ADDENDUM NO. 4. Project Name: Olmos Basin Central Watershed Sewer Relief Line (C-3), Reaches 1 to 4

Similar documents
ITEM NO SLIPLINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction

CITY OF ODESSA SPECIAL SPECIFICATIONS ITEM 1000 GLASS-FIBER REINFORCED POLYESTER (FRP) REHAB/REPLACEMENT MANHOLE

Wastewater Capital Projects Management Standard Construction Specification

SECTION STORM DRAINAGE

SAN ANTONIO WATER SYSTEM 2013 REHABILITATION WORK ORDER CONSTRUCTION CONTRACT 4 SAWS Job No SAWS Solicitation No.

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

SECTION XXXX POLYMER CONCRETE PUMP STATIONS

San Antonio Water System Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

SECTION GRAVITY WASTEWATER LINES

SPECIAL SPECIFICATION 5925 Polyvinyl Cloride (PVC) Sewer Pipe and Fittings

Specifications for SWC #110: Pipe, Pipe Liner, & Liner Installation

San Antonio Water System Standard Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

SECTION SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS

SECTION SANITARY SEWER SYSTEM

CHAPTER 6 - SANITARY SEWER

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

DUCTILE IRON PIPE AND FITTINGS

INDUSTRIAL PIPE FITTINGS, LLC

A. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water (30 kpa).

SECTION STORM SEWER COLLECTION SYSTEM

San Antonio Water System Standard Specifications for Construction ITEM NO. 852 SANITARY SEWER MANHOLES

San Antonio Water System Standard Specifications for Construction ITEM NO. 850 SANITARY SEWER STRUCTURES

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section DUCTILE IRON PIPE AND FITTINGS

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System

CVO/169897A OCTOBER 29, CONVEYANCE PIPING GENERAL

1.02 RELATED WORK: Refer to the following sections for related work:

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

1 Revised: 2019 Edition

B. Fiberglass for construction in back lot easements placed on cast-in-place base.

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

SECTION SANITARY SEWER SYSTEM

TECHNICAL SPECIFICATION

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

TABLE OF CONTENTS

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS

PIPE REHABILITATION. Comply with Division 1 - General Provisions and Covenants, as well as the following:

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION 300 STORM SEWER TABLE OF CONTENTS

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL

***************************************************************************************************************

Item 460 Corrugated Metal Pipe

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SaniTite. HP Sewer Pipe 300 mm 750 mm

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION

FOX METRO WATER RECLAMATION DISTRICT MANHOLE / SEWER PIPE MATERIALS AND INSTALLATION SPECIFICATIONS MATERIALS 1. PIPE & FITTINGS

CITY OF FARGO SPECIFICATION SANITARY SEWER

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS DAVIS, CALIFORNIA

SECTION 027 SPECIFICATIONS - PIPE MATERIALS FOR SEWERS

Draft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS

Overview. Advanced Dual Wall Profile Construction. Superior Polypropylene Material

SRPE AASHTO Specifications.

SECTION 39 - MANHOLES TABLE OF CONTENTS

SPECIFICATION FOR FIBERGLASS REINFORCED PLASTIC CHEMICAL STORAGE TANKS

SECTION SANITARY UTILITY SEWERAGE PIPING

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)

When a standard or other referenced document referred to in this specification is superseded by an approved revision, the revision shall apply.

A-2000 PVC Pipe for Sanitary Sewers

SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

ARTICLE 26 UTILITY LINE INSTALLATION REQUIREMENTS

All definitions are defined according to ANSI/AWWA C

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION 920 SANITARY AND STORM SEWER MANHOLES

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018

GWINNETT COUNTY STORM SEWER PIPE STANDARDS

Contents. dimensions and weights external loads deflection and testing installation...17

San Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES

SPECIAL SPECIFICATION 6664 Level (3) Communications System

NTPEP Evaluation of Spray Applied Non-Structural and Structural Pipe Liners for Storm Water Conveyance

UNI-BELL PVC PIPE ASSOCIATION UNI-B-15-10

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

SPECIAL SPECIFICATION 6658 Time Warner Communications System

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY CAST-IN-PLACE. Section CAST-IN-PLACE CONCRETE MANHOLES

Bondstrand Series 3300 Fiberglass Pipe (General Industrial Service) (For sizes 2 through 6 inch, use Series 3000 pipe and fittings products)

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

SECTION SEWER PIPE

Remember, on shop drawings for elastomeric bearings (Method B) to verify: 1. Vulcanize pad to sole plate - adhesives (epoxies) are unacceptable;

