SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS
|
|
- Gwendolyn Fitzgerald
- 6 years ago
- Views:
Transcription
1 SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings. 5. Duckbill check valve 1.2 SUBMITTALS Product Data: For each type of product indicated. Shop Drawings: 1. Drain Basins: Include plans, elevations, sections, details, frames, and grates for drain basins. 2. De-Chlorination tablet tube feeder: Include product literature, plans, elevations, sections, details 3. Duck bill valves: Include product literature, plans, elevations, sections, details 4. Non-pressure transition couplings: Include product literature, elevations, sections, details 5. Pipe: Include product literature, details, ce1iifications, loading information, bedding and backfill requirements and jointing 6. Specialty drains, funnel drains and air gaps: Include product literature, plans, sections, details Coordination Drawings: Show pipe sizes, locations, and elevations. Indicate interface and spatial relationship between drain basins, piping, and proximate structures. D. Profile Drawings: Show system piping in elevation. Draw profiles at horizontal scale of not less than 1 inch equals 10 feet and vertical scale of not less than 1 inch equals 5 feet. Indicate drain basins, in-line components, piping and valves. E. Product Ce1iificates: For each type of drain basin, pipe, joints, valves, coupling, and fitting, from manufacturer. 1.3 PROJECT CONDITIONS Interruption of Existing Storm Drainage Service: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary service according to requirements indicated: 1. Notify Owner no fewer than two days in advance of proposed interruption of service. STORM UTILITY DRAINAGE PIPING
2 PART 2 - PRODUCTS 2.1 PVC PIPE AND FITTINGS PVC Drain Piping: 1. Pipe: Schedule 40 pipe shall be manufactured from a Type I, Grade I Polyvinyl Chloride (PVC) compound with a Cell Classification of per ASTM D1784. The pipe shall be manufactured in strict compliance to ASTM Dl 785 and D2665, consistently meeting and/or exceeding the Quality Assurance test requirements of these standards with regard to material, workmanship, burst pressure, flattening, and extrusion quality. 2. Fittings: injection molded to ASTM D2665, solvent weld 3. Certification: Pipe and fittings to conform to ANSI/NSF Standard NON-PRESSURE TRANSITION COUPLINGS Comply with ASTM C 1173, elastomeric, sleeve-type, reducing or transition coupling, for joining underground non-pressure piping. Include ends of same sizes as piping to be joined, and corrosion-resistant-metal tension band and tightening mechanism on each end. Shielded, Flexible Couplings: 1. Description: ASTM C 1460, elastomeric or rubber sleeve with full-length, corrosionresistant outer shield and corrosion-resistant-metal tension band and tightening mechanism on each end. Ring-Type, Flexible Couplings: 1. Description: Elastomeric compression seal with dimensions to fit inside bell of larger pipe and for spigot of smaller pipe to fit inside ring. 2.3 CLEAN OUTS Plastic Cleanouts: 1. Description: PVC body with PVC threaded plug. Include PVC sewer pipe fitting and riser to cleanout of same material as sewer piping. 2.4 FLOOR DRAINS - STANDARD Standard: A WW A C 105. Material: Josam" Lite line body with 5" round "Nikaloy" top, or equivalent by J.R. Smith, MIF AB Manufacturing Inc. or Zurn Industries LLC 2.5 FLOOR DRAINS - FUNNEL Standard: AWWA Cl05. Material: Josam" Lite line body with 7" round "Nikaloy top and 4" diameter funnel or equivalent by J.R. Smith or Zurn Industries LLC.. Funnel to be at least 3-3/4" high. 2.6 DRAIN BASIN PVC Drain Basin: 1. Description: Drain basins shall be manufactured from PVC pipe stock conforming to ASTM Dl 784, cell class as manufactured by "NYLOPLAST", a division of Advanced Drainage Systems, Inc. or approved equal. 2. Diameter: Shall be as shown on the drawings, 24 and 30 inches. STORM UTILITY DRAINAGE PIPING
3 3. Connections to basins: Basin shall be formed to provide a watetiight connection. Joint tightness shall conform to ASTM D3212 using flexible elastomeric seals conforming to ASTMF477. Basin Frames and Covers: 1. Description: Grates and frames shall be integral to the drain basin. Grates and frames shall be specifically made for each basin so as to provide a round bottom flange that closely matches the diameter of the drain basin. 2. Grates and frames shall be ductile iron conforming to ASTM A536 grade Grates shall be slotted. 4. Grates and frames shall be "Neenah" R for 24" diameter applications and R for 30" diameter applications or equivalent products by other manufacturers. 5. Frame and grate shall be painted black. 