Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

M/s.NEERAJ KUMAR JAIN

Piplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P

Risk Assessment Nagla

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks)

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project

GRAVEL & ROUGH STONE QUARRY

Hind Energy & Coal Beneficiation (India) Ltd.

ENVIRONMENTAL MANAGEMENT PLAN

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

DHANWADA CRUSHER STONE QUARRY

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

PRE FEASIBILITY REPORT

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Pramod S. Kambli. Page 1

ENVIRONMENT MANAGEMENT PLAN

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

V: PROJECT SCOPING & METHODOLOGY

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006

Environment Management Plan

Project Details-Minor Minerals (Sand Stone)

PRE FEASIBILITY REPORT

ENVIRONMENTAL MANAGEMENT

ENVIRONMENT MANAGEMENT PLAN

CMPDI. 4.6 Mine Closure Plan

ENVIRONMENT MANAGMENT PLAN

Hind Energy & Coal Beneficiation (India) Ltd.

Shree Swami Samarth Stone Crusher

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

Period of Compliance Report : April, 2017 to September, 2017

ENVIRONMENT MANAGEMENT PLAN

PRE-FEASIBILITY REPORT OF SAND QUARRY

ENVIRONMENT MANAGEMENT PLAN

Name of Project: Panchagavi Laterite Mine, M/s J.K. Cement Works, Muddapur (Karnataka)

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

FROM I, PRE FEAsIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN FOR. M/s. BUILDING LIME stone MINE OF KARIBEN MAsARIBHAI BARIYA AREA

EnvironmEntal management Plan

ENVIRONMENTAL MANAGEMENT PLAN

NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P.

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

ENVIRONMENT MANAGEMENT PLAN

GUIDELINES FOR PREPARATION OF MINE CLOSURE PLAN

Chapter- V MANAGEMENT PLAN (EMP)

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

1.0 The Need for EIA. (a) the project proponent; (b) the regulatory agencies; and, (c) all stakeholders and interest groups.

Larsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia

Project Details-Minor Minerals (Blacktrap)

J.K. Cement WORKS, NIMBAHERA (RAJ)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

(A govt. of Kerala Undertaking)

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

Annex F Scoping Checklist

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara

APPENDIX- I FORM- 1. (I) Basic Information:

SMARA Reclamation Standards Review

Project Details - Riverbed Sand Mining Project

Mining is being carried out keeping safe distance from seasonal nallah/ stream.

ENVIRONMENT MANAGEMENT PLAN

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

ROADS: OPERATION AND MAINTENANCE

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

Action Plan along with the budgetary allocation for the queries raised in the public hearing is given below:

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator

MINING REGULATIONS IN FOREST AND ECO-FRAGILE AREAS A PRESENTATION BY RAJEEVA, IFS, ADDITIONAL PRINCIPAL CHIEF CONSERVATOR OF FORESTS.

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED

Pre- Feasibility RepoRt

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

ENVIRONMENTAL MONITORING REPORT

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA

Shri MANOJ VASANT ALKUNTE

Regulation of Mines In South Florida

Scanned by CamScanner

1. ENVIRONMENT MANAGEMENT PLAN

PROPOSED TERMS OF REFERENCE (TOR) FOR

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

Transcription:

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill. Bhola, Tal.Dhoraji, Dis.Rajkot, (Gujarat) has been granted to Ramjibhai samjibhai Gujarati. Vill. Bhola, Tal.Dhoraji, Dis.Rajkot, (Gujarat). Applied area -1.00.00 ha. Proposed production 24,000 TPA The Ordinary sand mine near Bhola, is a hub for Ordinary sand extraction. The Ordinary sand industry is a thriving industry because of profile use of Ordinary sand in building industry. The project is aimed at producing Ordinary sand slabs from the lease mine. The mining methodology consists of carving up blocks of dimensions with help of loader, in this method there is a reject of 95% of the production and about 05% of the yield is usable. Climate date From Secondary Sources The M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati area is situated in district Rajkot. Rajkot has semi-arid climate, with hot, dry summers from mid-march to mid- June and the wet monsoon season from mid-june to oct., when the city receives 500 mm of rain on average. The months from November to February are mild, the average temperature being around 20 C, with low humidity. During summer time, the temperature ranges between 24 C and 42 C. In the months of winter, Rajkot temperature varies between 10 C and 22 C but on a whole winters are pleasant.

Flora & Fauna No forests land the area. It is entirely a private Ag. Land. No endangered Species found in the core zone, so no adverse impact on the flora & Fauna. Since, there are no endangered spices of flora & fauna observed in core zone. The environmental Management plan has been developed with a view to bring down the levels of impacts as discussed in the last chapter within limits. In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts are to be enhanced/ augmented so that the overall adverse impacts are reduced to as low level as possible. The mining in the area has been proposed with time bound management plan so that impacts on different environmental parameters are minimized at every stage of mining. Measures to be taken for each of the impact areas are detailed in the following para: Air Environment Water Environment Noise Environment Reclamation & Rehabilitation of lands Discharge of Effluents Corporate Social Responsibilities Risk assessment & Disaster Management Plan