SECTION STORM DRAINAGE. A. This Section includes gravity-flow, nonpressure storm drainage (REMOVED), with the following components:

Bondstrand Series 3000 Fiberglass Pipe for General Industrial Service

PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE

DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS

SAMPLE SPECIFICATIONS FOR PREFABRICATED FRP LIFT STATIONS

Changes for the. TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION BORING AND/OR JACKING PIPE

ENGINEERING SPECIFICATION FIBERGRATE 1 INCH DEEP MICRO-MESH MOLDED GRATING SECTION 06610

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

Transcription:

ADDENDUM NO. 4 Date: 26 October 2011 San Antonio Water System Project Name: Olmos Basin Central Watershed Sewer Relief Line (C-3), Reaches 1 to 4 Project No.: 08-2512 Solicitation No.: B-11-051-CM This addendum, applicable to work referenced above, is an amendment to the bidding documents and as such will be a part of and included in the Contract Documents. Acknowledge receipt of this addendum by entering the addendum number and issue date in the space provided in submitted copies of the proposal. A. Bidding and Contract Requirement Revisions: Item 1: Item 2: Item 3: Invitation to Bidders, Page IV-1: a) The bid opening date has been changed to Monday, October 31, 2011. Note that there is no change to the location that bids will be received. DELETE first sentence of fifth paragraph that reads: Sealed bids will be received by the Contract Administration Division, 2800 U.S. Hwy 281 North, Customer Center Building, Suite 171, San Antonio, Texas 78212, until 2:00 p.m., October 27, 2011. and REPLACE with the following: Sealed bids will be received by the Contract Administration Division, 2800 U.S. Hwy 281 North, Customer Center Building, Suite 171, San Antonio, Texas 78212, until 2:00 p.m., October 31, 2011. Specification Section 02504, a) DELETE Specification Section 02504, (7 pages) in its entirety and REPLACE with the attached Revised Specification Section 02504, Fiberglass Reinforced Polymer Mortar Pipe (7 pages). SAWS Approved Product for Concrete Manhole Coatings a) ADD the the following SAWS Approved Product for Concrete Manhole Coatings to the Contract Documents: Carboline Protective Coatings Product/System "Plasite 4500", min. 125 mils thick Reference the following Contract Document items related to manhole coatings and update accordingly to include the above listed Carboline product as an approved Epoxy coating along with the Raven and Spray Wall products: Supplemental Specification Item 910 Manhole Rehabilitation SAWS Standard Specification Item 850 Sanitary Sewer Structures Special Provisions to SAWS Standard Specification Item 850 Sanitary Sewer Structures SAWS Standard Specification Item 852 Sanitary Sewer Manholes Special Provisions to SAWS Standard Specification Item 852 Sanitary Sewer Manholes B. Drawing Revisions: None with This Addendum, including these 2 pages, is 9 pages with attachments in its entirety. Attachment(s): Specification Section 02504, (7 pages) 10/26/11 Page 1 of 2

.0Olmos Central Watershed Sewer Relief Line (C-3), San Antonio Water System Job No. 08-2512 SECTION 02504 FIBERGLASS REINFORCED POLYMER MORTAR PIPE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item governs the furnishing and installing of fiberglass-reinforced polymer-mortar (FRPM) pipe in a trench, encasement pipe, tunnel or other installation where the pipe is lifted or carried into place and where the pipe will be used to convey gravity flow. This item does not apply to pipe where installation requires jacking or other means that subject the pipe to axial loads larger than are required to couple the pipe or where the pipe would be subjected to pressurized flow. 12RELATED DOCUMENTS A. Specification Item No. 848 Sanitary Sewer B. Specification Item SP848 Special Provisions to Sanitary Sewers C. Specification Item No. 804 Excavation, Trenching and Backfill D. Specification Item No. 849 Air and Deflection Testing E. Specification Item SP849 Air and Deflection Testing 1.03 REFERENCES A. ASTM D 3262 - Standard Specification for Fiberglass (Glass-Fiber-Reinforced Thermosetting-Resin) Sewer Pipe. B. ASTM D 2412 Standard Test Method for Determination of External Loading Characteristics of Plastic Pipe by Parallel-Plate Loading. C. ASTM D 3681 - Standard Test Method for Chemical Resistance of "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Pipe in a Deflected Condition D. ASTM D 4161 Standard Specification for Fiberglass (Glass-Fiber-Reinforced Thermosetting-Resin) Pipe Joints Using Flexible Elastomeric Seals. E. ASTM D 638 Test Method for Tensile Properties of Plastics 1.04 SUBMITTALS A. Submittals shall conform to requirements of Section 01300. B. The following information shall be provided, as a minimum, for approval of the pipe: 1. Drawings of the proposed pipe, including joint and gasket, and showing dimensions. 2. Pipe manufacturer s certification that the chemical composition of the gasket is compatible with the environment to which it will be subjected. 3. Certified copies of the most recent production test results for pipe stiffness (ASTM D 2412) of 02504-1

