SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR

Similar documents
SUSTAINABLE Office Design Checklist

Environmental & Sustainability Policy Statement

THE BIG 5 SAUDI 2018

LEED for Commercial Interiors

SUSTAINABLE CARPET STANDARDS

BUILDING FOR OUR FUTURE

Taylor Institute. LEED Certification : GOLD

IMPORTANT (Please read this before using the checklist).

Genentech Building 20 Office LEED-CI Gold XL CONSTRUCTION

Lowering our Environmental Impact. Lowering Impact, Raising Expectations

Environmental Sustainability Strategy

Analysis 1. LEED Analysis of Laboratory Buildings. Penn State School of Forest Resources University Park, PA

Certification Program for Tenants & Organizational Workspaces

ASC New Building 400 Masthead Street Albuquerque, NM

CIBC Mellon Case Study. Leadership in Energy and Environmental Design

Eaton Center - Shanghai LEED CI Certification Project

Certification Program for Tenants & Organizational Workspaces 2018

The Application of LEED Green Building Rating System in Indonesia

Certification Program for Tenants & Organizational Workspaces 2018

Project Summary. Sustainability Facts. LEED for New Construction Rating (out of 69 possible points) Total Score 40 Sustainable Sites 7

Sustainable Design A DIVISION OF SHIVE-HATTERY

ELG4126 Sustainable Development for Electrical Engineers

1st Floor. The Hunt Library Sustainability Tour

LEED Certified Health Center

Orange County Sanitation District SP-194 Section 06 Sustainability

OFFICE REFURBISHMENT CHECKLIST YOUR STEP BY STEP GUIDE TO ENSURING YOUR OFFICE REFURBISHMENT GOES WITHOUT A HITCH

Memorandum of Understanding

Pioneering Green Innovations

In 2010, after 20 years in North Burnaby, we relocated to our offices to 3605 Gilmore Way.

Leased Space Environmental and Energy Efficiency Attributes Tenant Instructions

Environmental Design Principles. For New Buildings and Refurbishments. MMU Environmental Management System

HUGH GARNER ENVIRONMENTAL POLICY

Note year for Reference as Specified in the LEED V Manual.

Jersey City Public Safety Communications Center

Monitor and measure our environmental performance and activities, particularly in the areas of energy, resource consumption and waste.

Topic 2 Overview of the Code for Sustainable Homes & BREEAM

Environmental Brief 2015 Summary

Sustainable buildings design, construction and refurbishment standard

LEED-CI ANALYSIS 115 STEVENS AVENUE VALHALLA, NY

LEED 2009 for Commercial Interiors. Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP

SUSTAINABLE PURCHASING POLICY

BREEAM_EUROPE_2009_Assessment_Tool_rev12 (1)_ Assessment Details. Building Profile Information - BREEAM Europe: Offices

Sustainable Design and Green Building Approaches. Ashley Schenkel, M.S. College & Career Coordinator University High School, Irvine, CA

platform Environmental Product Summary

IFMA Central Pennsylvania Chapter August 20, 2014

Decatur Fire Station No. 2

37% 100% 100% PROJECT HIGHLIGHTS LEED Facts. Wiener Auditorium

Green Smart. BUILDING Building SITE/LANDSCAPE ENERGY WATER INDOOR AIR QUALITY MATERIALS

IGBC Green Homes What they did Differently

Phillips Exeter Academy

Ska rating revision summary to GPMs version Offices v 1.1 and Occupancy Stage release. 'Ska' ID Good practice measure Rank CHANGE/STATUS

- AIA Honor Award for Interior Architecture - ALA/IIDA Library Interior Design Awards: Best

All Things Green Madison Public Library Central

LEED-CI ANALYSIS 140 GRAND STREET WHITE PLAINS, NY

CITY COUNCIL AGENDA REPORT

An Introduction to the LEED TM Green Building Rating System

Sugen Building 3 LEED-CI Pilot Project

Sustainable Purchasing Policy Page: 1 SUSTAINABLE PURCHASING POLICY

CURRIMJEE JEEWANJEE AND COMPANY LIMITED ENVIRONMENT & SUSTAINABILITY STATEMENT

BUILDING ENERGY EFFICIENCY CERTIFICATE

Responsible Property Investment Policy

Larsen Classrooms Photo: Harvard Office for Sustainability PROJECT HIGHLIGHTS. > 22% of the total value of materials has recycled content

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability

Sustainable supplies, equipment and services

Providence Newberg Medical Centre, U.S.A.

ENVIRONMENTAL AWARENESS AND SUSTAINABILITY

2011 CF GOES GREEN REPORT FIRMWIDE INITIATIVES

Environmental Policy and Guide December 2010

Responsible Property Investment Policy

SUSTAINABLE DESIGN STRATEGIES FOR BUILDING DESIGNERS

GLADYS VALLEY HALL. Materials & Resources Innovation & Design Process

City Green Court, Czech Republic

INSPIRATION STARTS HERE OFFICE DESIGN AND BUILD

Green Buildings, and LEED Certification. By Mohammad Tassi, BME, MEM, LEED AP, CxA, USGBC Faculty Sustainability & LEED Consultant

SUSTAINABILTY. Respect for the environment

PROGRAM SELF-ASSESSMENT

McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007

Implementing sustainable practices and measuring our progress

Tersus Consultancy Limited. Environmental & Sustainability Policy

2008 AWARD winners for wales

LiDe 3 Berlin October 8, 2015

LEED-CI ANALYSIS 6 LANDMARK SQUARE STAMFORD, CT

Green Star Design & As Built Summary of Credit Changes. By Rachael Lindup

Your Office Fit Out Checklist

LEED-CI ANALYSIS 1 LANDMARK SQUARE STAMFORD, CT

BUILDING ENERGY EFFICIENCY CERTIFICATE

A business case for sustainability. Matt Dickinson

DIGITAL AND ENVIRONMENTAL SKILLS FOR FACILITIES MANAGEMENT

Design and Construction Standards

Ecole Connaught Community School Welcomes. CaGBC Sask Chapter Members & Colleagues

Project location includes access to existing roads, existing water and wastewater infrastructure, and within or contiguous to existing development.

A PRACTICAL GUIDE TO SAN FRANCISCO'S GREEN BUILDING ORDINANCE

Tersus Consultancy Limited. Environmental & Sustainability Policy

DPR Phoenix Regional Office Net Zero Certification

Our Supply Chain Charter

Summary of Greening of State Government Executive Orders

Environmental Policy Statement

SOUTH LANARKSHIRE COLLEGE LOW CARBON TEACHING BUILDING TECHNICAL CASE STUDY

LEED-CI ANALYSIS 4 LANDMARK SQUARE STAMFORD, CT

Material resource efficiency in construction

Transcription:

1 SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR

1 SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR There are many reasons for making your office interior green, and if you do it right, going sustainable is as good for your business as it is for the environment. A sustainable office interior uses less energy, and could save you at least 25% off your energy bills, year after year. And a healthy, natural work environment has been proven to raise productivity and lower absenteeism. Best of all, it doesn t have to cost you much more than a traditional office to design and build. This checklist breaks down the complex issues into simple, easy-to-follow steps. Find out exactly what s involved, before you begin. BEFORE WORK BEGINS Be clear about your vision Get your Board or key stakeholders to buy into the benefits Decide what level of sustainability you want to achieve High Medium Average Decide what BREEAM* rating you want to achieve Outstanding Excellent Very Good Good Pass