2.7 DE-CHLORINATION TABLET TUBE FEEDER General: The tablet tube feeder shall be a specifically constructed one piece low linear, medium density, UV stabilized rotomolded polyethylene equipped with two (2) PVC removable feed tubes designed to hold 2-5/8" diameter tablets. The tubes are insetied through the top cover of the feeder into the stream flow of the water. The lower end of each tube shall be slotted to allow free flow of water through the tubes. Feeder shall be supplied with 4" pipe inlet and outlet Feeder shall be Exceltec International Corporation (EIC) Model 200 or equivalent. DE-CHLORINATION TABLETS Tablets for de-chlorination shall be 92.3% active sodium sulfite, 2-5/8" in diameter, 13/16" thick, 140 grams weight and a density of 2.0 grams/cc, and pale green in color. Tablets shall be manufactured by Severn Trent Exceltec, Norweco or equal. Provide one 45 pound container of tablets PIPE OUTLETS Pipe discharges in the drain basins shall be achieved with duckbill valves to prevent insect or vector intrusion. Duckbill valves shall be for 2" and 4" PVC pipe with stainless steel hose clamps connectors. Duckbill valves shall be manufactured by "Tideflex" Model TF-1 for the 4" and Model TF-2 for the 2" pipe. Equivalent products by other manufacturers will be considered EARTHWORK 2.11 Excavation, trenching, and backfilling are specified in Division 31. PIPING INSTALLATION General Locations and Arrangements: Drawing plans and details indicate general location and arrangement of underground storm drainage piping. Location and arrangement of piping layout take into account design considerations. Install piping as indicated, to extent practical. Where specific installation is not indicated, follow piping manufacturer's written instructions. STORM UTILITY DRAINAGE PIPING
4 D Install piping beginning at low point, true to grades and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and couplings according to manufacturer's written instructions for use of lubricants, cements, and other installation requirements. Install proper size increasers, reducers, and couplings where different sizes or materials of pipes and fittings are connected. Reducing size of piping in direction of flow is prohibited. Install gravity-flow, non-pressure drainage piping according to the following: 1. Install piping pitched down in direction of flow. 2. Install PVC sewer piping according to ASTM D 2321 and ASTM F CLEANOUT AND FLOOR DRAIN INSTALLATION Install cleanouts, floor drains and riser extensions from sewer pipes to cleanouts at grade. Use PVC fittings in storm sewer pipes at branches for cleanouts and floor drains and PVC pipe for riser extensions to cleanouts and floor drains. Install piping so floor drains and cleanouts open in direction of flow in storm sewer pipe. Set cleanout frames and covers in concrete floor with tops flush with floor surface. Set floor drain frames and covers in the concrete floors to the elevations shown on the plan and flush with the surrounding concrete floor. DRAIN BASIN INSTALLATION General: Install drain basins, complete with appurtenances and accessories indicated. Where specific drain basin construction is not indicated, follow drain basin manufacturer's written instructions. Set tops of frames and covers flush with finished surface surrounding the drain basin. CONNECTIONS Connect non-pressure, gravity-flow drainage piping in building's storm building drains. Make connections to piping and drain basins. 1. Use commercially manufactured wye fittings for piping branch connections. 2. Remove debris or other extraneous material that may accumulate. Connect to sediment interceptors specified in Division 22 Section "Sanitary Waste Interceptors." D. Pipe couplings and expansion joints with pressure ratings at least equal to piping rating may be used in applications below unless otherwise indicated. 1. Use non-pressure-type flexible couplings where required to join gravity-flow, nonpressure sewer piping unless otherwise indicated. a. Unshielded, flexible couplings for same or minor difference OD pipes. b. Unshielded, increaser/reducer-pattern, flexible couplings for pipes with different OD. c. Ring-type flexible couplings for piping of different sizes where annular space between smaller piping's OD and larger piping's ID permits installation. STORM UTILITY DRAINAGE PIPING
