DOCUMENTATION FOR REVIEW AND ASSESSMENT - Application Set -

Similar documents
1. Korean Regulatory Framework and Technical Standards applied to Site Selection and Safety Review for NPPs

Format and Content of the Safety Analysis Report for Nuclear Power Plants - Application Set -

Safety Documents for Research Reactors

NUCLEARINSTALLATIONSAFETYTRAININGSUPPORTGROUP DISCLAIMER

15 September Woo-Ho Lee, Seon Ho Song, Yong Lak Paek Nuclear Regulation Division. Korea Institute of Nuclear Safety (KINS)

Format and Content of the Safety Analysis Report for Nuclear Power Plants - Core Set -

Regulatory Oversight Activities of Human and Organizational Factors in Korea Dhong-Hoon Lee Ph.D.

REGULATORY CHALLENGES IN PREPARING FOR THE REGULATION OF NEW REACTOR SITING: MALAYSIA EXPERIENCE

Regulatory Requirements for Site Approval Permit of Nuclear Power Plants

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea

MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN

Integration of Human and Organization Factors in Canada

Document Preparation Profile (DPP) [Final] Version 5 dated 16 November, 2015

Post-Fukushima Actions in Korea

on Governmental and Regulatory Infrastructure

KHNP s strategies for Multi-unit Extreme Hazards Response

CONSIDERATIONS AND MILESTONES INFRASTRUCTURE FOR A RESEARCH REACTOR PROJECT

Wolsong-1 Stress Test

Implementation of the Rules for the Continued Operation in Korea

Use of PSA to Support the Safety Management of Nuclear Power Plants

An Overview of Site Survey, Site Selection and Site Evaluation for Nuclear Power Plants

IAEA Safety Standards for Research Reactors

3 Steps Approach : KHNP s Implementation of Post Fukushima Actions. ST(Sung-Tae) Yang. General Manager Corporate Safety Department KHNP

Page 1 / 11. Version 0 June 2014

CNSC Fukushima Task Force Nuclear Power Plant Safety Review Criteria

Considerations and Infrastructure Milestones for A Research Reactor Project

Integration of Human and Organization Factors in Canada Enhancing Nuclear Safety

Arab Journal of Nuclear Science and Applications, 48(3), ( ) 2015

Establishing the Independent, Effective Regulatory Authority in the United Arab Emirates

New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident

International Atomic Energy Agency. Impact of Extreme Events on Nuclear Facilities following Fukushima. Dr C H Shepherd Nuclear Safety Consultant, UK

This report describes a series of actions carried out by the government of the Republic of Korea

LEARNING OBJECTIVES FOR SECTION 4. Inspection and Enforcement by the Regulatory Body

Regulatory Issues and Challenges in Preparing for the Regulation of New Reactor Siting: Malaysia s Experience

Canadian Regulatory Approach for Safe Long-Term Operation of Nuclear Power Plants

EXTRABUDGETARY PROGRAMME ON SAFETY ASPECTS OF LONG TERM OPERATION OF WATER MODERATED REACTORS

Specific Considerations in Different Phases of the Country s First Research Reactor Project

TS1-5: Revision of NS-G-2.15 and Its Implementation for Verification and Validation of Severe Accident Management Guidelines

THE EVALUATION OF THE SELECTED ON-SITE LOCATION FOR A NEW NUCLEAR FACILITY ON A MULTI- FACILITY SITE

IAEA Safety Standards for Research Reactors

Regulating Nuclear Reactor Construction and Commissioning, and Preparation for Operation Challenges for a New Regulatory Body

REGULATORY CONTROL OF SAFETY AT NUCLEAR FACILITIES

NRC INSPECTION MANUAL

Applicability of EPRI Decommissioning Pre-Planning Manual to International Decommissioning Projects

Nuclear power plants observe a strict safety culture. Boat shed in Pyhäjoki, 2008.

