid Opening Date: April 22, 2015

For Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of

Snow Removal Equipment Storage Building

TABULATION OF BIDS DODGE CITY REGIONAL AIRPORT DODGE CITY, KANSAS RECONSTRUCT RUNWAY 14-32: SUMMARY PROJECT NO.: AIP

ITEM DESCRIPTION EST. QUANT. UNIT UNIT PRICE P

ADDENDUM NO. ONE REHABILITATION OF TAXIWAY G AND RECONSTRUCTION OF TAXIWAY D FOR THE TRENTON-MERCER AIRPORT AB

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

Company Page 1 of 13

YES, we received Addendum No. 1

BID FORM. TxDOT CSJ No. 1507JNCTN. Project Description: T-Hangar Development Project. Bid by: Name of Bidder. Address: Address:

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum:

CONTRACT ID : COMPLETION DATE : 09/15/08 =========

ADDENDUM NO. 1. CITY OF FORT MORGAN CONSTRUCT RUNWAY BID AIP Project No March 7, 2014

Bid Form. Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded)

CITY OF ELKO BID TABULATION FOR Sports Complex

URS CORPORATION NY Contract No. C REPUBLIC AIRPORT RUNWAY 1-19 RUNWAY SAFETY AREA (RSA) IMPROVEMENTS ADDENDUM NO. 4 TO:

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority

10:00 AM, Wednesday, May 6, Peters Creek Sanitary Sewer Rehabilitation Project

**BID OPENING DATE CHANGE Bid Open Date: Thursday, March 29, 2018 at 11:00 AM

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

Bid Form. To the Texas Department of Transportation hereinafter called the Agent.

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

BID FORM. Alt. Bid: Additional extension of proposed taxiway from STA: to TW F/G intersection, approximately 1,095 feet.


SECTION PAYMENT PROCEDURES

BASE BID FORM FY 2015

BASE BID Description Written & Numeric Price

10:00 AM, Wednesday, April 8, 2015

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2)

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1

Michael Baker International, Inc West Linebaugh Avenue Suite 240 Tampa, Florida Fax

ADDENDUM NO. 1 APRIL 24, 2017

ADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road

BID FORM (LUMP SUM CONTRACT)

ADDENDUM NUMBER THREE

A D D E N D U M N O. 4

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 SECTION 2 BID TOTAL

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of

City of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion

ADDENDUM. DATE: 10/12/15 BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: BID DATE: 10/27/15 ADDENDUM No: 1

2. Insert Pre-Bid Meeting Minutes, and Sign-in Sheet before Technical Specifications.

Maine Turnpike Authority

ADVERTISEMENT SET DECEMBER 2013

NOTICE TO BIDDERS. August 24, 2016 ADDENDUM NO. 1. Gosling Road Pedestrian, Bike & Related Improvements

BID FORM - LUMP SUM BID

REVISED PER ADDENDUM No. 1 - Unit Price Bid Schedule

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02

$ per ton x 12,000 = $ _ (Subtotal)

LJA Engineering, Inc.

Date of Advertisement: December 30, 2009 in the Herald Newspapers

ADDENDUM NUMBER THREE

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25

New Jersey Department of Transportation DATE : 05/17/12 PAGE : TABULATION OF BIDS

Forsyth County Procurement

Section C-111 ADVERTISEMENT FOR BIDS WINSTON-SALEM/FORSYTH COUNTY UTILITY COMMISSION IDOLS ROAD REGIONAL LIFT STATION

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF

ADDENDUM #2. FROM: Union County Engineers Office Luke Sutton. DATE: June 27, Mill Creek Estates WWTP Improvements. PAGES (including cover): 5

SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO.

SUBJECT: ADDENDUM #1 IFB # Taxiway A Rehabilitation - Bid Package 1 at Myrtle Beach International Airport (MYR) NOTICE of REVISIONS:

4TH STREET SEWER EXTENSION TO MBR PLANT BID SOLICITATION NO

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CECIL COUNTY, MARYLAND. ADDENDUM #2 Bid ; Marley Road Sewer Extension

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION

Maine Turnpike Authority

Addendum No. 1 Issue Date: March 29, 2016

Maine Turnpike Authority

Project Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS

ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013

REQUEST FOR BIDS CULVERT REPLACEMENT PROJECT FREEPORT, MAINE

MAY 11, 2017 T-MC-107A & T-MC-107B1

ADDENDUM NO This Addendum No. 5 shall be part of the Contract Documents and consist of pages ADD5-1 through ADD5-4 and attachments.


MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

ADDENDUM NO. 1. DATE ISSUED: June 1, 2018

SECTION EROSION AND SEDIMENTATION CONTROL

A new Proposal Form is being issued with this Addendum, the following is an explanation of the changes, disregard originally issued form.