5 IDENTIFICATION Furnish and install green warning tape directly over piping and at outside edge of underground structures. 1. Use detectable warning tape over nonferrous piping and over edges of underground structures. FIELD QUALITY CONTROL Inspect interior of piping to determine whether line displacement or other damage has occurred. 1. Submit separate reports for each system inspection. 2. Defects requiring correction include the following: a. Alignment: Less than full diameter of inside of pipe is visible between structures. b. Deflection: Flexible piping with deflection that prevents passage of ball or cylinder of size not less than 92.5 percent of piping diameter. c. Damage: Crushed, broken, cracked, or otherwise damaged piping. d. Infiltration: Water leakage into piping. e. Exfiltration: Water leakage from or around piping. 3. Replace defective piping using new materials, and repeat inspections until defects are within allowances specified. 4. Re-inspect and repeat procedure until results are satisfactory. Test new piping systems, and parts of existing systems that have been altered, extended, or repaired, for leaks and defects. 1. Do not enclose, cover, or put into service before inspection and approval. 2. Schedule tests and inspections with at least 24 hours' advance notice. 3. Submit separate report for each test. 4. Gravity-Flow Storm Drainage Piping: Test according to requirements of UNI-B-6, and the following: a. Test plastic piping according to ASTM F Leaks and loss in test pressure constitute defects that must be repaired. D. Replace leaking piping using new materials, and repeat testing until leakage is within allowances specified. END OF SECTION STORM UTILITY DRAINAGE PIPING
6 THIS PAGE INTENTIONALLY LEFT BLANK
SECTION FACILITY SANITARY SEWERS
SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More information1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings
SECTION 33 34 00 SANITARY FORCE MAIN PART 1 GENERAL 1.1 SCOPE OF WORK A. This section specifies the requirements for furnishing and installing sanitary force main and appurtenances. The pipe shall be of
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationSDR26 material is to be used as a minimum on all U-M projects.
BuildingName The Description of the Project P00000000 0000 DOCUMENTS SPECIFICATION DIVISION 33 NUMBER SECTION DESCRIPTION DIVISION 33 SANITARY SEWER UTILITIES SECTION 333100 - SANITARY SEWER END OF CONTENTS
More informationSECTION PIPE & PIPE FITTINGS PART 1 GENERAL
SECTION 02610 PIPE & PIPE FITTINGS PART 1 GENERAL 1.01 DESCRIPTION A. This Section includes the material and bedding requirements for all pipe and pipe fittings for underground pressure and non-pressure
More informationSECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)
SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density
More informationSECTION POLYVINYL CHLORIDE (PVC) WATERLINE
SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,
More informationDARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES
SECTION 15420 DRAINAGE AND VENT SYSTEMS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All cleanouts above finished (accessible and non-accessible) ceilings shall be extended to the floor above. B. Do
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 22 1319 - SANITARY WASTE PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationSECTION FACILITY SANITARY SEWERS
SECTION 22 1313 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install soil, waste, and vent piping systems within building and connect with outside
More informationDRAINS AND CLEANOUTS. 1. Division 7 - Thermal and Moisture Protection Piping (Plumbing).
SECTION 15421 DRAINS AND CLEANOUTS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. Division 7 - Thermal and Moisture Protection. 2. 15410 - Piping (Plumbing). 1.02 SUBMITTALS A. Product Data: Submit
More informationSECTION FOUNDATION DRAINAGE
SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section
More informationPVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe
Design and Installation Guide PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe TABLE OF CONTENTS Introduction 2 Products 3 Main-Line Fittings & Service-Line Fittings 3-4 Connections to Dissimilar
More informationSANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.
SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity
More informationINDUSTRIAL PIPE FITTINGS, LLC
Page 1 of 9 SPIROLITE MUNICIPAL AND INDUSTRIAL ODOR CONTROL PIPING Municipal wastewater treatment plants, industrial processes and composting facilities can be assured of trouble free transport of foul
More informationA. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationSection Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers
STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with
More informationITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS
ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing
More informationSECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD
PART 1: GENERAL 1.01 The design guidelines contained herein include the requirements for drainage and vent systems utilized at The University of Texas at Austin. It is the intention of this document to
More informationMANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems
SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.
