Pre-Assessment Data. Have there been any major changes to equipment or processes in the past year?

Similar documents
CUSTOMER FACILITY INFORMATION

Custom Application 2018 Retrofit Program

INDUSTRIAL WATER & SEWER USE SURVEY. 3. Operator (If different from the Owner, the name of the person, or firm, legally the operating the facility):

FirstEnergy s Pennsylvania Utilities. Energy Efficiency Programs for Business

INTEROFFICE MEMORANDUM

2012 CLEAResult All rights reserved. Industrial Facility

INTEROFFICE MEMORANDUM

2/17/2017. Energy Accounting & Education. Topics (Electricity) Creating Electricity

Customer Name Date. Site Address. Contact #1 Position. Office Phone Mobile Phone. Address. Contact #2 Position. Office Phone Mobile Phone

Key Issues. Key issues impacting food plant design: Productivity Improvement & Cost Reduction. Food Safety

The Role of Thermal Potential in Enhancing Energy Efficiency / Productivity

Section A: CUSTOMER INFORMATION. Customer Name Electric Account Number Rate Application Number. Facility Address City State Zip Code

Farm Energy IQ. Farms Today Securing Our Energy Future. Farm Energy Efficiency Principles Tom Manning, New Jersey Agricultural Experiment Station

US1 IEA. Renovation of Wausau West High School, Wisconsin, United States of America

Advanced heat driven cooling cycles for low-temperature waste heat recovery

TEA Facility Data Survey

Farm Energy IQ. Future. Tom Manning, New Jersey Agricultural Experiment Station

Corporate Responsibility Report FROM FARMS TO FACILITY: Our Journey of Quality & Sustainability

Central Chilled Water Plant Sustainable Design. By : George Berbari, CEO DC PRO Engineering

Farm Energy IQ. Farm Energy Efficiency Principles 2/16/2015. Farm Energy Efficiency. Basic Energy Principles

4th Class Power Engineering (PEN) Curriculum Mapping

3/6/2017 Past president & currently on the board of directors for the Wisconsin Geothermal Association

INTEROFFICE MEMORANDUM

ENERGY MANAGEMENT PLAN - HEADQUARTERS. ABC Winery 123 1st Street Franklin, NJ 12345

The Impact of VISIONWALL High Performance Windows on the Northern Telecom Building in Ottawa, Ontario

Heating and cooling with wastewater

INTEROFFICE MEMORANDUM

Final Report for National Grid USA Service Company. Evaluation of 2003 Custom Process Installations Part I. August 24, 2005.

INTEROFFICE MEMORANDUM

Plan and Policy for Energy Efficiency and Conservation Development

Private Sector Approaches to Extreme Weather and Climate Change. Jeff Silva. Senior Project Manager Aspen Aerogels

Summary of Greening of State Government Executive Orders

South Carolina Society for Hospital Engineers

Combined Heat and Power. Applications and Guidelines Jeffrey Ihnen, P.E.

Project : Power & Fuel consumption - an engineering initiative. VPS Rockland, Dwarka.

Commercial & Industrial Energy Optimization Programs

District Cooling Sustainable Design. Presented by George Berbari CEO of DC PRO Engineering

Chapter 3.7: Cooling Towers

1 Project Information. 2 Building Type. 3 Trade Ally/Contractor Information. HVAC Rebate Worksheet. Retrofit New Construction

Illinois Environmental Protection Agency

Minnesota Conservation

OPTION 1: PERFORMANCE RATING METHOD

Ohio Energy. Workshop G. Best Practices in Energy Efficiency to Help You Reduce Your Energy Spend. Tuesday, February 21, :45 a.m.

PureCycle 200 Heat-to-Electricity Power System

DOE Best Practice Software Tools. Joseph Chappell Adam Roget

The Ex Ante Calculations match the claimed savings in the project tracking system.

INTEROFFICE MEMORANDUM

Commercial Energy Savings Guide

NATURAL REFRIGERANTS

2. Chilled Water Storage: A 4.4-million gallon chilled water storage tank improves Cornell s ability to meet peak cooling needs.

A. Cornell s district energy systems include the following components:

Environment & Power Systems International. VOCGEN /CHP Feasibility Screening Data Form. Level 1 Feasibility Analysis

INCENTIVE ESTIMATOR HVAC USER GUIDE CONTENTS FLORIDA CUSTOM INCENTIVE PROGRAM

CITY OF BOISE. page 1 INTRA-DEPARTMENT CORRESPONDENCE. Date: October 26, Public Works Commission. Matt Hightree, Scott Canning, Paul Wakagawa

INTEROFFICE MEMORANDUM

Peppermill Renewable Energy Program

7 th NATIONAL CERTIFICATION EXAMINATION Nov FOR ENERGY MANAGERS & ENERGY AUDITORS

Combined Heat & Power An Overview

05/14/2012 THE CRIME OF IMPROPER ENERGY MANAGEMENT AGENDA

Air Source Heat Pumps in the Commercial Market. Thursday, February 5, :00-10:30 a.m.

Business Energy Rebates Application

Innovation in Green Building Technologies District Cooling and Seawater Cooling. The Business Case for Green Technologies

4/30/2018. Connecticut Energy Efficiency Board C1630: Largest Savers Evaluation April 25, Overview

Reply of POINT NO. 1 :

Environmental Impacts on Brewing and the Resulting Sustainability Efforts at a Commercial and Industrial Site.

