UNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE # 5A Metal and Structural Steel 09/01/11

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

SECTION EMBEDDED CMU/SPLIT FACE ARCHITECTURAL PRECAST/SITECAST CONCRETE. A. Site Cast or Tilt-Up CMU/Split Face Concrete Panels.

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

SECTION BRICK FACED ARCHITECTURAL PRECAST CONCRETE. A. Section Cast-In-Place Concrete: Concrete, reinforcing, anchors, etc.

SECTION ARCHITECTURAL PRECAST CONCRETE. C. Section Joint Sealers: Perimeter joints with sealant and backing.

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS

SECTION INSTALLATION OF OWNER-FURNISHED PRODUCTS

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION STRUCTURAL METAL FRAMING

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

SECTION DRILLED CONCRETE PIERS AND SHAFTS

McPherson Contractors, Inc.

SECTION STEEL H PILES. A. Section includes steel H piles embedded into drilled concrete piers.

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017

SECTION PRECAST CONCRETE COVER SYSTEM

SECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following:

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5.

Cherokee Nation W.W. Keeler Second Story Addition and Remodel Tahlequah, Oklahoma WORK PACKAGE # 7B EIFS 3/25/15

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

1. High bay shelving units, fabrication and installation including leveling.

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

SECTION INTERIOR STONE INTERIOR STONE

JONES AIRWAY, LLC CLEVELAND REGIONAL JETPORT SECTION STRUCTURAL STEEL

SECTION BRICK FACED ARCHITECTURAL PRECAST CONCRETE. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:

ReCote Finish System over Concrete

SPECIFICATIONS FOR INSTALLATION OF PRECAST PRESTRESSED CONCRETE DECK PANELS

2016 CDM Smith All Rights Reserved July 2016 SECTION COMPOSITE STEEL FLOOR DECK

SECTION 807 PUMP STATION REHABILITATION

SECTION EXTERIOR GRILLS AND SCREENS

UNISTRUT CORPORATION GENERAL NOTES 1. THIS UNISTRUT SUPPORT SYSTEM IS DESIGNED TO SUPPORT A MAXIMUM UNIFORM LOAD OF PSF.

Jobsite Layout Considerations

Strengthened Soil Wall Construction Manual

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

Nutrient Removing Filtration System

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION STRUCTURE MOUNT RAILING SYSTEM

SECTION ARCHITECTURAL PRECAST CONCRETE. A. American Society for Testing and Materials (ASTM):

STRUCTURAL STEEL FRAMING

PRECAST CONCRETE GIRDER ERECTION

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents

PROJECT MANUAL FOR: CP AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP HULSTON HALL STAIR TOWER REPAIRS

SECTION A. Manufacturer's data sheets on each product to be used, including:

A. The work under this section consists of furnishing and installing gauge steel framing and bracing as indicated on the drawings and as specified.

ATTACHMENT A. Bid # 6793

TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL

Expansion Joint Covers

Corium Brick Rainscreen System Specifications

Master Specifications for Microcotta November 2017

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION STAINLESS STEEL WALL PANELS

SECTION IRRIGATION WATER WELL

***************************************************************************************************************

DIVISION 5 METALS SECTION STRUCTURAL STEEL

SECTION IRRIGATION WATER WELL

DIVISION 2- EXISTING CONDITIONS

PART 1 / GENERAL SECTION ALUMINUM PLATE PANEL SYSTEM. ALPLY Insulated Panels. Alply TECH WALL Aluminum Plate System 2002

SECTIONAL OVERHEAD DOORS SECTION SECTIONAL OVERHEAD DOORS PART 1 GENERAL

SECTION UNCLASSIFIED EXCAVATION AND GRADING

1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

Expansion Joint Covers (079513)

GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM

EXHIBIT A - INSTRUCTIONS TO BIDDERS

SECTION MISCELLANEOUS METAL FABRICATIONS

ADDENDUM NUMBER 3 AUGUST 18, Jackson County Utility Authority Project No Pascagoula/Moss Point WWTP Escatawpa WWTP Repairs

***************************************************************************************************************

Mezzanines By Design Page 1

SECTION DECORATIVE METAL FENCES AND GATES

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.


Endicott Mbrick Thinbrick Color Red Blend Velour

Summitville Mbrick Thinbrick Color Old Salem

Endicott Mbrick Thinbrick Color Burgundy Sands

Summitville Mbrick Thinbrick Color Yorktown

Endicott Mbrick Thinbrick Color Coppertone

SECTION STRUCTURAL STEEL

County Materials Mbrick Thinbrick Color Tuscany Villa Blend

SECTION ORNAMENTAL ALUMINUM RAILING

REQUEST FOR PROPOSAL (RFP) INSTRUCTIONS AND SUPPLEMENTAL CONDITIONS

REQUEST FOR PROPOSALS Garfield Charter Township Hall Sidewalk Snowmelt Heating System Repairs Garfield Township, Grand Traverse County

SPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION FIRE HYDRANTS

2. Clarification: The building address is 801 Henderson Street.

SECTION PORTLAND CEMENT CONCRETE

REQUEST FOR PROPOSAL

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

STRUCTURAL STEEL FRAMING Section

Transcription:

Scope of Work Bid Package C-3 - West Precast Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools, equipment, plant, supplies, samples, shop drawings, layout, handling, storage, hoisting, distribution, protection, transportation, supervision, contributions, coordination, compliance with all agencies (University, City, County, State and Federal), taxes, insurance, overhead, profit and all other services and facilities necessary for the performance of the Work as shown, detailed, and/or implied by the following documents and as defined herein: 1. Contract Document List dated August 8, 2013. 2. Standard Provisions dated February 4, 2013. 3. Turner CCIP Manual July 13, 2012. 4. Turner Project Safety Program dated February 22, 2013 5. Storm Water Pollution Prevention Plan 6. Soils Reports- Geotechnical Services Reports (see bid manual) 7. KU LEEP2 BP-C Code Footprint document. 8. KU Select Manufacturer/Vendor List dated August 5, 2013. The Subcontractor is also responsible for trade specifications not specifically listed above but required by reference in the listed specifications or as required to perform the scope of work described herein, as well as the Division 1 specifications and the use of the Construction Documents as a whole. GENERAL The following scope of work is intended to be general in nature. This Subcontractor shall perform all work shown on the Contract Documents unless specifically indicated below to be excluded. Attention is called to the Understandings and Stipulations for additional information. The Scope of Work takes precedence over the drawings and specifications in the event of a conflict in trade assignment or responsibility. The Subcontractor acknowledges that the Contract Documents are not necessarily fully coordinated at 100% complete and accepts the responsibility to thoroughly review and analyze the complete set of Contract Documents to provide a complete system at no additional costs. The word Provide when used in this document means to furnish and install completely, including all costs for labor, materials, equipment, hoisting, pumping, layout, scaffolding, tools, rigging, and any of the facilities necessary to complete the Work. The word Furnish when used in this document means to provide to jobsite, freight on board. SCOPE OF WORK Provide all equipment, labor, and materials necessary for the complete construction of the Concrete Package as indicated in the contract drawings and the specifications sections listed below: 03 45 00 Precast Structural Concrete 07 92 00 Joint Sealants -6 -

Special Bidding Instructions: 1. All subcontractors shall provide their lump-sum BASE BID utilizing the select equipment manufacturers and/or vendors as detailed on the KU Select Manufacturer/Vendor List for ALL applicable materials included as part of this specific scope of work. Each subcontractor may provide a DEDUCT ALTERNATE to provide the specified materials from a separate supplier/provider (if approved in the contract documents/specifications) and must indicate the specific value of the deduct and information on the alternate equipment, material or vendor on the Bid Form. Refer to the KU Select Manufacturer/Vendor List for additional information. This Work shall include, but not be limited to providing: 1. The Contract Sum shall not be altered for any work that could have been reasonably inferred from the Contract Documents. The following items are listed as examples of the intent of this statement, but is not limited to these items alone: a. Variations to avoid interference and obstructions. b. Providing all necessary components, equipment and appurtenances, whether shown or not, for a complete system in strict code compliance based on the Contract Documents. 2. Provide all insulated precast panels & textured precast panels, including all concrete embeds, clip angles, inserts, threaded rods, shim plates/packs, bearing pads, lifting lugs, plates, support angles and rebar as required for attachment of all precast concrete units. Include all attachment angles, embeds, etc that are required to be furnished to other contractors for installation in their work, complete with detailed installation drawings. Include curing sealants. 3. Provide any and all necessary shimming and/or steel plates to set the precast at the design elevations to tolerances as defined in the drawings and specifications. Coordinate final requirements. 4. If required, provide all shop drawings, and calculations (sealed by a professional engineer registered in the state of KS), mock-ups, certificates, product data, material lists, qualification data, maintenance data, test reports, procedures, warranties and material samples required by the Contract Documents. 5. Provide shop drawings showing the intended placement sequence or locations of installed work with respect to coordination of the structures approved sequence. Provide written erection and rigging plans sealed by a professional engineer registered in the state of KS. 6. Install all embeds if required for work by other contractors in precast during casting operations. Embeds will be furnished to the Contractor by others. 7. Structural Steel shops will be reviewed and into fabrication prior to this award, Turner will furnish this subcontractor a record copy of the documents for coordination. 8. Provide joint sealant and backer rod at locations of precast to precast connections. All caulking at locations of dissimilar materials will be by others. 9. Make all markings on precast units with white chalk. Felt pens, spray paint and other permanent markings will not be allowed. All chalk marks must be removed from precast when finished. 10. During welding of plate connections and shims, etc., take care to keep weld burns on precast to a minimum. Clean-up of all welding rods must be done a daily basis, so that there are NO rust spots on exposed surfaces of precast. All exposed clips, shims, and fasteners should be hot dipped galvanized to prevent rusting. 11. Provide touch up paint to all steel connections after welding. -7 -

12. Submit a final as-built survey of all conditions, elevations of the completed, set in place, and welded precast. Control all camber and design to assure that tolerances are consistent with the concrete contractor s ACI tolerances and additional requirements as listed in the Construction Documents. 13. Provide all precast concrete units cleaned of all fabrication stains and residue. Perform final cleaning at the completion of the Work of this Bid Package. 14. Provide grouting of precast after installation and patching at lifting hooks and holes. 15. Provide all necessary repair of chips, spalls and misfits in accordance with the specifications. 16. Provide necessary protection to keep all portions of the Work free of dirt and damage. Clean all furnished materials prior to installation. 17. Furnish, install, maintain and remove all scaffolding required per OSHA standards necessary to perform the Work of this Bid Package. Scaffolding shall not be modified or altered (i.e., cross bracing removed) for loading of materials or any other reason unless specifically designed for that purpose. 18. The Work of this Bid Package includes coordination with adjacent existing work and the work of others in order to ensure that other items of the work are properly coordinated with contiguous work. The coordination efforts may require that certain sections of the Work be Left Out and/or Opened Up in order to allow for Other Trades to access their respective work areas. 19. Perform all layout work. Turner will provide layout of corners only. 20. Accept condition of the new concrete and steel structure by others prior to the start of the Work. Report any discrepancies from the Contract Documents or unforeseen conditions to the Construction Manager. 21. Remove and reinstall, where applicable, all temporary barricades and fall protection, which interfere with the installation of the Work of this Bid Package. 22. Cooperate with the Owner s Testing and Inspection Agency. Review the specified testing requirements and provide applicable coordination work/activities. 23. Contact the Owner s Testing Agency and inspection authorities directly to schedule inspections required for this Work. The Construction Manager and Owner s Testing Agency must be notified 24 hours in advance of any tests arranged by this Contractor. Copies of all test reports and inspection reports are to be submitted to the Construction Manager immediately. Costs associated with scheduled testing found to be not ready for testing will be the responsibility of this Contractor. 24. Provide coordination with all other Bid Packages required. 25. Provide cranes, hoisting, and installation/erection equipment as needed to perform the work. 26. Include all erection costs including operators, set up of cranes and equipment and removal. Coordinate all picks with safety provisions and capabilities of crane. EXCLUDED FROM THE SCOPE OF WORK 1. Sales Tax 2. Temporary site perimeter fencing (will be provided by Turner) -8 -

3. Caulking at dissimilar materials. 4. Cast-in-place concrete 5. Footings and Foundations 6. Bonds UNDERSTANDINGS AND STIPULATIONS 1. This Subcontractor shall be responsible for providing all layout (including registered surveying) and field engineering required. This includes the transfer and continuation of control lines/elevations. Any layout required is to be by this Subcontractor. Any discrepancies, inconsistencies, etc., found are to be brought to Turner s attention for review prior to installation of the Work. Any work installed incorrectly from inconsistent control without being brought to Turner s attention will be the responsibility of this Subcontractor. 2. It is understood that this Subcontractor visited the project site prior to award. This Subcontractor reviewed and understands the scope of the existing conditions on site. In addition, there are several existing site features that are indicated to remain in the documents, and all new construction must take place without disturbing these features. All costs to perform the work of this package in and around the existing site features are included in the work. 3. Site access will primarily be limited to the Southwest Corner of the project area (LOT 302). Vehicle access will come from Crescent Drive off of 23 rd Street. A limited amount of material storage may be permitted on site, and only with prior approval of Turner s site manager. If required to meet the Master Project Schedule, this Subcontractor shall store material off-site until ready to be shipped to the site for installation. 4. No parking is available on campus, and it shall be the responsibility of each Subcontractor, and/or his employees, to obtain parking permits directly from the University (this includes ALL subcontractors on site). Turner will not provide permits, and does not control campus parking. Violators will be towed by the University at the vehicle owner s expense. Transport vehicles will be required to obtain a permit from the University, and park on campus next to the project site, or return to the off-site parking area if campus parking is not available. Only superintendent s/foremen s vehicles will be permitted on site as required for construction (i.e., trucks carrying tools and equipment), and only as approved by Turner s site manager. 5. Contract award is subject to the Owner s approval. 6. All Subcontractors will be required to attend a brief Turner safety orientation on site prior to beginning work. 7. Provide all sequencing/scheduling/overtime as necessary to meet the schedule. This Subcontractor shall provide Turner with a schedule for his activities that in turn can be used by Turner to develop a Master Project Schedule. This Subcontractor shall provide all necessary manpower and/or equipment to complete the Work without extending the project schedule and causing delays. 8. This project is tax exempt from Kansas Sales Tax. This Subcontractor is responsible to be in compliance with all appropriate laws, etc. in support of such a tax exemption. 9. Provide all safety and security items necessary for the completion of the Work, including Drug Screening costs. -9 -

10. Provide all unloading, hoisting, access, staging and miscellaneous handling for the Work. 11. Turner will be providing electronic files (PDF) of the documents only. It is the responsibility of this Subcontractor to obtain any required hard copies. 12. All vehicle tires/tracks must be cleaned on site prior to entering any city or campus roads. 13. This Subcontractor shall be responsible for removal and replacement of all existing or temporary facilities and perimeter fencing as required for the Work of this package. Existing site conditions that are removed or damaged by this Subcontractor must be replaced in a manner that is equal to, or better than, the original condition. 14. This Subcontractor shall hold weekly meetings to coordinate the work of his subcontractors, independent of Turner s weekly Subcontractor Coordination Meeting. Turner s site manager may attend at his discretion. 15. No City of Lawrence permits are required for the performance of this Work. However, there are certain requirements of the that must be met even in the absence of a permit process. Allow for all inspections and testing required for the performance of the Work, and notify the Turner site manager 48 hours in advance of the need for testing services. The Owner shall provide all construction (earthwork, concrete/rebar/mortar/grout and steel) testing on site using a specified inspection company. Examples of contractor testing are pipe pressure testing, water quality testing, fire alarm testing, as well as any additional testing required by the Construction Documents. 16. All equipment access ways or other facilities necessary to allow the performance of the Work will be the responsibility of this Subcontractor and shall be approved by Turner s site manager. 17. Include all drinking water/ice for employees and all water required for the performance of the work. 18. This Subcontractor shall provide all labor, material and equipment as specified or as shown on the drawings, and as required for a complete installation whether or not shown. The intent is to include components indicated in the contract documents and any miscellaneous accessories necessary to complete said assemblies. 19. The site will not have temporary power for the performance of this subcontract Work package. Include the use of electrical generators as required to complete the Work. Any additional utilities and/or hookups required for the Work will be the responsibility of this Subcontractor. 20. This Subcontractor is to place special emphasis on the coordination and smooth transition of its work with the work of adjacent trades. 21. One week prior to installation, review existing conditions and inform Turner of any corrections required to insure proper installation of the Work. Start of the Work of this Subcontract indicates acceptance of work previously completed. 22. This Subcontractor will clean up all of his debris due to daily work during construction, and at the completion of the project. Provide all general cleanup labor necessary to maintain orderly housekeeping associated with this Work package. 23. Protect all materials, both stored and installed, from damage throughout the project. 24. All work is to be performed in accordance with OSHA and governing regulatory agency requirements. This Subcontractor is responsible for all safety requirements relative to the performance of his work, and will also be responsible for reading and understanding Turner s Project Safety Program (available upon -10 -

request). The successful bidder must sign an agreement form accepting these safety policies prior to contract award. 25. This Subcontractor shall make a good faith effort to award a percentage of his contract value to a Minority Business Enterprise (MBE) and/or a Women Owned Business (WBE) that is certified or capable of being certified by the State of Kansas. 26. Provide the extension of warranties required so the specified warranties start at the Date of Substantial Completion of the entire project. This is irrespective of any use of the equipment for temporary services during construction. 27. All warranties shall be written directly to the Owner. 28. It is understood that at least one employee of this Subcontractor will take and pass OSHA 30 Hour training and notify Turner as to who the participant(s) is/are. In addition, all lower tiered subcontractors are required to have at least one (1) supervisor take and pass the OSHA 30 Hour training and notify Turner as to who the participant is. It is understood that all the participants must complete the training within two months of the execution of this contract. 29. Water may be available on site at a hydrant if Subcontractor makes arrangements with the University well in advance. Plan on providing a meter and backflow assembly for this temporary usage. 30. It is understood that this subcontractor will not contract with any subcontractor who has an experience modification rate (EMR) greater than 1.0, and that evidence of this will be provided to Turner. 31. It is understood that these Understandings and Stipulations are project specific, and shall take precedence over the Standard Provisions if in conflict. ALLOWANCES Turner will use any monetary allowance(s) for the direct costs of labor and material and all overhead and profit per the terms of the formula for changes, included in the contract for any work items directed beyond the scope of this bid package. All authorized work must be approved by Turner s site manager on dailysigned work order tickets authorized by a TCCo SIS. Unused allowances shall be deducted from the contract in a change order. 1. Provide a $5,000 allowance for additional precast embeds/finishing work that may be required but is not defined in the documents. ALTERNATES 1. None. UNIT PRICES & LABOR RATES Unit prices listed herein will be used to adjust the Subcontract Price for changes in quantities authorized by Change Orders, Subcontract Work Orders or Superintendent s Instructions to Subcontractors. Unit prices listed shall include all labor, fringe benefits, materials, tools, equipment, plant, supplies, samples, shop drawings, layout handling, storage, hoisting, distribution, protection, transportation, supervision, contributions, coordination, compliance with all agencies (University, City, County, State and Federal), and all other services and facilities necessary for a complete installation of the item noted. Unit prices will apply to the net difference in quantities in any given change. -11 -

1. Unit Prices shall be priced on the Bid Form. 2. Labor Rates - Provide labor rates on the Bid Form and attach a completed bid rate calculation sheet for each applicable trade. SCHEDULE AND SEQUENCING OF WORK The schedule information below are anticipated dates of this Subcontractors Work and are to be considered as targets to assist this Subcontractor in anticipating manpower and equipment requirements. The Subcontractor is to submit a schedule showing its plan for accomplishing the work within the times described below. Submittals shall be completed as required to meet the installation dates noted below. Assume a minimum of one week for expedited submittal review. Critical dates of the work of this Contract are as follows: Start Complete Award Subcontract August 1, 2013 Mobilize Layout 1 or 2 nd qtr. 2014 100% Complete Bid Package-C August 2014 CONTRACT PRICING Base Bid TOTAL CONTRACT TBD TBD END SCOPE OF WORK -12 -