More informationFabrication and Installation Table of Contents
Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection
More informationStorm Drainage Structures
Storm Drainage Structures Tomorrow s Drainage System Today A DIVISION OF ADVANCED DRAINAGE SYSTEMS, INC. ADVANCED DRAINAGE SYSTEMS, INC. The Preferred Solution for Storm Drainage Applications. About Nyloplast-ADS
More informationSECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL
SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS
More informationSECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS
SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances
More informationSECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.
PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300 Record
More informationSECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.
SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete
More informationDIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1
DIVISION 3: SEWER 3.1 DESIGN CRITERIA A. APPLICABILITY 1. These Design Standards shall govern all construction and upgrading of public sanitary sewer facilities in the City of Dundee and applicable work
More informationA. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.
PART 1: GENERAL 1.01 Purpose A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationSECTION TAPPING SLEEVES AND VALVES
SECTION 33 12 16.17 TAPPING SLEEVES AND VALVES PART 1: GENERAL 1.01 SCOPE Furnish, install and test all tapping sleeves, tapping valves, and tapping saddles as shown on the Drawings. 1.02 RELATED WORK
More informationSEWER FORCE MAIN HDPE PIPE
SECTION 15150 SEWER FORCE MAIN HDPE PIPE PART 1: GENERAL 1-1 DESCRIPTION: This specification governs the material, pipe, fittings, joining methods and general construction practice for High Density Polyethylene
More informationDiffused Aeration Piping Equipment
1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections
More informationPIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE
PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE SUGGESTED STANDARD SPECIFICATION January, 2012 Prepared by International Pipe Bursting Association Thanks to the following participants for the development
More informationSECTION WATER DISTRIBUTION
SECTION 33 10 00 WATER DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY 1.02 CODES A. Section Includes: 1. Underground water service piping, watermains and appurtenances. A. All work shall comply with the most
More information***************************************************************************************************************
02735 WASTE WATER DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 22 14 00 ***************************************************************************************************************
More informationSECTION FOUNTAINS
PART 1 - GENERAL SECTION 13121 FOUNTAINS 1.1 SUMMARY A. Section includes design and complete installation of decorative fountains complete as shown on Drawings and as specified, including: 1. Equipment
More informationSection 3 Fusible PVC Pipe Connections
3.0 Fusible PVC pipe is joined together using butt-fusion joints, however, it may be necessary to utilize other connections to integrate Fusible PVC pipe sections into an overall pipe system. There are
More informationB. Drainage Piping: Building sewer piping outside building that conveys storm drainage from building.
SECTION 221316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More information2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.
General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting
More informationSEWER SYSTEM DESIGN GUIDELINES
SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water
More informationTRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)
PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without
More informationSECTION UTILITY MANHOLES AND STRUCTURES
SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition
More informationDIVISION 4 SANITARY SEWERS AND STORM DRAINS
DIVISION 4 SANITARY SEWERS AND STORM DRAINS 401 PIPE AND FITTINGS FOR SANITARY SEWERS AND STORM DRAINS...1 401.01.00 MATERIALS... 1 401.01.01 CERTIFICATION OF MATERIALS... 1 401.01.02 PIPE... 1 401.01.02A
More informationSECTION TURBINE VENTILATORS
SECTION 07 72 00 TURBINE VENTILATORS **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to suit your particular project.
More informationS T A N D A R D. ANSI/ASAE S376.2 JAN1998 (R2004) Design, Installation and Performance of Underground, Thermoplastic Irrigation Pipelines
ANSI/ASAE S376.2 JAN1998 (R2004) Design, Installation and Performance of Underground, Thermoplastic Irrigation Pipelines S T A N D A R D ASABE is a professional and technical organization, of members worldwide,
More informationSECTION GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP)
SECTION 02513 GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP) PART 1 GENERAL 1.01 SECTION INCLUDES A. Irrigation pipeline, as herein specified, consists of installing pipe
More informationSECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM
SECTION 13 1100 SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM This section includes editing notes to assist the user in editing the section to suit project requirements. These notes are included as
More informationA. This section includes the furnishing and installation of a sanitary sewer system.
