PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

Similar documents
Bonner Bridge Replacement Update:

Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Pushing the Envelope For 100 Years

2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January

BREAKTHROUGH AND BURIAL OF TBMS ON THE BRISBANE AIRPORT LINK PROJECT

King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

Presented by: Frank Guyamier

Alaska Way Viaduct Replacement Project

Construction Technology B (CON4313)

Civil Engineering Construction I (CBE5031)

COMMUNITY BOARD EIGHT

Principles for Tunnel Design

Underpinning. Underpinning

Design and Implementation of the South Hartford CSO Tunnel

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

Bi-Directional Static Load Testing of Driven Piles

Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective

BRADSHAW CONSTRUCTION CORPORATION

Diaphragm wall Construction

HIGH PERFORMANCE TUNNEL BORING MACHINE FOR QUEENS WATER TUNNEL, NO. 3: A DESIGN AND CASE HISTORY

ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA

Presentation Outline

Ironton Russell Bridge Project

6 Preliminary Assessment of Construction Method and Constructability Issues

Design Data 4. Jacking Concrete Pipe

Ironton Russell Bridge Project

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE

Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout

Ironton Russell Bridge Project

Ironton Russell Bridge Project

MICROTUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS

PIPE JACKING & TUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS

Experts in tunneling with Tunnel Boring Machines

USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward

Construction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk

D7: TUNNEL CONSTRUCTION AND METHODOLOGY

SECTION PRECAST CONCRETE SEGMENTAL TUNNEL LINING

Misan University - College of Engineering Civil Engineering Department

2013 ASCE Agenda. Microtunneling in Difficult Ground Craig Camp. Microtunneling Characteristics (NASTT) Akkerman MTBM Introduced 1995

FOUNDATIONS. Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1

ALMEDA TUNNEL PAST, PRESENT AND FUTURE

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS

4.5 GEOTECHNICAL, SUBSURFACE, AND SEISMIC HAZARDS

Trenchless Technology

Installation Manual. Bigfoot Systems Inc. EM

Presented By: Brenden Tippets, Project Executive

Ching Guan Kee ABSTRACT

Service Automation. Making the way

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig

TBM Selection and Specification

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:

Advanced Construction Techniques. Underpinning. Underpinning

Pump Station Excavation

KIEWIT FOUNDATIONS CO.

Steven Dapp, Ph.D., P.E. Steven Dapp, Ph.D., P.E. Dan Brown and Associates

Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization

Construction Technology B (CON4313)

ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems LTD. Titan Hollow Bar

PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today!

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts

1.0 Micro Tunnelling An overview

Forensics by Freezing

Tunnel Boring Machines

Developed countries require a modern infrastructure Roads Railways Power Communications Water Wastewater

Installation Manual For Conical Tanks. INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS

Ironton Russell Bridge Project

Ironton Russell Bridge Project

BEBO CONCRETE ARCHES TECHNICAL GUIDE

Shoring of Long Beach Main Pump Station utilizing Ground Improvement Methods, Long Beach, CA

ARMTEC.COM. Bridge Materials / Versatile Low Maintenance Rapid Installation

Goulds Multistage Process Pumps

Stevens & Associates, Inc. Tunnel Construction Projects. Fact Sheets

Pipejacking Tunnel Boring Machines TBMs. Michael Frenke, LOVAT Inc.

Ironton Russell Bridge Project

VTA s BART Silicon Valley Phase II Extension

Dulles Corridor Metrorail Project

FOR HIGHWAY TUNNEL GALLERIA SPARVO.

Ironton Russell Bridge Project

4th International Engineering and Construction Conference - July 28, 2006


Lecture 13 CONCRETE WORKS

Dahlia Ponds Tunnel Project. Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless

STANDARDIZED STRUCTURES

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL

Upon speaking with the representatives with Technical Foundations as well as Walder Foundations, it was determined that:

CS-13 TRENCHLESS TECHNOLOGY TABLE OF CONTENTS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS

Case History: Value Engineering of Driven H-Piles for Slope Stability on the Missouri River

Risk Management of the Restoration of Shanghai Metro Line 4

Tel: Neil: Tony: Website:

KIEWIT FOUNDATIONS GROUP

CWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending March 2, 2013

Garage Beam System DAYTONSUPERIOR.COM FORMING. For Post-Tensioned Beam and Slab Parking Structures

Learning Legacy Document Duration of data recorded (approx.) 1

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

Design Data 4M. Jacking Concrete Pipe

Transcription:

NORTH SHORE CONNECTOR TUNNELS AND STATION SHELL LIGHT RAIL PROJECT PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

North Shore Connector Alignment 7300 lf Extension to existing 25 mile system 18 Contracts $435 Million

Funding $ 435 Million 80% 17% 3%

Project Location 007 006 Future- to Airport North Shore Connector Light Rail Expansion 004 New Gateway Station 003 EXISTING GATEWAY STATION Existing Light Rail System

Project Team Owner Port Authority of Allegheny County Construction Manager TriGold Jacobs Civil HDR Kwame

Project Team Design Engineer DMJM Contractor North Shore Constructors JV Obayashi Corp. Trumbull Corp.

