The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

Similar documents
Ironton Russell Bridge Project

Ironton Russell Bridge Project

Ironton Russell Bridge Project

Ironton Russell Bridge Project

Ironton Russell Bridge Project

Ironton Russell Bridge Project

Ironton Russell Bridge Project

Ironton Russell Bridge Project

IMUA ANNUAL PRESENTATION 2013

STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE

LRFD Bridge Design Manual Changes

B R I D G E O F F I C E

B R I D G E O F F I C E

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

Highway Bridge Structure Components

Historic Bridge Foundation Facebook Archives

Final Estimates Level 2

Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc.

Tilikum Crossing Transit Bridge. Portland, OR

A Brief Overview Of Seismic Isolation Bridge Projects

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

Automated Machine Guidance

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS NO. 119 OVER THE RED LAKE RIVER DISTRICT 2 - POLK COUNTY, CITY OF EAST GRAND FORKS

TxDOT Superheavy Bridge Report Requirements. Bridge Division

Foundation Strengthening Of Bascule Piers At The Bridge Of Lions

Presentation Outline. Need for Creative Solutions in Technical Construction Problems. creativity, imagination, and innovative skills.

STANDARDIZED CONCRETE BRIDGES IN TEXAS. John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation

SOUTHEAST TEXAS CONTINUING EDUCATION BRIDGE INSPECTION, MAINTENANCE AND REPAIR

John James Audubon Bridge

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

PRECAST CONCRETE GIRDER ERECTION

VDOT s Experience with Reinforced Concrete and Metal Culverts

John James Audubon Bridge. Introduction

ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA

RESILIENT INFRASTRUCTURE June 1 4, 2016

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SOUTH MEDFORD INTERCHANGE BRIDGES

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE

SUNSHINE SKYWAY BRIDGE

ABRAHAM LINCOLN BRIDGE

SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal

Bridge Design. II. Bridge Types. Praveen Chompreda. Substructure. Superstructure. which support the roadway. Pier (Column) Abutment.

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 6 - RICE COUNTY

Presented by: Taya Retterer BRG Webinar July 30, 2012

St. Anthony Falls I-35W Bridge Replacement. ASHE National Conference June 13, Dustin Thomas, P.E. I-35W Bridge Construction Engineer

MOH AND ASSOCIATES, INC., TAIWAN Design of Taiwan Friendship Bridge River Tempisque, Costa Rica

PLANNING AND DESIGN PARAMETERS BRIDGE STRUCTURES. Engr. Ericson Mammag Feasibility Study Preparation CHARM2 Project

Foundation Engineering ECIV 4352

Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge

Accelerated Bridge Construction in USA

LRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE. Mark S. Mahan 1

Geotechnical Engineering

STRUCTURE SELECTION REPORT

Specification Changes and Their Effect on Plans. Bridge Construction Issues. BRG VTC April, 2010

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

Modeling and Design of Bridge Super Structure and Sub Structure

1. THE PROJECT Introduction to The Project History and status of The Tender for the D&B contract... 3

Implementing Vibration and Rail Gap Controls in Preliminary Design of Sound Transit Lynnwood Rail Link Extension

CHAPTER 11: WALLS.

Strengthened Bascule Piers for the Newly Rehabilitated Bridge of Lions

Displayed with permission The American Surveyor October Copyright 2008 Cheves Media

Construction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS

NCHRP LRFD DESIGN SPECIFICATIONS FOR SHALLOW FOUNDATIONS. Final Report September 2009

Attachment D Advanced Planning Studies

APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 3 OVER THE RED LAKE RIVER DISTRICT 2 - PENNINGTON COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 3 - MORRISON COUNTY

Rail Structure Interaction

Design of the IL 127 Kaskaskia River Bridge Illinois Transportation and Highway Engineering Conference February 24, 2015 University of Illinois at

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring

LRFD Bridge Manual - Part I 2-1 CHAPTER 2 PRELIMINARY ENGINEERING GUIDELINES

Table of Contents. ACKNOWLEDGEMENTS...ii LIST OF FIGURES...xii LIST OF TABLES...xv LIST OF SYMBOLS...xvi CHAPTER 1:ABOUT THIS STUDY...