Utilities Used in Production

Energy Conservation Opportunities in Carbonated Soft Drink Canning/Bottling Facilities. Ahmad R. Ganji, Ph.D., P.E. + Bryan Hackett and Sandra Chow

Texas Tech University Energy Savings Program FY 2017 Update

COMMERCIAL FOOD SERVICE EQUIPMENT REBATE APPLICATION

LIFE CYCLE ASSESSMENT FOR COOLING AND HEATING SOURCES OF BUILDING

Industrial Assessment Center (IAC) Program

AAON. Energy and Economics

ISPE CASA Energy Management Forum - Energy Management of Capital Projects at Novartis

IPP Industrial Inspection Form

ACEEE Hot Water Forum February 23, 2016

Small Oil-Less Centrifugal Compressors: Bringing Energy Efficiency and Reduced Costs to Chiller Plants

A Comprehensive Approach to Energy Management for Hotels & Resorts. PRESENTED BY: ROBERT GREENWALD, PEng, MBA May 18, 2011

The 4 R s of Sustainability

New Jersey Board of Public Utilities Clean Energy Program Incentives and Proposed Hurricane Sandy Storm Response

What is District Energy

Heating and Cooling Incentive Application for Business Customers

2016 Commercial Rebate Program

COMMERCIAL FOOD SERVICE EQUIPMENT REBATE APPLICATION

Integrating Standby Power and Steam Turbine Chillers for Better Resiliency at UNC Chapel Hill

NEHES Conference-Sustainable Hospital

Energy Treasure Hunt ESI Members Meeting. Shaunna Tobin, TE Connectivity Kelli Swain, TE Connectivity

Energy Efficiency in the Industry. HOCHTIEF Energy Management. Michael Terhorst

how to read an energy model

B. System Design and Performance Requirements

Energy Conservation Preventive Maintenance

A CHCP System Constituted by Microturbine and Exhaust Absorption Chiller

APPLICATION FOR INDUSTRIAL WASTEWATER DISCHARGE PERMIT

Customer Benefits. Why Energy Efficiency? Consumers Energy Business Solutions. What Business Solutions Incentives Are Available?

Montana Large Key Account Customers Demand Response Survey Results

Report of Independent Accountants

Ameren Illinois Energy Efficiency Business Program. PROGRAM OVERVIEW November 2017

Chilled Water Loop Optimization. Kazimir Gasljevic Richard Dewey Sandro Sanchez

EE036: Energy Efficiency, Design, Engineering & Auditing

BCM00 Introduction to Building Controls and HVAC (available on request) One day course BCIA Members VAT Non-members VAT

CO2 in Vending Machine

Transcription:

CEERI Industrial Assessment Center Boise State University Idaho State University University of Idaho Please return to: Kelly Moylan, Operations Manager kellymoylan@boisestate.edu (208) 426-4053 Form completed by: Date form completed: Contact information: Company Name: Address: Phone: Fax: Contact: Products Made: Raw Materials: Are there any particular problem areas with respect to pollution prevention, waste products, or energy consumption that you would like the team to pay special attention to? Have there been any major changes to equipment or processes in the past year? Other Comments: Are there any Safety Requirements the team should know about? (hard hats, hearing protection, safety glasses, steel toes, etc.) May we take photographs in your plant? (circle one) YES NO Some Areas

Plant Operations: Please include information on hours of operation as indicated below. Shift 1 Shift 2 Shift 3 Shift Start Shift End Lunch Break Hours per shift Number of Employees Work days per year Work weeks per year Office Shipping / Warehouse Other(s) Plant Layout: Please provide a drawing or sketch of your plant layout indicating major processes and equipment etc.

Process Description(s): It would be helpful to review a schematic or flow chart of your processes from raw material receipt through product manufacture and final product packaging and shipping. If you have drawings of your processes please attach them to these forms; or if unavailable please sketch them below.

Utility Billing: Please provide bills for the past 12 months to help us understand your typical annual usage and costs for the following: Utility Supply Company Approx. Annual Usage Approx. Annual Cost Electricity* Natural Gas* Other Fossil Fuels Water Trash *Assessment visit can be scheduled once we receive copies of these bills. Electricity Consumption: Number of meters: Are you aware of any power factor issues? Additional information: Fossil Fuel Consumption: Types of fuels used (e.g. natural gas, propane, fuel oil, other): Processes in which fossil fuels are used: Water Consumption and Treatment: Is water treated in-house? Describe in-house water treatment facilities (filtration, RO, ph, flow rates etc.): Sewage volume and associated costs: Is water recycled in-house? Pollution Prevention: Please provide information relative to pollution prevention areas such as solvents, coatings, abrasives, lubricants, chemical surface preparation solutions, air releases, wastewater treatment and general landfill waste information. Record N/A if not applicable. Waste Material Source Pounds per year Current Disposal or Treatment Method(s) Costs

Major Energy Consuming Equipment: Please provide information on the equipment and processes that consume the major portions of energy in your plant. (Cells will expand as data is typed.) Voltage (What is the plant voltage? Do any areas have different voltages?) Compressors (Size and number, HP, type, pressure, service factor, synthetic or hydrocarbon lubricants) Qty: HP: Pressure: System/Area Served: Other details: Pumps (Size and number, HP, type, pressure) Qty: HP: Type: Pressure: Application: Other details: Large Motor Drives (HP, VFD), where used Qty: HP: VFD? Application: Other details: Boilers (Size, fuel, steam or hot water, service factor time and application of use) Qty: Size: Fuel: Pressure: Other details: Furnaces / Ovens (KW or BTU, application, service factor) Qty: kw/btu: Application: Other details: Chillers, Refrigerators and Cooling Towers (KW, tonnage, coolant temperature, service factor etc.) Qty: Type: Size: Application: Other details: HVAC Equipment (tonnage, when and where used, temperature of cooled areas) Qty: Size: Area Served: Winter Setpoint: Summer Setpoint: Other details: Other energy intensive equipment (#, function, type, BTU or KW, average load) Type: Qty: Other details: