Application. Concrete Repair by Shotcrete APPLICATION PROCEDURES. FIELD GUIDE To CONCRETE REPAIR. ACI RAP Bulletin 12

Similar documents
Concrete Repair by Shotcrete Application

Spall Repair of Horizontal Concrete Surfaces

Repair Application Procedures As you may have seen on our website, ICRI s

Surface Repair Using Form-and- Pour Techniques

Vertical and Overhead Spall Repair by Hand Application

Surface Repair Using Form-and-Pour Techniques

Surface Repair Using Form-and- Pump Techniques

Repair Application Procedures

Repair Application Procedures

Repair Application Procedures

Leveling and Reprofiling of Vertical and Overhead Surfaces

Repair Application Procedures

Section Shotcrete

DIVISION 3 - CONCRETE Section Concrete Rehabilitation

SECTION SHOTCRETE Cast-In-Place Concrete Precast Prestressed Concrete Joists and Beams.

DIVISION 3 - CONCRETE Section Concrete Rehabilitation

2/16/17. Copyright Material. A Repair Technician s Guide to the ACI Chapter 10 Quality Assurance. The Big Picture. Who is a Repair Technician?

SECTION CONCRETE REPAIR AND PATCHING

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

THE USE OF SHOTCRETE AS A REPAIR PROCESS FOR STRUCTURAL CONCRETE REPAIR

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

Construction. R4 Low Resistivity Dry Sprayed Repair Concrete. Product Description. Product Data. Tests. Form. Storage

DIVISION 3 - CONCRETE Section Concrete Toppings Section Concrete Resurfacing Section Concrete Rehabilitation

ALBERTA TRANSPORTATION TECHNICAL STANDARDS BRANCH B373 JULY 2000 SPECIFICATION FOR THE REPAIR OF BRIDGES WITH FIBRE-REINFORCED SHOTCRETE

DIVISION 3 CONCRETE Section Concrete Rehabilitation

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

Construction. SikaTop 111 Plus. Application Instructions. Sika Corporation

ALBERTA TRANSPORTATION TECHNICAL STANDARDS BRANCH B391 JULY 2017 SPECIFICATION FOR CONCRETE PATCHING MATERIALS

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)

PROCEDURES. Cementitious Patch Repair

FIVE STAR PRODUCTS, INC. (800)

Analysis, Design & Strategy of Repair Lecturer: Professor Dr. Mohammad Ismail Faculty of Civil Engineering, UTM-Skudai, Johor Darul Ta zim, MALAYSIA

4.16. APPLICATION INSTRUCTIONS Construction Joints & Details

A. ASTM C 150 Standard Specification for Portland Cement. B. ASTM C 595 Standard Specification for Blended Hydraulic Cements.

Section 710. WATERPROOFING AND PROTECTIVE COVERS

ALBERTA TRANSPORTATION SPECIFICATION FOR CONCRETE PATCHING MATERIALS

MATERIALS &. RESEARCH DIVISION. RESEARCH UPDATE Number U90-07 REPAIR OF SUBSTRUCTURE CONCRETE USING SHOTCRETE

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.

DIVISION 7-THERMAL & MOISTURE PROTECTION Section Cementitious & Reactive Waterproofing

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

Crack Repair by Gravity Feed with Resin

1 Exam Prep Guide to Shotcrete Questions

SPECIAL SPECIFICATION 4491 Type CAC Concrete

B. Samples: Cured samples of materials as required by Architect/Engineer.

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

R4 Hand Placed / Wet Spray Repair Microconcrete

R4 Hand Placed / Wet Spray Repair Microconcrete

Construction. SikaRepair 223. Application Instructions. Sika Corporation

Construction. SikaRepair 223. Application Instructions. Sika Corporation

DIVISION 9 - FINISHES Section Protective Coatings

EN R4 High Strength High Build Concrete Repair Mortar

729 - MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY

Construction. SikaRepair SHA. Application Instructions. Sika Corporation

ARDEX GUIDE SPECIFICATION ARDEX TRM Transportation Repair Mortar Fast-Setting Concrete Repair Mortar

SPECIAL SPECIFICATION 4398 Multiple-Layer Polymer Concrete Overlay

BONDGROUT GP ( GENERAL PURPOSE NON-SHRINK STRUCTURAL GROUT) Page 1 / 7.

1.3 TUFCHEM Silicate Gunite is shot using specialized equipment such as an Allentown Gun, Reed Gun, or other similar types of so-called dry guns.

DIVISION 7-THERMAL & MOISTURE PROTECTION Section Cementitious & Reactive Waterproofing

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

CSI SECTION MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials

SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES

ARDEX GUIDE SPECIFICATION ARDEX FDM Full Depth Repair Mortar Concrete Repair Mortar with Corrosion Inhibitor

ASH GROVE KOLORSTONE BROOMCOAT MIXING KIT. Spec Sheets Contents: Kolorstone Broomcoat Mixing Spec Sheet Kolorflex Admixture Spec Sheet

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay

Polymer bonding aid and mortar additive bonding agent for old and new concrete. Test method Typical result Control. Compressive strength (BS6319,Pt2)

Repair Application Procedures

CONSTRUCTION SUMMARY REPORT

Rusty Boicourt, P.G. NDE & Materials Specialist Materials Testing & Inspection

A BRIEF STATE-OF-THE-ART REVIEW OF PNEUMATICALLY APPLIED CONCRETE OR MORTAR (SHOTCRETE)

Chapter 4 Equipment and Crew

Contract Specs Version 1 Project XXX. SECTION xxxx STRENGTHENING OF CONCRETE WITH FRCM (FABRIC REINFORCED CEMENTITIOUS MATRIX) PART 1 - GENERAL

The Wing Sang Building at 51 East Pender

SPECIAL SPECIFICATION 4897 Repair Structural Concrete

A Review Paper on Shotcrete Technology

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams

SECTION SURFACE-APPLIED CRYSTALLINE WATERPROOFING AND CONCRETE REPAIR

ALBERTA INFRASTRUCTURE AND TRANSPORTATION SPECIFICATION FOR CONCRETE PATCHING MATERIAL

CVO/169897A OCTOBER 29, VERTICAL AND OVERHEAD CONCRETE SURFACE REPAIR SYSTEMS

BRIDGE DECK CONCRETE OVERLAYS

SECTION SITE CONCRETE

AMENDMENTS TO OPSS 930 (MAY 94) CONSTRUCTION SPECIFICATION FOR STRUCTURE REHABILITATION CONCRETE PATCHES AND OVERLAYS 1

Section 710. WATERPROOFING AND PROTECTIVE COVERS Description. Furnish and place membrane waterproofing and protective covers.

DMS EPOXIES AND ADHESIVES

DIVISION 3 - CONCRETE Section Concrete Toppings Concrete Resurfacing Concrete Rehabilitation

Florock Seamless Flooring Systems

CONCRETE REPAIR IN ACTION: USING THE MANUAL AS A GUIDE. Christen Longoria, P.E. San Antonio District Project Engineer

ALBERTA TRANSPORTATION SPECIFICATION FOR CONCRETE PATCHING MATERIAL

A-9,250 Parking Structure Resurfacing Cement Look

Overlays. HCC Deck Overlays. Key Decisions for Concrete Deck Overlays

CORROSION ENGINEERING SPECIFICATION FOR INSTALLATION

DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section Joint Sealers Elastomeric and non-elastomeric sealant

Application Guidelines for PPC Coatings Flooring

Cementitious Concrete Repair Mortar

R4 Fast Setting Cementitious Repair Mortar

CAS Number. Pipe exteriors

TECHNICAL DATA SHEET SIKA RAPID REPAIR MORTAR 25KG

CSI SPECIFICATIONS SURFACE-APPLIED CRYSTALLINE WATERPROOFING Section

Standard Practice for Molding Roller-Compacted Concrete in Cylinder Molds Using a Vibrating Hammer 1

Transcription:

ACI RAP Bulletin 12 Reprinted with permission from the American Concrete Institute American Concrete Institute"' Advancing concrete knowledge FIELD GUIDE To CONCRETE REPAIR APPLICATION PROCEDURES Concrete Repair by Shotcrete Application Shotcrete Summer 2010 17

ACI RAP Bulletin 12 Field Guide to Concrete Repair Application Procedures Concrete Repair by Shotcrete Application Reported by AC I Committee E706 David W. Whitmore Chair J. Christopher Ball H. Peter Goller Kenneth M. Lozen George I. Taylor Gerald Chwny Fred R. Goodwin.John S. Lund David VanOcker Paul Gaudette Bob Joyce Kelly M. Page Patrick M. Watson Timothy R. W. Gillespie Brian F. Keane.Jay H. Paul Patrick Winkler *The committee wishes LO acknowledge Lhe primary authors of this report: R. Curtis While Jr. and Dudley R. Morgan. It is the responsibility of the user of tbis document to establish bealth and safety practices appropriate to tbe specific circumstances involved with its use. ACI does not make any representations with regard to bealtb and safety issues and the use of this document. n1e user must determine tbe applicability of all regulatory limitations before applying tbe document and must comply witb all applicable Jaws and regulations, including but not limited to, United States Occupational Safety and Healtb Admi nistration (OSHA) bealtb and safety standards. Structural Disclaimer This document is intended as a voluntary field guide for the Owner, design professional, and concrete repair contractor. It is not intended to relieve the user of this guide of responsibility for a proper condition assessment and structural evaluation of existing conditions, and for the specification of concrete repair methods, materials, or practices by an experienced engineer/designer. ACI Repair Application Procedure 12. Copyright 2010, American Concrete Institute. All rights reserved including rights of reproduction and use in any form or by any means, including the making of copies by a ny photo process, or by electronic or mechanical device, printed, written, or oral, or recording for sound or visual reproduction or for use in any knowledge retrieval system or device, unless permission in writing is obtained fro m the copyright proprietors. Printed in the United States of America. The Institute is not responsible for the statements or opinions in its publications. Institute publications are not able nor intended to supplant individual training, responsibility or judgment of the user, or the supplier of the information provided. 18 Shotcrete Summer 2010

Introduction One of the most economical and effective methods of concrete repair is by the shotcrete process. This is particularly true for repairs that would otherwise require forming, such as vertical and overhead repairs. Repair materials, comprised of cementitious products with aggregates, are placed pneumatically onto prepared substrates, finished, and cured with no additional steps required. The use of bonding agents is not required or advised because consolidation and bonding of the material occurs during proper shotcrete application. As with all repair techniques, proper surface preparation is paramount in attaining a permanent repair solution. When do I use this method? This technique is most economical on vertical surfaces, such as columns, walls, beam sides, pier caps, and overhead horizontal surfaces such as ceilings, beam bottoms, slab soffits, and deck overhangs. Fig. 1-Repair areas with feathered edges (left) should be avoided by making sawcws along the edges. What is the purpose of this repair? The shot.crete process is typically used to restore structural integrity, increase concrete cover over reinforcement, or both. It's typically used when forming requirements are difficu lt or prohibitively expensive or as another repair tool in the designer's and contractor's tool kits. How do I prepare the surface? 1l1e most imporlant requirement for successful concrete repair is surface preparation. Deteriorated or spaued concrete should be removed back to sound concrete. If reinforcing bars are exposed, they must be undercut to provide mechanical bond for the shotcrete. Corrosion products on reinforcing bars should be removed by abrasive or high-pressure water blasting. The repair boundaries should be left at an outsloping 45 degree angle to facilitate air and rebound escape. The outer edge of the repair area should be sawcut to a depth of about 3/4 in. (20 mm) to prevent the formation of feathered edges (Fig. 1). Step-by-step procedures for surface preparation are: Observe or sou nd the concrete to determine areas of delamination or deficiency; Remove unsound concrete with a hand-held chipping hammer or ultra-high-pressure water blaster so as not to unnecessarily damage substrate concrete and reinforcing bar. Remove any resulting loose or fractured material; Replace or supplement damaged reinforcement as necessary. Consult the designer for required sizes and spacing. Separate lap splices by one bar diameter to facilitate placement of repair material. Do not place new rein forcing steel directly behind or in front of existing reinforcing steel (Fig. 2); Abrasive blast or water blast the reinforcing steel and the surface of the area to be repaired to remove any contaminants; and Spray the surface with water and allow to dry back to a saturated surface-dry (SSD) condition. How do I select the correct materials? Shotcrete can be placed by two processes: wet-mix and dry-mix. In most repair operations, the choice is left to the Fig. 2-Separate lap splices of reinforcing bars by one bar diameter to facilitate placing of repair material between the bars: A-Correct; B- lncorrect; and C-lncorrect. contractors, who often select the process they are most comfortable with and have the right equipment for. Maximum aggregate size will generally be less than 1/2 in. (13 mm), and the grading of the total aggregate constituent should conform t.o ACI 506R, "Guide to Shotcrete," or ASTM Cl436, ''Standard Specification for Materials for Shotcrete, '' requirements. 'D1e materials can be ready mixed, prepackaged, or site batched. They can include fibers, silica fume, or other additives for enhancing physical properties and performance. Bonding agents are not recommended as they may act as bond breakers. Potential drying shrinkage problems can usually be minimized with the addition of fibers and proper curing conditions. An auempt should be made to generally match the substrate concrete and the repair material in strength characteristics unless the substrate concrete is very weak. Ready mixed shotcrete should be batched and delivered in accordance with ASTM C94/C94M, "Standard Specification for Ready-Mixed Concrete, or ASTM Clll6/Clll6M, "Standard Specification for Fiber-Reinforced Concrete." Materials for shotcrete mixtures should meet the requirements of ASTM C1436. Prepackaged product should meet the requirements or ASTM C1480/Cl480M, "Standard Specification for Packaged, Pre-Blended, Dry, Combined Materials for Use in Wet or Dry Shotcrete Application." Shotcrete Summer 2010 19

What equipment do I need? An extensive discussion of the equipment requirements for shotcrete application is contained in ACI 506R. Equipment necessary for wet-mix shotcrete includes: A concrete pump; An air compressor; Concrete hoses; Air hoses; and Shotcrete nozzles with air rings. Equipment necessary for dry-mix shotcrete includes: A cement gun; A mixer/elevator; An air compressor; Shotcrete hoses; A water pressure booster pump; Water hoses; and Shotcrele nozzles with water rings. Equipment common to both processes includes: Finishing tools and screeds; Air lances for blowing away rebound/overspray; Abrasive blast equipment or water blaster; and Chipping hammers. What are the safety considerations? Shotcrete operations have multiple hazards, and job-site safety practices should include, but are not limited to, the following, where applicable: Material safety data sheets (MSDS); Protective clothing or skin barriers; Protective eye wear, hearing protection, and dust masks; and Forced-air respirators during abrasive blasting. It is the responsibility of the user of this document to establish health and safely practices appropriate to the specific circumstances involved with its use. ACI does not make any representations with regard to health and safely issues through the use of this document. The user must determine the applicability of all regulatory limitations before applying recommendations in this document and must comply with all applicable laws and regulations, including but not limited to, United States Occupational Safety and Health Administration (OSHA) health and safety standards. Preconstruction meetings Prior to proceeding witl1 tl1e repair, a preconstruction meeting is recommended. The meeting should include representatives for tl1e owner, engineer, contractor, and any other parties involved to explain the means, methods, and materials necessary to achieve tl1e repair objectives. Repair procedure Prepare material-receive transit, site-batched, or prepackaged mixture. Material placement-thoroughly wet the prepared surface and bring it to an SSD condition. Begin material placement, filling the corners first and continuously moving tl1e nozzle to encapsulate reinforcing steel and avoid buildup of shotcrete at any one spot. A bond coat of neat cement will automatically be placed due to the initial aggregate rebound. Use a blow pipe to remove any overspray and rebound that accumulates in corners or on reinforcing steel. Repair thicknesses are not limited by the thickness that can be placed in a single layer. Additional layers can be placed as necessary. Preparation of the immediately preceding layer is crucial to obtaining a successful bond. Single layer thicknesses can be increased by tl1e use of additives. Continue bringing the material out to just past tl1e desired plane and allow it to stiffen. When the shotcrete can be worked without disturbing the bond, use a sharp-edged trowel or cutting instrument to trim the plastic material back to the desired plane. Do not overwork tl1e material because this could create delarninations and spalls. Finish and cure-excessive finishing is discouraged, although rodding to straight lines is not a problem. Proper curing procedures will enhance the physical properties of the shotcrete and reduce shrinkage cracking. 'Ibese procedures include moist curing and use of curing compounds as outlined in ACI 308R, "Guide to Curing Concrete." How do I check the repair? One of the many benefits of t.he shot.crete repair process is tl1at it can be observed during placement because there are no forms hiding what is going on in tl1e cavity. Inspectors and applicators can both observe tl1e corners being filled and reinforcing steel being encapsulated. The possibility of honeycombing is largely eliminated if care is taken to prevent voids and unconsolidated overspray and rebound is removed as it accumulates. Once the shotcrete has set, tl1e bond can be verified by sounding for voids witl1 a hammer. If additional bond information is desired, tl1e test metl1ods described in ASTM C1583/C1583M, "Standard Test Metl1od for Tensile Su engtl1 of Concrete Surfaces and tl1e Bond Strengtl1 or Tensile Strengtl1 of Concrete Repair and Overlay Materials by Direct Tension (Pull-off Metl1od)," can be followed. A good repair should typically fail in tl1e substrate and, in most cases, have a tensile strength exceeding 150 psi (1 MPa). References and additional reading AASHTO Task Force 37 Reports, 1998, 1999, "Guide Specifications for Shotcrete Repair of Bridges," (TF37-l), 108 pp.; and "Inspector's Guide for Shotcrete Repair of Bridges," (IGSRB-1), 80 pp., American Association of State Highway and Transportation Officials, Washington, DC. ACI Committee 308, 2001, "Guide to Curing Concrete (ACI 308R-01) (Reapproved 2008)," American Concrete Institute, Farmington Hills, MI, 31 pp. ACI Committee 506, 2005, "Guide to Shotcrete (ACI 506R-05)," American Concrete Institute, Farmington Hills, MI, 40 pp. ACI Committee 506, 2008, "Guide to Fiber-Reinforced Shotcrete (ACI 506.1 R-08)," American Concrete Institute, Farmington Hills, MI, 14 pp. ACI Committee 546, 2004, "Concrete Repair Guide (ACI 546-04)," American Concrete Institute, Farmington Hills, MI, 53 pp. American Shotcrete Association, Shotcrete Magazine, 43 published articles on Shotcrete Repair, 1998-2008, www.shotcrete.org. 20 Shotcrete Summer 2010

This ACI Repair Application Procedure, along with many others, can be downloaded from ACI s Web site at www.concrete.org. Shotcrete Summer 2010 21