1 ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the, operation and the entire life cycle to minimize adverse environmental impacts resulting from the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the sites including fire. Environmental Management Plan The Environment Management Plan () is a site specific plan developed to ensure that the project is implemented in an environmental sustainable manner where all contractors and subcontractors, including consultants, understand the potential environmental risks arising from the project and take appropriate actions to properly manage that risk. also ensures that the project implementation is carried out in accordance with the design by taking appropriate mitigation actions to reduce adverse environmental impacts during its life cycle. The plan outlines existing and potential problems that may adversely impact the environment and recommends corrective measures where required. Also, the plan outlines roles and responsibility of the key personnel and contractors who will be in-charge of the responsibilities to manage the project site. The is generally Prepared in accordance with rules and requirements of the MoEFCC and CPCB/ SPCB To ensure that the component of facility are operated in accordance with the design A process that confirms proper operation through supervision and monitoring A system that addresses public complaints during and operation of the facilities and A plan that ensures remedial measures is implemented immediately.
2 The key benefits of are that it offers means of managing its environmental performance thereby allowing it to contribute to improved environmental quality. The other benefits include cost control and improved relations with the stakeholders. includes four major elements: Commitment & Policy: The management will strive to provide and implement the Environmental Management Plan that incorporates all issues related to air, water, land and noise. Planning: This includes identification of environmental impacts, legal requirements and setting environmental objectives. Implementation: This comprises of resources available to the developers, accountability of contractors, training of operational staff associated with environmental control facilities and documentation of measures to be taken. Measurement & Evaluation: This includes monitoring, counteractive actions and record keeping. It is suggested that as part of, a monitoring committee would be formed by the management comprising of a site in-charge/coordinator, environmental group representative and project implementation team representative. The committee s role would be to ensure proper operation and management of the including the regulatory compliance. The components of the environmental management plan, potential impacts arising, out of the project and remediation measures are summarized below in Table 11:
3 TABLE 1: SUMMARY OF POTENTIAL IMPACTS AND REMEDIAL MEASURES S. Environmental Potential Potential Source Controls Impact Remedial Measures No. components Impacts of Impact Through Evaluation & Design 1. Ground Water Ground Water Construction Phase No surface No significant Quality Contamination Waste water accumulation impact as generated from will be allowed. majority of temporary labor Mobile labors would be tents. type toilets will locally be provided. deployed Waste water will be collected in septic tanks. Proponent will No negative Wastewater treat waste impact on Discharge from the water in STP ground water project provided of 100 quality KLD Capacity. envisaged. Not significant.
4 2. Ground Water Ground Water Construction Phase Controlled No significant Quantity Depletion Ground use of water impact on water will not be during ground water used for quantity envisaged. activity. No significant The source of Storm water impact on water during collection for surface/ground operation phase is storage of rain water quantity water supply water. envisaged from pumps and tube Awareness the project. wells. Campaign to reduce the water consumption 3. Surface Water Surface water Construction Phase Silt traps No off-site Quality contamination Surface runoff will be impact from site during constructed to envisaged as no control surface surface water activity. run-off during receiving body site is present in the development core zone.
5 Proponent will treat waste water in onsite STP of 100 KLD capacity. 4. Air Quality Dust Emissions Construction Phase Emissions All activities heavy of Construction Phase PM, SO 2, NO 2 Operation of Waste water will be treated in onsite STP of 100 KLD capacity During phase contractors advised the are to facilitate mask for the labors. Water sprinklers will be used for suppression of dust during phase. Use of Personal No off-site Waste water will be impact treated in STP of 100 envisaged. KLD capacity and recyclable for reuse, excess STP treated water (if any) will be discharged in municipal sewer line. Not significant During phase because dust the contractors are advised generation will to facilitate masks for the be temporary labors. Water sprinklers and will settle will be used for fast due to dust suppression of dust during suppression techniques. phase. Not significant. Regular monitoring of emissions and control
6 and CO Protective measures will be taken to equipment and Equipment reduce the emission levels. vehicles during site (PPE) like development. earmuffs and Operation earplugs during of D.G. set (back up) activities Use of low Not significant. Power sulphur diesel if generation by DG available No significant sets during power Stack height of increase in failure DG set as per ambient air CPCB norms. quality level is Emission from vehicular traffic in use Providing Footpath expected from and the project s pedestrian ways activities. will be provided There are no within the site. Avenue sensitive receptors plantation will located within be done with the vicinity of site.
7 5. Noise Environment Construction phase native species to help reduce PM level. Proper maintenance of equipment Provision of noise shields near the heavy operations and acoustic enclosures for DG set. Construction activity will be limited to day time.
