Kansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max:

Similar documents
Kansas Department of Transportation DISTRICT 5. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT TE / TA-T045 (501) Project(s): Min: Max:

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance

Kansas Department of Transportation. Counties: Project(s): 106 KA / Max: Min:

Kansas Department of Transportation Bureau of Construction and Maintenance Estimating Section

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

3Bureau of Construction and Maintenance

Contractor Construction Staking 1.0 Lump Sum. Granular Backfill (Wingwalls) (Set Price) 1.0 Cu.Yds $50.00 $ Mobilization 1.

ITEM QUANTITY UNITS UNIT PRICE AMOUNT. Contractor Construction Staking 1.0 Lump Sum

Kansas Department of Transportation DISTRICT 1. Project(s): Min: Max:

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance

Please note the requirement for alternate bids as described in Section 3 of the Instructions to Bidders portion of the contract specifications.

3Bureau of Construction and Maintenance

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

Kansas Department of Transportation DISTRICT 5. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): 079 C / HSIP-C486(201) Min: Max:

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids

Department of Transportation Mitchell Region Office

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17

SECTION BID FORM. Garfield Street Drainage Improvements

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

New Jersey Department of Transportation DATE : 05/17/12 PAGE : TABULATION OF BIDS

MAY 11, 2017 T-MC-107A & T-MC-107B1

OKLAHOMA TURNPIKE AUTHORITY JUNE 7, 2018 SCHEDULE OF BID ITEMS EOC JP 26422(10) INTERCHANGE AT I-40

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:


Figure Inlet protection (Source: Minnesota DOT)

Maine Turnpike Authority

CONTRACT ID : COMPLETION DATE : 09/15/08 =========

Lump Sum L.S. (15") EA

SECTION PAYMENT PROCEDURES

Maine Turnpike Authority

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)


ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

Virginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR


Franklin County Engineer's Office - Highway Design FRA-Hamilton Road Bid Tabulation

SECTION GENERAL EXCAVATION

BID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA

Bids JANUARY 10, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $29,000,000.00) Miller Bros. Const., Inc. $27,699,031.59

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

DOCUMENT ADDENDA AND MODIFICATIONS

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

ADDENDUM #3. STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No ; Federal Project No.

Maine Turnpike Authority

Dial or (800)

SANBORN COUNTY

MONROE STREET CONTRACT NO DATE: 12/21/17

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.

CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018:

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS



ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN

OAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No

NOTICE TO BIDDERS ADDENDUM NO. 3. Dated: March 25, 2019 SAP

SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION ABSTRACT OF BIDS RECEIVED 06/06/2018 LETTING CONTENTS

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

Company Page 1 of 13

General Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 01/22/02 PAGE : 1 TABULATION OF BIDS

Riverside County Transportation Department Summary of Bids

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

Maine Turnpike Authority

MISSOURI HIGHWAY and TRANSPORTATION COMMISSION

MISSOURI HIGHWAY and TRANSPORTATION COMMISSION

MISSOURI HIGHWAY and TRANSPORTATION COMMISSION

Mainelli Wagner & Associates, Inc.

Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD Phone: 605/ FAX: 605/

T. P. Concrete, Inc. Wood Sewer & Excavating, Inc. 589 CY , , , SF

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

UNIT PRICE LIST January 2009

DBE TOTALS December 29, 2016 LETTING FEDERAL AID JOBS

Federal Project No.: HSIP-5A27(394)

CITY OF ELKO BID TABULATION FOR Sports Complex

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

Federal Project No.: STP-033-2(049)

ADDENDUM #1 ISSUE DATE: WEDNESDAY, MARCH 16, 2016 BID DATE: TUESDAY, MARCH 22, 2016 AT 12:00 PM (NOON)

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

Federal Project No.: STP-513-8(192), STP-5138(191)

TABULATION OF BIDS DODGE CITY REGIONAL AIRPORT DODGE CITY, KANSAS RECONSTRUCT RUNWAY 14-32: SUMMARY PROJECT NO.: AIP

City of Town & Country Wirth Tract Development

Project # Brown County PCN i40h Replace Section Line Road Culvert

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96

Federal Project No.: NHPP-BR01(335)

Transcription:

Page 1 of 18 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025600 FIELD OFFICE AND LABORATORY (TYPE A) 4 012340 FOUNDATION STABILIZATION (SET PRICE) 5 020100 CONTRACTOR CONSTRUCTION STAKING 6 025200 REMOVAL OF EXISTING STRUCTURES 7 070580 FLAGGER (SET PRICE) CUYD HOUR 38,914.00000 38,914.00 71,600.00000 71,600.00 0.00000 0.00 0.00000 0.00 10,5200 10,521.00 4,334.00000 4,334.00 40.00000 40.00 40.00000 40.00 8,6900 8,691.00 10,200.00000 10,200.00 9,652.00000 9,652.00 25,690.00000 25,690.00 40.00000 40.00 40.00000 40.00 $67,858.00 $111,904.00 Section Total with LCC: $67,858.00 $111,904.00

