KASHAGAN / KAZAKHSTAN >>>

Similar documents
NORTH CASPIAN OPERATING COMPANY (NCOC)

SKEMA SPortfolio. Skema s

SKEMA SPortfolio. Skema S LaTeST Top projects

SOLUTIONS FOR THE OIL & GAS INDUSTRY IN THE CASPIAN REGION

ProPlan Ltd. Integrated Services. References Conclusion. Project Controls Commissioning

Modularized Plants. -Process Modules Buildings

Gorgon Project Briefing Rick Robinson Director Perth Operations Kellogg Joint Venture. Perth, November

Gorgon Project Briefing Rick Robinson Director Perth Operations Kellogg Joint Venture. Karratha, Feb

Corporate Information about Kazakhstan Caspian Offshore Industries LLP (KCOI)

Project Production Institute Challenges and Myths of Offsite Fabrication for Mega Projects

TCO Future Growth Project Wellhead Pressure Management Project

UNEX STROY Company LLP PRESENTATION

modular substations Products Vol. 01

Six Keys to Floating Projects Success

TCO Future Growth Project - Wellhead Pressure Management Project Construction Contractors Forum

MOBILE SUBSTATIONS TRAILER AND SKID. tgood.com. Energy, Fast!

Offshore Wind In Aibel NORWEP TAIWAN APRIL 2018

Caspian Energy Group. an EPCI contractor in the Caspian Sea

Status of first generation of FLNG and trend and perspective for the next generation

Raw Gas Injection Barge 1-2 Kashakan Kazakhstan Biomass Plant, Manciano, Italy CTH Project Rhourde Nouss Algeria

Raw Gas Injection Barge 1-2 Kashakan Kazakhstan Biomass Plant, Manciano, Italy CTH Project Rhourde Nouss Algeria

Slade Shipping Pipe Management Services. Amsterdam Storage Facility

Corporate Presentation

UCEP Company Profile And

Energetics. Industry & Offshore. N CRO19896Q

TEklA SofTwArE In PrAcTIcE: SAIPEM offshore

Platform Construction and Installation

Ground Loading after Distribution. In Which:

STRONGER SMARTER STRONGER SAFER

Doseo Pipeline Project Modularization Overview Advantages/Disadvantages & Drivers

EPS. Organization Chart. Civil Sector Head. Steel Structures Dept. Manager. Supervision Dept. Manager. Concrete structures Dept.

Saudi Aramco General Bid Slates (GBS)

GLNG project sanctioned. Final investment decision on US$16 billion 2-train 7.8 mtpa project

Siemens at LNG 16 News from Siemens Energy Oil & Gas

WE RE HERE FOR THE LONG HAUL.

Head Office and Workshops Auckland Office Taupo Office Brisbane Office

SUMMARY OF PRICES FOR 30MVA 161/24/36 kv MOBILE SUBSTATION ACCORDING to SR-152

Citec Engineering Russia LLC presentation. Copyright 2015 Citec Group Oy Ab

The execution of a Complex Project A guided tour

Cable and Pipe Transits

Worker Residential City Project including Worker, technician, supervisor dormitory buildings.

Floating LNG Business A breakthrough in offshore gas monetization

Floating Production / Offshore solutions for tough challenges

ONSHORE WIND PART OF THE ALE WIND SERVICES DIVISION WORLDWIDE HEAVY TRANSPORTATION AND LIFTING

Iran Oil Industry. Arkutun-Dagi Oil and Gas Field, Sakhalin 1, Russia. (Reference:Offshore Technology & Other Sources)

YOUR PARTNERS IN EXCELLENCE

SCOPE OF WORK SUBSTATIONS

Speaker Name: Mirodil Mirakhmedov, UZACE

ASMEF Monthly Newsletter February 2016 Issue

CTH Project Rhourde Nouss Algeria. Raw Gas Injection Barge 1-2 Kashakan Kazakhstan Biomass Plant, Manciano, Italia

GE EQUIPMENT CENTERS APPLICATION CONSIDERATIONS

The knowledge, without know how, is totally useless (M.Plank)

On Escape Bangladesh Limited

Modularization affecting the Oil and Gas industry

ABWR Construction Experience in Japan

Status of ITER Buildings construction and next procurement steps

CASE STUDY LNG SKIKDA S PROJECT

A new market trend. E-House. Make the most of your energy

Norwegian Offshore Wind Cluster

Special Energy Issue on Kazakhstan

Cathodic Protection. Cathodic Protection for Pipelines, Storage Tanks and Process Industrial Plant Assets - 2 days. Major Benefits of Attending

Sarens Australia Mobile Crane Division: Personnel and Services

The Tassie Shoal Methanol and LNG Projects - Monetising stranded Timor Sea gas

AMBA SHIPPING & LOGISTICS PVT.LTD.

Project Management Consultancy Services. Ensuring safe and successful execution of your projects

Case Study Gas Compression Project

End-to-end electrical solutions for the biggest challenges involved with connecting wind energy to the grid. Solutions for Wind Energy Integration

IFC COLOS Presentation

Brochure Cable transport. Engineering. Cable handling & storage. Equipment

Sustainable Desalination. The World s 1 st Solar Powered Zero Carbon Footprint Water Plant

Till date, Rotary has built more than 60% of independent storage tanks in Singapore.

IED-HOLDING. Reference list

«NMSC «Kazmortransflot» LLP. Information about the company

Project Management Consultancy Services. Ensuring safe and successful execution of your projects

Brochure. Cable transport. Cable handling & storage. Deck Spread. Equipment

Fabrication Facilities A HEEREMA COMPANY

Future Growth Project - Wellhead Pressure Management Project Construction Contractors Forum

Transportation of the equipment for the Omsk Refinery (2016)

Renewable Energy. Innovative Engineering Solutions

Special Energy Issue on Kazakhstan

The new Lauenburg lock

PORTABLE ELECTRICAL SHELTERS

Special Energy Issue on Kazakhstan

COUNTRY SUSTAINABILITY REPORT KAZAKHSTAN

Special Energy Issue on Kazakhstan February 2017

ABENGOA ABENGOA. Transmission and Distribution

MECTHROLEUM NIG LTD READ + THINK + ACT = SOLUTION

Gorgon Project Activity at the AMC

Printed on elementary chlorine-free bleached paper.

The Offshore Way. WIPOS Wind power offshore substation. Answers for energy.

DESIGN. DEVELOP. DELIVER. CAPABILITY STATEMENT

Construction of the Superstructure of Major Sea Crossings

EXHAUST GAS SCRUBBER RETROFIT

Special Energy Issue on Kazakhstan September 2017

EEESTA Prestige Seminar 9th November 2011 London 2012 Olympic Park Delivery of a Time Critical Major Programme

Firstly I would like to recognise the Nyoongar people on whose land we meet today and pay my respects to their elders past and present

Alaska South Central LNG (SCLNG) Project

Wind Vietnam. January 22,

November 2000 Transmission & Distribution World

Our Motto aims to be "NEW ZESCO" New Value Creater. Endless Innovation. Work with Passion for Stakeholders

Transcription:

KASHAGAN / KAZAKHSTAN >>>

Kashagan / Kazakhstan Kashagan Field Development Experimental Programme frame agreement mv/lv packaged substations Local equipment rooms process and utilities buildings >>>

The giant KASHAGAN Kashagan, 80km south-east of Atyrau, in the North Caspian Sea, is the largest oil field discovered over the last thirty years worldwide and extends over a surface area of approximately 75km by 45km. Its development represents one of the greatest challenges faced by the petroleum industry, given the deep, high-pressure reservoir, the high sulphur content, the shallow waters that freeze in winter and the marked shifts in temperature (from -30 C to +40 C). The potential daily average production amounts to 1.2 million barrels, with estimated reserves of 38 billion barrels. The Kashagan Project consists of two developments: Offshore Complex (artificial islands in the Caspian Sea) and Onshore Complex (Bolashak onshore processing facility). Skema supplied Local Equipment Rooms, MV/LV complete Packaged Substations, all LV Switchgears/Intelligent Power Motor Control Centers, RTUs, LMS/DMS (onshore) and the IPCS System. Skema, through its in-country subsidiary Skema LLP, is also working in joint-venture with one of the major local industrial group, Isker Consortium, on the epc contract for the fabrication of 20 process and utilities buildings. The fabrication yard is located on the Ural River in Atyrau. End user Agip KCO A consortium of ConocoPhillips - ENI - ExxonMobil - Inpex KazMunaIGaS - Shell - Total >>> 190 km 2 total area of onshore operations = the size of Amsterdam 120,000 tons total weight of steel items and structures used = 1.5 times the weight of the Golden Gate Bridge in San Francisco 510 km total length of pipelines = almost the distance between New York and Montreal 5,000 km total length of electric and instrumentation cables = about the distance between Almaty and Rome 50,000 m 3 volume of concrete structures used = the size of the landmark 88-floor building of Petronas Towers in Kuala Lumpur, Malaysia

Frame Agreement Onshore / Offshore Skema was awarded the frame agreement for the provision of all intelligent LV Switchgear / Intelligent Power Motor Control Centers, RTus, the Integrated Protection and Control System for both offshore and onshore facilities and LMS / DMS (onshore). 5.1 km = the total length of columns supplied by Skema ( the length of 340 trailer trucks ) EPC contractors ABB Ps&s - Aker Kvaerner - Bateman - Consafe - Fores - GE oil & gas np GustoMSC - Kazstroyservice - Litwin - Mss - Punji Lloyd - Saipem SBM - Siemens turbomachinery - Rosetti Marino - Renco - Tekfen - Zafer

MV/LV Packaged Substations Onshore Skema was in charge of the engineering, manufacturing, testing and commissioning of 6 MV/LV Packaged Substations. The Substations feed the infrastructure utilities for the Kashagan field and are part of the Early Works of the Kashagan Experimental Programme. Each Substation was equipped with: 10 kv Switchboards PMCC LV Switchboards Distribution boards Distribution transformers AC and DC UPS batteries Alarm and communication RTUs HVAC system Electrical Control System ( ) The products supplied by Skema were able to meet the strict technical standards of the job. Skema s project team showed competent technical skills and the ability to work and support us at all stages of the project from engineering to commissioning. Project Electrical and Instrumentation Engineer

Local Equipment Rooms Offshore Skema was awarded in joint venture the EPC Contract for the provision of 20 Local Equipment Rooms (LERs). The scope of work includes the coordination and monitoring of every aspect of the project, from feasibility studies and cost/performance optimization to the design of structural, electrical, HVAC and safety systems, procurement, construction, assembly, commissioning, final inspection and supervision of on-site installation. The LERs are pre-fabricated steel-structure modules (measuring on average 8.3m in height, 15.3m in width and 44m in length), which have the following systems installed: medium and low voltage switchboards, transformers, distribution switchboards, UPSs and relevant batteries, supervision and control equipment, HVAC with provisions for explosive/dangerous gas injections, electrical networks, fire-detection and fire-fighting systems and telecoms equipment. Each LER has an average length of 50 m and weight of 1000 tonnes. The LERs are being built in Ravenna, are shipped to the Caspian Sea on barges and will be located on artificial islands in the Caspian Sea.

procurement and fabrication of offshore buildings - in country Skema has been highly committed to developing the local content of its operations in Kazakhstan since the early stages of its presence in the country. Having already founded Skema LLP in Atyrau, Kazakhstan, a year earlier, in 2009, Skema and Isker Consortium established a 100% Local Joint Venture Company called Ozen Port Production Base LLP (OPPB LLP) with the intention of becoming one of the major EPC Contractors in the Oil & Gas Industry in the Republic of Kazakhstan. The OPPB LLP s operations can leverage major pre-fabrication facilities, including: the AZTU workshop, with a total area of 22,500 m 2 ; and the Ozen Port Yard, located in Atyrau on the Ural River and covering a total surface area of 100,000 m 2, which plays host to a workshop for sub-assembly, an indoor assembly area of 40,000 m 2, a quay measuring 215 m in length (including the 110 m Ro-Ro quay), controlled-atmosphere storage warehouses and a series of offices that are fully equipped for use by managers and supervisors. By making the most of the perfect mix of skilled local personnel and expatriates to ensure local development and top-quality solutions, OPPB LLP handles the design, engineering, construction, pre-commissioning, commissioning, installation, start-up and maintenance of modules, local equipment rooms, process and utilities buildings, temporary refuges, manifolds and piping fabrication for both offshore and onshore applications. FIRST MILESTONE ACHIEVED BY OPPB LLP Winning an EPC Contract for 13 Offshore Utilities Buildings for the Kashagan Experimental Programme, Island D.

KEY SUCCESS FACTORS - Maximum local content achievable for modules, temporary refuges, local equipment rooms, process and utilities buildings - First local Contractor to be awarded a multidisciplinary EPC Contract for offshore applications (highest quality standard required in the Oil & Gas Industry) - Project delivered on time and without any punch list - The complete project cycle is managed by internal resources (from feasibility studies and cost/performance optimization to the design of structures, electrical HVAC and safety systems, procurement, construction, assembly pre-commissioning, start-up, commissioning, load out activities and on site supervision/installation) - Facilities located in a strategic position (Atyrau) and designed for all modular solutions ( ) Company congratulates Contractor with the big achievement of meeting the requested delivery date, and thanks for its good work and cooperation, and wishes to Contractor to maintain its place for the future achievements. AKCO Contract Holder