ENERGOCENTROMONTAZH INTERNATIONAL Ltd. (ECM Inter) Steam and GT power plants 1
ECM Group overview Steam, GT & combined cycle power plants Design, consulting, supply of equipment, supervision, testing, erection, installation, commissioning, training. EPC and EPCM contracting. Substations and transmission lines Design, consulting, supply of equipment, supervision, testing, erection, installation, commissioning, training. EPC and EPCM contracting up to 500 kv range. Hydropower Plants Design, consulting, supply of equipment, supervision, testing, erection, installation, commissioning, training. EPC and EPCM contracting. Major equipment design. Erection & Commissioning Design, supervision commissioning, testing and commissioning of hydro, nuclear power plants, transport networks and power substations.
ECM Group in brief Since the date of its incorporation, ECM Group has installed the following power facilities: turbine generators of 60 429 MW total power; package boilers producing 214 312 tons of steam; power transformers of 163 302 MVA installed capacity; high-voltage transmission lines of 5 570 km. 3
ECM Group staff The high competence of ECM specialists and workers who, having decades of experience in power plants engineering and construction, allows us to solve, at a high quality level, a wide range of problems in the field of construction and operation of power projects in difficult natural environments and climatic conditions. Engineers 852 Administration 121 High Skilled Workers 3 807 R&D 244 Total 5 024 4
Core Activities ECM Inter is a Russian leading company that, relying on its own resources, performs any work related to design, engineering, construction, installation and commissioning during the construction of power facilities: Owner Engineer, EPC or EPCM Contractor; Designing of thermal, gas turbine power plants, heating networks and boiler houses, renewable energy sources (solar, wind, etc.); Procurement of equipment; Construction, installation, expansion, reconstruction, re-equipping, all kinds of repairs and adjustment of energy facilities and equipment; Surveying, engineering, servicing, erection, installation and commissioning works for rehabilitation, construction and operation of power facilities; Operation and maintenance of power plants of different type and capacity; Transportation of heavy cargo, handling operations, passenger transportation. 5
6
Selected references 2008 2013 Steam and Gas turbine power plants Adler CCPP-360 Vologda CCPP-110 Two combined cycle co-generation units with a total capacity of 360 MW, thermal capacity 227 Gcal/h. 4xGT: V64.3A type (Ansaldo Energia 4x65 MW), 2xST: T-48/62-7,4/0,12 (Power Machines, 2x60 MW), 4xHRSG: (Podolsk Machine Building Factory). One combined cycle co-generation unit with a total capacity of 110 MW, thermal capacity 75 Gcal/h. 1xGT: PG 6111FA type (GE 1x75 MW), 1xST: Power Machines, KTZ 1x35 MW), 1xHRSG: (Podolsk Machine Building Factory). 7
Selected references 2008 2013 Steam and Gas turbine power plants Nyagan CCPP-420 Kirishi CCPP-800 Unit No.1: combined cycle units with capacity 420 MW. 1xGT: SGT5-4000F type (Siemens 1x285 MW), 1xST: SST-800 (Siemens, 2x135 MW), 4xHRSG: (LOOS, Germany). Unit No.6: combined cycle unit with capacity 800 MW. 2xGT: SGT-5-4000F type (Siemens 2x279 MW), 1xST: К-245-13,3 (Power Machines, 1x260 MW), 2xHRSG: П-132 (EMAlliance). 8
Selected references 2008 2013 Steam and Gas turbine power plants Kharanorskaya TPP Coal-fired steam power plant Krasnodar CCPP-410 Unit #3: steam coal-fired unit with capacity 225 MW. 1xST: К-225-12.8-3Р (Power Machines, 2x225 MW), 1xSteam boiler: Еп-630-13.8 565БТ (ТПЕ-216М) (EMAlliance). Combined cycle co-generation unit 410MW. 1xGT: M701F4 type (Mitsubishi Heavy Ind., 2x280 MW), 1xST: Т-113/145-12,4 (Ural turbomachinery, 1x130 MW), 2xHRSG: (EMAlliance). 9
Selected references 2008 2013 Steam and Gas turbine power plants Pervomayskaya Co-generation Plant (2 x CCPP-180 units) Kirov TPP-4 Peat & lignite fired PP Two combined cycle co-generation units with a total capacity of 2x180 MW, thermal capacity 227 Gcal/h. 4xGT: V64.3A type (Ansaldo Energia 4x65,8 MW), 2xST: Т-50/64-7,4/0,12 (Power Machines, 2x60 MW), 4xHRSG: (Podolsk Machine Building Factory). Rehabilitation of steam co-generation units of peat fired. Replacement of existing steam turbines to the new ones type Тп-65/75-12,8 (Ural Turbomachinery Works). 10
ECM Inter Substations 11
Core Activities ECM Inter is the Russian leading company that, relying on its own resources, performs any work related to design, engineering, construction, installation and commissioning of HV substations: Construction expansion, renovation, restructuring, technical upgrading, all kinds of technical repair/ overhaul services of electrical facilities and equipment; Designing and marketing of industrial equipment: power/electrical equipment, electrical facilities; Design and survey service, developing equipment technology, materials, licensing, patenting. Complex electrification activities both for industrial and economic/private facilities as well as individual buildings; Mounting of overhead and cable transmission lines up to and over 110 kv; General contractor and general designer services for new electrical/power facilities. 12
13
Major turn-key projects 2010-2013 Novo-Orekhovo Substation GIS 110 / 20 kv, 2 х 80 MVA Meschanskaya Substation GIS 220 / 20 kv 3 x 100 MVA. 14
Major turn-key projects 2010-2013 Pererva Substation GIS 220 / 20 kv, 2 х 100 MVA Location: South-East Administrative District, Moscow The standard switchgear GIS-220 kv includes 9 standard gas-insulated cells, switchgear-20 kv of 49 cells. The substation building is of 3 stores of 57.1 x 42 m Inlets of cable lines of 220 kv Pererva-ПП Saburovo-Baskakovo route length of 1,865 m Commissioned in Q3 2010 15
Major turn-key projects 2010-2013 Pervomayskaya Substation GIS 220 / 20 / 10 kv, 3 х 100 MVA Novo-Kuzminki Substation GIS 220 / 20 kv 2 x 160 MVA. 16
Major turn-key projects 2010-2013 Krasnoselskaya Substation GIS 220 / 20 kv, 3 х 100 MVA Mnevniki Substation GIS 220 / 20 kv 3 x 100 MVA 17
Major turn-key projects 2010-2013 Novo-Izmaylovo Substation GIS 220 / 20 kv 3 x 100 MVA Location: East Administrative District, Moscow The installed capacity of the substation is 3 x 100 MVA. The integrated switchgear GIS-220 kv includes 7 standard gas-insulated cells, switchgear-20 kv of 56 cells. The substation building is of 3 stores of 72 x 36 m. Commissioning Q1 2013 18
THANK YOU! 19