Shippers Meeting. Hoofddorp, 27 May 2015

Similar documents
Exhibit G to the General Terms and Conditions Forward Flow as of 2018

Exhibit G to the General Terms and Conditions Forward Flow as of 2018

Exhibit G to the General Terms and Conditions Forward Flow November 2015

1 September 2017 GAS MARKET ENTRY REPORT: THE NETHERLANDS

Exhibit G to the General Terms and Conditions Forward Flow as of 2018November 2015

EU Gas Market Reform what does it mean in practice?

European Network Code Workshop

ENTSOG s Capacity conversion model

2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

Draft position paper for consultation. Exploring the feasibility of implicit allocation in the (North West) European gas market

Roadmap for early implementation of the Network Code on Capacity Allocation Mechanisms (CAM NC)

Workshop CAM, CMP. GTS shippermeeting, 21 November 2012

Stakeholder Workshop II

Introducing PRISMA European Capacity Platform

Network Code. on Capacity Allocation Mechanisms

NATURAL GAS TRANSPORTATION SERVICES PROVIDED BY IUK BETWEEN GB AND BELGIUM

EU Gas Market Reform what does it mean in practice?

European Developments

IUK Access Agreement Summary. 10 Oct 2013

Ellund capacity. - Creating new capacity at Ellund (DE) Maja Klejs Pedersen and Poul Johannes Jacobsen. 11 December 2014 User Group 1

Introduction of Entry Capacity to Northern Ireland Transitional Arrangements

Shippers Meeting. Schiphol. 15 June 2010

European Update. 2nd July 2015

CEER Vision for a European Gas Target Model Conclusions Paper Ref: C11-GWG December 2011

on the conditions for the application of FDA UIOLI pursuant to paragraph a) - d) of the CMP Guidelines

The present ACER Guidance to ENTSOG provides a framework for the development of a

on the conditions for the application of FDA UIOLI pursuant to paragraph a) - d) of the CMP Guidelines

EU Network Code Implementation Project

Role Model for the Gas Sector

COMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the document. Commission decision

Key elements of the 2025 vision on Gas

Demand assessment report for the incremental capacity process starting 2017

Towards efficient and effective congestion management of the European gas transmission network:

Consultation on the ZIGMA Model and Implementation of the Capacity Allocation Mechanism and Balancing EU Network Codes

ACCESS CODE FOR TRANSMISSION. Attachment B: Subscription & Allocation of Services

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Market Consultation Session

Development of Gas Hubs in Europe

EASEE-gas. European Association for the Streamlining of Energy Exchange gas

Outline of the European Roadmap for CAM

Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network FG-2011-G August 2011

PEGAS response to German Grid Development Plan Gas

Tariff Network Code. An Overview

IUK is key infrastructure in physically connecting pipeline systems and markets

Applicable TSO Terms for Use of the PRISMA Capacity Platform. 01 November 2015

Gas transmission Technical and Economic Aspects for TSOs

EU Code Implementation Programme

COMMISSION STAFF WORKING DOCUMENT. Guidance on best practices for congestion management procedures in natural gas transmission networks

Brussels/Ljubljana, TITRE 1 April 2015

Coordinated implementation of the Network Code on Capacity Allocation Mechanisms. Information Memorandum

The shift from oil-indexation to market pricing:

1. Principles for transmission capacity management in common Baltic gas market

APPENDIX E.1: PROCEDURE FOR THE MARKETING OF CAPACITIES AT THE PIRINEOS VIRTUAL INTERCONNECTION POINT

The conclusions from the 20 th Madrid Forum (September 2011) form an important input for ACER. In this matter, the forum stressed that both ACER and t

EFET perspective. Andrea Bonzanni Regulatory Advisor, EDF Trading. 8 th ENTSOG Transparency Workshop Brussels, 11 th December 2014

where implicit capacity allocation methods are applied, national regulatory authorities may decide not to apply Articles 8 to 37.

ACER and the Transparency Platform

What are your main views of the proposed measures? Do you think Network codes

Virtual Reverse Flow: at Interconnection Points. Implementing EU Regulations. Code Modification No. A064. Business Rules. 17 th July Version 3.

UNC 0616: Capacity Conversion Mechanism for Interconnection Points. UNC Modification. 01 Modification. 02 Workgroup Report

European Developments

Shippers Meeting. Amsterdam. 25 March 2010

Interconnector (UK) Limited IUK Access Code

European perspective on regional market integration

EU Gas Balancing Code - Daily Nominations at Interconnection Points (IP)

Network code on harmonised transmission tariff structures for gas (NC TAR)

Virtual Reverse Flow: at Interconnection Points. Implementing EU Regulations. Code Modification No. A064. Business Rules. Version 2.