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

2016 ACEC/PA ANNUAL MEETING

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts...

Pushing the Envelope For 100 Years

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 15 OVER THE ARCOLA CHANNEL HENNEPIN COUNTY

STRUCTURES INSPECTION SELF STUDY TRAINING COURSE PART ONE

Foundation Engineering and Design. ground

ACCELERATED BRIDGE CONSTRUCTION IN TEXAS. Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M.

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Get In, Get Out, Stay Out!

Safe, innovative, quality construction since Riding on the Strength

I-74 over the Mississippi River

PHASING CONSIDERATIONS FOR BRIDGES

Design of Izmir Bay Crossing Bridge

Construction of Bridges

ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING. Kansas City Terminal Railway Company

A NEW STEEL ARCH BRIDGE FOR THE US 52 MISSISSIPPI RIVER CROSSING

Fort (M-85) Street Bascule Bridge

Guide to Bridge Standard Drawings. August 2017 Bridge Division

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

Transcription:

The Chief Estimator Software Item Cost Summary Bridge & Overpass Projects

Elevated Transit Guideways Precast Girder Elevated Guideway 10 Abutment Excavation & Backfill 1,500.00 m3 222 10,368 8,634 1,309 5,257 25,568 0.15 6.91 5.76 0.87 3.50 17.05 20 Concrete Caissons & Piles 6,400.00 m 89,864 5,247,344 5,269,412 1,804,632 2,909,935 15,231,323 14.04 819.90 823.35 281.97 454.68 2,379.89 30 Substructure Concrete 19,000.00 m3 141,130 8,184,749 1,754,619 3,502,944 2,873,746 16,316,058 7.43 430.78 92.35 184.37 151.25 858.74 40 Superstructure 100,000.00 m2 672,351 38,311,390 12,104,492 14,226,923 27,997,682 92,640,487 6.72 383.11 121.04 142.27 279.98 926.40 50 Approach Slab 40.00 m3 172 9,657 2,294 1,247 6,743 19,941 4.30 241.43 57.34 31.17 168.58 498.51 60 Plinth Construction 10,000.00 m 98,020 5,404,229 438,825 481,828 3,205,642 9,530,524 9.80 540.42 43.88 48.18 320.56 953.05 70 Steel Reinforcement (Girders) 9,550.00 t 132,631 6,546,848 576,680 195,778 18,271,759 25,591,065 13.89 685.53 60.39 20.50 1,913.27 2,679.69 Section (Precast Girder Elevated Guideway ) Totals: 100,000.00 m2 1,134,390 63,714,584 20,154,956 20,214,661 55,270,765 159,354,966 11.34 637.15 201.55 202.15 552.71 1,593.55 Segmental Precast Guideway 10 Abutment Excavation & Backfill 1,500.00 m3 222 10,368 8,634 1,309 5,257 25,568 0.15 6.91 5.76 0.87 3.50 17.05 20 Concrete Caissons & Piles 6,400.00 m 89,864 5,247,344 5,269,412 1,804,632 2,909,935 15,231,323 14.04 819.90 823.35 281.97 454.68 2,379.89 30 Substructure Concrete 18,963.80 m3 119,548 6,940,493 1,303,374 2,991,270 2,577,514 13,812,650 6.30 365.99 68.73 157.74 135.92 728.37 40 Superstructure 100,000.00 m2 630,905 36,390,191 18,783,502 2,627,183 53,930,718 111,731,595 6.31 363.90 187.84 26.27 539.31 1,117.32 50 Approach Slab 40.00 m3 172 9,657 2,294 1,247 6,743 19,941 4.30 241.43 57.34 31.17 168.58 498.51