2.0. ENVIRONMENT IMPACT & MEASURES 2.1. AIR ENVIRONMENT 2.1.1 Anticipated impacts The opencast mining operations are generally prone to generation of high levels of PM and to a limited extent SO2, NOx due to fossil fual based vehicles and machines etc. Air pollution due to SO2, NOx and PM may result in irritation and inflammation of eyes and congestion of throat and infection in lungs. 2.1.2 Mitigation Measures: In addition to the above the following measures will be adopted:- 1. Water spraying on the roads for suppression of dust. 2. Development of green belt. 3. Water sprinklers will be sprayed at all loading / transfer points. 4. Wet cutting will be adopted. 5. PPE will be provided to the workers. 6. To control the emissions regular preventative maintenance of equipment will be carried out. 2.2. WATER ENVIRONMENT 2.2.1 Anticipated impacts No impact on the surface water resources is envisaged. The rain water accululates in the area, which will be used for dust suppression and plantation purpose. The ground water table in this region range from 30-35 m from the surface level. Due to mining, ground water will not intersect in this project. Since no chemicals or explosives are used for mining of building Limestone, there is no source of contaminants that can contaminate surface waters or the ground waters. 2.2.2 Mitigation Measures There is not the case with this lease, as mineral or soil does not contain any harmful ingredients that could leach to the water table. Thus the area working shall not affect the ground water quality.

The impact of mining on ground water is not anticipated; therefore measures are not required. 2.3. LAND ENVIRONMENT 2.3.1 Anticipated impacts In open cast mining, the top crust of earth i.e. top soil/sub soil is completely removed below which are mineral deposits. The earth rock and other strata, called O/B are completely removed to provide access to the mineral deposit. In this manner land use pattern of an area always changes in the form of voids formed due to excavation of mineral. Topography of the surrounding area will remain unchanged. The drainage pattern due to proposed mining will not be disturbed within core zone as well as buffer zone. The thickness of the top soil is 1.0 m, it shall be scrapped and stack at separate place and will be used for plantation. 2.3.2 Mitigation measures The mining area will be affected to the land environment. The excavated area will be backfilled for aesthetic purpose at the life of area. The top soil will be stack at separate earmarked site and use for the plantation. 2.4. NOISE ENVIRONMENT 2.4.1 Anticipated impacts As far as noise pollution is concerned, Limestone mining does not contribute much to noise pollution, except the noise generated from stone cutter. Noise level in the working environment is compared with the standards prescribed by central pollution control board which will be adopted and enforced by the govt. of india through the noise pollution (Regulation and control) Rules, 2000 The exposures to excessive noise levels can lead to: Prevention of sleep, insomnia & fatigue. Decrease in speech reception, communication, disturbance and diminished concentration thus adversely affecting job performance efficiency. Irreparable psychological disturbance including impaired hearing. 2.4.2 Mitigation measures Mitigate the noise level following control measures will be adopted:-

1. Periodical monitoring of noise will be done. 2. Regular and proper maintenance of noise generating machinery. 3. Proper PPE in form of earplugs and safety eye wear shall be provided to workers working with the stone cutter and those in immediate vicinity of it. 4. Plantation in applied area will also reduce propagation of noise outside the core zone. 5. Green belt shall provide at the lease periphery, within the applied area. 2.5. BIOLOGICAL ENVIRONMENT No forests land the area. It is entirely a private Ag. Land. No endangered species found in the applied area, so no adverse impact on the flora & fauna. Since, there are no endangered spices of flora & fauna observed in core zone as well as buffer zone. Therefore, measures are not required. 2.5Socio-Economic The impact of mining on social demographic profile is positive because displacements of habitat are not involved in this project. Bhola project will generate rural employment. The mining activities in the area will raise economic status of the mine workers. 2. ENVIRONMENTAL MANAGEMENT PLAN IMPLEMENTATION Environmental Management plan serves no purpose if it is not implemented with true spirit. Thus, an implementation and monitoring program has to be prepared. Implementation of proposed control measures and monitoring programmed has an implementation on the surrounding area as well as for the region. Therefore mining management should be strengthening the existing control measures implemented within the sandstone mining area relating to the following specific areas. Collection of air and water samples at strategic location with frequency suggested and by analyzing thereof. If the parameters exceed the permissible tolerance limits, corrective regulation measure should be taken. Collection of soil samples at strategic locations once in a year and analysis thereof with regard to deleterious constituents, if any.

Regular visual examination will be carried out to look for possibilities of erosion. Any abnormal condition, if observed should be taken care of. Measurement of noise levels at mine site, stationary and mobile sources, and adjacent villages will be done. Plantation will be done as per program i.e. along the boundary. 2.6. ENVIRONMENTAL OFFICER Environmental professional should be hired to implement the environment management plan. The officer shall ensure the suitability, adequacy and effectiveness of the environment management programme:- Environmental officer will be responsible for proper maintenance and operation of the programme and it will oversee the following aspect: Conduct environmental awareness program to the workers, supervisory staff and contract laborers during the mining and operation period. Regularly monitor the environmental parameters and prepare reports as required by the GPCB. Recommend necessary measures to improve environmental conditions. Conduct safety program to create safety awareness among workers/staff. Train the staff and other workers on safety measures and conduct safety drills to educate them. Environmental officer will be in regular touch with state pollution control board and state mining department and send them annual progress report. Any new regulations considered by state/central pollution control board for the building stone mining would be taken care of. 2.7. PROPOSED SET UP The Environmental professional/ officer will be responsible for: Liaison with environment monitoring laboratory for collecting and analyzing water and air samples from surrounding area and work zone monitoring for pollutants. Implementing the control and protective measures. Co-coordinating the environment related activities within the project as well as with outside agencies.

Collecting statistics of health of workers and population of surrounding villages. Monitoring the progress of implementation of environmental management program. Greenbelt development along the area.