About Us Atlas Offshore Co. is a general contractor in oil & gas field mainly focusing on offshore activities. Our goal on all of our projects is to obtain our client s complete satisfaction by performing our work for the most competitive price, with the highest quality construction and within the schedule requirements. We take all steps necessary to ensure that these three goals are met at the end of each project. Project management is integrated to our overall service. We ensure smooth operation and build strong relationships with our customers by pulling together an integrated team at the bidding stage. This team sees the project through to installation, thus reducing the number of interfaces required during the project life span and increasing control and efficiency. Integrated provider of design, fabrication, hook-up & operations support services. A provider of services and engineering solutions to the Iran s infrastructure, manufacturing & process industries. Provides highly skilled project management, engineering, maintenance, construction & support services to oil, gas & process industry 2
Our Capabilities Project capabilities include: Project management & project control Design engineering Installation engineering Fabrication Hook-up, commissioning and start-up Inspection, maintenance and repair Integrated logistics Human resource supply & management Besides design, construction and installation engineering, our engineering services to the project include the following: Comprehensive project planning, scheduling, and reporting `Engineering support Procurement Inspection Expediting Construction management Start-up and commissioning assistance 3
Work Shop / Storage Atlas Offshore Yard Location: Across First Tangak, Power plant road, Bushehr, Iran This yard is the workshop for various fabrication jobs as well as main storage place for all company equipment & machinery. 4
EPC Services Pipeline Engineering & Design Atlas Offshore provides the following pipeline engineering and design services: Feasibility studies Survey coordination/data collection Property identification Route selection and optimization Environmental studies, permitting, and compliance assurance Design of piping, crossings, compressors/pump/meter stations. Tank farm/terminals, and interconnections Material specification Operations procedures Project Management Project management activities including project planning, costing, scheduling, contracting and regulatory / third party interfacing. Procurement Material and equipment quotation, purchasing and expediting with full document operation, technical support and vendor inspection. Construction management Construction scheduling, client representation, contract administrator, QA/AC inspection, and commissioning support, both office and site based. 5
Diving Diving is an essential part of our activities. Diving by our highly qualified and experienced diving experts, including: Supporting exploration, installing pipelines for production and transportation completing sub sea facilities inspecting platform and pipelines Repairing and maintaining fixed platforms and pipelines Near end of cycle, salving and clearing sites. HSE HSE plays a key role in all our activities, therefore, in keeping with then company s mission to minimize the risk to all company, supplier and contractor personnel and the environment during all phases of a project, we shall: Ensure that the top management attaché the highest priority to maintaining sound HSE practice Ensure that HSE standards meet and, where possible, exceed all regulatory requirements. Ensure that all hazards are identified and the necessary controls are implemented through the integration of HSE management system Ensure that each employee and contractor has adequate HSE awareness and training. 6
HSE - Continued Project HSE Organization Chart HSE Manager Workshop HSE Supervisor HSE Officers (Onshore) Workshop Health & Environment Officer Workshop Trainer Officer HSE Officers (Offshore) 7
Projects In Progress Installation of Floating Storage Unit (FSU) Location: Soroosh Oil Filed Persian Gulf Client: Oceanus / IOOC Project Status: in Progress Job summary: Installation of FSU including; performing the installation engineering, preparation of installation procedures, positioning of FSU, hookup of mooring chains and as-built survey of mooring lines using more than 8 DP vessels as pull and push tugs, positioning tugs and diving support vessels. 8
Phase 14 two top deck Engineering and one top deck (deck C) Fabrication Location: Bandar Abbass Client: ISOICO Project Status: in Progress Job summary: Engineering of two top decks for Phase 14 and Prefabrication and Fabrication of one Top deck 9