60 Plinth Construction 10,000.00 m 98,020 5,404,229 438,825 481,828 3,205,642 9,530,524 9.80 540.42 43.88 48.18 320.56 953.05 70 Steel Reinforcement (Girders) 4,968.00 t 68,468 3,522,059 307,716 101,906 10,327,148 14,258,829 13.78 708.95 61.94 20.51 2,078.73 2,870.13 Highway Overpasses Section (Segmental Precast Guideway) Totals: 100,000.00 m2 1,007,198 57,524,341 26,113,757 8,009,375 72,962,956 164,610,429 10.07 575.24 261.14 80.09 729.63 1,646.10 Section (Elevated Transit Guideways) Totals: 100,000.00 m2 2,141,588 121,238,926 46,268,713 28,224,036 128,233,721 323,965,396 21.42 1,212.39 462.69 282.24 1,282.34 3,239.65 Precast Box Girder Single Span Overpass 10 Roadway Protection 30.00 m2 295 15,258 9,410 4,980 6,676 36,324 9.85 508.60 313.66 165.99 222.54 1,210.79 20 Excavation & Backfill 4,200.00 m3 586 27,368 24,014 3,365 15,772 70,519 0.14 6.52 5.72 0.80 3.76 16.79 30 Dewatering 2.00 Week 108 4,983 3,265 8,248 54.00 2,491.27 1,632.60 4,123.87 40 MSE Abutment & Wingwalls 350.00 m2 1,176 56,093 32,030 779 224,338 313,239 3.36 160.26 91.51 2.23 640.96 894.97 50 Substructure Concrete 100.00 m3 414 21,739 3,085 4,283 17,074 46,180 4.14 217.39 30.85 42.83 170.74 461.80 60 Superstructure 802.00 m2 1,722 93,766 36,275 7,986 957,496 1,095,522 2.15 116.91 45.23 9.96 1,193.89 1,365.99 70 Approach Slab 87.00 m3 337 17,424 3,794 1,122 16,263 38,603 3.87 200.28 43.61 12.89 186.93 443.71 80 Slope Paving 340.00 m2 431 20,355 4,606 596 9,789 35,346 1.27 59.87 13.55 1.75 28.79 103.96 90 Reinforcing Steel 76.00 t 1,077 51,045 4,997 3,056 142,809 201,907 14.18 671.65 65.75 40.21 1,879.07 2,656.67 Section (Precast Box Girder Single Span Overpass) Totals: 800.00 m2 6,147 308,030 121,477 26,166 1,390,217 1,845,889

Precast Concrete Girder Overpass 7.68 385.04 151.85 32.71 1,737.77 2,307.36 10 Roadway Protection 50.00 m2 531 27,345 16,814 8,399 11,129 63,687 10.62 546.91 336.28 167.97 222.58 1,273.74 20 Excavation & Backfill 7,759.00 m3 1,144 53,499 41,942 5,945 26,747 128,132 0.15 6.90 5.41 0.77 3.45 16.51 30 Dewatering 2.50 Weeks 135 6,230 4,082 10,312 54.01 2,491.84 1,632.97 4,124.81 40 Foundation Piles @ 15 m long 1,400.00 m 1,227 60,954 33,527 277,612 372,093 0.88 43.54 23.95 198.29 265.78 50 Substructure Concrete 997.82 m3 4,826 252,558 37,555 61,233 171,192 522,538 4.84 253.11 37.64 61.37 171.57 523.68 60 Superstructure 1,400.00 m2 8,378 447,039 116,950 103,161 966,557 1,633,706 5.98 319.31 83.54 73.69 690.40 1,166.93 70 Approach Slab 130.00 m3 453 23,017 4,972 794 24,300 53,083 3.49 177.05 38.24 6.11 186.93 408.33 80 Slope Paving 600.00 m2 757 35,799 8,125 1,042 17,277 62,242 1.26 59.67 13.54 1.74 28.79 103.74 90 Reinforcing Steel 175.00 t 2,604 123,288 11,327 5,984 382,159 522,758 14.88 704.50 64.73 34.19 2,183.77 2,987.19 Section (Precast Concrete Girder Overpass) Totals: 1,400.00 m2 20,057 1,029,728 275,294 186,558 1,876,973 3,368,552 14.33 735.52 196.64 133.26 1,340.69 2,406.11 Segmental Precast Concrete Bridge 10 Roadway Protection 295.00 m2 1,740 91,859 57,004 49,434 58,998 257,295 5.90 311.39 193.23 167.57 199.99 872.19 20 Excavation & Backfill 69,780.00 m3 9,250 431,891 387,205 54,220 255,375 1,128,690 0.13 6.19 5.55 0.78 3.66 16.17 30 Dewatering 6.00 Month 1,296 59,791 39,182 98,973 40 Concrete Caissons 3,100.00 m 13,444 654,481 645,580 80,647 958,901 2,339,609

4.34 211.12 208.25 26.02 309.32 754.71 50 Substructure Concrete 6,112.00 m3 25,532 1,332,515 211,831 320,820 1,035,324 2,900,490 4.18 218.02 34.66 52.49 169.39 474.56 60 Superstructure 13,000.00 m2 128,385 6,340,300 2,296,335 1,197,575 13,432,164 23,266,373 9.88 487.72 176.64 92.12 1,033.24 1,789.72 70 Approach Slab 220.00 m3 770 39,094 8,437 1,371 41,124 90,025 80 Slope Paving 1,190.00 m2 1,503 71,033 16,103 2,080 34,090 123,306 1.26 59.69 13.53 1.75 28.65 103.62 90 Reinforcing Steel 1,068.00 t 17,782 842,167 71,635 37,999 2,786,885 3,738,685 16.65 788.55 67.07 35.58 2,609.44 3,500.64 Section (Segmental Precast Concrete Bridge) Totals: 13,000.00 m2 199,702 9,863,129 3,733,311 1,744,145 18,602,860 33,943,446 15.36 758.70 287.18 134.16 1,430.99 2,611.03 Structural Steel Bath-Tub Girder Overpass 10 Roadway Protection 95.00 m2 641 33,542 20,658 15,809 18,918 88,927 6.75 353.07 217.45 166.41 199.14 936.07 20 Structural Excavation & Backfill 21,550.00 m3 2,940 137,244 122,990 17,388 80,503 358,124 0.14 6.37 5.71 0.81 3.74 16.62 30 Dewatering 2.00 Month 432 19,930 13,061 32,991 40 Foundation Piles @ 30 m long 9,280.00 m 7,847 390,963 209,590 4,285 1,842,965 2,447,803 0.85 42.13 22.59 0.46 198.60 263.77 50 Substructure Concrete 1,240.00 m3 5,327 277,829 44,280 70,441 213,866 606,416 4.30 224.06 35.71 56.81 172.47 489.04 60 Superstructure 4,200.00 m2 23,255 1,224,694 412,074 342,854 4,734,498 6,714,120 5.54 291.59 98.11 81.63 1,127.26 1,598.60 70 Approach Slab 56.00 m3 196 9,951 2,148 349 10,468 22,916 80 Slope Paving 130.00 m2 166 7,836 1,764 232 3,747 13,579 1.28 60.27 13.57 1.78 28.82 104.45

90 Reinforcing Steel 426.00 t 6,338 300,061 27,563 14,566 930,250 1,272,440 14.88 704.37 64.70 34.19 2,183.68 2,986.95 Section (Structural Steel Bath-Tub Girder Overpass) Totals: Post-tensioned Cast in Place Concrete Overpass 4,200.00 m2 47,141 2,402,050 854,127 465,924 7,835,214 11,557,315 11.22 571.92 203.36 110.93 1,865.53 2,751.74 10 Roadway Protection 100.00 m2 669 35,022 21,611 16,589 20,037 93,259 6.69 350.22 216.11 165.89 200.37 932.59 20 Excavation & Backfill 15,610.00 m3 2,128 99,364 89,064 12,414 58,948 259,790 0.14 6.37 5.71 0.80 3.78 16.64 30 Dewatering 1.50 Month 324 14,948 9,796 24,743 40 Foundation Piles @ 28.6 m long 5,660.00 m 4,876 242,856 130,324 2,614 1,124,247 1,500,041 0.86 42.91 23.03 0.46 198.63 265.02 50 Substructure Concrete 860.00 m3 3,006 156,180 20,589 38,403 145,943 361,115 3.49 181.60 23.94 44.65 169.70 419.90 60 Superstructure 3,000.00 m2 34,588 1,793,065 275,502 838,294 1,548,797 4,455,658 11.53 597.69 91.83 279.43 516.27 1,485.22 70 Approach Slab 50.00 m3 175 8,885 1,917 312 9,346 20,460 80 Slope Paving 275.00 m2 348 16,446 3,725 480 7,924 28,575 1.27 59.80 13.55 1.75 28.82 103.91 90 Reinforcing Steel 460.00 t 7,658 362,702 30,848 16,367 1,200,327 1,610,245 16.65 788.48 67.06 35.58 2,609.41 3,500.53 Section (Post-tensioned Cast in Place Concrete Overpass) Totals: 3,000.00 m2 53,771 2,729,468 583,377 925,472 4,115,570 8,353,887 17.92 909.82 194.46 308.49 1,371.86 2,784.63 Structural Steel Girder Overpass 10 Roadway Protection 100.00 m2 670 35,093 21,652 16,887 20,037 93,669 6.70 350.93 216.52 168.87 200.37 936.69 20 Excavation & Backfill 16,300.00 m3 2,192 103,087 91,652 1,870 100,546 297,156