PAGE 333000-1 SECTION 333000 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More informationUNI-BELL PVC PIPE ASSOCIATION UNI-B-15-10
UNI-BELL PVC PIPE ASSOCIATION UNI-B-15-10 RECOMMENDED STANDARD SPECIFICATION FOR POLYVINYL CHLORIDE (PVC) FABRICATED PRESSURE FITTINGS November 2010 UNI-BELL PVC PIPE ASSOCIATION 2711 LBJ Freeway, Suite
More informationWASTEWATER SYSTEM STANDARDS
8.1 SCOPE Wastewater pipelines and appurtenances shall be provided as shown on the plans and as specified herein. Clearing, grubbing, trench excavation and backfill, pipe material, valves, cutting and
More informationSUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)
PART 1 GENERAL SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) 1.01 SCOPE This specification includes the materials and procedures required for the internal sealing of the frame-chimney
More informationUnderground Piping for Private Hydrants & Sprinkler Supply Line
City of Brea Brea Fire Department Fire Prevention 1 Civic Center Circle Phone: (714) 990-7655 Underground Piping for Private Hydrants & Sprinkler Supply Line PURPOSE The provision of adequate water supplies
More informationB. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.
SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution
More informationContact the Jurisdictional Engineer for materials allowed by each jurisdiction.
Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the
More informationC900/RJ. CertainTeed. PVC Pipe. with CertainTeed s proven Certa-Lok restrained joint system. Directional Drilling
1 1 CertainTeed C900/RJ PVC Pipe with CertainTeed s proven Certa-Lok restrained joint system Directional Drilling Underground Water Mains and Restrained, Non-Metallic Change-of-Direction Fittings (No Thrust
More informationPush Fit Drain, Waste and Vent (DWV) Fittings
NSF International Special Engineered Specification NSF SE 14974 Push Fit Drain, Waste and Vent (DWV) Fittings The Public Health and Safety Company. TM NSF SE 14974 SPECIFICATIONS FOR A SPECIAL ENGINEERED
More informationTYPICAL INSTALLATION INSTRUCTIONS
TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect
More informationSITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013
WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown
More informationSPECIFICATION for ISCO HDPE DUAL CONTAINMENT PIPE
SPECIFICATION for ISCO HDPE DUAL CONTAINMENT PIPE SECTION 15000 MECHANICAL 1. GENERAL 1.1 This specification shall govern the materials and installation of polyethylene dual contained system of pipe, structures
More informationSUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION DUCTILE IRON PIPE, FITTINGS AND SPECIAL ITEMS
SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 33 11 13.13 DUCTILE IRON PIPE, FITTINGS AND SPECIAL ITEMS PART 1 GENERAL... 3 1.1 Description... 3 1.2 Reference Specifications,
More informationChapter 8 TECHNICAL SPECIFICATIONS FOR CONVEYANCE SYSTEMS
Chapter 8 8.01 General Provisions 8.02 Manholes and Structures 8.02.1 Materials 8.02.2 Workmanship on Manholes 8.02.3 Types of Connections 8.03 Catch Basins and Inlets (Storm only) 8.03.1 Materials 8.03.2
More informationRULES AND REGULATIONS FOR WATER AND WASTEWATER SERVICE APPENDIX B WATER AND WASTEWATER SERVICE CONSTRUCTION SPECIFICATIONS
RULES AND REGULATIONS FOR WATER AND WASTEWATER SERVICE APPENDIX B WATER AND WASTEWATER SERVICE CONSTRUCTION SPECIFICATIONS Last Approved Revision: 3-23-2017 Page i TABLE OF CONTENTS SECTION I GENERAL...