Page 2 of 18 SECTION: 02 ROAD ITEMS 8 025361 CLEARING AND GRUBBING 9 012420 ROCK EXCAVATION 10 012412 COMMON EXCAVATION (URB) 11 012415 COMMON EXCAVATION (CONTRACTOR FURNISHED) 12 012364 SELECT SOIL (CONTRACTOR FURNISHED) 13 030189 SALVAGED TOPSOIL 14 012316 COMPACTION OF EARTHWORK (TYPE A) (MR-0-5) 15 012318 COMPACTION OF EARTHWORK (TYPE AA) (MR-0-5) 16 025026 SIDEWALK CONSTRUCTION ( 4") (AE) 1,.000 CUYD 1,696.000 CUYD 583.000 CUYD 235.000 CUYD 3,066.000 1,343.000 CUYD 9.000 CUYD 18 5900 591.00 16,500.00000 16,500.00 36.35000 44,201.60 33.00000 40,128.00 31.15000 52,830.40 50.00000 84,800.00 20.10000 11,718.30 30.00000 17,490.00 27.30000 6,415.50 400 9,635.00 3.80000 11,650.80 1.20000 3,679.20 9.40000 12,624.20 12.00000 16,116.00 79.20000 712.80 110.00000 990.00 44.15000 7,991.15 35.00000 6,335.00

Page 3 of 18 SECTION: 02 ROAD ITEMS 17 025029 SIDEWALK CONSTRUCTION ( 5") (AE) 18 022625 SIDEWALK RAMP 19 023449 GUARDRAIL, REMOVAL OF STEEL PLATE 20 012491 CONCRETE SAFETY BARRIER (TYPE I) 21 012711 FLUME INLET (CONCRETE) 22 012272 SLOPE DRAIN (CONCRETE) 23 080321 AGGREGATE DITCH LINING ( 6") 24 070211 INLET (TYPE II CURB) 25 012821 INLET (TYPE I CURB) 26 013063 MANHOLE (REINFORCED CONCRETE) 198.000 14.000 151.250 84.000 3.000 55.000 115.000 TON 2.000 48.25000 9,553.50 33.00000 6,534.00 244.00000 3,416.00 168.00000 2,352.00 20.50000 3,100.63 14.00000 2,117.50 260.00000 21,840.00 2300 19,404.00 1,734.00000 5,202.00 1,623.00000 4,869.00 65.70000 3,613.50 52.00000 2,860.00 52.95000 6,089.25 49.00000 5,635.00 4,332.00000 4,332.00 3,626.00000 3,626.00 4,416.00000 8,832.00 2,743.00000 5,486.00 6,000.00000 6,000.00 4,179.00000 4,179.00

Page 4 of 18 SECTION: 02 ROAD ITEMS 27 056101 STORM SEWER (15") (RCP) 28 056551 STORM SEWER (24") (RCP) 29 057151 STORM SEWER (36") (RCP) 30 054526 END SECTION ( 15") (RC) 31 054601 END SECTION ( 24") (RC) 32 054701 END SECTION ( 36") (RC) 94.000 14.000 85.000 2.000 78.85000 7,411.90 168.00000 15,792.00 97.00000 1,358.00 107.00000 1,498.00 124.00000 10,540.00 1600 13,685.00 640.00000 640.00 612.00000 612.00 929.00000 929.00 812.00000 812.00 1,345.00000 2,690.00 727.00000 1,454.00 $244,283.53 $286,588.70 Section Total with LCC: $244,283.53 $286,588.70

Page 5 of 18 SECTION: 03 RETAINING WALL ITEMS 33 013848 RETAINING WALL (MBW) 460.000 SQFT 56.95000 26,197.00 37.00000 17,020.00 $26,197.00 $17,020.00 Section Total with LCC: $26,197.00 $17,020.00

Page 6 of 18 SECTION: 04 TEMP PRJ WTR POL CTL 34 072286 EROSION CONTROL (CLASS 1) (TYPE D) 35 071291 SEDIMENT REMOVAL (SET PRICE) 36 072400 TEMPORARY BERM (SET PRICE) 37 071320 TEMPORARY INLET SEDIMENT BARRIER 38 070827 FILTER SOCK ( 8") 39 010598 SILT FENCE 40 000098 SWPPP DESIGN 41 000097 SWPPP INSPECTION 42 000103 WATER POLLUTION CONTROL MANAGER 43 030635 MULCHING TACKING SLURRY 2,998.000 CUYD 2.000 42.000 1,284.000 15.000 25.000 360.000 LBS. 2.20000 6,595.60 1.90000 5,696.20 35.00000 35.00 35.00000 35.00 00 1.00 00 1.00 88.70000 177.40 77.00000 154.00 4.75000 199.50 4.10000 172.20 2.05000 2,632.20 1.80000 2,311.20 2,660.00000 2,660.00 2,295.00000 2,295.00 236.00000 3,540.00 230.00000 3,450.00 266.00000 6,650.00 255.00000 6,375.00 00 360.00 0.90000 324.00

