Subsurface Environmental Investigation

Size: px
Start display at page:

Download "Subsurface Environmental Investigation"

Transcription

1 Subsurface Environmental Investigation Lake Development East Lake and 21 st Avenue South February 23, 201 Terracon Project No. MP14738A Prepared for: Minneapolis Public Schools Prepared by: Terracon Consultants, Inc.

2 Exhibit A-2 AERIAL PHOTOGRAPHY PROVIDED BY MICROSOFT BING MAPS DIAGRAM IS FOR GENERAL ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES Project Manager: JAF Drawn by: JLH Checked by: JAF Approved by: KPO Project No. MP14738 Scale: AS SHOWN File Name: A-2 Date: 2/ th Ave N. Plymouth, MN 441 SAMPLING S Lake St. Redevelopment SW of Lake and 21st Avenue South

3 PROJECT: Minneapolis Public Schools-Lake St. Redevelopment SITE: SW of Lake and 21st Avenue South SAND (SP), fine, trace gravel, light brown, very dense CLAYEY SAND (SC), dark brown, dense SAND (SP), fine to medium, trace gravel, light brown, medium dense BORING LOG NO. 1 Special School District No. 1 CLIENT: ELEVATION (Ft.) (Ft.) RECOVERY (In.) Page 1 of 1 FIELD TEST RESULTS N= N= N= N=14 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL MP14738.GPJ TEMPLATE UPDATE GPJ 2/12/ SILTY SAND (SM), light brown, loose - medium dense below 28' Boring Terminated at 40 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hollow Stem Auger Boring backfilled with soil cuttings upon completion. None while drilling See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. 33 Hoffman Road E White Bear Lake, Minnesota Hammer Type: Automatic Boring Started: 1/16/201 Drill Rig: # 928 Project No.: MP Driller: CR -6-4 N= 4-4- N= N= N=23 Boring Completed: 1/16/201 Exhibit: A-4

4 PROJECT: Minneapolis Public Schools-Lake St. Redevelopment SITE: SW of Lake and 21st Avenue South SAND (SP), fine to medium, trace gravel, brown, medium dense 8. Offset about ' due to parked truck SILTY SAND (SM), light brown, loose BORING LOG NO. 2 Special School District No. 1 CLIENT: ELEVATION (Ft.) (Ft.) RECOVERY (In.) 8 9 Page 1 of 1 FIELD TEST RESULTS 7--9 N= N= N= N=8 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL MP14738.GPJ TEMPLATE UPDATE GPJ 2/12/ SAND (SP), fine to medium, trace gravel, brown, medium dense SILTY SAND (SM), trace gravel, brown, medium dense SILTY SAND (SM), brown, loose SAND (SP), fine to medium, trace gravel, brown, medium dense Boring Terminated at 4 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hollow Stem Auger Boring backfilled with soil cuttings upon completion. 44' while drilling See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. 33 Hoffman Road E White Bear Lake, Minnesota Hammer Type: Automatic Boring Started: 1/16/201 Drill Rig: # 928 Project No.: MP Driller: CR 6-6- N= N= N= N=1 Boring Completed: 1/16/201 Exhibit: A-

5 Subsurface Environmental Investigation Maaco Property Lake Development 200 East Lake May 12, 201 Terracon Project No. MP14738A Prepared for: Minneapolis Public Schools Prepared by: Terracon Consultants, Inc.

6 APPROXIMATE SITE BOUNDARY DIAGRAM IS FOR GENERAL ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES AERIAL PHOTOGRAPHY PROVIDED BY MICROSOFT BING MAPS Project Manager: JAF Drawn by: AP Checked by: JAF Approved by: DJW Project No. MP14738 Scale: A AS SHOWN File Name: - Date: 0/08/ th Ave N. Plymouth, MN 441 SAMPLING Minneapolis Public Schools-Lake Development 2019 East Lake Exhibit 2

7 SITE: 200 Lake BORING LOG NO. B-3 0. ASPHALT FILL - POORLY GRADED SAND WITH GRAVEL, light to dark brown, no odor, moist (ft) Page 1 of POORLY GRADED SAND WITH SILT (SP), little gravel, nonplastic, light brown, no odor, moist to wet, soft, trace orange mottling 0.0 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. ENVIRONMENTAL SMART LOG MP14738A.GPJ TERRACON2012.GDT /21/ SILT (ML) POORLY GRADED SAND WITH SILT (SP), trace gravel, no odor, wet Boring Terminated at 1 Feet Soil sample collected from to 7 feet at 094. Boring Started: 4/24/201 Boring Completed: 4/24/21 Project No.: MP14738A Exhibit: B

8 SITE: 200 Lake BORING LOG NO. B-4 0. ASPHALT POORLY GRADED SAND WITH SILT (SP), trace gravel, fine grained, dark brown to orange brown, no odor, moist to wet (ft) Page 1 of POORLY GRADED SAND WITH GRAVEL (SP), fine to medium grained, light to dark brown, no odor, moist 0.3 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. ENVIRONMENTAL SMART LOG MP14738A.GPJ TERRACON2012.GDT /21/ POORLY GRADED SAND WITH GRAVEL (SP), fine grained, light brown, no odor, moist to wet, 3 inches of silt from 12 to 12. feet SILT (CL-ML), trace clay, light brown, no odor, wet POORLY GRADED GRAVEL (SP), fine grained, light brown, no odor, wet, iron staining at 21 feet Soil sample collected from 20 to 22. feet at Boring Started: 4/24/201 Boring Completed: 4/24/201 Project No.: MP14738A Exhibit: B

9 SITE: 200 Lake BORING LOG NO. B-4 POORLY GRADED GRAVEL (SP), fine grained, light brown, no odor, wet, iron staining at 21 feet (continued) (ft) Page 2 of THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. ENVIRONMENTAL SMART LOG MP14738A.GPJ TERRACON2012.GDT /21/1 Change to moist at 27 feet Trace gravel at 40 feet Boring Started: 4/24/201 Boring Completed: 4/24/201 Project No.: MP14738A Exhibit: B

10 SITE: 200 Lake POORLY GRADED GRAVEL (SP), fine grained, light brown, no odor, wet, iron staining at 21 feet (continued) 43.0 POORLY GRADED GRAVEL (GP), some sand, light brown, no odor, moist 44.0 BORING LOG NO. B-4 SILTY CLAY (CL-ML), trace sand, trace gravel, semi-plastic, brown to dark gray, no odor, moist to wet, soft (ft) 4 Page 3 of THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. ENVIRONMENTAL SMART LOG MP14738A.GPJ TERRACON2012.GDT /21/1.0 Boring Terminated at Feet Groundwater sample collected from to feet at Boring Started: 4/24/201 Boring Completed: 4/24/201 Project No.: MP14738A Exhibit: B

11 SITE: 200 Lake 0. ASPHALT POORLY GRADED SAND (SP), trace gravel, light brown, no odor, moist SANDY SILTY CLAY (CL-ML), dark brown, no odor, moist BORING LOG NO. B- (ft) Page 1 of POORLY GRADED SAND (SP), trace to little gravel, fine grained, light brown, no odor, moist 21. THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. ENVIRONMENTAL SMART LOG MP14738A.GPJ TERRACON2012.GDT /21/ GRAVEL LENS POORLY GRADED SAND (SP), trace gravel, fine grained, light brown, no odor, moist GRAVEL LENS POORLY GRADED SAND (SP), trace gravel, fine grained, light brown, no odor, moist SILT LENS POORLY GRADED SAND (SP), trace gravel, fine grained, light brown, no odor, moist to wet Boring Terminated at 1 Feet Soil sample collected from 8 to feet at Boring Started: 4/24/201 Boring Completed: 4/24/201 Project No.: MP14738A Exhibit: B

12 SITE: 200 Lake ASPHALT 1.0 CLAYEY SAND (SC), dark brown, no odor, moist, soft BORING LOG NO. B-6 (ft) Page 1 of POORLY GRADED SAND (SP), trace gravel, fine to coarse grained, light brown, no odor, moist THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. ENVIRONMENTAL SMART LOG MP14738A.GPJ TERRACON2012.GDT /21/ POORLY GRADED SAND (SP), trace ash, coarse grained, gray, no odor, moist POORLY GRADED SAND (SP), trace gravel, fine to coarse grained, light brown, no odor, moist SILT WITH SAND (ML), trace sand, fine grained, light brown, no odor, wet POORLY GRADED SAND (SP), fine to medium grained, light brown, no odor, wet Boring Terminated at 1 Feet Soil sample collected from 8 to feet at Boring Started: 4/24/201 Boring Completed: 4/24/201 Project No.: MP14738A Exhibit: B