Olmos Central Watershed Sewer Relief Line (C-3), San Antonio Water System Job No. 08-2512 pipe of the same type, liner, grade, class, and diameter as specified for the Project. 4. Certified copies of most recent qualifications test results for long-term chemical resistance (ASTM D 3681), joint tightness (ASTM D 4161), and beam strength (ASTM D 3262) of pipe of the same type, liner, and grade as specified for the Project. Qualification test results shall be from pipe manufactured in the same facility as will be used to produce pipe for the Project and shall be from pipe manufactured of material from the same sources as will be used to produce pipe for the Project. C. The following information shall be provided, as a minimum, prior to delivery of pipe to the Project: 1. Manufacturer shall provide layout drawings illustrating placement of each pipe identified with a numbering system, including manhole risers if constructed of FRPM pipe and joint type. 2. Drawings of each fitting or manhole riser, identified by location on the Project D. The following information shall be provided, as a minimum, prior to installation of the pipe: 1. Certified copies of test reports on the elastomer from which the shipment of gaskets was made. 2. Certified copies of production test results on pipe manufactured for the Project. Production tests shall be as defined by ASTM D 3262 and shall involve workmanship (inspections for visible defects), dimensions (pipe diameter, length, wall thickness, and end squareness), and pipe stiffness (as determined by ASTM D 2412). 3. Blocking diagrams specific to each pipe size, stiffness and joint lengths including blocking material, location, width and spacing. Provide associated calculations for beam stresses, maximum allowable grout pressure, expecting initial deflection, and uplift force. PART 2 - PRODUCTS 1.05 MANUFACTURERS A. Pre-approved manufacturers for fiberglass reinforced polymer mortar pipe, based on method of installation, are listed below: 1. HOBAS, USA, Inc. Approved for Open Cut, Slip Line, Jacking, Boring and Tunneling 1413 Richey Road Houston, TX 77073 2. FLOWTITE Pipe Approved for Open Cut only 18585 Samuels Road Zachary, LA 70791 1.06 MATERIALS A. Resin Systems: The manufacturer shall use polyester resin systems with a proven history of performance in this particular application. The historical data shall have been acquired form a composite material of similar construction and composition as the proposed product. B. Glass Reinforcements: The reinforcing glass fibers used to manufacture the components shall be the highest quality commercial grade E-glass filaments with binder and sizing compatible with impregnating resins. C. Silica Sand: Sand shall be minimum 95% silica with a maximum moisture content of 0.2%. 02504-2

Olmos Central Watershed Sewer Relief Line (C-3), San Antonio Water System Job No. 08-2512 D. Additives: Resin additives such as curing agents, pigment dyes, fillers, thixotropic agents, etc., when used, shall not detrimentally affect the performance of the product. E. Pipe F. Joints 1. Pipe shall conform to the requirements of ASTM D 3262 and shall be manufactured of glassfiber-reinforced thermosetting polyester resin mortar with a non-reinforced or glass-reinforced thermoset liner and non-reinforced polyester resin/sand or a glass-reinforced polyester resin surface layer. Pipe shall have a minimum stiffness of 72 psi (496 kpa) at 5 percent deflection for direct bury and 72 psi at 5 percent deflection for installation in tunnel and/or jack and bore where there is a primary liner when tested according to ASTM D 2412. Pipe shall meet Designation Code ASTM D 3262-1-2-3- or 1-1-1. 1. Joints shall conform to the requirements of ASTM D 4161. Joints shall be sleeve coupling, bell and spigot coupling, or flush bell and spigot coupling and shall be compatible with the installation procedure. All joint components not manufactured with the pipe shall be produced by one manufacturer. Unless otherwise specified, the pipe shall be field connected with fiberglass sleeve couplings that utilize elastomeric sealing gaskets made of EPDM rubber compound as the sole means to maintain joint watertightness. The joints must meet the performance requirements of ASTM D 4161. Joints at tie-ins, when needed, may utilize fiberglass, gasket-sealed closure couplings. G. Fittings: Flanges, elbows, reducers, tees, wyes, laterals and other fittings shall be capable of withstanding all operating conditions when installed. They may be contact molded or manufactured from mitered sections of pipe joined by glass-fiber-reinforced overlays. Field taps shall be made using inserta-tee as manufactured by Fowler manufacturing Company, or equal. All fittings and accessories shall be furnished by the pipe supplier and shall have bell and/or spigot configuration compatible with the pipe. H. Gaskets 1. Gaskets shall conform to the requirements of ASTM F 477. All gaskets shall be produced by one manufacturer and be suitable for service intended. I. Marking 1. Pipe: Each length of pipe shall be marked in at least one location using large, easily legible, permanent letters indicating the nominal pipe size, manufacturer s name, and ASTM designation code. If the Owner requires identification of each pipe length by a numbering system for tracking or installation purposes, manufacturer shall mark such numbers on the inside and outside of the pipe. 2. Gaskets: Markings shall include gasket manufacturer s name or symbol, gasket size and manufacturer s code to differentiate between high- and low-head gaskets. J. Grout Ports: Provide grout ports in the wall of pipe when required. Provide plugs of 316 stainless steel or other corrosion-resistant material compatible with the pipe. Grout port plugs shall be designed and installed to meet the test pressure of the pipe and remain watertight over the design life of the pipe. K. Manhole Connections: Provide a water stop flange (wall pipe) for connection to a cast-in-place manhole base or other structure. 02504-3