Shippers Day LNG. 13 April Jean-Paul PINON Director Gas Market Commission for Electricity and Gas Regulation (CREG)

Regional Gas Markets Recent Trends

Achieving a single European gas market. Walter Boltz Executive Director E-Control Austria, Vice Chair of ACER s Regulatory Board

Removing barriers to LNG and to gas storage product innovation

Implementation Workshop

8.1. GENERAL RULES OF CAPACITY BOOKING

INFO SESSION. 9 March :30 17:00. Fluxys Belgium non-binding document for discussion & information purposes only

Network codes workshop

Consultation on the integration of gas markets of Czech Republic and Austria

GTE+ Capacity Product Coordination First Phase Report

THE ITALIAN REGULATORY AUTHORITY FOR ELECTRICITY GAS AND WATER

Implementation of the Balancing Network Code: an overview of TSOs main challenges

New UI Design. Shipper training. October 2015

The New Market Model in Austria a case study

Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) Title 1 Principles

Stakeholder Support Process

Virtual Workshop on PJM ARR and FTR Market 2017/2018

Gas Charging Review. NTSCMF 5 April 2017 Final slide pack Update provided on 3 April All slides added or updated are marked with a blue star

Gas Transmission Charging Methodology Statement. Gas Year 2016/17

National Grid s specific response to questions raised in E10- GNM-13-03b: ERGEG consultation on Pilot Framework Guidelines on gas balancing rules.

Fluxys natural gas transport services in Belgium Indicative Conditions & Tariffs

The Outlook for a Gas Hub in SE Europe

ERGEG Guidelines for Good Practice on Open Season Procedures (GGPOS) Ref: C06-GWG-29-05c 21 May 2007

Study about models for integration of the Spanish and Portuguese gas markets in a common Iberian Natural Gas Market

A study on the implementation status of TAR NC in six northwest European countries

Gas Target Model. Electricity and Gas Interactions Workshop. Keelin O Brien 3 rd July 2014

Interconnector (UK) Limited. IUK Access Code

Overview of issues, solutions and open questions in the CAM NC early implementation process

Business Rules. Incremental Proposal

UNOFFICIAL TRANSLATION

Gas Charging Review. NTSCMF 6 September 2016 Interim Slide Pack - Update to be provided on 1 September 2016.

PRISMA Auction of OMV Gas Storage GmbH on 1 March Product Information & Marketing Procedure. Baumgarten / CEGH (VTP) OMV Gas & Power

Gasunie response to the ACER Discussion Paper. A Bridge to December N.V. Nederlandse Gasunie Councourslaan Groningen

Transcription:

Shippers Meeting Hoofddorp, 27 May 2015

Programme 11:00 13:00 13:00 14:00 14:00 19:00 Plenary session Lunch including individual consults Social event

Agenda plenary session The Evolution of European Gas Hubs Patrick Heather The European Network Codes Peter Schultz Auction Results PRISMA Diederik Top Miscellaneous Dewi Telehala

PatrickHeatherConsultancy The Evolution of European Gas Hubs Gasunie Transport Services Shippers Meeting Amsterdam, 27 th May, 2015 The contents of this presentation are subject to PHCL copyright. This presentation may not be reproduced in whole or in part without the written permission of Patrick Heather, PHCL, Lulworth, Longfield Road, Twyford, READING RG10 9AT Tel: +44 118 934 5039 Mobile: +44 777 194 6334 Email: phcl@outlook.com Patrick Heather Consultancy Limited

Outline Wholesale markets Terminology and Market Pricing The development of gas exchanges The European gas exchanges and their role A comparison of EU hubs European gas hubs and trading data Setting the scene The 5 Key Elements Summary and Conclusion 2015 Patrick Heather Consultancy Limited 2

Wholesale markets Gas contract price formation 2015 Patrick Heather Consultancy Limited 3

Terminology Traded gas: Gas traded at the hubs, whether for physical delivery or for financial hedging or for speculative reasons Usually a standard product, either OTC or exchange Usually for spot, prompt or near to mid curve maturity In Britain, about 50% of consumed gas is (net) traded And, about 20 times consumption is (gross) traded: churn Contracted gas: Gas traded or contracted bilaterally, for delivery at a hub Can be of a standard product or bespoke Can be of any time duration, often medium to long term In Britain, about 50% of consumed gas is contracted There is no churn Gas Exchanged at a hub: Gas physically nominated and delivered at a hub There is much confusion in the use of these three terms 2015 Patrick Heather Consultancy Limited 4