What we are building Two Contracts Combined Contract Value - $156,500,000500 000 Time NTP Oct 2, 2006 003 Tunnels 1243 days Feb 26, 2010 006 Station / C&C 870 days Feb 18, 2009

Four Major Structure Types Boat Section 340 lf SOE - Steel Soldier Piles and Wood Lagging g Cut and Cover 1200 lf SOE - Cement Deep Soil Mixing i Wall (CDSM) SOE Cement Bentonite Wall (CB) Top Down Construction - Station SOE - Slurry Wall Bored Tunnel 2240 lf SOE - Precast Concrete Segmental Lining i

Boat Section Soldier pile and lagging Excavation 0 to 35 feet Soldier Piles and Wood Lagging Above or at the water table Deep Wells Walls and Waterproofing EXISTING SOILS

Boat Section - SOE - Soldier Piles & Lagging Soldier Piles and Lagging

Cut & Cover SOE CDSM Walls 60 +/- BACKFILL CDSM Walls Cut off ground water ROCK

Cut & Cover / Launch Pit CDSM Walls

Cut & Cover / Launch Pit - CDSM WALLS In place soils mixed with Bentonite Slurry going down Insert Steel Soldier Piles Cement Slurry mixed going up

CDSM SOE Drill Rock Socket

CDSM WALLS Temporary Bridge

Excavation / Mud Slab / WP/ Base Slab ROCK

Structural Concrete Waterproofing ROCK

Structural Concrete Cut and Cover

Backfill BACKFILL ROCK

Bridge to hold the Bridge Support two Bents

Cut & Cover Instrumentation Instruments Stain gauges Weather Tilt Meters Motorized Total Station

Underpinning SR-65 Drilled Pier Drilled Pier

Underpinning SR-65 ROCK

Underpinning SR-65 Drilled Pier

Underpinning SR-65 ROCK

Underpinning SR-65 ROCK

North Side Station Shell

North Shore Station - Slurry Walls SEA PARKING GARAGE Concourse

North Shore Station - Slurry Walls

North Shore Station Slurry Walls DESANDING Pi Primary Excavate Slot Panel Secondary Panel Pi Primary Panel Pi Primary Panel

North Side Station Slurry walls Concrete Pi Primary Panel Secondary Tremie pipe Panel Rebar Pi Primary Panel Secondary Panel Pi Primary Panel

Slurry Walls - Rebar Cage

North Side Station Top Down ROCK

North Side Station Pour Roof Slab Roof Slab ROCK

Excavate to Concourse Backfill Roof Slab CONCOURSE ROCK

Excavate to Concourse CONCOURSE Soldier Backfill Piles installed by building Roof Slab contractor ROCK

Excavate to first row of struts Backfill Roof Slab CONCOURSE ROCK

Station Roof Slab Excavation 60 ft 40 ft

Excavate to Invert Pour Base Slab Backfill Roof Slab CONCOURSE SLAB ANCHORS ROCK

Station Ground Anchors Ground Anchors

Construct Platform & Deck Backfill Roof Slab CONCOURSE ROCK

TBM Launch Pit - SOE CDSM WALL

TBM Launch Pit - SOE Tie Backs

Launch Pit - SOE Tie Backs TIE BACKS TBM TIE BACKS ROCK

Ground Improvement - Jet Grouting

Launch Pit - Jet Grout Jet Grout column construction Drill Down Grout bottom up

Launch Pit Entrance Packing Soft Eye

TBM Move to Launch Pit

TBM Move to Launch Pit 150 feet fully assembled

Launch Pit TBM Launch JET JET GROUT GROUT 1 3 2

Launch Pit Structure Work JET GROUT

Stanwix St. Receiving Pit Location GATEWAY II HORNE BUILDING RECEIVING PIT

Ground Improvement - Jet Grout Receiving Pit 75% COVERAGE 100% 100% Coverage 6 Around Tunnel

Ground Improvement - Jet Grout 75% HORNE BLG. Minimize Angular Distortion due to ground loss

Jet Grouting Stanwix Street

Stanwix Street Receiving Pit CB Wall

Bored Tunnels Tunnel Boring Machine Launch Pit NORTH SHORE TBM Tunnels 2200 lf SOUTH SHORE Receiving Pit