Olmos Central Watershed Sewer Relief Line (C-3), San Antonio Water System Job No. 08-2512 1.07 DIMENSIONS A. Diameters: The actual outside diameter (18" to 48") of the pipes shall be in accordance with Table 3 of ASTM D 3262. For other diameters, OD s shall be per manufacturer s literature. B. Lengths: Pipe shall be supplied in nominal lengths of 20 feet. Actual laying length shall be nominal +1, -4 inches. At least 90% of the total footage of each size and class of pipe, excluding special order lengths, shall be furnished in nominal length sections. C. Wall Thickness: 1. Wall Thickness for Direct Bury installation and Tunnel Carrier Installation: The minimum wall thickness shall be per manufacturer s literature. 2. Wall Thickness for Jacking Installation: The minimum wall thickness, measured at the bottom of the spigot gasket groove where the wall cross-section has been reduced, is determined from the maximum jacking load. Minimum factor of safety against jacking force is 2.5 based on straight alignment. D. End Squareness: 1. End Squareness for Direct Bury installation and Tunnel Carrier Installation Pipe ends shall be square to the pipe axis with a maximum tolerance of 1/8". 2. End Squareness for Jacking Installation Pipe ends shall be square to the pipe axis with a maximum tolerance of 1/16". E. Tolerance of Fittings: The tolerance of the angle of an elbow and the angle between the main and leg of a wye or tee shall be plus or minus 2 degrees. The tolerance on the laying length of a fitting shall be plus or minus 2 inches. 1.08 STIFFNESS CLASSES A. Stiffness class of FRPM pipe shall satisfy design requirements, but shall not be less than 72 psi, when tested in accordance with ASTM D 2412, for used in direct bury operation or 72 psi when installed within a primary tunnel liner. B. Stiffness class of FRPM in a pipe jacking operation shall be governed either by the ring deflection limitations or by a pipe design providing longitudinal strength required by the jacking method and shall satisfy design requirements stated below. Submit design calculations as required in Paragraph 1.05, Submittals. 1. Ring deflection calculations shall conform with design requirements of 30 TAC Chapter 217 pertaining to flexible pipe used in gravity sewers. The pipe deflection calculations shall ensure that predicted deflection will be less than 5 percent under long-term loading conditions (soil prism load) for the highest density of soil overburden and surcharge loads. Deflection on calculations shall be prepared using long-term (drained) values for soil parameters contained in the geotechnical investigation report for the Project, or other site-specific data obtained by the CONTRACTOR as approved by the ENGINEER. 2. Minimum pipe stiffness when tested in accordance with ASTM D 2412 shall normally be 140 psi. 1.09 SOURCE QUALITY CONTROL 02504-4