Market pricing Separates the financial from the physical Usually flat gas volumes Allows for separate financial risk management Provides the right gas price at any given time Open and transparent Can apply to contracts of any length Increasing demand for market pricing Seller and buyer can each choose when to hedge Seller & buyer can each choose how much to hedge Market pricing is gradually gaining ground in Continental Europe but fully mature, liquid hubs essential to enable transition 2015 Patrick Heather Consultancy Limited 5

The development of gas exchanges European gas exchanges and their role 2015 Patrick Heather Consultancy Limited 6

Exchange function Risk Management Providing a facility for managing price risk through a secure and regulated market hedging and trading Price Transparency The ability to know the price of gas now and in the future (up to six years ahead on ICE NBP and five years for ICE-Endex TTF) Supply/Pricing flexibility The ability to separate price function from supply function Physical balancing Providing a market place for the buying and selling of, usually, marginal quantities of physical gas 2015 Patrick Heather Consultancy Limited 7

The gas exchanges volumes - 2014 Futures Spot ICE/Endex EEX PNXT CEGH GME Totals ICE/Endex EEX PNXT CEGH GME ICE/Endex futures ICE/Endex spot EEX futures EEX spot PNXT futures PNXT spot CEGH futures CEGH spot GME futures GME spot The ICE/ICE-Endex dominates with 95% of the total exchange volumes 2015 Patrick Heather Consultancy Limited 8

OTC + Exchange traded market shares - 2014 VOB VTP PSV PEGs ZEE+ZTP NCG+GPL OTC and Exchange Market shares of each gas hub TTF NBP 0% 20% 40% 60% 80% 100% OTC EXCH OTC and Exchange market shares of total European gas trading 0% 1% 1% 0% 2%1% 0% 7% 25% 5% 30% 28% NBP OTC NBP Exch TTF OTC TTF Exch NCG+GPL OTC NCG+GPL Exch ZEE+ZTP OTC ZEE+ZTP Exch PEGs OTC PEGs Exch PSV OTC PSV Exch VTP OTC VTP Exch VOB OTC VOB Exch OTC dominates across traded hubs overall but exchange trading rising fast at NBP (~30%/2011 to ~52%/2014) and growing at TTF (~6%/2011 to ~15%/2014) 2015 Patrick Heather Consultancy Limited 9

A comparison of EU hubs European gas hubs and trading data Setting the scene 2015 Patrick Heather Consultancy Limited 10

European gas regions, markets and hubs This is my interpretation of the European gas scene in 2015, based on gas market liberalisation and commercial development 2015 Patrick Heather Consultancy Limited 11

Development of the hubs The most developed part of Europe in terms of liberalised gas hubs is in the North-West but this is also the one with the most disparity between the mature, poor and illiquid hubs The Central European region is the one showing most promise for further development over the coming years, both in infrastructure and in market development Most of Eastern Europe is still heavily dependant on Russian gas supplies, arriving through the historic network of transit pipelines; their local gas networks are generally poor and there is a major need for better north/south connectivity Europe is not one homogenous gas market: neither in infrastructure nor in political desire to change 2015 Patrick Heather Consultancy Limited 12

Market development hurdles Liquidity and transparency are key but assessment needs defined measures and criteria Physical connectivity is also key to realise the EU s aim for regional Market Areas Political willingness and cultural attitudes to trading are also key to the development of successful gas trading hubs Much has happened in the development of the European gas hubs but there are still some hurdles to overcome 2015 Patrick Heather Consultancy Limited 13

NWE/CE/SE hubs price correlation: 2012-2014 Price correlation means prices move in the same direction at the same time by about the same amount; it does not mean same price Price correlation in itself is no indicator of one hub being active or inactive, in absolute terms or in relation to the other hubs 2015 Patrick Heather Consultancy Limited 14

European gas regions, markets and hubs Not all hubs are developing in the same way or at the same speed Only two mature gas trading hubs in Europe: NBP and TTF 2015 Patrick Heather Consultancy Limited 15

A comparison of EU hubs European gas hubs and trading data The 5 Key Elements 2015 Patrick Heather Consultancy Limited 16