0.13 6.32 5.62 0.11 6.17 18.23 30 Dewatering 1.00 Month 216 9,965 6,530 16,495 40 Concrete Caissons 1200 mm 1,510.00 m 7,682 373,381 371,116 42,376 587,796 1,374,670 5.09 247.27 245.77 28.06 389.27 910.38 50 Earthwall Abutment & Wingwalls 400.00 m2 1,346 64,202 36,672 872 256,604 358,351 3.37 160.51 91.68 2.18 641.51 895.88 60 Substructure Concrete 654.00 m3 5,842 304,886 54,064 93,746 127,301 579,997 8.93 466.19 82.67 143.34 194.65 886.85 70 Superstructure 5,600.00 m2 25,071 1,300,969 679,214 306,006 9,305,878 11,592,067 4.48 232.32 121.29 54.64 1,661.76 2,070.01 80 Approach Slab 106.00 m3 371 18,836 4,065 661 19,814 43,376 90 Reinforcing Steel 680.00 t 9,273 439,020 42,220 22,928 1,244,809 1,748,977 13.64 645.62 62.09 33.72 1,830.60 2,572.02 Section (Structural Steel Girder Overpass) Totals: 5,600.00 m2 52,663 2,649,441 1,307,185 485,346 11,662,786 16,104,758 9.40 473.11 233.43 86.67 2,082.64 2,875.85 Structural Steel Overpass with Tiedown Anchors 10 Roadway Protection 100.00 m2 670 35,093 21,652 16,887 20,037 93,669 6.70 350.93 216.52 168.87 200.37 936.69 20 Excavation & Backfill 16,430.00 m3 2,023 93,934 93,728 19,818 38,313 245,793 0.12 5.72 5.70 1.21 2.33 14.96 30 Dewatering 1.00 Month 216 9,965 6,530 16,495 40 Rock Anchors 2,000.00 m 3,111 149,437 111,444 135,170 396,052 1.56 74.72 55.72 67.59 198.03 50 Substructure Concrete 2,380.00 m3 8,306 431,338 71,355 100,314 407,451 1,010,458 3.49 181.23 29.98 42.15 171.20 424.56 60 Superstructure 2,000.00 m2 10,913 574,024 193,693 178,755 2,210,290 3,156,762 5.46 287.01 96.85 89.38 1,105.14 1,578.38