SAFETY OF NUCLEAR POWER PLANTS: COMMISSIONING AND OPERATION

Ageing Management and Development of a Programme for Long Term Operation of Nuclear Power Plants

SPESS F Document Preparation Profile (DPP)

Contents. 1. The Occurrence of a Cover-up Event, Its Implications and Effects. 2. Korea s Approach to Regulatory Oversight of Safety Culture

Technical Support Organization - Organization and Interfaces -

NRC INSPECTION MANUAL

GUIDELINES FOR REGULATORY REVIEW OF EOPs AND SAMGs

My name is Yong Soo Kim. I have responsibility for the development of Advanced Nuclear Power

SPESS F Document Preparation Profile (DPP)

TITLE: Algeria NUSSC comments to DPPDS476 on Safety of Research Reactors

Nuclear Security Regulatory Authorization and Assessment Process for Barakah NPP in United Arab Emirates

Federal Authority for Nuclear Regulation UAE

Implementation of SSR2/1 requirements for Nuclear Power Plant Design in Polish regulation.

INDONESIAN NUCLEAR POWER PROGRAM

Module X. Operational safety including operational feedback

PNRA Safety Goals for Nuclear Installations

UAE NATIONAL REPORT. For the 7th Review Meeting of the CONVENTION ON NUCLEAR SAFETY March/April 2017

Preparation of the Regulatory Infrastructure for the New Nuclear Build

SPESS F Document Preparation Profile (DPP) Version 04 dated 16 November 2018

European level recommendations Sect. in NAcP 2 Generic recommendation for WENRA, Finland participates and follows the work.

New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident

Nuclear power plant outages. 1 General 3. 2 General outage requirements 3

Bringing safety performance of older plants on par with advanced reactor designs

IAEA activities related to construction and risk management

WNA - New Build Licensing Conference Multinational cooperation in the licensing of nuclear power plants. Session 3: Design development

Occupational Radiation Protection in Nuclear / Fuel Cycle Facilities Summary of the Contributed Papers

Japanese Nuclear Accident And U.S. Response. April 15, 2011

Research and development needs in a step-wise process for the nuclear waste programme in Sweden

IAEA Safety Standards

Compilation of recommendations and suggestions

WENRA Reactor Safety Reference Levels. January 2008

Executive Report. BEES, Inc. Best Engineering in Energy Solutions. 1. BEES Business Areas

Answers to Questions on the National Report

Joint ICTP-IAEA School of Nuclear Energy Management August National Nuclear Programme Internal and External Stakeholders

Nuclear Safety Enhancement in China after Fukushima Event. July 11, 2013

Regulatory Oversight of Licensees Safety Culture in Romania. Madalina TRONEA National Commission for Nuclear Activities Control (CNCAN) ROMANIA

Dimensions of Human Factors in Nuclear Power Safety

DRAFT IMPLEMENTING DECREE. of 2016

INS QA Programme Requirements

Draft Design Safety Requirements for Proposed Nigeria NPPs to SMRs and probable Application Challenges G. O. Omeje

Korean Perspective on Nuclear Energy after Fukushima Accident

REQUIREMENTS OF SMR TECHNOLOGY DEVELOPMENT & DEPLOYMENT IN THE UK

L16 Plant specific implementation interface ERO training

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation

PURCHASE ORDER ATTACHMENT Q-201 SOFTWARE QUALITY SUBCONTRACTOR REQUIREMENTS TASK DESCRIPTIONS - PURCHASE CATEGORY "A"

Radiation and Nuclear Safety Authority Regulation on the Safety of Disposal of Nuclear Waste Adopted in Helsinki on 22 December 2015

Safety Classification of Structures, Systems and Components in Nuclear Power Plants

Improvements Needed in Nuclear Power Plant Probabilistic Risk Assessments: Lessons Learned from Fukushima