Olmos Central Watershed Sewer Relief Line (C-3), San Antonio Water System Job No. 06-2512 A. Production tests and qualification tests shall be performed and documented as required by ASTM D 3262. B. For pipe larger than 36 diameter, manufacturer must provide evidence of current ISO registration. 1.010 REJECTION 1. Pipe: Pipe shall be subject to rejection whenever the following defects are, in the opinion of the Engineer, of an extent, severity or nature to detrimentally affect the strength or serviceability of the pipe: surface cracking, interlaminar separation, separation of the liner or surface layer from the structural wall, blisters, bubbles, pinholes, pits, foreign inclusions, resin-starved areas, or damage from improper handling or installation. In addition, bulges, dents, ridges and other surface irregularities on the inside of the pipe that result in variation of the inside diameter by more than 1/8 inch (3 mm) from the adjacent unaffected area may be cause for rejection. 2. Gaskets: Gaskets shall be subject to rejection whenever they show surface checking, weathering, or other deterioration, or damage from improper installation. 3. Any joints that do not pass the air test shall be removed and relayed. 4. The method of mitigation shall be the sole option of the Owner and Engineer. Repair with a structural glass lay-up will not be performed without specific written permission by Owner. A repair will be considered correction of defective work and may not be performed without compensation to the Owner. 1.011 INSPECTION A. The ENGINEER shall be entitled to inspect pipes or witness the pipe manufacturing. Such inspection shall not relieve the manufacturer of the responsibilities to provide products that comply with the applicable standards and these Specifications. B. Manufacturer s Notification to Customer: Should the ENGINEER wish to see specific pipes during any phase of the manufacturing process, the manufacturer must provide the ENGINEER with adequate advance notice of when and where the production of those pipes will take place. C. Failure to Inspect: Should the ENGINEER elect not to inspect the manufacturing, testing, or finished pipes, it in no way implies approval of products or tests. 1.012 PACKAGING, HANDLING, AND SHIPPING A. Packing, handling, and shipping should be done in accordance with the manufacturer s recommendations. PART 3 - EXECUTION 1.013 INSTALLATION A. Install pipe and fittings in accordance with requirements of Item 848 Sanitary Sewers. B. The manufacturer must supply a suitable qualified field service representative to be present periodically during the installation of pipe. C. Pipe Bedding: Conform to requirements of Item 804 Excavation, Trenching and Backfill. 02504-5

Olmos Central Watershed Sewer Relief Line (C-3), San Antonio Water System Job No. 06-2512 D. Pipe Handling: Use textile slings, other suitable materials or a forklift. Use of chains or cable is not recommended. E. Jointing 1. Clean ends of pipe and coupling/joint components. 2. Check pipe ends and couplings for damage. Correct any damage found. 3. Coupling grooves must be completely free of dirt. 4. Apply joint lubricant to pipe ends and the elastomeric seals. Use only lubricants approved by the pipe manufacturer. 5. Use suitable equipment and end protection to push or pull the pipes together. 6. Pipe shall be coupled using suitable equipment such as wire rope puller or come along to pull pipes together in a manner that will not damage pipe or exceed forces recommended by the manufacturer for coupling or joining or pushing pipe. 7. Join pipes in straight alignment then deflect to required angle. Do not allow the deflection angle to exceed the deflection permitted by the manufacturer for the joint used. F. Pipe Grouting: Annular space grouting shall not damage the liner and shall conform to the manufacturer s requirements. G. If pressure grouting of the pipe is conducted as part of a pipe-jacked tunnel installation, seal the grout holes with liner resin to a thickness equal to the pipe liner thickness, or with a threaded plug for that purpose. 1.014 FIELD TESTS A. Infiltration / Exfiltration Test: Maximum allowable leakage shall be per local specification requirements. B. Low Pressure Air Test: Pipe may be tested with air pressure (max 5 psi). The system passes the test if the pressure drop due to leakage through the pipe or pipe joints is less than or equal to the specified amount over the prescribed time period. C. Individual Joint Testing: For pipes large enough to enter, individual joints may be pressure tested with a portable tester to 5 psi (max.) with air or water in lieu of line infiltration, exfiltration or air testing. Owner s Inspector and Contractor s representative who witness the testing will be required to sign off on joint test reports each day. D. Deflection: Maximum allowable long-term deflection is 5% of the initial diameter. PART 4 - MEASUREMENT AND PAYMENT 1.015 MEASUREMENT AND PAYMENT A. No payment will be made for fiberglass pipe under this Section. Include in unit price for Item 848 Sanitary Sewers and SP 848 Special Provisions to Sanitary Sewers. 02504-6

Olmos Central Watershed Sewer Relief Line (C-3), San Antonio Water System Job No. 06-2512 B. The minimum stiffness of FRPM pipe required is shown on the Drawings. A minimum stiffness of 72 psi is required for direct bury pipe regardless of depth or concrete encasement. C. Air and Deflection testing pipe shall not be paid separately but shall be considered subsidiary in the related unit price under Item 848 Sanitary Sewers and SP 848 Special Provisions to Sanitary Sewers.. END OF SECTION 02504 02504-7