13 SITE: 200 Lake CONCRETE 1.0 SILTY SAND (SM), trace gravel, medium brown, no odor, moist BORING LOG NO. B-7 (ft) Page 1 of POORLY GRADED SAND (SP), trace gravel, fine to medium grained, light brown, no odor, moist 13.3 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. ENVIRONMENTAL SMART LOG MP14738A.GPJ TERRACON2012.GDT /21/1 1.0 Boring Terminated at 1 Feet Soil sample collected from 8 to feet at. Boring Started: 4/24/201 Boring Completed: 4/24/201 Project No.: MP14738A Exhibit: B

Typical Subsurface Profile. November 28, 2016

Typical Subsurface Profile. November 28, 2016 November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 203 to 210 Drainage Structure Pipe Jacking Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Pavement Subgrade Survey State Highway 125 over Hudson Creek Ottawa County, Oklahoma September 23, 21 Terracon Project No. 415121 Prepared for: Guy Engineering Services,

More information

Appendix A - Vicinity Map Vicinity Map: Palm Beach Gardens City Hall Additions, 000 N Military Trail, Palm Beach Gardens, FL Proposed Location of Police Dept. Attached Addition Proposed Location of New

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 210 to 218 Drainage Structure Pipe Jacking Creek County, Oklahoma July 1, 2016 Terracon Project No. 04165017 Prepared for: Benham Tulsa,

More information

EXHIBIT G GEOTECHNICAL REPORT (DRAFT)

EXHIBIT G GEOTECHNICAL REPORT (DRAFT) EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Proposed Prairie Lane HDD Cores D7-A and D7-B Wayne County, Ohio February 14, 2015 Terracon Project No. N4149328 Prepared for: Project Consulting Services, Inc. Prepared by: Terracon

More information

FIGURES Printed By: aday Print Date: 3/23/2011 12:48:08 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-vm01.dwg Layout: FIGURE 1 VICINITY

More information

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:

More information

CONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE

CONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE APPENDIX A - TEST HOLE LOGS PORTAGE AVE TH -9 CONTRACT E- DR DR BOURKEVALE CAVELL WINSTON DR PARKSIDE DR ASSINIBOINE AVE AUTHORIZED BY: DATE: CONSULTING GEOTECHNICAL ENGINEERS AUTHORIZED /0/ CLIENT DRAWING

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E. LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Shaw AFB West Gate Entrance Control Facility Amendment Sumter, South Carolina September 13, 20 Terracon Project No. 735021A Prepared for: TranSystems North Charleston, South

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Parking Lot Evaluation & Physical Plant Additions Rogers State University Claremore, Oklahoma May 20, 2015 Terracon Project No. 04155080 Prepared for: Rogers State University

More information

Site Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan

Site Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan Site Location 0606 1771 North Dixie Highway Monroe, Michigan 48162 Tel: 734-289-2200 Fax: 734-289-2345 www.manniksmithgroup.com Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe

More information

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL Bay County Solid Waste 11411 Landfill Rd. Panama City Beach, Florida 32413 Telephone: (850) 236-2212 Fax: (850) 233-5053 Board of County Commissioners www.baycountyfl.gov Sepetember 27, 2018 Florida Department

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Proposed Abbington Crossing Apartments 119 Lipscomb Road Wilson, North Carolina March 18, 2016 Project No. 7216011 Prepared for: Rea Ventures Group, LLC Atlanta, Georgia

More information

November 14, Robert Peccia & Associates, Inc. PO Box 5653 Helena, MT Mr. Bill Burkland, P.E.