More informationSECTION PACKAGE BOOSTER PUMP STATIONS
SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to
More informationHouston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College
SECTION 323113 - CHAIN LINK FENCES AND GATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationThe Road Authority ADS Nyloplast Stormwater Drainage System http://www.roadauthority.com/database/product.asp?prod=4241 28/04/2010 ADS Nyloplast Stormwater Drainage System Engineered PVC surface drainage
More informationSANITARY SEWER SYSTEM CONSTRUCTION STANDARD SPECIFICATIONS SECTION 130 SANITARY SEWER SYSTEM CONSTRUCTION
SANITARY SEWER SYSTEM CONSTRUCTION STANDARD SPECIFICATIONS SECTION 130 SANITARY SEWER SYSTEM CONSTRUCTION 130-1.01 Description All sanitary sewer system components and related items for new construction
More informationCONDUITS AND FITTINGS
CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit
More information4 1 /2 MARK 73-5 AMERICAN FLOW CONTROL. It s What We Know. AMERICAN-DARLING FIRE HYDRANT AMERICAN-DARLING 4 1 /2 MARK 73-5 FIRE HYDRANT
AMERICAN-DARLING FIRE HYDRANT AMERICAN-DARLING FIRE HYDRANT AMERICAN FLOW CONTROL It s What We Know. CONSTRUCTION AMERICAN-DARLING FIRE HYDRANT OPERATING NUT Cast one-piece bronze operating nut. Design
More informationSERVICE LINES, METERS AND APPURTENANCES
AUGUST02 SECTION 02646 SERVICE LINES, METERS AND APPURTENANCES PART 1 - GENERAL 1.1 DESCRIPTION A. This section concerns materials and installation of corporation stops, curb stops, service lines, meters,
More informationHydrodynamic Separation Product Calculator
Hydrodynamic Separation Product Calculator Example Project BMP #1 CDS 2015-4 Project Information Project Name Example Project Option # A Country US State Kentucky City Covington Contact Information First
More informationCHAPTER 11 CONDUITS AND FITTINGS
CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1
More informationSECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.
SECTION 02830 CHAIN LINK FENCES AND GATES (GALVANIZED) 1.0 GENERAL 1.1 Section Includes A. Fence framework, fabric, gates, and accessories. B. Excavation for post bases; concrete footing for posts. C.
More informationTrench Tough Plus TM MOLDED SDR35 GASKETED SEWER FITTINGS MOLDED SDR26 HEAVY WALL GASKETED SEWER FITTINGS
Trench Tough Plus TM MOLDED SDR35 GASKETED SEWER FITTINGS MOLDED SDR26 HEAVY WALL GASKETED SEWER FITTINGS Trench Tough Plus TM North America s Leader of PVC Fittings Since 1954, Multi Fittings has been
More informationSANITARY GRAVITY SEWER LINES. A. Sanitary sewer lines, manholes, fittings, accessories, and bedding
PART 1 GENERAL 1.1 SECTION INCLUDES A. Sanitary sewer lines, manholes, fittings, accessories, and bedding B. Municipal sewer service connections and clean-out access C. Bore and jack casing D. Creek crossing
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-33 30 00 (April 2008) Change 4-02/16 -------------------------- Preparing Activity: USACE Superseding UFGS-33 30 00 (July 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain
More informationTHE ADVANTAGES HDPE MANHOLES
NIC HDPE manholes are custom fabricated for many varied applications including municipal and industrial manholes, sewer and storm water manholes, leach ate collection, sewer lift stations, siphon structures,
More informationHIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61)
PART 1-GENERAL INTEGRALLY MOLDED FLANGED OUTLET (IMFO ) - COMPLETE DRAIN HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61) 1.01 Requirements 1. The
More informationSample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction
Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction 1.00 DESCRIPTION 1.01 WORK INCLUDED: This work shall include the furnishing of all labor, equipment and materials necessary
More informationChapter 3: General Regulations
Chapter 3: General Regulations General Comments The content of Chapter 3 is often referred to as miscellaneous, rather than general regulations. Chapter 3 received that label because it is the only chapter
More informationFLOOR AND AREA DRAINS
Pictorial Index Product Recommendations Floor Drain Selection Factors Load Rating Grate Free Area Material & Characteristics Pipe Connection Commonly Specified Options Typical Installations FLOOR AND AREA
More informationCONCRETE PIPE JOINTS, YOUR BEST CHOICE
CONCRETE PIPE JOINTS, YOUR BEST CHOICE www.concretepipe.org FREQUENTLY ASKED QUESTIONS Q. Are joints covered by National Standards? A. Yes. There are ASTM and AASHTO standards for concrete products joints.
More information2000-SG STAINLESS STEEL SLIDE GATES
2000-SG STAINLESS STEEL SLIDE GATES 1. GENERAL CONDITIONS 1.1. SCOPE. This section covers Stainless Steel Flow Control Slide Gates and operators. 1.2. GENERAL. Slide gates, including actuation devices,
More informationRB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION
GENERAL DESCRIPTION The Orbinox model RB Weir Gate is designed for downward opening applications where a more accurate flow control is required. The water flows over the top of the slide permitting a constant
More informationSTANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.
STANDARD SPECIFICATIONS SECTION 02445 BORING AND JACKING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for boring and jacking casing pipe. 1.2 DEFINITIONS A. Carrier Pipe: Sewer or water
More informationConcrete Pipe Joints Your Best Choice
Frequently Asked Questions Q. Are joints covered by National Standards? A. Yes. There are ASTM and AASHTO standards for concrete products joints. The various standards are discussed in this publication.
More informationSECTION WATER DISTRIBUTION SYSTEM
PART 1 GENERAL 1.1 SCOPE SECTION 02660 WATER DISTRIBUTION SYSTEM A. The Contractor shall furnish all labor, equipment, and materials and perform all operations necessary to construct a complete, functioning
More informationDIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING
DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SCOPE A. This work shall consist of the underground construction of a pipeline across the state right-ofway, or other facility as indicated on the plans and as
More informationSECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS
SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and
More informationInstallation Practice InnerSeal
Installation Practice InnerSeal Rehabilitation of a Full-Length Sewer Service Lateral using One-Piece Main and Lateral Cured-In-Place Liner Assembly Installed By Means Of Air Inversion 1. Intent This instruction
More informationGB-50. Submittal Special Precautions Specifications Installation Application Specific Details
Submittal Special Precautions Specifications Installation Application Specific Details 37" (94.0 cm) 10½" (26.7 (27 cm) 28½" (72.4 cm) (46.7 (45.7 cm) 28" (71.1 cm) SUBMITTAL STANDARD: 4" plain end inlet/outlet
More informationSECTION BASIC ELECTRICAL MATERIALS AND METHODS
SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:
More informationSECTION WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA
SECTION 6900 - WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA 6901 DESIGN CRITERIA A. General 1. The design standards presented in the City of Lee's Summit Design Criteria are the minimum standards
More informationSANITARY SEWER REHABILITATION SPECIFICATIONS
SANITARY SEWER REHABILITATION SPECIFICATIONS Section 01501 - Flow Control 1. General: 1.01 The Contractor shall furnish all labor, materials, equipment and supplies, and shall perform all work related
More informationCITY OF MARTINEZ STANDARD SPECIFICATIONS FOR WATER LINE WORK
CITY OF MARTINEZ STANDARD SPECIFICATIONS FOR WATER LINE WORK Engineering Division Community Development Department 525 Henrietta Street Martinez, CA 94553 (925) 372-3515 I. Water Pipe TABLE OF CONTENTS
More informationSOLID WALL PVC SEWER PIPE
INSTALLATION GUIDE FOR SOLID WALL PVC TABLE OF CONTENTS INTRODUCTION: Introduction 3 Receiving 4 Unloading and Handling 5-6 Storage 7 Trenching 8 De-Watering 9 Field Cutting 10 Lowering Pipe into the Trench
More informationSECTION I FLEXIBLE PIPE VS. RIGID PIPE (GENERAL)
h~i:! SECTION I FLEXIBLE PIPE VS. RIGID PIPE (GENERAL) Generally, rigid pipes have the following characteristics: made in discrete lengths use gaskets in joints to form a water-tight seal often produced
More informationSOLID WALL PVC SEWER PIPE
INSTALLATION GUIDE FOR SOLID WALL PVC SEWER PIPE TABLE OF CONTENTS Introduction 3 Receiving 4 Unloading and Handling 5-6 Storage 7 Trenching 8 De-Watering 9 Field Cutting 10 Lowering Pipe into the Trench
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain
More informationGB-75. Submittal Special Precautions Specifications Installation Application Specific Details
Submittal Special Precautions Specifications Installation Application Specific Details 38½" 38.5" (97.8 cm) 12½" (31.7 cm) 26" (66.0 cm) 46" 33½" 32" (851 (81.3 mm) cm) SUBMITTAL STANDARD: 4" plain end
More information