5 key elements In order to evaluate the depth, liquidity and transparency of the traded gas hubs across Europe, I analyse the results of 5 key elements; as far as these are available The 5 key elements analysed are: who trades in each of the hubs what products are traded there how much volume is traded, and over which periods the Tradability Index the churn rates They are all important but the churn is the most It is essential to review as a minimum these 5 criteria to permit a rigorous analysis; but not all of the elements are always available in all of the hubs 2015 Patrick Heather Consultancy Limited 17

Key Element 1: Market Participants The absolute number of market participants can be misleading as, in reality, it s the number of active participants that really counts Active participants are those who regularly trade and, the more there are, the more liquidity there will be in a market 2015 Patrick Heather Consultancy Limited 18

Key Element 2: Traded Products - 2014 Sources: ICE ; ICE-Endex ; EEX ; Powernext ; CEGH ; GME; P. Heather The type of products available to trade and their traded volumes are a good indication of whether a market is used for balancing or risk management 2015 Patrick Heather Consultancy Limited 19

Key Element 3: Traded volumes Volumes are very important in the analysis of the development of a traded gas hubs. The traded volumes compared to the overall size of the underlying market determine the churn rate, which is probably the most important factor in determining the success of a traded market High absolute traded volumes usually indicate a market with high churn, a large and varied range of participants and free from price manipulation 2015 Patrick Heather Consultancy Limited 20

Traded volume development: 2011-2014 NOTE: NBP and TTF volumes divided by 5 in this graph Sources: LEBA; ICIS; ICE ; ICE-Endex ; EEX ; Powernext ; CEGH ; GME; P. Heather NBP has lost volume to TTF but remains the predominant hub for how long? TTF has seen phenomenal rise in activity since 2011/12, especially in 2014; 2015 Patrick Heather Consultancy Limited 21

Key element 4: Tradability Index: 2008 - Q1-15 The ICIS Tradability Index is not in itself an indication of a deep, liquid and transparent market but it can assist the analysis of the development of a traded hub, in conjunction with other metrics For the result to have any indication, you need to look firstly at the progression of the Index over time, then at the actual number: Sources: ICIS European Gas Hub Reports 2008-2014; P. Heather A result below 16 is not very meaningful, whereas a result of 18 or above does indicate that the hub in question does have reasonable liquidity 2015 Patrick Heather Consultancy Limited 22

Key element 5: Churn rates Probably the most important factor in determining the success of a traded market. Commodity markets are deemed to have reached maturity when the churn is in excess of 10 times When looking at market liquidity, you simply cannot transfer liquidity from a mature hub to a neighbouring hub that does not have the same characteristics, even if the headline price of the spot marginal gas is closely correlated There are two clear benchmark hubs today: NBP and TTF; no other hub is even near to the 10x criterion for mature markets; ZEE continues as essential trading location for large shippers, now joined by VTP; PEGs struggling 2015 Patrick Heather Consultancy Limited 23

Summary and conclusion 2015 Patrick Heather Consultancy Limited 24

Summary and Conclusion Britain s gas markets liberalised in the mid-1990 s and, with a very successful benchmark hub, reached maturity within 10 years, albeit at a high cost NBP is the benchmark for gas in the British Isles and some LNG supplies West European gas markets really started in the mid- 2000 s and, despite a successful Dutch hub, are still some way from being fully liberalised across all countries East European gas markets have barely started their evolution towards liberalised, competitive markets but, through EU Directives and commercial pressure, will change in time Further down the line another European hub is feasible European Gas Hubs already provide price markers for physical contracts but the EU vision for a Single Energy Market is still many years off However, today, TTF has become the benchmark hub for North West European gas supplies and is being widely used for risk management 2015 Patrick Heather Consultancy Limited 25

PatrickHeatherConsultancy Thank you! The contents of this presentation are subject to PHCL copyright. This presentation may not be reproduced in whole or in part without the written permission of Patrick Heather, PHCL, Lulworth, Longfield Road, Twyford, READING RG10 9AT Tel: +44 118 934 5039 Mobile: +44 777 194 6334 Email: phcl@outlook.com Patrick Heather Consultancy Limited

Agenda plenary session The Evolution of European Gas Hubs Patrick Heather The European Network Codes Peter Schultz Auction Results PRISMA Diederik Top Miscellaneous Dewi Telehala

The European Network Codes Functionality of Network Codes (FuNC) Peter Schultz Long Term Use It or Lose It (LT UIOLI) Network Code Tariff (NC TAR) Adaptation of tariff for connections (BAT)

