INTEGRATED FLOOR SYSTEM

Similar documents
BIM Support for the Construction Project from a Suppliers POV

MEP21252 Revit Plug-in: Automated Hanger and Seismic Bracing Layout and Design for MEP Systems

Bolting it all together

Produkt og Procesmodeller (PPM) i byggeriet. Product and Process models in Construction. 6. Process Models

Hilti Cable Transit System. More safety on board. Hilti. Outperform. Outlast.

International Construction Consulting, LLC. Modularization Overview.

International outlook international customers service partners in a global economy

The ACR : Advanced Design Features for a Short Construction Schedule

POSITION DESCRIPTION

Tekla Structures for Precast Concrete Industry TRANSFORMING THE WAY THE WORLD WORKS

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK


SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

2014 HDR, all rights reserved.

DeltaV Enclosures. DeltaV Whitepaper. January 2013 Page 1

TABLE OF CONTENTS Public Safety Building

PATHWAYS FOR COMMUNICATIONS SYSTEMS

CONSTRUCTION MANAGEMENT

6D-BUILDTECH Building Systems. Products and services. Introduction

ENGINEERING SERVICES

Exterior System installation instructions

SystemFS. SystemFS product sheet. Generation 6

Construction Fabrication Integration The Future is Here: Benefits of Advanced Technology for Subcontractors Presenter: Steve Hunt Dee Cramer, Inc.

CIVIL ENGINEERING BENEFITS OF BIM. Helping Civil Engineers do more with BIM

Tate Grid. Aluminium Structural Grid System for Data Centres. Metric Edition

SystemFS. SystemFS product sheet. Generation 6

A. The work under this section consists of furnishing and installing gauge steel framing and bracing as indicated on the drawings and as specified.

FROM AUTOCAD TO ADVANCE STEEL 1 MOVE FROM 2D TO 3D WITH ADVANCE STEEL BASED ON AUTOCAD

Structural Ceiling Grid. Continuous Threaded Slot for Maximum Flexibility

Product available worldwide

Industry the world we live in. MCE Group

SafeDeck Supported Scaffold System

Com-Tray. Under Floor

JORACK. Storage Solutions from Design to Installations.

Architecture & Construction Cluster. Skills-to-Course Matrix. Cluster Knowledge and Skills (CTE standards) Date: 2/28/2017

Framed formwork Frami Xlife

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

A White Paper February System for piping global management

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL CASES WHERE THE CE MARKING IS NOT POSSIBLE ON THE BASIS OF EN

Field Connector for simple installation. Floating Perimeter detail. Field Connector. Perimeter & XL Connector

Global Building Information Modeling (BIM) Market: Size, Trends & Forecasts ( ) May 2016

Value Benefits of Modular Construction in Building Extensions

Construction Simulation An Introduction

Steel Forming System BROCHURE. A durable, all-steel forming system that is ideal for pier caps and self-spanning applications.

SECTION ORNAMENTAL ALUMINUM RAILING

Dimensional Control, Survey

SECTION NON--STRUCTURAL METAL FRAMING

Architecture & Construction Cluster. Skills-to-Course Matrix. Cluster Knowledge and Skills (CTE standards)

VICTAULIC VIRTUAL DESIGN

FIVE WAYS YOUR MOVE TO A BIM WORKFLOW PAYS OFF

LIGHT-GAUGE PANELIZED WALL SYSTEMS. Michael Waggoner Mark Schroeder

SERVICES. About Us. EDS Company Ethos. Services. Categories

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE

Concert Halls, Lyric Theatres and Performing Arts Venues

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series

Materials Services Infrastructure. Global expertise for infrastructure projects.

The FlexLink catalogue

SECTION NON-STRUCTURAL SEISMIC DESIGN CRITERIA PART 1 - GENERAL 1.1 RELATED DOCUMENTS

EXPLOSION PROTECTION REINVENTED EXpressure by R. STAHL

Benjamin D. Hall Interdisciplinary Research Building

THE IMPLEMENTATION EXPERTS!

DHL INDUSTRIAL PROJECTS SPECIALIZED LOGISTICS SAFELY AND SKILLFULLY EXECUTED

Techlift International Limited Capability Statement

BILFINGER SE OIL AND GAS PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND MAINTENANCE

Doing things differently to deliver genuine efficiency.

STRUCTURAL STEEL FRAMING

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

ABWR Construction Experience in Japan

9/11/2009. Return on Investment. Building Information Modeling & Virtual Design and Construction

BILFINGER SE PHARMACEUTICALS AND BIOPHARMA PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND MAINTENANCE

Challenging Skew: Higgins Road Bridge over I-90

A new market trend. E-House. Make the most of your energy

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Moduline. Acoustic Enclosure System. Rugged Noise Control Structures Using Acoustically Rated & Field Proven Demountable Components

MOUNTING SYSTEMS PRODUCT CATALOG

ONSHORE WIND PART OF THE ALE WIND SERVICES DIVISION WORLDWIDE HEAVY TRANSPORTATION AND LIFTING

EcoSteel Pre-Engineered Steel Buildings provide the world s most advanced Eco friendly construction systems.

ATLAS COPCO CONSTRUCTION TECHNIQUE

The fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general specifications:

Modcrete. Modcrete OVERVIEW COMPONENTS COMPONENTS

HOME SYSTEMS CONSTRUCTION PROCEDURE

CORPORATE PRESENTATION E BUILDINGS MODULAR BUILDINGS ROOFS AND FACADES LIFELINE SYSTEMS MADE-TO-MEASURE BUILDINGS MODULAR BUILDINGS ROOFS AND FACADES

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax:

Product Overview Workplace Systems

Technical Data Sheet. Hilti CFS-CU Firestop Cushion. European technical approval ETA N o 08/0213. Issue 04 / Hilti Firestop Cushion CFS-CU

INSTALLATION MANUAL KOCH

Massive but Lean: How Design + Construction Efficiency Led One Mass Timber Project to Success

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

LFP ROOFGUARD LIFTSAFE FALL PROTECTION INC. -

SEISMIC RESTRAINT SYSTEM

Installation Instructions

BIM integration in education: A case study of the construction technology project Bolt Tower Dolni Vitkovice

FULL ENGINEERING SERVICES FOR SUCCESSFUL BUSINESS

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

ADVANCED TIMBER STRUCTURES

SECTION NON-STRUCTURAL METAL FRAMING

SECTION COLD-FORMED METAL FRAMING

RATIONALE AND REASONING The following information is provided in response to the issues raised by the Board of Regents at the September 2012 meeting:

Transcription:

INTEGRATED FLOOR SYSTEM Improving the design and construction management of control rooms July 6 th, 2017 Belgioioso, Italy

1.0 Our Company 2.0 Hilti Energy & Industry 3.0 Integrated System Business 4.0 The Integrated Floor System

THIS IS HILTI Founded in 1941 in Liechtenstein Partner of the professional construction industry More than 24,000 employees Operations in more than 120 countries 3

WE PASSIONATELY CREATE ENTHUSIASTIC CUSTOMERS AND BUILD A BETTER FUTURE. 4

PRODUCT AREAS Anchor systems Electric tools and accessories Direct fastening and screw fastening Firestop systems Diamond systems Measuring systems Installation systems 5

OUR CUSTOMER SEGMENTS & TRADES Building construction Civil engineering Steel/metal construction Interior finishing HVAC Electrical installation Diamond service contractors Natural resources Power Industry Energy and Industry 6

1.0 Our Company 2.0 Hilti Energy & Industry 3.0 Integrated System Business 4.0 The Integrated Floor System

ENERGY AND INDUSTRY: WE ARE WHERE YOU ARE A GLOBAL TEAM WITH OVER 1,400 EMPLOYEES North America 320 Europe 450 Eastern-Europe & Russia 140 South America 100 Middle-East & Africa 180 Asia 210 Over 1,000 of our team members have direct interaction with Energy and Industry customers 8

FOCUS SEGMENTS - ENERGY Thermal & Ren Power Gen Nuclear & Decomm T&D Projects Utilities, MRO Oil & Gas Offshore Oil & Gas Onshore Mining Shipbuilding 9

FOCUS SEGMENTS - INDUSTRY Vehicle Machinery Food & Beverage Electronics Facade Telecom & Data Pharmaceutical Elevators 10

WE ARE PRESENT THROUGHOUT THE E&I VALUE CHAIN New Build Projects Brownfield works Engineering Design Procurement Construction MRO & upgrades Decommissioning Design support Global logistics Jobsite support Engineering advisory Engineering advisory Technical libraries Software Model integration Engineering advisory Customized purchasing solutions Range of solutions Engineering advisory Health & safety Trainings On-time jobsite support Health & safety Logistics Engineering consulting Customized solutions MRO Maintenance, Repairs and Operation 11

1.0 Our Company 2.0 Hilti Energy & Industry 3.0 Integrated System Business 4.0 The Integrated Floor System

VALUE PROPOSITION OF INTEGRATED SYSTEM BUSINESS GOES FAR BEYOND PRODUCT ONLY PRODUCTS Modular system, Fastening solutions and more Customer and project specific products to complete the system solution Testing for special application conditions Technical calculations Design support Kitting, cutting, pre-assembly Trainings & jobsite support TAILORED TOTAL SOLUTION SERVICES SOFTWARE 2D/3D drawings Typical libraries BIM and Plant Design 13

WE CAN SUPPORT YOU ON A WIDE RANGE OF APPLICATIONS 14

1.0 Our Company 2.0 Hilti Energy & Industry 3.0 Integrated System Business 4.0 The Integrated Floor System

THE TRADITIONAL ARRANGEMENT OF TECHNICAL ROOMS REQUIRES 3 SEPARATED KINDS OF SUPPORT The floating floor What happens? The electrical cable tray support The panel stand Narrow space for cables Time consuming Additional scaffolding Conflicts during the work Need a lot of coordination Modification is difficult Heavy lifting required 16

HILTI INTEGRATED FLOOR SUPPORT IS AN INNOVATIVE AND COST EFFICIENT SOLUTION 17

ONE SUPPORT STRUCTURE SOLUTION FOR DIFFERENT KINDS OF EQUIPMENT, CABLE TRAYS AND FLOOR TILES The solution 3 different supports in 1 integrated system Comparison Traditional vs. Hilti IFS Narrow space for cables Time consuming Additional scaffolding Conflicts during the work A lot of coordination Modification is difficult Heavy lifting required Easier cable routing Fast installation No scaffolding 3 systems integrated Minimal coordination Easily adaptable Light components 18

THE RESULT: TIME SAVING AND LESS TOTAL COST Hilti support system is able to reduce more than half the installation time, compared to the traditional structures Flexibility, less planning, lower coordination effort and time savings lead to considerable overall cost saving 19

IMPROVE THE DESIGN PROCESS Electrical & Instrumentation Engineering The design of the cable routing is not affected by the rigid grid of the pedestals of the traditional false floor, but can be easily managed with a larger span and flexible layout The cabinets position and spare management for future needs are flexible and can be handled without the use of panel frames in steelwork Civil Engineering Utilize the minimum space to accommodate the services and prevent from interferences The modularity of the system enables last-minute changes and fine adjustment after installation Reduce the re-work and re-design 20

OPTIMIZE THE WORKFLOW The integration of the disciplines in one single system - minimizes the coordination needs - optimizes the workflow - mitigates conflicts and disruptions Project Management The minimization of interferences and rework strongly simplifies the erection and dramatically shrinks the installation time, thus reducing the time pressure Design to cost through optimization Reduce the site work (with pre-assembly and cut to length services) On-site support and supervision 21

EASY AND CUSTOMIZED DELIVERY Accurate MTO and cost forecast Procurement Department Stock availability without time delivery pressure or prefabrication lead-time Global coverage Provide special logistic requirements 22

EASY FACILITY MANAGEMENT Flexibility and removability to incorporate later changes and future modifications Plant Owner Enable easier and safe maintenance and renovation, since panels can be added or moved directly on the floor without the need of temporary scaffolding 23

CASE STUDY: INTEGRATED FLOOR IN AN INSTRUMENT BUILDING WITH SEVERAL LAYOUT CHALLENGES The challenges Narrow spaces and congested cable routes under the floor Portion of the room with sloping ground and no pillars allowed Large air duct laying on the ground under the floor The solution Hilti Integrated Floor with MQ channels (C profiles) for the typical structures Special frames with heavy Hilti girders (MI system) in critical areas Customer benefits Flexible grid layout that overcomes the issues met by the customer in early design Easily adaptable structure, despite the changes done during detail design Easy installation for future cabinets Full satisfaction also by the Plant Owner 24

CONGESTED CABLE ROUTES SOLVED WITH VARIABLE PILLARS LAYOUT Congested cable routes The solution Pillars layout with variable grid 25

SLOPING GROUND SOLVED THROUGH SPECIAL STRUCTURES WITH HEAVY GIRDERS Sloping ground, no pillars allowed The solution Special structure with Heavy Duty system MI 26

AIR DUCTS SECTIONS SOLVED WITH SPECIAL BRIDGES Large air ducts and side by side in critical sections The solution Pillars layout with variable grid and bridges with Heavy Duty system MI 27

TYPICAL LAYOUTS OF INTEGRATED FLOORS Single layer of channels with frame distance given by tiles size (e.g. 600mm). Typical grids: 600x800 600x1000 600x1200 Two layers of channels with frame distance variable, the layout is totally free. Typical grids: 800x1000 1000x1000 800x1200 28

TYPICAL LAYOUTS OF INTEGRATED FLOORS 29

SPECIAL CASE: INDEPENDENT PANEL FRAMES In some cases it s required that the panels are installed on fully separated structures. For those situations the floor integrates the cable trays only and the panel stands are fabricated through Hilti modular system but with independent structures 30

SPECIAL CASE: INDEPENDENT PANEL FRAMES 31

REFERENCES OF INTEGRATED FLOORS SYSTEM WITH MAIRE TECNIMONT GROUP Under design: Combined Oil Refinery Unit (CORU) in Moscow refinery, Russia In construction: Punta Catalina coal-fired power plant in Dominican Republic Completed: Refinery Off Gas (ROG) in Antwerp petrochemical district, Belgium 32

DESIGN THE SYSTEM IN BIM TO EXPLOIT THE ADVANTAGES OF THE SOLUTION Created parametric objects Delivering a total solution 33

IMPLEMENTED A CASE STUDY WITH TECNIMONT FOR THE INTEGRATION IN A 3D MODEL 34

A DESIGN RICH IN INFORMATION Automatic creation of elevations, plans and sections from the 3D model Clash detection Automatic Bill of Quantities Additional info like cost and installation time Family Type Product Family Product Group Product Name Manufacturer Count InstallationOrder InstallationTime(min) N Anchor N Bolts Rail_support floor skeme MQP-21-72 Installation System Rail Support MQP-21-72 Hilti 137 1 548 274 274 MQ_upright- skeme MQ-41 Installation System Installation Channel MQ-41 6m Hilti 137 2 685 0 0 Bracket MQK-41 skeme MQK-41/300 Installation System Bracket MQK-41/300 Hilti 716 3 1432 0 1432 MQW-4 skeme MQW-4 skeme Installation System 4-Hole Angle MQW-4 Hilti 308 3 616 0 616 MQ_cross - skeme MQ-41 Installation System Installation Channel MQ-41 6m Hilti 154 4 770 0 0 Generic MQ-join MQ-72 Installation System Installation Channel MQ-72 6m Hilti 43 4 215 0 0 MQV skeme MQV-3D skeme Installation System Channel Tie MQV-3/2D Hilti 137 4 548 0 548 MQV-12 skeme MQV-12 Installation System Channel System MQV-12 Hilti 26 5 52 0 104 Rail_support wall skeme MQP-21-72 Installation System Rail Support MQP-21-72 Hilti 34 6 136 68 68 1692 5002 342 3042 35

BIM NOT ONLY FOR DESIGN USEFUL TOOL FOR PROPOSAL AND PLANNING PROVIDES Cost trasparency Automatic update of material take-off Forecast installation time Integration in project schedule Sequence planning 36

www.hilti.com 37