2 Decide what LEED* rating you want to achieve Platinum Gold Silver Certified Decide what Ska* rating you want to achieve Gold Silver Bronze Define your project objectives Increase energy efficiency to reduce ongoing costs Reduce carbon emissions Comply with CRC Energy Efficiency Scheme* reporting requirements Comply with (or exceed) building regulations (Part L, Part F) Comply with (or exceed) CIBSE and BSRIA Guidelines Make better use of your space Boost productivity Create a healthier workplace (reduce VOCs*, improve air quality) Create or enhance your Corporate Social Responsibility programme Communicate a sustainable ethos to staff, stakeholders and clients Assess and compare your potential buildings for energy efficiency Measure the CO 2 and CO emissions of the assessed building / office space What is the difference in CO 2 emissions (by percentage) between your site, and a notional building that complies with 2002 building regulations? Request a copy of the Energy Performance Certificate (EPC) and the associated building report Choose a building that is already BREEAM (or LEED) rated Measure the building s solar gain to assess the impact it will have on energy use Check the compass direction of the space. Is it north or south? Assess how you can use daylight to reduce your lighting demand What is the energy rating of the heating, ventilation and air-conditioning systems? Will they need to be replaced? Does the space have a building management system, to enable the monitoring and control of energy use? Is there sufficient sub-metering in place to measure and report energy use? Are there enough public transport links to satisfy BREEAM standards? Is there space for installation of bicycle racks and showers, to meet BREEAM standards?

3 DRAWING UP THE DESIGNS AND SOURCING MATERIALS Build sustainability into the design Design flexible floor plans, that can be rearranged and reconfigured easily in the future, and reduce churn costs Include convenient recycling points in the design Incorporate locally manufactured materials, to cut down on the energy and carbon emissions it takes to transport them Salvage and reuse as many materials that are already on-site as you can Choose carpeting manufactured from wool or recycled fibres go for woven carpeting, with minimal backing materials (especially petroleum-based ones) Make the most of the available natural daylight Make sure every desk is no more than 7m from a window Aim for 80% of the net lettable office floor area to receive natural light Include a user-friendly glare control system Use increased insulation Choose highly efficient or super windows Use shading to reduce glare and heat from the sun Choose a design that uses minimal finishes, paints, wall coverings and plastering Minimise storage to encourage more electronic archiving Incorporate signs that encourage your staff to turn off equipment and lights Choose sustainable office fixtures, fittings and furniture Are they manufactured from recycled materials? Are they recyclable at the end of their life? Opt for low VOC emitting carpets, furniture, cabling, paints and adhesives Are they made by environmentally responsible manufacturers? Are they produced locally? Does your timber come from sustainable forests? Is it FSC* certified? Use rapidly renewable materials wherever you can (like bamboo)

4 Think about what you can reuse Consider energy efficiency and carbon reduction Select high-quality, energy efficient lighting (see next section) Put reasonable limits on your temperature controls for day-to-day use Use zoned energy controls, to control low-usage areas separately Install an automatic shut-off system for equipment on standby Choose a building management system (BMS) to automatically turn off power at night and on weekends Install smart, energy efficient heating, ventilation and air-conditioning systems Choose items that qualify for Enhanced Capital Allowances* Make sure 10% of the total energy demand comes from local renewable / low emission energy sources Install wireless sub-metering to monitor, track and reduce energy use across floors / zones Install workplace footprint tracker software to control and display energy use on dashboards to encourage building occupants to reduce their individual energy use Install devices to manually shut down workstations when not in use Install timers on appliances to automatically shut down equipment out-of-hours (televisions, audio-visual, etc.) Do you qualify for interest-free loans from the Carbon Trust? Be smart with your lighting Make sure you meet appropriate maintained luminance levels (in lux), as per building regulations Use zoned lighting, with separate controls Choose light fittings with built-in daylight sensors, to make the most of your natural light Install infrared motion detectors for automatic lighting control Install timers to shut off lighting on weekends and at night Fit high efficiency fluorescent lights Consider LED lighting. A standard 40W incandescent bulb has an expected lifespan of 1,000 hours while an LED can continue to operate with reduced efficiency for more than 50,000 hours - 50 times longer than the incandescent bulb Use task lighting. Task lighting provides better light for detail work and offers more control to individuals, reducing the need for energy-hungry overhead lighting