8 Tree No significant Noise from plantation. impact. vehicular DG sets movement with acoustic Noise from enclosures. DG set operation 6. Land Soil Construction Construction No significant Environment contamination Phase debris will be impact. Disposal of collected and Impact will be suitably used local, as waste debris on site as per generated will the solid waste be reused for management filling of low plan for lying areas etc. phase It is Since solid Generation of proposed that waste is municipal solid the solid waste handled by waste. generated will the authorized Used oil be managed as agency, waste generated from per SWM dumping is
9 D.G. set Rules, on, Collecti segregation, transportation and disposal will be done as per Management SW Rules, 2016 by the authorized agency oil will disposed through Used authorized recyclers generated be not going to be allowed. Not significant/ne gligible impact.
10 7. Biological Displacement of Construction No plantation Environment Flora and Fauna Phase currently (Flora and on site Site existing at site. Fauna) Development during Increase in Adequate Beneficial green covered green area will impact. area be developed using local floral species. 8. Socio- Population Construction Local Beneficial Economic displacement Phase labour will be impact Environment and loss of Construction hired which income activities leading will boost the to relocation. local economy. Site operation Project Beneficial will provide impact
11 direct and indirect employment opportunities to the local people. Providi ng quality- Integrated infrastructure. 9. Traffic Pattern Increase of Construction Adequate No negative vehicular traffic Phase parking facility impact Vehicular will be movement during provided. The phase peak hours will avoided for transportation of material. Vehicular No major Traffic movement will significant
12 increase once the project operational is be regulated inside the project premises. Adequately wide road and parking space will be provided. impact.
13 ENVIRONMENTAL MANAGEMENT CELL It is recommended to have a permanent organizational set up with the task of ensuring effective implementation of and environmental monitoring. The major duties and responsibilities of Environmental Management Cell may be as given below: To implement the environmental management plan. To assure regulatory compliance with all relevant rules and regulations. To ensure regular operation and maintenance of pollution control devices. To minimize environmental impact of operations as by strict adherence to the. To initiate environmental monitoring as per approved schedule. Review and interpretation of monitored results and corrective measures in case monitored results are above the specified limit. Maintain documentation of good environmental practices and applicable environmental laws for a ready reference. Maintain environment related records. Coordination with regulatory agencies, external consultants, monitoring laboratories. ENVIRONMENTAL MONITORING The purpose of environmental monitoring is to evaluate the effectiveness of implementation of Environmental Management Plan () by periodic monitoring. The important environmental parameters within the impact area are selected so that any adverse effects are detected and time action can be taken. The project proponent will monitor ambient air Quality, Ground Water Quality and Quantity, and Soil Quality in accordance with an approved monitoring schedule. Table 2: Suggested Monitoring Program S. No. Type Locations Parameters Period and Frequency 1. Ambient Air Project Site Criteria Pollutants: Quaterly (24 hr average Quality SO 2, NOx, PM, CO samples) during phase and annual during operation phase. 2. Groundwater Project site Drinking water Quarterly
14 (Portability testing) 3. Ambient Noise 4. Potable water quality parameters as per IS Project site db (A) levels Quarterly (Hourly day and night time l eq levels) during phase and every year during operation phase. Project site As per IS Quarterly potable water standards 5. Soil quality Project site Organic matter, Quarterly C.H., N, Alkalinity, Acidity, heavy metals and trace metal, Alkalinity, Acidity. 6. Waste Residential Physical and Daily Characterizati on Chemical composition 7. Treated water Outlet of BOD, MPN, Daily CSTP coliform count, etc. Awareness and Training Training and human resource development is an important link to achieve sustainable operation of the facility and environment management. For successful functioning of the project, relevant would be communicated to: Occupants and Contractors Occupants must be made aware of the importance of waste segregation and disposal, water and energy conservation. The awareness can be provided by periodic Integrated Society meetings. They would be informed of their duties.
15 Environmental Audits and Corrective Action Plans To assess whether the implemented is adequate, periodic environmental audits will be conducted by the project proponent s Environmental division. These audits will be followed by Correction Action Plan (CAP) to correct various issues identified during the audits.
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the construction and
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan (EMP) would consist of all mitigation measures for each component of the environment due to the activities increased during the construction,
More informationAir Traffic Control Tower and Technical Block, Netaji Subhash Chandra Bose International Airport, Kolkata
1. ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan (EMP) would consist of all mitigation measures for each component of the environment due to the activities increased during the construction,
More information10. ENVIRONMENT MANAGEMENT PLAN
10. ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan (EMP) will consist of all mitigation measures for each component of the environment due to the activities increased during the construction,
More informationENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)
ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN The Environment Management Plan (EMP) would consist of all mitigation measures for each component of the environment due to the activities increased during the construction,
More informationENVIRONMENTAL MANAGEMENT PLAN
INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the
More informationENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors
1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction
More informationEnvironmental Management Plan during Construction Phase
Management Plan during Phase Sr 1 Ambient Air Quity Negative inside site premises outside site 2 ise Negative near noise generation sources inside premises on ambient noise levels in the Surrounding area
More informationEnvironment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006.
Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Thus, EIA is not applicable for proposed project. We have derived project
More informationENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan
ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL
More informationHealth and safety norms of CPWD should be followed during construction.
Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"
More informationMunicipal solid / hazardous waste
(10) ENVIRONMENTAL MANAGEMENT PLAN The mitigation measures for reducing the adverse environmental impacts together constitute a part of EMP. The environmental issues, which need management, plan for the
More informationApplication of Low and Non Waste Technology in the production process;
9.0 ENVIRONMENT MANAGEMENT PLAN (EMP) 9.1 INTRODUCTION Environment Management Plan is required for ensuring sustainable development. It should not affect the surrounding environment adversely. The management
More informationPROPOSED TERMS OF REFERENCE
ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment
More information4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:
4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to
More informationENVIRONMENT MANAGEMENT PLAN
Clearance for Affordable Group Housing Colony ENVIRONMENT MANAGEMENT PLAN Introduction The Management Plan () is a site specific plan developed to ensure that the project is implemented in an environmental
More informationChapter 9 SUMMARY AND CONCLUSION
Chapter 9 SUMMARY AND CONCLUSION The potential environmental impacts and socio-economic issues associated with the construction and operation of the dye house at La Tour Koenig have been assessed in this
More informationEXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT
EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged
More information5. ENVIRONMENT MANAGEMENT PLAN
5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate
More informationFORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS
FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps
More informationConceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: -
Conceptual plan Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Area of plot= 5293SQM, Sanctioned FAR = 10586SQM as per earlier sanctioned.(2) Sanctioned Built up Area=19480.63
More informationGENERAL CONDITIONS. 7. The Applicant will adopt the prescribed norms, and standards provided in the national Building Code of India 2005.
GENERAL CONDITIONS 1. The Project Proponent shall comply with all the conditions stipulated in the building approval letter. 2. The applicant (Project proponent) will take necessary measures for preventions,
More informationTATA STEEL LIMITED. Environment Compliance Report (Oct 2017 to Mar 2018)
TATA STEEL LIMITED Construction of Residential Complex For Tata Steel Plant located at Kalinganagar Industrial Complex, at Environment Compliance Report (Oct 2017 to Mar 2018) Environment Department Tata
More informationEnvironment Clearance for Multi Level Parking with Commercial Development
Clearance for Multi Level Parking with Commercial Development ENVIRONMENT MANAGEMENT PLAN Introduction The Management Plan () is a site specific plan developed to ensure that the project is implemented
More informationThe emphasis on the EMP development is on the following;
ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The
More informationSIX MONTHLY COMPLIANCE REPORT JUNE- 2015
SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,
More informationENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION 1.2 EMP DURING CONSTRUCTION PHASE
ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The
More informationPROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE For PROPOSED RESIDENTIAL AND COMMERCIAL DEVELOPMENT AT Plot bearing survey no. 86/1, 86/2, 86/3 (pt), 86/4 (pt), 86/5 (pt), 115/1 (pt), 115/2 (pt), 115/3 (pt), 115/4 (pt), 115/5
More informationThe emphasis on the EMP development is on the following;
ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The
More informationMATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES
MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation
More informationThe emphasis on the EMP development is on the following;
ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The
More informationMax. building height (m)
Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project
More informationEnvironment Compliance Report (Apr 2017 to Sep 2017)
TATA STEEL LIMITED Construction of Residential Complex For Tata Steel Plant located at Kalinganagar Industrial Complex, at Environment Compliance Report (Apr 2017 to Sep 2017) Environment Department Tata
More informationBHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI
TERMS OF REFERENCE (TOR) FOR AN ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI AT PLOT NO.: 63, 67-70, 72-101 AND 105, MOUZA-JUNGLE MOHAL, JL. NO. 01,
More informationEM P. Project Name. Project Address Lok Nayak Hospital, Jawahar Lal Nehru Marg, New Delhi Environment Consultant
Clearance for the Proposed New Medicine, Maternity and ENVIRONMENT MANAGEMENT PLAN Introduction The Management Plan (EMP) is a site specific plan developed to ensure that the project is implemented in
More informationJ-11011/45/2009- IA II (I)
SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh
More informationCOMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated
COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated 10.08.2009 Period : January 2018 to June 2018 Sl.No. CONDITIONS STIPULATED BY MoEF COMPLIENCE Specific Conditions
More informationANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES
ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 1.1 INTRODUCTION The primary function of an environmental impact assessment study is to predict and quantify potential impacts, and assess & evaluate
More informationPRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.
More informationRepublic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY PROJECT Rehabilitation works on the big arch of Krk Bridge
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY
More informationLarsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN
` Larsen & Turbo Limited The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plans for which the
More information(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity)
[Vide Paragraph - 6 of Notification dated 14 th September 2006, only for construction projects listed under item 8 of the Schedule] (1) LAND ENVIRONMENT (Attach panoramic view of the project site and the
More informationENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT
ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL
More informationProposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from
More informationANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI
M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement
More informationEnvironment Management Plan For B 2 Category Project
Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.
More informationFor PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra
Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech
More informationKhasra no &1111,Village Noor Nagar Pargna Loni, NH-58,Raj Nagar Extension, Ghaziabad, UP
Khasra no. 1104 &1111,Village Noor Nagar Pargna Loni, 1 ENVIRONMENT MANAGEMENT PLAN The (EMP) would consist of all mitigation measures for each component of the environment due to the activities increased
More informationExecutable EMP. Mahanagar Realty. CTS no. 373(pt), 375, (pt),378 (pt), S. No. 19A/3A, Dhanakawadi, Pune
Executable EMP for Residential & Commercial Project Ishanya by Mahanagar Realty CTS no. 373(pt), 375, 376 377(pt),378 (pt), S. No. 19A/3A, Dhanakawadi, Pune Project Details: Old data New data 1 Plot Area
More informationM/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh
M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25
More informationTABLE OF CONTENTS. Para No. Contents Page No
TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report
More informationV: PROJECT SCOPING & METHODOLOGY
V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities
More informationPre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra.
Pre- feasibility Report For Shiv Kailasha At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. Proposed By M/S Om Shivam Buildcon Private
More informationV.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN
V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite
More informationManningham Works Code of Practice
Manningham Works Code of Practice June 2017 Manningham City Council 699 Doncaster Road (PO Box 1) Doncaster Vic 3108 t 9840 9333 f 9848 3110 e manningham@manningham.vic.gov.au www.manningham.vic.gov.au
More information1. ENVIRONMENT MANAGEMENT PLAN
1. ENVIRONMENT MANAGEMENT PLAN The Environment Management Action Plan (EMP) is required to ensure sustainable development of the proposed Sewerage System in District A of Allahabad, Uttar Pradesh. The
More informationMitigation Monitoring Program Campus Master Plan 2015
Mitigation Program Campus Master Plan 2015 California State University, Sacramento May 2015 Environmental Mitigation Program Sacramento Campus Master Plan 2015 Project Section 1: Authority This Environmental
More informationEnvironment Management Plan For B 2 Category Project
Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey
More informationMezitli Wastewater Treatment Plant
Mezitli Wastewater Treatment Plant Revised Environmental and Social Action Plan (ESAP) October 2017 Issued by: Mersin Water and Sewage Administration (MESKI) Table of Contents 1. Environmental and Social
More informationFORM I A GROUP HOUSING PROJECT GH-03C, SECTOR-144 NOIDA, UP. For. M/s GULSHAN HOMES and INFRASTRUCTURE PVT.LTD. En-vision Enviro Technologies Pvt.
GROUP HOUSING PROJECT AT GH-03C, SECTOR-144 NOIDA, UP For M/s GULSHAN HOMES and INFRASTRUCTURE PVT.LTD ENVIRONMENT CONSULTANT En-vision Enviro Technologies Pvt. Ltd (NABET/EIA/364/IA-018(Rev. 1) dated
More informationM/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA
1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which
More informationSr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)
Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in
More informationENVIRONMENTAL MONITORING PROGRAMME
Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.
More informationENVIRONMENT MANAGEMENT PLAN
EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/
More informationCHAPTER 15 MITIGATION AND MONITORING
CHAPTER 15 MITIGATION AND MONITORING 15.1 Overview of Impacts The study of, and commitment to, mitigate measures have become an extensive and meaningful part of the environmental impact assessment process.
More informationEnvironmental Management Plan
Environmental Management Plan 10.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality.
More informationEnvironmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department
2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote
More informationE1184 v1. 6. Environmental Management Plan (EMP)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 6. Environmental Management Plan (EMP) This EMP reviews the potential negative impacts
More informationExpansion of Info Technology Park at Manapakkam Village, Kancheepuram District Chennai, Tamil Nadu
FORM 1A CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental
More informationReport on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan
Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land
More informationHINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES
HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES Maton Rock Phosphate Mine of M/s HZL is proposing
More informationENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP)
ENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP) Disclaimer: The information contained in this communication document is intended solely for the use of guidance cannot be
More informationDESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT
DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,
More informationAPPENDIX II (See paragraph 6)
APPENDIX II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information
More informationEnvironmental Assessment Report
TE-TO AD SKOPJE Combined Cycle Co-Generation Power Plant Project Skopje Environmental Assessment Report ENVIRONMENTAL MANAGEMENT PLAN Thermal Energy Plants Department Combined Cycle Co-Generation Power
More informationPresented for Environmental Clearance under EIA Notification 2006 from SEIAA of Maharashtra
Executable EMP for Green Valley Project Project Location: S. no 257, Wakad, Pune Project Details: 1 Plot Area 9899 sqm 2 BUA 29464.01 sqm 3 Tenements Residential: 179, 1 twin bungalow, Commercial: 5 convinient
More informationPromoter: Navkar Prime Developers Private Limited ENVIRONMENTAL MANAGEMENT PLAN & CER
ENVIRONMENTAL MANAGEMENT PLAN & CER 52 ENVIRONMENTAL & SOCIAL MANAGEMENT PLAN 1.1 INTRODUCTION: The Environmental impact can be defined as any alteration of environmental conditions, adverse or beneficial,
More informationSIX MONTHLY COMPLIANCE REPORT JUNE- 2015
Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed
More informationEnvironmental Leadership Program Inspection Form Portable Asphalt Facility
Environmental Leadership Program Inspection Form Portable Asphalt Facility Company Name -Name & Location of Facility: Date of Inspection: FID Number Name of Inspector: Names of Inspection Participants:
More informationTechnical Guidance Document for Operational Environmental Management Plan (OEMP)
Technical Guidance Document for Operational Environmental Management Plan (OEMP) EAD-EQ-PCE-TG-06 Signature on Original Environment Quality Sector * Corporate Management Representative Secretary General
More informationLIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776]
LIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776] 1. Notwithstanding all the other permits and clearances
More informationCOMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER TO MARCH-2017
COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER - 2016 TO MARCH-2017 F.No. SEIAA 281/2014/EC/110 SUBMITTED BY- M/S. TERON CONSTRUCTION PVT. LTD MAA PADMA COMMERCIAL COMPLEX, H/N-
More informationOverburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.
ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked
More informationFORM-1 A CHECK LIST OF ENVIRONMENTAL IMPACTS
San Envirotech Pvt. Ltd. FORM-1 A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT 1.1. Will the existing land-use get significantly altered from the project that is not consistent with the surroundings?
More informationDilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT
Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure
More informationState Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests
State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us
More informationProposed TOR Calix Industries
1 A tabular with index for point-wise compliance of below mentioned TORs. 2 Executive summary of the project giving a prima facie idea of the objectives of the proposal, use of resources, justification,
More informationEnvironmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment
Ministry of the Environment Soil Management A Guide for Best Management Practices The Ministry of the Environment (ministry) encourages the beneficial reuse of excess soils in a manner promoting sustainability
More informationFacilities Environmental Protection Plan: Burnaby Terminal
Facilities Environmental Protection Plan: Burnaby Terminal 1 Facilities Environmental Protection Plan: Overview What The Environmental Protection Plan (EPP) communicates environmental procedures and mitigation
More informationContractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector
Contractors, Illicit Discharges, & Best Management Practices Chris Allen Stormwater Inspector What is an Illicit Discharge? Georgetown County Stormwater Ordinance defines an Illicit Discharge as: Any activity
More informationThis project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report.
The proposal under consideration, Regularization of Existing Resort at Sidheshwarwadi, Village Ubhadanda, Taluka Vengurla, Dist. Sindhudurg is located in CRZ III area having total plot area of 4000 m 2,
More informationNo construction activity started
Sr. Particulars Details No. 1. Proposal is for New Project 2. Type of Project Residential Flats and Shops 3. Project / Activity No. 8(a) [8(a) or 8(b)] 4. Name of the project Kaveri Soham Vistara 5. Name
More informationSFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY Public Disclosure Authorized October 2015 Public Disclosure
More informationSUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam
More informationConsumerism. Emissions to air. Environmental Management System. Enjoyed by some at the expense of others Earths resources endangered
Environmental Management System Consumerism Enjoyed by some at the expense of others Earths resources endangered Emissions to air Acid rain Movement of pollution Ozon depletion Global warming Local air
More information