Functionality of Network Codes Aim of the working group Progress and status Identified issues Way forward

Aim of the working group Identify and solve issues resulting from imperfections in network codes Issues relevant for majority of stakeholders Solutions supported by involved TSOs Most issues related to bundled capacity, solutions involve multiple TSOs

Progress and status Until 21 April First selection of issues and potential solutions presented by EFET and ENTSOG at Madrid Forum Other interested stakeholders invited to participate Questionnaire to express views Two workshops to identify issues and find solutions 2 May GTS sent letter to inform and encourage participation of customers 20 May First workshop; no new insights

Identified issues The working group identified four issues: I. Different CMP measures implemented; Oversubscription & Buy Back vs restriction of renomination rights II. Different lead times for trading at PRISMA secondary III. Different procedures for surrender of capacity IV. Different technical capacities each side of the border

I Different CMP measures Problem description: NRAs can choose between restriction of renomination rights or overbook & buy back. At IPs with unidirectional flow the downward restriction of renomination rights does not result in the TSO being able to offer firm backhaul capacity. Proposed solutions: NRAs are to enforce same mechanism at both sides, alignment per IP or per product Increase liquidity secondary market

II Different lead times for trading Problem description: GTS processes trading requests on a near real time basis, other TSOs take up to 10 days. Harmonization of lead times will enhance the secondary market for bundled capacity. Proposed solutions: Define best practice as standard solution for all TSOs Define maximum lead time for each product; 5 days for monthly, quarterly and yearly capacity. Best endeavours for DA capacity trades

III a Different procedures for SoC; Pro rata vs FcFs Problem description: TSOs use different mechanisms when re-assigning surrendered capacity. Bundled capacity becomes (partly) unbundled. Implemented solution: All TSOs have implemented or will implement FcFs mechanism.

III b Different procedures for SoC; return/recall capacity Problem description: GTS returns capacity immediately after the auction, other TSOs roll over until DA auction. Surrendered bundeled capacity can become trapped because of automatic roll over. Proposed solution: Where a TSO automatically rolls over SoC, shippers can recall their capacity when an auction is finished but only until capacity is uploaded by TSO to PRISMA for next auction.

IV Differences in technical capacity; Primarily bundled capacity offered Lack of unbundled capacity to be matched with existing contracts of unbundled capacity at the other side of the IP

IV Capacity mismatch; Proposed solutions: Conditional surrender Allocation of CAM leftovers Capacity is offered as bundled and unbundled capacity in competing auctions

Way forward Planning meeting on 3 June 2015 in Brussels where experts from stakeholders and working group will: Re-assess discussions and conclusions of first workshop Discuss concrete business rules / proposals for the four identified issues based on the conclusions from the workshop Prepare material and positions for second workshop on 30 June 2015

The European Network Codes Functionality of Network Codes (FuNC) Peter Schultz Long Term Use It or Lose It (LT UIOLI) Network Code Tariff (NC TAR) Adaptation of tariff for connections (BAT)

Content Background ACM, CREG, Ofgem paper Roles of ACM, GTS & shippers

Background The LT UIOLI measure was launched August 2012 as one of the CMP measures valid as of 1 October 2013 During the CMP implementation period GTS asked your opinion on the implementation of LT UIOLI measure End 2014, the NRAs from the Netherlands, Belgium and UK decided to launch a joint paper on the implementation of LT UIOLI This paper was officially published by ACM on the 8 th of April 2015 In this session GTS will inform you on the details of this paper and on potential consequences for GTS customers

ACM, CREG, Ofgem paper 1. Process timeline 2. Process steps

1. Timeline of the process Period to process information Yearly auction y+1 Quarterly auction y+1 Yearly auction y+2 Quarterly auction y+2 Period for which Monitoring period capacity is withdrawn Oct y-1 Apr y Oct y Oct y+1 Oct y+2 Oct y+3 Processing steps

2. Process steps

Contractual congestion? There is contractual congestion if, for the monitoring period all technical capacity offered in Y or Q auctions is sold out or any technical capacity offered in Y or Q auctions is sold at a premium or the TSO did not offer any capacity in the Y or Q auctions

Request for firm capacity? There is an (unfulfilled) request for firm capacity if, for the monitoring period all firm capacity offered in Y or Q auctions is sold out or any firm capacity product offered in Y or Q auctions is sold at a premium or the TSO did not offer any firm capacity in the Y or Q auctions

Systematically underutilised? When is a contract systematically underutilised Capacity is not liable to be withdrawn under the LT UIOLI mechanism if the utilisation rate was 80% or higher from 1 April until 30 September and/or from 1 October until 31 March The utilisation rate is the average utilisation per gas day In a portfolio of multiple contracts (profiled bookings), the capacity in contracts with a duration of one year or longer is assumed to be used before any other contracts with shorter duration

Unused capacity sold, offered under reasonable conditions? When has a shipper offered enough capacity Shipper has surrendered capacity and/or offered capacity on the PRISMA secondary platform for at least three consecutive months ahead against a price up to the reserve price (as given in the latest yearly CAM auction within the monitoring period) The capacity offer should be accessible for all interested counterparts registered as a trader on the PRISMA platform

Proper justification? Shipper will have the opportunity to properly justify a utilisation rate lower than 80% by proving that he needs the capacity. Justifications will be assessed on a case by case basis Typical justification: Existence of a delivery contract Security of supply contract Shipper may use this opportunity to prove that it has offered unused capacity under reasonable conditions at another platform than PRISMA.

The capacity to withdraw? If at the end of the day the average utilisation for both periods is still < 80% then the NRA will instruct the TSO to withdraw capacity: up to 80% threshold for an effective duration of two gas years via obligatory surrender yearly capacity rolled over to auction quarterly capacity shippers rights and obligations remain for unsold part

Roles of ACM, GTS, shipper Paper is guideline from NRAs towards shippers NRAs are to decide ultimately on withdrawal If required GTS provides ACM with all necessary data to assess long term contracts Shippers can appeal against withdrawal decision

The European Network Codes Functionality of Network Codes (FuNC) Peter Schultz Long Term Use It or Lose It (LT UIOLI) Network Code Tariff (NC TAR) Adaptation of tariff for connections (BAT)

Content of NC TAR Brief overview Ensure a stable, transparent and cost reflective transmission tariff structure that prevents cross subsidies between network users and leads to efficient investments Make cost allocation mechanisms and impact on tariffs understandable Is applicable to all Entry/Exit points, not only to Interconnection Points (IPs) Cost allocation methodologies Transparency obligations Consultation obligations

European process NC TAR Several ongoing dialogues ENTSOG submits draft NC TAR 26/12 ACER reasoned opinion 26/3 ENTSOG to be resubmitted draft NC TAR EC NC TAR proposal? 2015 2014 2016 Publication Final NC TAR? 19/3 TODAY 1 st informal Comitology 2 nd formal Comitoloy: DECISION? EC and Member States 2 nd formal Comitology: DECISION? PWC Impact Assessment for EC Market (IOGP/EFET) proposal for reduced NC TAR

Dutch implementation of NC TAR Potential planning, timing dependent on EU process GTS updates you on process TODAY GTS and ACM market consultation GTS submits change proposal Dutch tariff code ACM to consult and decide on Dutch tariff code (after 6 months) GTS submits tariff proposal for next year ACM to take tariff decision (after 3 months) 2015 2016 2017 2018 EC NC TAR proposal? Publication Final NC TAR? 24 months implementation deadline GTS and ACM to engage in consultation with market

The European Network Codes Functionality of Network Codes (FuNC) Peter Schultz Long Term Use It or Lose It (LT UIOLI) Network Code Tariff (NC TAR) Adaptation of tariff for connections (BAT)

Adaptation of tariff for connections (BAT) Since 1 January 2014 there is a BAT tariff, separate from transport, balancing and quality conversion The BAT tariff is applied to connections in operation before 1 April 2011 For 2014 & 2015, BAT is a uniform, capacity dependent tariff of 0,111 & 0,119 /kwh/h/y GTS has proposed a new tariff calculation method that reflects the actual costs for maintaining a connection better than the current method

Proposed change for BAT The new tariff calculation method is based on the new-build cost of the connection which is based on the cost for GOS, the connection valves, and the diameter of the connection line As before the tariff is invoiced to the shippers Expected introduction of new tariff calculation method is 1 January 2016

Effects for network users Current yearly fee New yearly fee average of the bottom 50% average average of the top 50% average of the bottom 50% average average of the top 50% Industry 2.940 15.550 78.351 84.924 101.950 150.657 Feeders 60.147 379.257 2.852.359 233.662 546.258 1.228.287 Storages 483.458 1.142.172 2.327.857 53.324 91.707 142.885 Industrial connections will have a significant higher tariff: for some small connections the tariff will change from less than k 1 to k 85 The average feeder will have an increase of approximately 50% The tariffs for storages will decrease to approximately 10% of the current tariff