Page 7 of 18 SECTION: 04 TEMP PRJ WTR POL CTL 44 030638 MULCHING 45 010123 WATER (EROSION CONTROL) (SET PRICE) TON MGAL 414.00000 414.00 357.00000 357.00 35.00000 35.00 35.00000 35.00 $23,299.70 $21,205.60 Section Total with LCC: $23,299.70 $21,205.60

Page 8 of 18 SECTION: 05 CONCRETE SURFACING ITEMS 46 070468 GRANULAR BASE ( 8") 47 010355 WATER (GRANULAR BASE) (SET PRICE) 48 012770 LIME 49 012971 MANIPULATION (LIME TREATED SUBGRADE) 50 012282 WATER (LIME TREATED SUBGRADE) (SET PRICE) 51 013631 CONCRETE PAVEMENT (10" UNIFORM) (AE) (PLAIN) 52 013621 CONCRETE PAVEMENT (10" UNIFORM) (AE) 53 070432 CONCRETE PAVEMENT (10" UNIFORM) (AE) (NRDJ) 54 013551 CONCRETE PAVEMENT ( 6" UNIFORM) (AE) (PLAIN) 5,677.000 MGAL 38.000 TON 1,410.000 MGAL 667.000 650.000 3,669.000 47.000 10.15000 57,621.55 100 62,447.00 35.00000 35.00 35.00000 35.00 323.00000 12,274.00 2300 8,778.00 14.00000 19,740.00 17.00000 23,970.00 35.00000 35.00 35.00000 35.00 82.80000 55,227.60 88.00000 58,696.00 78.10000 50,765.00 74.00000 48,100.00 74.30000 272,606.70 75.00000 275,175.00 75.90000 3,567.30 86.00000 4,042.00

Page 9 of 18 SECTION: 05 CONCRETE SURFACING ITEMS 55 061597 CURB AND GUTTER, COMBINED (AE) 56 081050 PAVEMENT EDGE WEDGE (ROCK) 57 011478 WATER (EARTHWORK COMPACTION) (SET PRICE) 1,292.000 246.000 TON MGAL 34.05000 43,992.60 25.00000 32,300.00 23.85000 5,867.10 22.00000 5,412.00 35.00000 35.00 35.00000 35.00 $521,766.85 $519,025.00 Section Total with LCC: $521,766.85 $519,025.00

Page 10 of 18 SECTION: 06 ASPHALT SURFACING ITEMS 58 041003 HMA-COMMERCIAL GRADE (CLASS A) 253.000 TON 2000 50,853.00 226.00000 57,178.00 $50,853.00 $57,178.00 Section Total with LCC: $50,853.00 $57,178.00

Page 11 of 18 SECTION: 07 SIGNING ITEMS 59 025500 SIGN (FLAT SHEET) (HIGH PERFORMANCE) 60 026176 SIGN POST (4" X 6" WOOD) (FLAT SHEET SIGN) 61 026184 SIGN POST (4" X 6" WOOD) (REINFORCED PANEL SIGN) 62 026094 SIGN POST (2-1/4" PERFORATED SQUARE STEEL TUBE) 63 026097 SIGN POST FOOTING ( 2-1/4" PERFORATED SQUARE STEEL TUBE) 64 026052 SIGNING DELINEATOR (TYPE A) (WHITE FLEXIBLE) (TYPE 1 ANCHOR) 65 026494 SIGN (REMOVE AND RESET) 43.750 SQFT 112.000 28.000 22.000 2.000 3.000 35.45000 1,550.94 300 1,356.25 17.75000 1,988.00 15.00000 1,680.00 18.90000 529.20 16.00000 448.00 17.75000 390.50 15.00000 330.00 236.00000 472.00 204.00000 408.00 118.00000 354.00 102.00000 306.00 2,608.00000 2,608.00 6600 661.00 $7,892.64 $5,189.25 Section Total with LCC: $7,892.64 $5,189.25