County of Georgetown, South Carolina

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

SECTION May 17, 2013 PROPOSAL/BID FORM ADDENDUM No.1


TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT

BID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA

Maine Turnpike Authority

CAMP BULLIS ROAD 12-INCH WATER MAIN PROJECT Solicitation No.: CO RA Addendum 2 July 22 nd 2016

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR 2014 WATER MAIN AND SEWER MAIN REPLACEMENT IN EASEMENTS

Transcription:

Department of Aviation Airport Office Building 8500 Peňa Boulevard Denver, Colorado (303) 342-2200 www.flydenver.com March 3, 2015 Taxiways P and P7 Drainage Improvements Re-bid ADDENDUM NUMBER ONE This Addendum Number One supersedes and/or supplements all portions of the Contract Documents with which it conflicts. Bidders must acknowledge receipt of this addendum on page 28 of the Bid Forms. Dave LaPorte Deputy Manager of Aviation Airport Infrastructure Management

D E N V E R I N T E R N A T I O N A L A I R P O R T TAXIWAYS P AND P7 DRAINAGE IMPROVEMENTS RE-BID ADDENDUM NUMBER ONE Scope of this Addendum Addendum Number One includes modifications to the following Contract Documents issued February 20, 2015. These modifications are deemed necessary by the City and County of Denver. PART ONE, VOL. 1 - CONTRACT DOCUMENTS Questions are due, in writing, no later than 2pm Friday, March 6, 2015. All questions are to be submitted to contract.procurement@flydenver.com. PART ONE, VOL. 1 SCHEDULE OF PRICES AND QUANTITIES Beginning on page 33 replace in its entirety, the Schedule of Prices and Quantities with the following attachment. The total number of pages (including cover sheet) contained in this Addendum Number One is two (2) and one attachment. * * * * * * * End of Addendum Number One.

DENVER INTERNATIONAL AIRPORT TAXIWAY P AND P7 DRAINAGE IMPROVEMENTS RE-BID Part 2 - Schedule of Prices and Quantities Item No. Description and Price Quantity Unit Unit Price Extension Schedule A: Taxiways P, P7, and Runway 17L-35R Drainage Improvements (Non-Federal) 015050b Construct Unpaved CDOT Class 6 Access Roads at the unit price of 3,675 SY 015700a Vehicle Tracking Control at the unit price of 2 EA 015700b Reinforced Rock Berm Inlet Protection at the unit price of 4 EA 015525a Flagger at the unit price of 320 HR ($ ) per hour. P-150a Remove Existing Rip Rap at the unit price of 829 SY P-150b Remove Existing Grouted Rip Rap at the unit price of 110 SY P-152a 6" Topsoil Removal, Stockpile, and Replacement at the unit price of 21,911 SY P-152b Unclassified Excavation Import Lower Select Fill from Offsite at the unit price of 5,033 CY P-152d Unclassified Excavation at the unit price of 809 CY P-161a Geotextile Fabric at the unit price of 1,674 SY P-304Ca Crushed Aggregate Base Course, CDOT Class 6 (6-Inch Lift) at the unit price of 1,674 SY

D-710a Riprap, Type M, Grouted at the unit price of 548 CY D-710b Riprap, Type H, Grouted at the unit price of 126 CY D-752a Concrete Trickle Channel at the unit price of 1,625 LF T-901a Seeding at the unit price of 4.3 AC T-908a Hydraulic Mulching at the unit price of 4.3 AC Schedule A Total: Schedule B: Drainage Outfall Improvements (Non-Federal) 015050c Construct Temporary Access Road at the lump sum of 1 LS 015700b Reinforced Rock Berm Inlet Protection at the unit price of 2 EA P-150a Remove Existing Rip Rap at the unit price of 98 SY P-152a 6" Topsoil Removal, Stockpile, and Replacement at the unit price of 1,670 SY P-152c Unclassified Excavation Export Offsite at the unit price of 18 CY P-152d Unclassified Excavation at the unit price of 128 CY D-710b Riprap, Type H, Grouted at the unit price of 221 CY

D-752a Concrete Trickle Channel at the unit price of 389 LF T-901a Seeding at the unit price of 0.3 AC T-908a Hydraulic Mulching at the unit price of 0.3 AC Schedule B Total: Schedule C: ARFF Station No. 3 Drain Line (Non-Federal) 02521a 2-Inch Type K Copper or Sch 40 PVC Water Pipe Including Trench and Backfill at the unit price of 595 LF 02521b 2-Inch Pipe Outfall With Tideflex Check Valve at the unit price of 1 EA Schedule C Total: Basis for Selecting the Apparent Low Bidder - Total for Schedules A through C: