CONSULTING SERVICES : SEWERAGE SYSTEM IMPROVEMENT FOR GREATER TIRANA. 6/8/2012 Address: Rruga Dora D Istria 2/1, Apt 4/13, Tirane, Albania

Similar documents
Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION

9-2. Wet-weather high-speed wastewater filtration system (primary treatment of untreated wastewater)

9-1. Wet-weather high-speed wastewater filtration system

Ex-ante Evaluation - 1 -

Proposal by Lithuania for deletion of the Hot Spot No. 41 Šiauliai WWTP

Japanese ODA Loan. Ex-Ante evaluation

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION

Daw Khin Aye Myint Executive Engineer Engineering Department (Water & Sanitation) Yangon City Development Committee

SEWERAGE SYSTEM IN ULAANBAATAR

Public Information Meeting Wastewater Master Plan

Japanese ODA. Ex-ante Evaluation

Study on Economic Partnership Projects. in Developing Countries in FY2009. Da Nang City in Socialist Republic of Viet Nam SUMMARY.

Mid-Halton Wastewater (Sewage) Treatment Plant Expansion And Effluent Sewer Public Information Centre # 1 May 14, 2009

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

PROJECT INFORMATION FORM - WATER Part A General Information

CONSTRUCTION OF 20 MLD SEWAGE TREATMENT PLANT WITH PUMPING MAIN AND ANCILLARY UNITS AT VASCO.

EPA Waste Water Discharge Licence Application

Appendix B-1. Design Calculations for Sewage Treatment Plant

ISAM INTEGRATED SURGE ANOXIC MIX

STANDARD SUMMARY PROJECT FICHE: PROJECT PL Project Title: Waste Water Treatment Plant "FORDON" in Bydgoszcz Sub-programme: Environment

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT

CITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT

Course: Wastewater Management

INCHEM Tokyo Current Status and Implementation Approach for Industrial Zones Wastewater Management In Yangon Region

3) Din Daeng WWTP. Outline of the Project. Appendix 2-9

Chapter 2: Description of Treatment Facilities

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

Wastewater Treatment. Where does wastewater go when it leaves your house?

Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility

CHARLES RIVER POLLUTION CONTROL DISTRICT Capital Improvement Plan

Characteristics and performance of small and medium wastewater treatment plants in Greece

Watertown Wastewater Facility Plan. August 11, 2015

13. High Rate Filtration Process

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

PREPARATORY SURVEY REPORT ON THE SEWERAGE SYSTEM IMPROVEMENT PROJECT FOR THE CITY OF BELGRADE REPUBLIC OF SERBIA VOLUME I SUMMARY & MAIN REPORT

Causes. Release of waste water from drains or sewers (toilets, washing machines, and showers) and include human wastes, soaps and detergents.

Proprietary AquaTron technology incorporates three (3) innovative features that increase its efficiency and reduces cost:

FMBR Technology Brochure

TECHNICAL BROCHURE WASTEWATER TREATMENT SYSTEMS

Ex-ante Evaluation - 1 -

Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014

Dundalk Wastewater Treatment Plant

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT

Compact Waste Water Treatment MBR /MBBR Technology

Current Status of Water Environment in Kathmandu Valley, Nepal

WEPA Workshop on Decentralized Domestic Wastewater Treatment in Asia Jakarta, 14th November 2013

RESTRICTED URBAN REUSE OF KONYA (TURKEY) MUNICIPAL WASTEWATER TREATMENT PLANT EFFLUENTS VIA RECLAIMED WATER DISTRIBUTION SYSTEM

APPENDIX C. Public Consultation Centre (PCC) Displays. Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3

Town of Robbinsville Constructs Cheoah River BNR Wastewater Treatment Facility to Meet New Nitrogen and Phosphorus Permit Limits

2017 Annual Performance Report

1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 4000 as described below and as shown on the drawings.

1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 5000 as described below and as shown on the drawings.

Ex-Ante Evaluation (for Japanese ODA Loan)

WASTEWATER DEPARTMENT CITY OF MANNHEIM

Waste water treatment

1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 2000 as described below and as shown on the drawings.

12. Super-High-Speed Fiber Filtration for Untreated Combined Sewage Water Overflow on Rainy Days

WATER POLLUTION CONTROL DIRECTIVE ASMINISTRATIVE PROCEDURES DECLARATION

JEDDAH INDUSTRIAL CITY

Japanese Technology of Urban Sanitation

Communal Sewage Inspection Report

PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form

Sequence Batch Reactor A New Technology in Waste Water Treatment

2014 ASSINIBOINE RIVER MONITORING REPORT

OPERATIONAL CHALLENGES AT THE KOORLONG WASTEWATER TREATMENT PLANT. Derek de Waal Kevin Murphy

EXPERTISE. We provide sustainable solutions of waterworks. We served for the World Heritage Sites. Integrated Bottom-up Approach

GB Translated English of Chinese Standard: GB NATIONAL STANDARD OF THE PEOPLE S REPUBLIC OF CHINA

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

Efforts for use of methane gas in wastewater treatment of Japan

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

WASTEWATER TREATMENT

PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form

Anderson Water Pollution Control Plant

ECO Smart Aerobic Waste Water Treatment System. Optimising the re-use and recycling of waste water

Ex-Ante Evaluation (for Japanese ODA Loan)

SECTION-I. b) Write a short note on pumping of savage. 4

Wastewater Treatment Processes

ANNEX C INFRASTRUCTURE & OPERATION

c: Don Labossiere, Director, Environmental Compliance and Enforcement Public Registries

2017 Annual Performance Report

Manitoba Water Quality Standards, Objectives, and Guidelines Dwight Williamson, Manager Water Quality Management Section Manitoba Conservation

Contents. Current Status and Future of Membrane Process in KOREA. Background of Korean Water & Wastewater Works

EVW 2 Hynds Commercial Wastewater Systems April 2013

SBR PROCESS FOR WASTEWATER TREATMENT

WATER TREATMENT & POLLUTION

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

CRIS Number: 2002/

Ex-ante Project Evaluation

POTABLE WATER SUPPLY DEFINITIONS

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

PRESENTED BY: IR. TAI LEE YOON JURUTERA JASA (SARAWAK) SDN BHD

HISTORY

The Municipality of North Grenville

Optimisation of sewage treatment process at Pagla

Emission accounts. Julian Chow United Nations Statistics Division September 2016 Putrajaya, Malaysia

Regional District LGDE Help Manual

Dundalk Wastewater Treatment Plant

Transcription:

CONSULTING SERVICES : SEWERAGE SYSTEM IMPROVEMENT FOR GREATER TIRANA 1

SECTOR OPPORTUNITIES Albania is very rich in natural and water resources. The development process entails many opportunities in the area of sewerage system, water supply and infrastructure in general. The Environment Sector is actually one of the key areas of funding for local government and international institutions: 137 million EUR budgeted for 2013 150 million EUR budgeted for 2014 (referring to EC data for Albania) 2

ABOUT US EUROPARTNER'S CONSULTING is an engineering consulting firm, which have the capacity to deliver almost the full range of professional engineering services in the related fields of: I. Environment II. Waste Water Treatment Sewerage systems Water Supply Irrigation Infrastructure Roads 3

OUR SERVICES Our scope of services includes: Studies & Master Planning Engineering and Arch. Design Construction Supervision Project Management Capacity building 4

OUR RESOURCES EPC, possesses a vast network of consultants in the engineering field with high reputation and experienced in the following specialties and not only: Project Manager Geotechnical Investigator Surveyor GIS Specialist Pipeline Engineer Cost Estimator Civil Engineer Sewerage Treatment Specialist Structural Engineer Mechanical Engineer Electrical Engineer Architectural Engineer Environmental Expert 5

ONGOING PROJECTS On October 2009, EPC in collaboration with Tokyo Engineering Consultants Co. Ltd, a premier Japanese firm in the water sector since 1959; signed jointly a contract with the Government of Albania (Ministry of Public Works, Transport and Telecommunication) for: "Consulting Services for Greater Tirana Sewerage Improvement Project". contract amount is Japanese Yen 989,908,916 financed through JICA in terms of an ODA Loan Project implementation life is 5 years. The Project, was formulated based on the feasibility study conducted by JICA in 2005 and 2006. 6

PROJECT OBJECTIVES Provide a better living and sanitary environment for more people by expanding the sewerage system which will collect and convey the sewage in an appropriate manner. Contribute towards water quality improvement in the Lana and Tirana Rivers, by introducing sewage treatment. Provide flooding protection and reduce flood damage by collecting sewage in pipes and by discharging at a designated point into the river. Institutional capacity building of General Directorate of Water Supply and Sewerage through 7

CONSULTANT S ROLE The objective of the Consulting Services for the Project is to provide services and assistance to General Directorate of Water Supply and Sewerage (DPUK) carrying out: Review of Basic Design and Existing Studies Detailed Design (D /D) for First stage project, Assistance of Tender and Contract Procedures, Construction Supervision, Development and Implementation of Environmental Management and Monitoring Plan, Training for Sewerage Sectors' O&M and Other Technical Awareness Raising and Education Campaign (AREC) Feasibility Study for Second stage project, Institutional Capacity Building of DPUK (PIU) 8

KEY AREAS FOR SEWERAGE IMPROVEMENT 6/8/2012 Address: Rruga Dora D Istria 2/1, Apt 4/13, Tirane, Albania 9

NEW LINES AND OVERFLOWS IN AREA A 6/8/2012 Address: Rruga Dora D Istria 2/1, Apt 4/13, Tirane, Albania 10

AREA S-07 11

AREA B (B1+B2) 12

SEWAGE TREATMENT PLANT DATA Population 335,880 persons Mean dry weather flow 75,843 m3/day Peak dry weather flow 94,046 m3/day Site Area 23,74 ha (total 53.08 Parameter ha) Maximum concentration Biochemical Oxygen Demand (BOD5) Suspended solids (SS) Chemical Oxygen Demand (CODCr) Total phosphorus Total Nitrogen Fecal Coli forms (mg/l) 25mg/l 35 mg/l 125mg/l Not applicable- Not applicable- Not applicable- 13

SEWAGE TREATMENT PLANT GENERAL PLAN 14

FLOW CHART OF SEWAGE TREATMENT PROCESS 15

PRIMARY SETTLING TANK 16

SECONDARY SETTLING TANK 17

CHLORINATION TANK 18

SLUDGE THICKENER 19

SLUDGE DIGESTER 20

SLUDGE DEWATERING BUILDING 21

THANK YOU FOR YOUR ATTENTION! 22