Page 12 of 18 SECTION: 08 PAVEMENT MARKING ITEMS 66 023140 PAVEMENT MARKING (MULTI- COMPONENT) (WHITE) ( 6") 67 023141 PAVEMENT MARKING (MULTI- COMPONENT) (WHITE) ( 8") 68 023428 PAVEMENT MARKING (MULTI- COMPONENT) (WHITE) (12") 69 023139 PAVEMENT MARKING (MULTI- COMPONENT) (WHITE) ( 4") 70 013812 PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 71 013348 PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 72 013727 PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (THRU ARROW) 73 013349 PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (RT ARROW) 1,333.000 106.000 18.000 2,236.000 178.000 3.000 4.000 5.000 2.35000 3,132.55 2.10000 2,799.30 3.55000 376.30 3.10000 328.60 7.10000 127.80 6.10000 109.80 1.95000 4,360.20 1.70000 3,801.20 18.90000 3,364.20 16.00000 2,848.00 414.00000 1,242.00 357.00000 1,071.00 296.00000 1,184.00 255.00000 1,020.00 414.00000 2,070.00 357.00000 1,785.00

Page 13 of 18 $15,857.05 $13,762.90 Section Total with LCC: $15,857.05 $13,762.90

Page 14 of 18 SECTION: 09 TRAFFIC SIGNAL ITEMS 74 025325 TRAFFIC SIGNAL 75 071752 VIDEO DETECTION SYSTEM 76 070250 TRAFFIC SIGNAL INTERCONNECT NON-PART 207,6200 207,621.00 176,460.00000 176,460.00 6,0000 6,001.00 5,100.00000 5,100.00 1,200.00000 1,200.00 1,020.00000 1,020.00 $214,822.00 $182,580.00 Section Total with LCC: $214,822.00 $182,580.00

Page 15 of 18 SECTION: 10 SEEDING ITEMS 77 030451 SEED (FESCUE) (TALL TURF TYPE BLEND) 78 030344 FERTILIZER (15-30-15) 79 030573 SOD (TALL TURF TYPE FESCUE) (STRIPS) 168.000 LBS. 120.000 LBS. 1,257.000 8.30000 1,394.40 7.10000 1,192.80 1.50000 180.00 1.30000 156.00 8.85000 11,124.45 10.00000 12,570.00 $12,698.85 $13,918.80 Section Total with LCC: $12,698.85 $13,918.80

Page 16 of 18 SECTION: 11 TRAFFIC CONTROL ITEMS 80 025331 WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 81 025332 WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 82 025333 WORK ZONE SIGNS (16.26 SQ.FT. & OVER) 83 025376 WORK ZONE BARRICADES (TYPE 3-4 TO 12 LIN. FT.) 84 025374 WORK ZONE BARRICADES (PEDESTRIAN) 85 011492 CHANNELIZER (PORTABLE) 86 025343 WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 87 025365 PORTABLE CHANGEABLE MESSAGE SIGN 88 070916 PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I) 1,580.000 EADA 950.000 EADA 210.000 EADA 3,890.000 EADA 420.000 EADA 11,760.000 EADA 7,770.000 EADA 210.000 EADA 72.000 STAL 0.05000 79.00 0.05000 79.00 1.20000 1,140.00 1.02000 969.00 1.20000 252.00 1.02000 214.20 0.30000 1,167.00 0.26000 1,011.40 1.20000 504.00 1.02000 428.40 0.10000 1,176.00 0.10000 1,176.00 0.01000 77.70 0.01000 77.70 29.55000 6,205.50 26.00000 5,460.00 112.00000 8,064.00 97.00000 6,984.00

Page 17 of 18 SECTION: 11 TRAFFIC CONTROL ITEMS 89 013019 PAVEMENT MARKING REMOVAL 90 082001 WORK ZONE SIGN (SPECIAL) (16.25 SQ.FT. & LESS) 91 025308 TRAFFIC SIGNAL INSTALLATION (TEMPORARY) 92 072116 TRAFFIC CONTROL (INITIAL SETUP) 220.000 8.000 3.55000 781.00 3.10000 682.00 384.00000 3,072.00 332.00000 2,656.00 21,602.00000 21,602.00 18,360.00000 18,360.00 8,277.00000 8,277.00 7,140.00000 7,140.00 $52,397.20 $45,237.70 Section Total with LCC: $52,397.20 $45,237.70 Contract Item Totals Contract Time Totals $1,237,925.82 $1,273,609.95 Contract Life Cycle Costs Totals $0.00 $0.00 Contract Grand Totals ( ) indicates item is bid as Lump Sum $1,237,925.82 $1,273,609.95

Page 18 of 18

Vendor Ranking Page 1 of 1 HSIP-U231(701) Rank Vendor ID/Name Total Bid Percent Of Low Bid 1 00011 AMINO BROTHERS $1,237,925.82 100.00% 2 02363 FREEMAN CONCRETE $1,273,609.95 102.88%