QUALITY ADMINISTRATIVE PROCEDURE

EXAMPLE OF SEVERE ACCIDENT MANAGEMENT GUIDELINES VALIDATION AND VERIFICATION USING FULL SCOPE SIMULATOR

Overview for a feasibility study

Site selection and current status of Ninhthuan NPP project

CSA N Environmental qualification of equipment for nuclear power plants

QUALITY ASSURANCE PROGRAMMES FOR BRAZILIAN NUCLEAR FACILITIES AND ACTIVITIES

ISO 9001: 2008 Engineering Design Construction Quality Management System Sample - Selected pages (not a complete plan)

Transcription:

DOCUMENTATION FOR REVIEW AND ASSESSMENT - Application Set -

Contents 1. Overview 2. Licensing Practice in Korea 3. Safety Reviews for License or Approval 4. Licensing Review Documents 5. Safety Approval Documents 6. Documents for Inspection 7. Summary

1. Overview GS-G-1.2; Operator is responsible for submitting Documentation At each stage of the authorization process such as siting, design, construction, commissioning, operation and decommissioning Any modification of a facility or activity SSG-16; Action 181 Operating org. should prepare and provide the safety doc. required in licensing process

1. Overview Purpose of Licensing System is to make sure the safety of nuclear power plant so that no significant damage will be made to human and to the environment throughout the life of the plant For the administrative system and procedure a construction permit can be issued when all the safety aspects in terms of design and construction are sure to be met a operating license can be issued when the regulators decide that the NPP is constructed in accordance with the appropriate codes and standards and is ready to operate in safe manner in compliance with the approved terms and conditions 4

2. Licensing Practice in Korea Licensing stages in comparison with IAEA Standards Siting Design Certification (Optional) Design Early Site Approval (Optional) Construction Construction Permit Commissioning Inactive stage Active stage Operating License Operation Periodic Safety Review Periodic Safety Review Decommissioning (Close-out or closure) Approval for Decommissioning Approval for Continuous Operation

2. Licensing Practice in Korea Licensing stages interaction with inspection Operating Organization (KHNP) Apply for Early Site Approval (ESA) Apply for CP Apply for Pre-Operational Inspections (POIs) Apply for OL Fuel Load Start-up Tests Apply for Periodic Inspections (PIs) Construction Permit (CP) Phase Operating License (OL) Phase Commercial Operation Phase Issue ESA Issue CP Construction, Performance Issue OL Start-up Conduct PIs (QA Inspection) Conduct POIs (QA Inspection) Daily inspection by resident inspectors Regulatory Body (NSSC/KINS)

Construction Permit Stage 2. Licensing Practice in Korea Licensing stages interaction with inspection Korea Hydro & Nuclear Power Co. (KHNP) Nuclear Safety & Security Commission (NSSC) Korea Institute of Nuclear Safety (KINS) Apply for Early Site Approval (ESA) Request Safety Review for ESA Conduct Safety Review Launch Foundation Work Grant ESA Submit Safety Review Report Apply for Construction Permit (CP) Request Safety Review for CP Conduct Safety Review Commence Construction Work Issue CP <NSSC Review> Submit Safety Review Report

Operating License Stage 2. Licensing Practice in Korea Korea Hydro & Nuclear Power Co. (KHNP) Nuclear Safety & Security Commission (NSSC) Korea Institute of Nuclear Safety (KINS) Apply for Pre-operational Inspections (POIs) Request POIs Conduct POIs Apply for Operating License (OL) Request Safety Review for OL Conduct Safety Review Load Fuel Start-up Test Issue OL <NSSC Review> Submit Safety Review Report Submit POIs Report (Construction, Performance) Submit POI Report (Start-up Test) Inform the POI Results

Commercial Operation Stage 2. Licensing Practice in Korea Korea Hydro & Nuclear Power Co. (KHNP) Nuclear Safety & Security Commission (NSSC) Korea Institute of Nuclear Safety (KINS) Inform the POI Results Commence Commercial Operation Apply for Periodic Inspections (PI) Request PI Conduct PI Power Operation Inform PI Results Submit PI Report