Hendijan Offshore Complex Development Spools and Risers fabrication and Installation Location: Hendijan Field Client: ISOICO Project Status: In progress Job summary: Fabrication, load out, transportation and installation of Hendijan 12 subsea pipelines spools and risers on CHD, WHP07 and WHP08 platforms. 10
Structure Fabrication of topside deck phase 16 south pars (SPD16) Location: Bandar Abbas Client: ISOICO (MSG) Project Status: In progress Job summary: Fabrication of the structures of offshore platform (WHP) relevant to the south pars gas development project phase 16 11
Projects Completed Hendijan Offshore Complex Development Two 12 subsea pipelines installation Location: Hendijan Field Client: ISOICO Project Status: Completed Job summary: Engineering for two 12 subsea pipelines (WHP07 to CHD & WHP08 to CHD), for Hendijan offshore development complex and pipe lying operation with Hydrotest, risers and spool installation. 12
Hendijan Offshore Complex Development WHP 07 & WHP08 Engineering and WHP07 Fabrication of Top deck Location: Bandar Abbass Client: ISOICO Project Status: in Progress Job summary: Engineering of two top decks (WHP07 & WHP08) for Hendijan offshore development complex and Pre-fabrication and Fabrication of one Top deck WHP07). Water depth in this area was 3 and 5 meter 13
OFFSHORE HOOK UP and COMMISSIONING WORKS OF DECKS and BRIDGES Location: Persian Gulf Aboozar & Bahregansar field Client: GPC Project Status: Completed Job summary: Preparing Aboozar and Bahregansar Top decks and Bridges by Connecting Piping s, Electrical and Instrument cables, GRE connections, Riser connection and Main panel installation from old facilities (platforms) to new Platforms. Cable connections testing and Hydro test the Platforms for Commissioning. 14
Hendijan Offshore Complex Development WHP 07 & 08 Jackets Load Out, Transportation & Installation Location: Persian Gulf Hendijan field Client: ISOICO - FARSA Project Status: Completed Job summary: Installation of two jackets (07 & 08) in Hendijan field, which is 2 mile away from Bahregansar Field. Water depth in this area was 3 and 5 meter 15
Hendijan Offshore Complex Development WHP 07 & 08 Jackets Load Out, Transportation & Installation 16
Kharg Island Gas Gathering & NGL Recovery project offshore Installation of Decks, Bridges and Apparatuses Location: Persian Gulf Client: Gulf Piping Company Project Status: Completed Job summary: Offshore installation of Decks, Shipped loose items and offshore construction management. Main Job steps include: Installation of AB-GCP and B-GCP Deck, Bridge Preparation and submission of offshore installation manual and procedures Offshore construction management for AB-GCP, B-GCP and Deck and Bridge installation AB-GCP Top Deck 17
Kharg Island Gas Gathering & NGL Recovery project offshore Installation of Decks, Bridges and Apparatuses B-GCP Top Deck Installation operation 18
Kharg Island Gas Gathering & NGL Recovery project offshore Installation of Decks, Bridges and Apparatuses 19
Kharg Island Gas Gathering & NGL Recovery project offshore Installation of Decks, Bridges and Apparatuses AB-GCP bridge installation B-GCP Bridge Installation 20
Offshore jackets installation & appurtenances in Aboozar and Bahregansar fields Location: Persian Gulf Client: Gulf Piping Company Project Status: Completed Job summary: As a part of ongoing development of the Aboozar and Bahregansar Fields, Atlas Offshore has installed three Gas Compression Platforms (GCP s) Aboozar Gas Compression Platform (AB-GCP), Aboozar Field Bahregansar Gas Compression Platform (B-GCP), Bahregasar Field. Bridge support (BST), Bahregansar Field AB-GCP Jacket Installation (Aboozar Field) 21
Offshore jackets installation & appurtenances in Aboozar and Bahregansar fields B-GCP Jacket Installation (Bahregan Field) 22
Offshore jackets installation & appurtenances in Aboozar and Bahregansar fields Bridge Support and Top Deck (Bahregan Field) 23
24 pipeline in Kharg Island Location: kharg island, Persian Gulf Client: Iranian offshore Oil company (IOOC) Project Status: Completed Job summary: Fabrication and Installation of 2000 m of carbon steel 24 pipeline onshore Kharg island. Main Job steps include: Design and installation engineering Right of way execution Sand blast &anti- corrosion coating of all pipe joints Cold bending of pipe joints at site ( up to 51 ) Insulation joints Installation at two tie-in points Pipeline Road crossing Pipeline Cathodic protection Pipeline hydro test / pre commissioning Anchor flange/block installation 24
Fabrication of tie-in spools Location: Khoram shahr, Iran Client: Iranian offshore Engineering and construction company (IOEC) Project Status: Completed Job summary: This project has been fabrication of 53 tie-in spools (71 parts) from 4 to 36 with various lengths up to 45 meter. Various stages if project included preparation of engineering documents and shop drawings, welding qualifications, fit up and welding pipe joints, NDT, protective coating and hydro testing of spools. 25
Interconnection of the new production plant with the existing one Location: Bahregan, Iran Client: Iranian Offshore Oil Company(IOOC) Project Status: Completed Job summary: This project covers the following scope of work: Fabrication/installation of 700 meters 4 carbon steel pipeline. Design, supply and installation of two vertical centrifugal pumps for sea water Fabrication/installation of 500 meters underground/ aboveground polyethylene waste water pipeline Design, supply and installation of two horizontal centrifugal pumps for fresh water Design and execution of storm water disposal system which is partly covered concrete channels and some is concrete pipes. 26
24 Shore pulling pipeline Location: kharg island, Persian Gulf Client: Valentine Maritime (Kish) L.L.C. Project Status: Completed Job summary: Shore pulling preparation & assisting operations including preparation of site and installation of Equipment & assisting during shore pulling operation &Trenching that included Constructing a Berm for Excavation access from Land Fall Point to water level which was approx. 70 meter Long 27
South Pars Phases 6, 7 & 8 Offshore Projects Flooding of 4" MEG Pipeline Location: Asalooye Client: Statoil Hydro Project Status: Completed Job summary: This operation carried out in two phases: Phase 1 Flooding with treated water while the pipeline is ROV inspected to locate the point of break in the pipeline. Fluorescent dye facilitating locates the leaking point by ROV. Phase 2 Upon completion of repair of the pipeline, phase 2 started which includes flooding/preservation of the pipeline by chemically treated seawater followed by pressure test of the pipeline to ensure its integrity. 28
Fabrication, installation and pre-commissioning of 24 riser and tie-in spools Location: Abouzar offshore complex Client: Iranian Offshore Oil Company(IOOC) Project Status: Completed Job summary: Fabrication, installation and pre-commissioning of 24 riser and tie-in spools This project covers the following scope of work: Fabrication of a 24 riser pipe, riser clamps and tiein spools for new 24 subsea pipeline to Abouzar offshore complex including NDT, anti-corrosion coating, pigging and hydrotest Offshore transportation and installation of riser clamps, riser pipe and first piece of spool Sub sea meteorology, fabrication and installation of subsea tie-in spool including NDT, anti-corrosion coating, pigging and hydrotest Leak test of the installed riser and spools including flooding and pressurization of spool 29
Kharg Island Gas Gathering and NGL Recovery (26 Shore Pulling) Location: kharg island, Persian Gulf Client: Valentine Maritime (Kish) L.L.C. Project Status: Completed Job summary: Shore pulling preparation & assisting operations including preparation of site and installation of Equipment & assisting during shore pulling operation. 30
Miscellaneous lifting jobs in Salman offshore complex & Siri island oil production facilities Location: Siri Island & Salman Complex Client: Iranian Offshore Oil Company (IOOC) Project Status: Completed Job summary: Scope of work includes Mobilization of a crane barge (crane capacity 250 ton) and replacing a scrubber vessel on Salman platform as well as removing the damaged loading arms & relocating a control building in Siri island. 31
Pre-Commissioning of 26 Pipeline in kharg Island Location: kharg island, Persian Gulf Client: Valentine Maritime (Kish) L.L.C. Project Status: Completed Job summary: Logestic servises for pigging and Hydrotesting the 26 pipeline in kharge Island 32
South pars gas field development Phase 1 2" & 8" Piping on SPD1 Platform Location: Persian Gulf SPD1 Platform Client: SPEC Project Status: Completed Job summary: Fabrication & Offshore installation of new 8 and 2 piping on SPD1 platform 33
Certificates 34
Certificates 35
Certificates 36
Certificates 37
Certificates www.atlas-offshore.com 021-88774544 38
Contact Us Postal Address: Unit 5, No. 8, Negar str., Vali-e Asr Ave., Vanak Sqr. Tehran-Iran Telephone: (+ 9821) 88774544 (+ 9821) 88773663 (+ 9821) 88885406 Fax: (+ 9821) 88790572 E-mail Address: Website: Atlas@atlas-offshore.com www.atlas-offshore.com Atlas Offshore 39