Bored Tunnel Section PRECAST SEGMENT LINING Segment Lining 20 inside diameter CAST IN PLACE INVERT

TBM Tunnels Slurry Pressure Balance TBM (SPBTBM) Mixed Shield (Soft Ground and Rock) Working Pressure 3 bar

Mining Cycle Mine 4 & Grout Mine 4 GROUT MAINTAINED GROUT MAINTAINED BEHIND SHIELD

Mining Cycle Install 4 Segment Ring Build 4 Ring

Mining Cycle Ring Complete - Mine Mine 4 GROUT MAINTAINED GROUT MAINTAINED BEHIND SHIELD

Segment Grouting Segments Grout Nozzle Grout

TBM SLURRY MIX SHIELD 22-9

SPTBM Mixed Shield

Slurry TBM 22-9 dia (6.92 m) 24-17 inch twin disk cutters 20 - Scrapers Bucket lips 3 - Wear detection devices 0-2.7 rpm Left or Right

Cutting Tools After first tunnel Disk Cutters Scrappers Bucket Lips

Rock Crusher

TBM Assembly Man Locks 3 Bar (45 psi) Material Lock

Cutter Head Drive Motors - 8 101 hp Total - 808 hp Variable Frequency Drive (VFD) 480 v AC 0-2.7 rpm (l or r) 7 6 8 5 1 4 2 3 Main bearing 85ft 8.5

TBM Rear of Middle Shield 5 Cylinders 4 Steering Groups 6 Cylinders 7 Cylinders

TBM Rear of Middle Shield Propel Cylinders - 24 Piston Diameter - 260 mm Rod Diameter - 220 mm Max Stroke - 1750 mm Advance force - 38227 kn (4,296 tn)

TBM Operation Excavation Chamber Working Chamber Hydrostatic and Soil Pressure Slurry In Slurry Out

TBM Operation Plan SLURRY IN 455 hp PUMP SLURRY OUT 2 EA - 455 hp PUMPS

Slurry Separation Plant Plant Capacity 1000 m 3 /hr

Segment Erector Hydraulic telescopic arm type 6 ranges of movement Telescope Rotation ti Travel Independent Roll & Yaw Controlled by joy stick

Segment Erector Thrust rams retracted 4-6

Segment Installation BOLT Segment Erector

Key Segment Installation TBM Shield

Key Segment Installation MOVE OUT KEY SEGMENT MOVE FORWARD

TBM Mining Start North Side SOUTH SHORE NORTH SHORE Equitable Resources Building Soft Ground

Fluvioglacial Material Gravel 40% - 57% Sand 50% - 38% Fines 10% - 5% Cobbles - up to 2

TBM Mining - River Crossing SOUTH SHORE NORTH SHORE Equitable Resources Building Mixed Face

TBM North River Wall Alluvium Fluvioglacial Claystone Siltstone

TBM North River Wall - Grouting Alluvium Fluvioglacial Claystone Siltstone

River Crossing SOUTH SHORE NORTH SHORE Equitable Resources Building Rock

River Crossing 25 feet ALLEGHENY RIVER 22 feet RIVER SILTS (ALLUVIAL) ) Top of Rock FLUVIOGLACIAL 10 feet SILTY SHALE (5,400 11,800 psi) COAL CLAYSTONE (200-4,400 400 psi) SILTSTONE (3,400-11,000 000 psi)

River Crossing SOUTH SHORE NORTH SHORE Well Horne Blg. Equitable Resources Building Jet Grout Soft Ground Mixed Face

TBM Guidance System VMT Total Station Operator s Display 80 mm Target

Precast Segments Universal Ring Six pieces + Key 4 Long 20 ID Bolted Two tapers 2-3/8 & 1-5/8

Segment Rebar Cages

Seg Plant cycle 4 rings X 2/ day

Segment Finishing Line Rotate Segments curve up Repair Surfaces Add Gasket Add Joint Packing Stack in reverse order of installation

Secondary Steam Curing 5 day Secondary Cure 8000 psi

Multi Purpose Vehicle (MVP)

Multi Purpose Vehicle (MVP)

Heading Segment Unloading

Heading Segment Unloading

Segment Erection

Tunnel Infrastructure Temporary Lighting 50,000 CFM Ventilation 2-4 water 8 Discharge Walkway

First Tunnel to Receiving Pit - July 10, 2008 Soft eye Fiberglass piles

First Tunnel to Receiving Pit - July 10, 2008 Containment Wall

TBM U-Turn

TBM U-Turn- Rotate 180 deg

TBM U-Turn- Rotate 180 deg

TBM U-Turn- Rotate 180 deg

TBM U-Turn- Rotate 180 deg

Invert Clean Up

Invert Placement

Thank You Questions?