3. Safety Reviews for License and Approval Category Construction Construction Phase OL Phase Operation Commercial Phase Licensing Construction Permit Operating License - Standard Design - Topical Report - Amendment of Permit or License - Licensing Change Safety Approval - Accident Management Program - Early Site Approval - Continued Operation - Periodic Safety Review - Power Uprate 10

4. Licensing Review Documents (Construction) Construction Permit (CP) To ensure the adequacy of plant site, design, and construction in accordance with Rules and Regulations, prior to the commencement of construction Documents to be submitted for CP - Radiation Environmental Report (RER) - Preliminary Safety Analysis Report (PSAR) - Quality Assurance Program (QA) - Description on the Technical Capability

4. Licensing Review Documents (Construction) Radiation Environmental Report (RER) 1. Environmental status in adjoining areas of NPPs and the site; 2. Projected radiation impact on surrounding environment due to construction/operation of NPPs; 3. Environmental radiation monitoring programs to be executed during construction/operation of NPPs; 4. Environmental impact by radiation in the event of an accident during operation of NPPs; and 5. Opinions, analysis and evaluation of the results of a public hearing.

4. Licensing Review Documents (Construction) PSAR Contents Chapter 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Title Introduction and Interfaces Sites Characteristics and Site Parameters Design of Structures, Components, Equipment, and Systems Reactor Reactor Coolant System and Connected Systems Engineered Safety Features Instrumentation and Controls Electric Power Auxiliary Systems Steam and Power Conversion System Radioactive Waste Management Radiation Protection Conduct of Operations Initial Test Program Accident Analysis Technical Specifications Quality Assurance Human Factors Engineering 13

4. Licensing Review Documents (Construction) Quality Assurance Program 1. Organization of a quality assurance system; 2. Quality assurance program; 3. Design control; 4. Procurement document control; 5. Instructions, procedures and drawings; 6. Document control; 7. Control of purchased items and services; 8. Identification and control of items; 9. Control of special process; 10.Inspection; 11.Test control; 12.Control of measuring and test equipment; 13. Handling, storage and shipping; 14.Inspection, test and operating status; 15.Control of nonconforming items; 16.Corrective action; 17.Quality assurance records; and 18.Audits

4. Licensing Review Documents (Construction) Description on the Technical Capability: 1. Organization necessary for the construction 2. Engineering and technical support organization to review safety-related matters during construction 3. Qualification and experience of personnel 4. System for reflection of experiences in design and construction 5. Test and inspection plans

4. Licensing Review Documents (Construction) Operating License (OL) To confirm that the final design of NPP meet the applicable standards and to ensure that the completed NPP can be operated as expected throughout the design life Documents to be submitted for OL Final Safety Analysis Report Technical Specifications(T/S) Quality Assurance Program for Operation Radiological Emergency Plan, Emergency Operating Procedure

4. Licensing Review Documents (Construction) FSAR - Contents are same with PSAR (Chapter 1-19) - Changes in the construction stage are revised Technical Specification (T/S) - Contents are same with PSAR T/S (Chapter 16) - Changes in the construction stages are applied to the T/S 17

4. Licensing Review Documents (Construction) QA Program for Operation - Contents are same with construction stage - Changes for the purpose of operation are accommodated Radiological Emergency Plan - Off-site Emergency Zone - Organization and Responsibility - Secure the Facility and Equipment - Emergency Classification 1, 2, 3 - Initial Action Plan, Retrieve and Recover Plan - Training program, etc. 18

4. Licensing Review Documents (Construction) Emergency Operating Procedures Standard Post Trip Action Guideline Optimal Recovery Guideline Function Recovery Guideline Validation and Verification Report 19

4. Licensing Review Documents (Any Phase) Amendment of Permit, License or Approval - To ensure the adequacy of a modification of the contents of the approved documents after permit, license, or approval Documents to be submitted - Supplementary materials to verify the adequacy for the approved license and permit 20

4. Licensing Review Documents (Any phase) Topical Report (TR) - To evaluate the suitability of a specific technology expected to be applied repetitively Features of TR - Methodologies and relevant computer codes regarding technical matters related to siting, design, manufacturing, construction, pre-service test, startup operation, operation - Matters that serve as the basis in preparing documents attached to an application for permits

4. Licensing Review Documents (Any Phase) Standard Design - To ensure the adequacy of a standard NPP design for the repeated construction; effective for 10 years Documents to be submitted for SD - Explanatory statement on the use of the nuclear reactor - Explanatory statement on technical capabilities - Safety Analysis Report on the SD - Preparation Plan of Emergency Operating Procedures, etc.

5. Safety Approval Documents (Construction) Early Site Approval (ESA) To allow the applicant to do the limited scope works such as the concrete construction for the site s land adjustment before CP Documents to be submitted for ESA - Site Investigation Report - Radiation Environmental Report(RER)

5. Safety Approval Documents (Construction) Site Investigation Report : 1. Geographic characteristics and status of population distribution; 2. Nearby industrial, transportation and military facilities to consider chemical explosions, aircraft crashes, floods and waves caused by dam failure, and so on; 3. Meteorology such as tropical cyclones, precipitation;

5. Safety Approval Documents (Construction) Site Investigation Report (cont.) 4. Marine characteristics such as height of regional tsunamis; 5. Hydrologic engineering to consider ground water and underground water movement; 6. Geology, seismology and geotechnical engineering such as surface faulting, earthquakes, slope instability. etc.

5. Safety Approval Documents (Construction) Accident Management Program - To secure severe accident prevention and/or mitigation features, and to enhance the capability against the severe accidents - Reviewed before Commercial Operation Documents to be submitted - Severe Accident Management Guideline - Technical Background of SAMG - Organization and Responsibility - Training Program - Equipment Information, etc.

5. Safety Approval Documents (Operation) Continued Operation - To operate the plant after licensed design life - Application 2 to 5 years before the end of design life for additional 10 years of operation Documents to be submitted - Periodic safety evaluation report, aging evaluation report of major equipment, radiological environmental report, etc.

5. Safety Approval Documents (Operation) Periodic Safety Review - To review, comprehensively and systematically, the safety of each operating NPP in 10 year intervals after the OL Documents to be submitted - Physical conditions, safety analysis, equipment verification, aged deterioration, safety performance, experience feedback, operating procedures, etc.

5. Safety Approval Documents (Operation) Power Uprate - To increase the Reactor Power from 2% to 20% by using the proven technology and changing relative facilities Documents to be submitted - Power Uprate Method - Safety Analysis Report - FSAR - Equipment Change - Performance Test Plan, etc.

6. Documents for Inspection Types of Regulatory Inspection Quality Assurance Inspection Pre-Operation Inspection Periodic inspection Resident inspection Special inspection 30

6. Documents for Inspection Quality Assurance Inspection To confirm the quality achievement of organizations involved in the design, manufacturing, construction, and operation of facilities To verify the effectiveness of QA Program (QAP) and the appropriateness of applicant s QA activities Performed in reference to the QAP approved by the regulatory body, in a programmatic manner, annually planned for each organization 31

6. Documents for Inspection Pre-operational Inspection To confirm the adequacy of materials, components, systems and structures, as well as construction related activities, processes, procedures and personnel competence Performed in compliance with safety assessment results and Safety Analysis Reports, and in reference to the project milestones 32

6. Documents for Inspection Periodic Inspection To ensure that the performance of reactor facility is maintained in the state of the preoperational inspection, for re-criticality after plant overhaul Performed during the plant outage period 33

6. Documents for Inspection Resident Inspection To monitor daily construction and operation status, and identify and respond to any activities adverse to nuclear safety Performed by resident inspectors at each plant site Special Inspection Initiated in response to unexpected, unplanned or unusual situation or event, as necessary 34

7. Summary Licensing Relative Documents CP: PSAR, QAP, RER, Tech. Capability OL: FSAR, QAP, T/S, REP, EOP Other License: SDR, TR Approval Required Documents ESA, PSR, Power Uprate, SAMP Documents for Inspection QAI, POI, PI, RI, SI