Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Similar documents
Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Subsurface Investigation Report

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES

Geotechnical Engineering Report

EXHIBIT G GEOTECHNICAL REPORT (DRAFT)

SECTION SOILS REPORT

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

5.0 SITE CONDITIONS. 5.1 Surface Conditions

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062.

GEOTECHNICAL INVESTIGATION

Geotechnical Exploration and Evaluation Report

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida

Geotechnical Engineering Report

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES

Woodhaven Retirement Community Addition Wentworth Street Livonia, Michigan 48154

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO

Geotechnical Engineering Report

GEOTECHNICAL ENGINEERING REPORT

March 10, 2017 SITE AND PROJECT INFORMATION

EEI PROJECT NUMBER 5891G-NC PREPARED FOR: HILCO LTD 1435 US HIGHWAY 285 N KINSTON, NC SUBMITTED BY: MATTHEW C. KIRCHNER, E.I.

Geotechnical Engineering Report

Subsurface Investigation and Geotechnical Engineering Report Proposed Volvo Dealership 1022 Hingham Street Rockland, Massachusetts

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017

Geotechnical Engineering Report

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.

GEOTECHNICAL ENGINEERING REPORT

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5

Subsurface Environmental Investigation

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199

SUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING EVALUATION

GEOTECHNICAL ENGINEERING REPORT

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 11 Jacksonville, Florida

Geotechnical Engineering Report

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL

GEOTECHNICAL INVESTIGATION

Geotechnical Engineering Report

Civil Geotechnical Surveying

TABLE OF CONTENTS 1.00 INTRODUCTION GENERAL PROJECT DESCRIPTION SUBSURFACE EXPLORATION SUBSURFACE CONDITIONS...

August 3, 2018 TTL Project No Supplemental Test Borings Cleveland Bulk Terminal Cleveland, Ohio

Geotechnical Engineering Report

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

REPORT OF GEOTECHNICAL CONSULTING SERVICES

TEAM Services. Subsurface Exploration Grant Wood Elementary Future Additions - Bettendorf, Iowa Project No November 29, 2016 TABLE OF CONTENTS

Proposed Family Dollar Store Watford City, North Dakota. 7B Building & Development Lubbock, Texas January 26, Terracon Project No.

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY

Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTECHNICAL ENGINEERING STUDY. MERIWETHER LEWIS ELECTRIC COOPERATIVE BUILDING Houston/Stewart County Industrial Park AG & E FILE NUMBER:

PROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No.

Geotechnical Engineering Report

Geotechnical Exploration and Evaluation Report


SUBSURFACE EXPLORATION RECOMMENDATIONS

Mr. Cliff Bates, VP of Development The Park Companies 124 One Madison Plaza, Suite 1500 Madison, Mississippi Report No.

Geotechnical Engineering Report

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA

Geotechnical Engineering Report Proposed Communications Tower Spain Park Site Hoover, Alabama

Geotechnical Engineering Report

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146

SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO

REPORT OF SUBSURFACE EXPLORATION. Burn and Rescue Facility Spartanburg County Emergency Services Academy Duncan, SC GeoTrack Project No.

GEOTECHNICAL INVESTIGATION. Proposed WONDERLAND MONTESSORI ACADEMY Legacy Drive Prosper, Texas PROJECT NO. 18-DG9174.

GEOTECHNICAL INVESTIGATION. Proposed RETAIL DEVELOPEMNT 1300 W. Pflugerville Parkway Pflugerville, Texas PROJECT NO. 17-DG8780.

SECTION EARTHWORK

Geotechnical Engineering Report

PROJECT NO A. ISSUED: February 29, 2016

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

August 13, Geotechnical Recommendations, New Physical Education Building, Chabot College, Hayward, California

For. Report of Geotechnical Exploration. Beaver St Lane Ave to Carnegie St Trans Water Main Project Jacksonville, FL

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL EXPLORATION and ENGINEERING REPORT. Proposed Sebright Products Expansion Wayland Township, Allegan County, Michigan

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

REPORT GEOTECHNICAL STUDY PROPOSED 8-WARD YSA MEETINGHOUSES APPROXIMATELY 1345 EAST 1100 NORTH LOGAN, UTAH LDS PROPERTY NUMBER:

GEOTECHNICAL INVESTIGATION

SECTION FILL AND BACKFILL

LEWIS COUNTY JEFFERSON COMMUNITY COLLEGE EDUCATIONAL CENTER PROJECT

APPENDIX A GEOTECHNICAL REPORT

Report of Geotechnical Exploration For. University of North Florida Kernan Shuttle Stop Jacksonville, Florida

Geotechnical Engineering Report

PROJECT INFORMATION EVALUATION PROCEDURES

T. Brian Williamson, P.E. Matthew B. Haston, P.E.

GEOTECHNICAL EXPLORATION REPORT. For the

Transcription:

AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street, Suite 660 Chicago, Illinois 6064 Prepared by 38 Hammond Dr., Suite 6 Schaumburg, Illinois 60173 847-303-0300 July 6, 0

July 6, 0 Mr. Steve Panko Key Development Partners, LLC North State Street, Suite 660 Chicago, Illinois 6064 Re: Subsurface Investigation Report Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Dear Mr. Panko: The subsurface exploration at the above-referenced site has been completed. The attached report represents the findings of the subsurface exploration and provides the geotechnical analysis for the project. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning the contents of this report, or if we may be of further service to you in any way, please do not hesitate to contact us. Sincerely, APPLIED GEOSCIENCE, INC. Adam M. Moghamis, P.E. Principal Engineer enc.

6447 Grand Avenue Gurnee, Illinois INTRODUCTION The purpose of this exploration was to evaluate the subsurface soil conditions at the site and to formulate conclusions and guideline recommendations pertaining to the influence of these conditions upon the proposed site improvements. The subject site is located at 6447 Grand Avenue in Gurnee, Illinois, as shown on Appendix A, Boring Location Diagram. It is our understanding that the proposed improvements are to include a new one-story building without a basement. Site improvements will presumably include paved driveways and underground utilities. It is anticipated that proposed grades will be approximately equivalent to existing grades. Results of field and laboratory testing and final guideline recommendations based upon these data are included in this report. The soil borings performed at the site, a site location map, the results of the exploration, and general notes, are included with this report. The purpose of this report is to describe the subsurface conditions encountered in the borings, to summarize the test data and to provide guideline recommendations regarding design and construction of foundations of the proposed site development. SUBSURFACE EXPLORATION PROCEDURES Five () soil borings were extended to a depth of.0 feet below the ground surface as part of the soils exploration on July 1 and, 0. (AGI) personnel established boring locations in the field, without the aid of sophisticated surveying techniques; and as such, the locations are considered approximate. The soil borings were performed using a truck-mounted rotary drilling rig using continuous flight augers. Representative samples were obtained using the split-barrel sampling procedure according to ASTM Specification D-86. In the split-barrel sampling procedure, a -inch O.D. split-barrel sampling spoon is driven into the ground with a 140-pound hammer, free falling a distance of 30 inches. The blows required to advance the sampling spoon by 1 inches after an initial 6 inch penetration are reported as the penetration resistance (N) values. These values are shown on the boring log at their test depths. The penetration resistance value is an indication of the relative density of in-place granular soil and, to a lesser degree of accuracy, the consistency of cohesive soil. Cohesive soil samples were tested for unconfined compressive strength using a calibrated penetrometer test device. Upon completion of the drilling, the borings were filled with auger cuttings. All soil samples obtained from the drilling operation were visually classified in the field. Samples were sealed and returned to AGI s laboratory for further examination, classification and testing. Field logs of each boring were prepared by our field engineer. These logs include visual classifications of the materials encountered during drilling as well as the engineer s interpretation of the subsurface conditions between samples. Final boring logs, included with this report in Appendix July 6, 0 Page 1

6447 Grand Avenue Gurnee, Illinois B, represent an interpretation of the field logs and include modifications based on the laboratory testing of the samples. SOIL CONDITIONS In general, the borings encountered. to 3. inches of asphalt over 10.0 to 1. inches of crushed stone and gravel at the ground surface. The pavement subbase was underlain by silty clay fill materials extending to depths of. to 3.0 feet below the ground surface. The fill materials were underlain by brown silty clay in a very stiff condition extending to depths of. to 8.0 feet below the ground surface. In all borings, except boring B-, the brown silty clay was underlain by gray silty clay in a very stiff to stiff condition extending to the boring termination depth of.0 feet. In boring B-, the brown silty clay was underlain by brown and gray silt in a medium dense condition extending to a depth of 7. feet below the ground surface. The silt was underlain by gray silty clay in a very stiff to hard condition extending to the boring termination depth of.0 feet. The enclosed boring logs provide descriptions of the soil conditions encountered at the boring locations. The stratification lines shown on the boring logs represent the approximate boundary between soil types; the actual transition between materials may be gradual. LABORATORY TESTING PROGRAM The geotechnical testing program consisted of performing water content tests on selected soil samples according to ASTM D-16 and calibrated penetrometer tests on the cohesive samples recovered. These tests were performed upon representative portions of the samples obtained in the field. The results of all testing performed, along with a visual classification of the material based upon both a textural analysis and the Unified Soil Classification System, are indicated on the boring logs. GROUNDWATER CONDITIONS Water level observations were recorded while drilling and immediately after completion of the borings. Groundwater was not encountered in any of the borings. The borings were backfilled immediately after drilling for safety reasons. Groundwater observations in the borings provide an approximate indication of the groundwater conditions at the time the borings were drilled. Since the soils encountered were predominately cohesive, which have a low coefficient of permeability, much time is required for the groundwater to seep into the boreholes and attain an equilibrium level. Longer-term observations in cased holes or piezometers would be necessary for a more accurate evaluation of the groundwater conditions at this site. Fluctuations in the groundwater level and the possible development of perched water table should be anticipated throughout the year depending on variations in climatological conditions and other factors not apparent at the time the borings were performed. The possibility of groundwater level fluctuation should be considered when developing the design and construction plans for the project. July 6, 0 Page

6447 Grand Avenue Gurnee, Illinois ANALYSIS AND GUIDELINE RECOMMENDATIONS The following guideline recommendations assume that the scope of the project as described in the beginning of this report does not change, and that no significant variations in soil conditions occur from those reported on our final boring logs. The boring logs and laboratory test results depict subsurface conditions only at the specified locations on the site. Our recommendations are based upon the assumption that the proposed grades will be approximately equivalent to the existing grades. With these limitations, the following geotechnical recommendations are given for the proposed new 1-story building. Foundation for Proposed One-Story Building For this structure, foundation loads are expected to be light. Based on the soil boring data, we recommend a shallow spread footing type foundation for the support of this structure. Based on the boring information and the anticipated site preparation, building foundations extending to minimum depths required for frost protection should bear in the very stiff silty clay soils encountered 3.0 feet below the existing grade. If unsuitable bearing soils such as old footing foundation, loose, soft silty clay, or organic materials are encountered in a footing excavation, the footing should be deepened to competent bearing soil and the footing could be lowered or an overexcavation and backfill procedure could be performed. An overexcavation and backfill treatment would require widening the deepened excavation in all directions at least 8 inches beyond the edges of the footing for each 1 inches of overexcavation depth. The overexcavation should then be backfilled in maximum 9-inch thick loose lifts with suitable granular fill material, such as IDOT gradation CA-1 or equivalent capped with CA-6 or equivalent, compacted to at least 9 percent of the maximum modified Proctor dry density (ASTM D-7). Shallow footings bearing on the natural silty clay soils encountered below the minimum depths required for frost protection, tested and evaluated by an experienced geotechnical professional, could be designed using a maximum net allowable soil bearing pressure of 3,00 psf. The net pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation. A one-third increase in the allowable design bearing pressure could be used for design of footings for added temporary live loads such as those due to wind gusts or seismic activity. Perimeter footings and footings beneath unheated areas should extend at least 48 inches beneath the lowest adjacent finished grade for frost protection. Interior footings should also be founded at least 4 inches below floor slab level for confinement of the bearing soils. Isolated footings should have a minimum width of 30 inches, and continuous formed footings should have a minimum width of 0 inches. Anticipated long-term settlement of the footing foundation designed and constructed as recommended above should be on the order of less than 1-inch with a differential settlement of less July 6, 0 Page 3

6447 Grand Avenue Gurnee, Illinois than ½ to ¾ inch. Reinforcement should be provided in the walls to minimize cracking from differential settlement. Floor Slab Available information indicated that the existing silty clay soils and silty clay fill materials are capable of providing support for the proposed floor slab situated on grade. Any asphalt pavement should be removed and the exposed surface be observed by a soil engineer to determine if there are any localized deposits of soft or unsuitable material. Any such deposit, as observed by the soil engineer, should be removed and replaced with an approved fill free of organic matter and debris. A 6-inch layer of gravel meeting IDOT gradation CA-7 or equivalent should be provided below the floor slab to minimize dangers from capillary rise of moisture. Stabilization of Subgrade Soils We recommend that all asphalt pavement, loose, soft, organic, or otherwise unsuitable materials be removed from any new pavement area. The necessary stripping depths will vary and should be closely monitored during construction to verify that all unsuitable materials have been removed. Prior to fill placement and after rough grading is completed, the exposed subgrade should be proofrolled if space allows. Proofrolling aids in providing a firm subgrade for new pavement and for delineating soft or disturbed areas that may exist at or slightly below subgrade level. Unsuitable areas observed at this time should be undercut and replaced with suitable fill if they cannot be compacted in place. Proofrolling may be accomplished with a fully loaded, tandem-axle dump truck or other equipment providing an equivalent subgrade loading. A minimum gross weight of tons is recommended for the proofrolling equipment. Proofrolling should be performed in dry weather conditions only as a wet subgrade will not allow detection of buried weak soils. The gravel and crushed stone subbase encountered below the asphalt pavement at the site may be stockpiled and reused as engineering backfill material. All fill materials should be properly placed and compacted as described above. Appropriate laboratory testing should be performed on samples of proposed off-site borrow materials before they are used for fill, particularly if they are to be placed within feet of the finished pavement subgrade elevation. Borrow materials should consist of only clay to silty clay soils. CONSTRUCTION CONSIDERATIONS As a general precaution, the exposed subgrade soils should be kept free of standing water or excessive runoff. Due to the potential for soil variations and loose natural soils, it is recommended that soils at subgrade elevation be observed and tested by an representative prior to concrete or asphalt placement to evaluate the suitability and uniformity of the soils for support of the design at any structure or pavement areas. It is our understanding that the existing structure will be demolished. It is recommended that all existing footings and other debris be completely removed from the new footing areas, and that the former building structure be backfilled with IDOT gradation CA-1 crushed stone. The CA-1 should be placed in maximum 9-inch loose lifts and compacted to 9% of its maximum modified Proctor dry July 6, 0 Page 4

6447 Grand Avenue Gurnee, Illinois density, or to the Resident Engineer s satisfaction. Continuous observation by a geotechnical engineer or his representative should be maintained during site preparation and compaction of all fill and backfill material. If the former footings are located below the proposed slab-on-grade, the old footings should be removed a minimum of two feet below the proposed slab-on-grade and backfilled with compacted engineering fill materials to avoid hard spots. All excavation should be performed in accordance with the most recent Occupational Safety and Health Administration requirements. No unique soil-related construction problems other than those discussed in previous sections are foreseen. An experienced soil engineer should be retained to oversee all soil-related operations. GENERAL COMMENTS The analysis and recommendations presented in this report are based upon the data obtained from the soil borings performed at the indicated locations and from any other information discussed in this report. This report does not reflect any variations that may occur across the site. The nature and extent of such variations may not become evident until construction. If variations appear evident, it will be necessary to reevaluate the recommendations of the report. It is recommended that an geotechnical engineer be given the opportunity to review the plans and specifications so that comments can be made regarding the interpretation and implementation of our geotechnical recommendations in the design and specifications. It is further recommended that the geotechnical engineer be retained for testing and observation during earthwork construction phases to help determine that the design requirements are fulfilled. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No other warranties, either expressed or implied, are intended or made. In the event that any changes in the nature, design or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless the changes are reviewed and the conclusions of this report modified or verified in writing by the geotechnical engineer. July 6, 0 Page

APPENDIX A Boring Location Diagram

4.'.' B- B-3 3' 4' 77' B- 7' 36' 68' 10' 6' 6' B-1 B-4 16' PROJECT NUMBER: -11 CLIENT: Key Development DATE: July 1 &, 0 APPENDIX A: Boring Location Diagram PROJECT LOCATION: 6447 Grand Avenue Gurnee, Illinois N Not to Scale 38 Hammond Drive, Suite 6 Schaumburg, Illinois 60173 (847) 303-0300

APPENDIX B Soil Boring Logs

AGI Job No. -11 BORING LOG NO. B-1 Sheet 1 of 1 CLIENT Key Development PROJECT Proposed New 1-Story Building STATION AND OFFSET(ft): LOCATION 6447 Grand Avenue COUNTY: Lake SAMPLES TESTS CITY & STATE: SURFACE ELEVATION 1.3. Gurnee, Illinois Datum:. inches asphalt over 1. inches gravel FILL, silty clay, trace sand & gravel, brown & gray, stiff SILTY CLAY, trace sand & gravel, brown, very stiff, with silty sand seams, (CL) GRAPHIC LOG DEPTH (FT.) SPT-N BLOWS / FT. 4 10 NUMBER 1 TYPE % RECOVERY 6 78 MOISTURE, % 8 16 DRY DENSITY PCF Qu tsf Failure Type 1.. HNu Units ppm ORGANIC CONTENT, % 9 3 7 3 8.0 SILTY CLAY, trace sand & gravel, gray, very stiff, (CL) 10 11 4 83 1 3. 9 83.0 End Of Boring 10 6 83 16. WATER LEVEL OBSERVATIONS Dry AGI COPY -11--6447 GRAND GURNEE- KEY DEVELOPMENT.GPJ 7/6/ 38 Hammond Drive, Suite 6 Schaumburg, Illinois 60173 Tel: (847) 303-0300 Fax: (847) 303-0900 STARTED DRILL CO. DRILLER ENG/GEOL. 7-1- WDI Pecka FINISHED DRILL RIG A'T DRILLER APPROVED 7-1- AMM

AGI Job No. -11 BORING LOG NO. B- Sheet 1 of 1 CLIENT Key Development PROJECT Proposed New 1-Story Building STATION AND OFFSET(ft): LOCATION 6447 Grand Avenue COUNTY: Lake SAMPLES TESTS CITY & STATE: SURFACE ELEVATION 1.1. Gurnee, Illinois Datum: 3 inches asphalt over 10 inches gravel FILL, silty clay, with sand & gravel, brown & gray, very stiff SILTY CLAY, trace sand & gravel, brown, very stiff, (CL) GRAPHIC LOG DEPTH (FT.) SPT-N BLOWS / FT. 7 8 NUMBER 1 TYPE % RECOVERY 7 89 MOISTURE, % 13 DRY DENSITY PCF Qu tsf Failure Type 3.. HNu Units ppm ORGANIC CONTENT, % 11 3 100 13 8.0 SILTY CLAY, trace sand & gravel, gray, very stiff, with sand seams, (CL) 10 8 4 100 14. 1 89 14..0 End Of Boring 8 6 89 11 WATER LEVEL OBSERVATIONS 14. Cave-In AB AGI COPY -11--6447 GRAND GURNEE- KEY DEVELOPMENT.GPJ 7/6/ 38 Hammond Drive, Suite 6 Schaumburg, Illinois 60173 Tel: (847) 303-0300 Fax: (847) 303-0900 STARTED DRILL CO. DRILLER ENG/GEOL. 7-- WDI Pecka FINISHED DRILL RIG A'T DRILLER APPROVED 7-- AMM

AGI Job No. -11 BORING LOG NO. B-3 Sheet 1 of 1 CLIENT Key Development PROJECT Proposed New 1-Story Building STATION AND OFFSET(ft): LOCATION 6447 Grand Avenue COUNTY: Lake SAMPLES TESTS CITY & STATE: SURFACE ELEVATION 1.1 Gurnee, Illinois Datum: 3 inches asphalt over 10 inches gravel SILTY CLAY, trace sand & gravel, brown, very stiff, (CL) GRAPHIC LOG DEPTH (FT.) SPT-N BLOWS / FT. NUMBER 1 TYPE % RECOVERY 7 MOISTURE, % 14 DRY DENSITY PCF Qu tsf Failure Type HNu Units ppm ORGANIC CONTENT, % 6.0 SILTY CLAY, trace sand & gravel, gray, very stiff to stiff, (CL) 13 1 3 89 100 14 13 3. 3. 10 11 4 78 13. 6 83 16 1..0 End Of Boring 7 6 89 16 1. WATER LEVEL OBSERVATIONS Dry AGI COPY -11--6447 GRAND GURNEE- KEY DEVELOPMENT.GPJ 7/6/ 38 Hammond Drive, Suite 6 Schaumburg, Illinois 60173 Tel: (847) 303-0300 Fax: (847) 303-0900 STARTED DRILL CO. DRILLER ENG/GEOL. 7-- WDI Pecka FINISHED DRILL RIG A'T DRILLER APPROVED 7-- AMM

AGI Job No. -11 BORING LOG NO. B-4 Sheet 1 of 1 CLIENT Key Development PROJECT Proposed New 1-Story Building STATION AND OFFSET(ft): LOCATION 6447 Grand Avenue COUNTY: Lake SAMPLES TESTS CITY & STATE: SURFACE ELEVATION 1.. 6.0 Gurnee, Illinois Datum: 3 inches asphalt over 11 inches gravel FILL, silty clay, with sand & gravel, brown, gray & black SILTY CLAY, trace sand & gravel, brown to brown & gray, very stiff, (CL) SILTY CLAY, trace sand & gravel, gray, very stiff, with moist sand seams, (CL) GRAPHIC LOG DEPTH (FT.) SPT-N BLOWS / FT. 9 1 8 NUMBER 1 3 TYPE % RECOVERY 61 100 94 MOISTURE, % 1 13 11 DRY DENSITY PCF Qu tsf Failure Type 3. HNu Units ppm ORGANIC CONTENT, % 10 7 4 94 17. 7 94 18.0 End Of Boring 8 6 83. WATER LEVEL OBSERVATIONS Dry AGI COPY -11--6447 GRAND GURNEE- KEY DEVELOPMENT.GPJ 7/6/ 38 Hammond Drive, Suite 6 Schaumburg, Illinois 60173 Tel: (847) 303-0300 Fax: (847) 303-0900 STARTED DRILL CO. DRILLER ENG/GEOL. 7-- WDI Pecka FINISHED DRILL RIG A'T DRILLER APPROVED 7-- AMM

AGI Job No. -11 BORING LOG NO. B- Sheet 1 of 1 CLIENT Key Development PROJECT Proposed New 1-Story Building STATION AND OFFSET(ft): LOCATION 6447 Grand Avenue COUNTY: Lake SAMPLES TESTS CITY & STATE: SURFACE ELEVATION 1. 3.0. 7. Gurnee, Illinois Datum: 3. inches asphalt over 11 inches gravel FILL, silty clay, with sand & gravel, trace topsoil, brown, gray & black SILTY CLAY, trace sand, gravel & mottle, brown, very stiff, (CL) SILT, brown & gray, medium dense, moist, (ML) SILTY CLAY, trace sand & gravel, gray, very stiff to stiff, (CL) GRAPHIC LOG DEPTH (FT.) 10 SPT-N BLOWS / FT. 7 8 11 9 NUMBER 1 3 4 TYPE % RECOVERY 33 89 94 100 MOISTURE, % 17 14 DRY DENSITY PCF Qu tsf Failure Type 3.7 HNu Units ppm ORGANIC CONTENT, % 8 100 16 1.7.0 End Of Boring 6 6 89 17 1. WATER LEVEL OBSERVATIONS Dry AGI COPY -11--6447 GRAND GURNEE- KEY DEVELOPMENT.GPJ 7/6/ 38 Hammond Drive, Suite 6 Schaumburg, Illinois 60173 Tel: (847) 303-0300 Fax: (847) 303-0900 STARTED DRILL CO. DRILLER ENG/GEOL. 7-- WDI Pecka FINISHED DRILL RIG A'T DRILLER APPROVED 7-- AMM

UNIFIED SOIL CLAIFICATION SYSTEM Note: Dual symbols are used to indicate borderline soil classifications Geotechnical, Environmental & Materials Engineering