Agenda plenary session The Evolution of European Gas Hubs Patrick Heather The European Network Codes Peter Schultz Auction Results PRISMA Diederik Top Miscellaneous Dewi Telehala

Agenda Auction points and products Congestion status PRISMA platform statistics Auction capacity bookings Within-Day product Fall Back PRISMA

Auction points and products Julianadorp BBL Emden GASSCO NPT, EPT Oude Statenzijl H GASCADE GUD OGE Oude Statenzijl L GUD GTG Nord Zevenaar OGE/Thyssengas Winterswijk OGE Tegelen OGE H-gas G-gas Zelzate Zandvliet-H Fluxys Hilvarenbeek Fluxys s Gravenvoeren Fluxys Bocholtz OGE Fluxys (TENP) Bocholtz Vetschau Thyssengas

Congestion status Dutch Southern border GTS Southern border exits plus BBL & entry Zelzate

Congestion status Dutch Eastern border

PRISMA platform statistics Currently 35 TSOs >400 registered shippers on PRISMA platform Registered GTS shippers increased from 95 to 111 since start Average of 23 shippers per month that actually book capacity Number of bookings doubled compared to GEA C&B Number of Number bookings of contracts received by GTS doubled Capacity sold in kwh/h Entry Exit Entry Exit Year 0 59 0 8.204.035 Quarter 0 2 0 166.666 Month 67 108 42.314.000 23.511.817 Day-Ahead avg 5 11 2.094.368 3.563.830 Day-Ahead Total 2.402 4.966 978.070.054 1.664.308.627

Auction capacity bookings Total of booked entry and exit capacity FCFS Entry: 45 million FCFS Exit: 130 million Auction bookings on top of already booked FCFS Too early to draw conclusions

Auction capacity bookings Share per product type (average per day in kwh/h) 16.000.000 Exit Capacity Entry Capacity 14.000.000 12.000.000 10.000.000 8.000.000 6.000.000 4.000.000 2.000.000 0 Year Quarterly Month Day No long term entry capacity sold Month Day

Auction capacity bookings Yearly exit capacity in kwh/h 65% less yearly capacity booked for Gas Year 15 16 No yearly capacity sold with surcharge Quarterly auction on 1st of June

Auction capacity bookings (Monthly)

Auction capacity bookings (Daily)

Start Within-Day product (1 November 2015) First Within-Day auction starts on 31 October 2015 at 7 PM Remaining Day-Ahead capacity is rolled over to Within-Day auction Within-Day auction is 4 hours before runtime capacity Within-Day tariff is based on hours: x/24th of daily tariff

Within-Day Schedule 1st bidding window open for 7½ hours (7 PM to 2.30 AM) Duration of each following bidding window is 30 minutes Each bidding round opens at the start of every hour FIRST AUCTION WINDOW FOR NEXT GAS DAY S T A R T N E X T G A S D A Y FIRST AUCTION WINDOW OPEN FOR 7,5 HOURS CAPACITY UNTIL THE END OF THE RELEVANT GAS DAY 19 20 21 22 23 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0 1 2 3 4 5 6 Day D-1 Day D

Fall Back PRISMA Availability of the PRISMA platform: 99,99% PRISMA is working on a Fall Back procedure No Fall Back procedure required for Yearly, Quarterly and Monthly auctions Fall Back for Day-Ahead in place by offering the WiD product

Agenda plenary session The Evolution of European Gas Hubs Patrick Heather The European Network Codes Peter Schultz Auction Results PRISMA Diederik Top Miscellaneous Dewi Telehala

Miscellaneous Supplier of last resort Dewi Telehala Merger of Emden NPT and Emden EPT Interlocutory decision Court of Appeal (CBb) on ACM Method Decision 2014-2016 Single sided nominations (SSN) Intended split GTS Access to Gasport Customer satisfaction survey

Supplier of last resort Follow-up: 1. Code improvement process is still going on After consultation with Reporgs, GTS and TenneT submitted a code change proposal to ACM at 11 December 2014 Implementation is expected summer 2015 2. Robustness codes with regard to bankruptcy of bigger market parties Analysis performed by ACM, EZ, TenneT and GTS is finalized The results will be published shortly after the summer Ministry of Economic Affairs (EZ) is expected to start consultation sessions with Reporgs after publication

Miscellaneous Supplier of last resort Dewi Telehala Merger of Emden NPT and Emden EPT Interlocutory decision Court of Appeal (CBb) on ACM Method Decision 2014-2016 Single sided nominations (SSN) Intended split GTS Access to Gasport Customer satisfaction survey

Merger of Emden NPT and Emden EPT Gassco will merge the NPT entry point with the EPT entry point at Emden The merging of booking and nominations points will take place on 1 October 2015 GTS will contact shippers with capacity bookings at Emden NPT on short notice

Miscellaneous Supplier of last resort Dewi Telehala Merger of Emden NPT and Emden EPT Interlocutory decision Court of Appeal (CBb) on ACM Method Decision 2014-2016 Single sided nominations (SSN) Intended split GTS Access to Gasport Customer satisfaction survey

Interlocutory decision Court of Appeal (CBb) on ACM Method Decision 2014-2016 Interlocutory decision on the 5 th of March 2015 This interlocutory decision currently has no effect on the status of the method decision 2014-2016, x-factor decision 2014-2016 or tariff decision 2015 The final decision of the CBb is expected at the end of 2015 Financial recalculations, if any, depend on final decision With regard to timing, we do not expect any financial recalculations before 2017

Miscellaneous Supplier of last resort Dewi Telehala Merger of Emden NPT and Emden EPT Interlocutory decision Court of Appeal (CBb) on ACM Method Decision 2014-2016 Single sided nominations (SSN) Intended split GTS Access to Gasport Customer satisfaction survey

Single Sided Nominations As of 1 November 2015 GTS will enable shippers to nominate the flows of their capacity via a single nomination Single sided nominations (SSN) for bundled AND unbundled capacity Alignment with other TSOs for exact implementation per network point; date, role of TSO, Edigas messages Market parties will be informed in due course via GTS website

Implementation by GTS Preparation for SSN Shippers A & B to agree on use of SSN; shipper B will nominate on behalf of shipper A Shipper A informs his TSO (TSO 1) via Edigas message which shipper which network point which period Nomination process Shipper B submits SSN to his TSO (TSO 2) TSO 2 that receives SSN from shipper B informs TSO 1 TSO 1 and TSO 2 send confirmations to their shippers

Please note that: Regular nominations (double sided) still possible Shipper A can still submit nominations, overruling the SSN SSN requires Edigas version 5.1 or higher

Miscellaneous Supplier of last resort Dewi Telehala Merger of Emden NPT and Emden EPT Interlocutory decision Court of Appeal (CBb) on ACM Method Decision 2014-2016 Single sided nominations (SSN) Intended split GTS Access to Gasport Customer satisfaction survey

Gasunie intends to split its subsidiary Gasunie Transport Services (GTS) Split will result into two separate transmission system operators as of 1 January 2016 a network operator for the national main transmission system (Gasunie Transport Services, GTS) a network operator for the regional high-pressure transmission system (Gasunie Grid Services, GGS) GTS will submit the necessary code changes within the coming weeks The split has minimal practical implications for customers and GTS will inform its customers in due time

Miscellaneous Supplier of last resort Dewi Telehala Merger of Emden NPT and Emden EPT Interlocutory decision Court of Appeal (CBb) on ACM Method Decision 2014-2016 Single sided nominations (SSN) Intended split GTS Access to Gasport Customer satisfaction survey

Access to Gasport GTS is presently researching alternatives for the use of certificates for access to Gasport Examples of alternatives: Hardware tokens (little device that generates passcodes), Software tokens (mobile app that generates passcodes), SMS verification, Email verification Identity federation (security integration between companies: we trust your user accounts) Etc. GTS will send a questionnaire in Q3 2015 to certificate holders to gain insight in your preferences

Miscellaneous Supplier of last resort Dewi Telehala Merger of Emden NPT and Emden EPT Interlocutory decision Court of Appeal (CBb) on ACM Method Decision 2014-2016 Single sided nominations (SSN) Intended split GTS Access to Gasport Customer satisfaction survey

Customer satisfaction survey Taken actions as a result of the survey 2014 Customer Desk Complaint handling Invoices Other action taken to improve our customer processes Customer Desk for shippers Industry Desk for connected parties The next customer satisfaction survey will be conducted in September 2015

Thank you for your attention 13:00 14:00 14:00 19:00 Lunch including individual consults Social event (Madurodam and beach BBQ) There are busses to bring you to Madurodam. Busses are parked in front of the hotel and will depart at 14:00 hours. After the beach BBQ, there will be one bus driving to Schiphol. The other bus will drive back to the hotel. Busses depart at 19:00 hours.