5 Waste less water Choose low water flow fittings Low flush toilets Waterless urinals Use rainwater or grey water systems Fit a reliable leak detection system Include proximity detection shut-off to the water supply for all WCs Install point-of-source, filtered water to reduce the cost, waste and transport of bottled water Improve air quality Use more natural ventilation Monitor and assess your CO 2 emissions Use low emitting materials, without volatile chemicals Carpet Paints and adhesives Composite wood DURING THE BUILD Ensure environmental best practice on site Manage stripped out materials, to divert waste from landfills Donate unwanted furniture, computers and appliances to charity Recycle plasterboard, carpet and other materials Separate waste Follow the proper procedures to dispose of hazardous materials (with the paper trail to prove it) Prove you have a proper recycling policy in place Put a proper environmental management system (EMS) in place Use only FSC certified wood Fit out made CarbonNeutral Set targets for energy, carbon and water use on site

6 AFTER YOU VE MOVED IN Talk to your people Get feedback from your staff on your new office Communicate clearly about your ongoing sustainable goals and objectives Design presentations Project extranet Notice boards and company newsletters Training on how to use all the systems (lights, heating and air, etc.) Make recycling part of everyday life Set up lots of convenient recycle bins for staff Have separate recycle bins for paper, electronics, batteries, plastics, etc. Make the case for a paperless office, encouraging electronic archiving instead Set clear policies on shutting down computers, copiers and appliances out-of-hours Make ongoing plans for the future Educate your staff on environmental issues, to get them personally involved Re-assess all your systems at the end of the first year Plan to run an energy audit every year Put procedures in place for monitoring your energy use CHOOSING A SUSTAINABLE OFFICE DESIGN AND FIT OUT CONTRACTOR What environmental credentials do they have? ISO 14001 Certified (evidence provided) Company Environmental Policy (evidence provided) Company environmental management system EMS (evidence provided) BREEAM assessors in-house LEED accredited professionals in-house Ska accredited assessors in-house Environmental management team in-house (not subcontracted) Environmental good practice on site Do they have a documented system for separating, managing and recycling waste on site?

7 What services are included, or on offer? BREEAM assessments LEED assessments Ska assessments Building assessments for sustainability Can they supply FSC certified timber through their supply chain? Advice on Enhanced Capital Allowances In-house sustainability / environmental experts Sourcing and procuring sustainable materials, furniture and fittings Environmental compliance on site Project extranet for project communication Electronic surveys for your staff CarbonNeutral fit outs Do they have a track record of sustainable projects? Do they have case studies that show successful energy reduction? * WHAT S THAT? BREEAM (BRE s Environmental Assessment Method), LEED (Leadership in Energy and Environmental Design s green building rating system) and Ska are the three most recognised and authoritative systems for rating how green or eco-friendly a building is. CRC Energy Efficiency Scheme is a new regulatory regime that is intended to encourage large, non-energy intensive businesses (for example: retail chains, banks, local authorities and many institutional landlords) to improve their energy effi ciency and reduce their carbon emissions. VOCs are volatile organic compounds, emitted by many paints, glues, wirings, carpets and other materials. They can be harmful over time. The Forest Stewardship Council (FSC) promotes environmentally appropriate, socially benefi cial, and economically viable management of the world s forests. Enhanced Capital Allowances are a Government incentive, to encourage you to choose energy efficient heating, ventilation and air-conditioning equipment. You can claim back money for certain kinds of equipment.

Call us on 0800 028 0945 contactus@ 16 Noel Street London W1F 8DA T 020 7734 4466 Maxis 1 Western Road Bracknell Berkshire RG12 1RT T 01344 353 800