70 Approach Slab 70.00 m3 245 12,439 2,684 436 13,085 28,644 80 Reinforcing Steel 450.00 t 7,459 353,186 31,556 16,908 1,062,031 1,463,681 16.58 784.86 70.12 37.57 2,360.07 3,252.62 Section (Structural Steel Overpass with Tiedown Anchors) Totals: 2,000.00 m2 32,944 1,659,417 532,643 333,118 3,886,376 6,411,555 16.47 829.71 266.32 166.56 1,943.19 3,205.78 Major River Bridges Structural Steel Girder River Bridge Section (Highway Overpasses) Totals: 30,000.00 m2 412,424 20,641,262 7,407,415 4,166,729 49,369,996 81,585,402 13.75 688.04 246.91 138.89 1,645.67 2,719.51 10 Steel Trestle in & Out (360m long) 1,830.00 m2 21,283 1,035,671 779,138 2,948,595 200,589 4,963,994 11.63 565.94 425.76 1,611.25 109.61 2,712.57 20 Excavation, Backfill & Scour Protection 8,650.00 m2 12,692 608,310 1,070,625 5,796 1,507,091 3,191,822 1.47 70.32 123.77 0.67 174.23 369.00 30 Dewatering 7.00 Month 1,512 69,756 45,713 115,468 40 Foundation Piles 6,335.00 m 94,766 4,575,313 1,995,413 271,591 15,838,038 22,680,355 14.96 722.23 314.98 42.87 2,500.08 3,580.17 50 Substructure Concrete 11,000.00 m3 52,720 2,673,804 958,113 762,822 2,930,227 7,324,967 4.79 243.07 87.10 69.35 266.38 665.91 60 Superstructure 15,000.00 m2 58,033 2,996,352 1,759,427 655,473 25,371,906 30,783,157 3.87 199.76 117.30 43.70 1,691.46 2,052.21 70 Approach Slab 155.00 m3 543 27,543 5,944 966 28,974 63,427 80 Slope Paving 1,000.00 m2 1,269 59,971 13,556 1,760 28,813 104,099 1.27 59.97 13.56 1.76 28.81 104.10 90 Reinforcing Steel 2,690.00 t 36,077 1,707,680 163,066 80,643 4,888,564 6,839,954 13.41 634.83 60.62 29.98 1,817.31 2,542.73 Section (Structural Steel Girder River Bridge) Totals: 15,000.00 m2 278,894 13,754,401 6,790,996 4,727,646 50,794,201 76,067,244

Cable Stayed Structural Steel River Bridge 18.59 916.96 452.73 315.18 3,386.28 5,071.15 10 Shallow Water Steel Trestle 4,265.00 m2 24,321 1,181,772 652,178 2,678,336 504,284 5,016,568 5.70 277.09 152.91 627.98 118.24 1,176.22 20 Pier Foundation Cofferdams 7,400.00 m2 87,004 4,275,297 2,753,844 6,606,456 969,638 14,605,235 11.76 577.74 372.14 892.76 131.03 1,973.68 30 Excavation, Backfill & Scour Protection 11,523.00 m2 16,895 804,421 1,582,762 71,047 1,989,570 4,447,800 1.47 69.81 137.36 6.17 172.66 385.99 40 Drilled Shafts 2,227.00 m 52,300 2,540,417 3,400,188 963,160 5,003,496 11,907,260 23.48 1,140.73 1,526.80 432.49 2,246.74 5,346.77 50 Pier Tower Concrete 17,599.00 m3 60,342 2,885,313 728,483 1,021,605 3,456,423 8,091,824 3.43 163.95 41.39 58.05 196.40 459.79 60 Superstructure 20,000.00 m2 135,493 6,797,638 3,811,572 1,814,448 40,929,762 53,353,420 6.77 339.88 190.58 90.72 2,046.49 2,667.67 70 Reinforcing Steel 2,940.00 t 39,942 1,889,516 205,070 60,270 5,431,459 7,586,315 13.59 642.69 69.75 20.50 1,847.43 2,580.38 80 Bridge Access 1.00 LS 582 33,608 13,185 527,000 573,793 582.00 33,607.68 13,185.12 527,000.00 573,792.80 Section (Cable Stayed Structural Steel River Bridge) Totals: Grand Totals: 20,000.00 m2 416,878 20,407,982 13,147,281 13,215,321 58,811,632 105,582,216 20.84 1,020.40 657.36 660.77 2,940.58 5,279.11 Section (Major River Bridges) Totals: 35,000.00 m2 695,772 34,162,382 19,938,277 17,942,967 109,605,833 181,649,460 19.88 976.07 569.67 512.66 3,131.60 5,189.98 165,000.00 m2 3,249,785 176,042,571 73,614,405 50,333,732 287,209,550 587,200,258 19.70 1,066.92 446.15 305.05 1,740.66 3,558.79