November 14, Robert Peccia & Associates, Inc. PO Box 5653 Helena, MT Mr. Bill Burkland, P.E. November 14, 2018 Robert Peccia & Associates, Inc. PO Box 63 9604 Attention: Subject: Gentlemen: Mr. Bill Burkland, P.E. bill@rpa-hln.com Final Report of Geotechnical Investigation Upgrades to Taxiways

More information

GEOTECHNICAL SUBSURFACE DATA REPORT

GEOTECHNICAL SUBSURFACE DATA REPORT GEOTECHNICAL SUBSURFACE DATA REPORT SC-41 REPLACEMENT BRIDGE OVER MAIDEN DOWN SWAMP MARION COUNTY, SOUTH CAROLINA PREPARED FOR Mr. Joshua Meetze, E.I.T. RPG-2 GDS South Carolina Department of Transportation

More information

Geotechnical Engineering Report Proposed Communications Tower Spain Park Site Hoover, Alabama

Geotechnical Engineering Report Proposed Communications Tower Spain Park Site Hoover, Alabama Geotechnical Engineering Report Proposed Communications Tower Spain Park Site Hoover, Alabama July 24, 2014 Terracon Project No. E1145095 Prepared for: The City Of Hoover Hoover, Alabama Prepared by: Terracon

More information

APPENDIX A DRAINAGE STUDY PHASE 2 ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE 4C IMPROVEMENTS LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC

APPENDIX A DRAINAGE STUDY PHASE 2 ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE 4C IMPROVEMENTS LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC DRAINAGE STUDY PHASE ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE C IMPROVEMENTS ` FOR: LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC APPENDIX A J-.000 Prepared by: Savannah, GA Charleston, SC Myrtle

More information

Questions and Answers Environmental Drilling Investigation and Construction Monitoring Oversight

Questions and Answers Environmental Drilling Investigation and Construction Monitoring Oversight Questions and Answers Environmental Drilling Investigation and Construction Monitoring Oversight Question : Answer : Question : Answer : Question : Answer : The Phase I Environmental Site Assessment I

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Shaw AFB East Gate Entrance Control Facility Amendment Sumter, South Carolina September 13, 2010 Terracon Project No. 73105020A Prepared for: TranSystems North Charleston,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report REPORT C OVER PAGE Geotechnical Engineering Report GDRTA Building 600 Renovations Dayton, Montgomery County, Ohio March 16, 2018 Terracon Project No. N1185054 Prepared for: Champlin Architecture Cincinnati,

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

VOCs, including fuel oxygenates, via EPA Analytical Method The second soil sample from MW-24 (MW ) was analyzed for Total Organic Carbon.

VOCs, including fuel oxygenates, via EPA Analytical Method The second soil sample from MW-24 (MW ) was analyzed for Total Organic Carbon. December 5, 2012 Mrs. Jenny Herman Maryland Department of the Environment Oil Control Program 1800 Washington Boulevard Baltimore, Maryland 212301719 Re: Additional Monitoring Well Installation Report

More information

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784 REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO. 35-55 CLIENT ID: 78 Prepared for: Construction & Engineering Services Consultants, Inc. 93 Baymeadows

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Union County Landfill Retaining Wall Wingate, North Carolina October 22, 2015 Project No. 71155054 Prepared for: CDM Smith Charlotte, North Carolina Prepared by: Terracon

More information

Geotechnical Engineering Report

Geotechnical Engineering Report The Residence at Yukon Hills Cornwell Drive and Vandament Avenue Yukon, Oklahoma May 20, 2016 Terracon Project No. 03165108 Prepared for: Jones Gillam Renz Architects, Inc. Salina, Kansas Prepared by:

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Caswell County Public Library Yanceyville, North Carolina June 15, 2017 Project No. 75175054 Revised Prepared for: Gunn Memorial Public Library Yanceyville, North Carolina

More information

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA 73171 JANUARY 06 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT I-15

More information

November 13, Eckas Water 1514 Ambrosia Court Fort Collins, Colorado Attn: Mr. Wayne Eckas

November 13, Eckas Water 1514 Ambrosia Court Fort Collins, Colorado Attn: Mr. Wayne Eckas November 13, 2018 Eckas Water 1514 Ambrosia Court Fort Collins, Colorado 80526 Attn: Mr. Wayne Eckas (wayne@eckaswater.com) Re: Geotechnical Subsurface Exploration Walker Recharge Pipeline Project Morgan

More information

South Sound Geotechnical Consulting P.O. Box Lakewood, WA (253) Figure 1 Site Plan. SERA Playground Tacoma, WA.

South Sound Geotechnical Consulting P.O. Box Lakewood, WA (253) Figure 1 Site Plan. SERA Playground Tacoma, WA. N TP -3, E3RA TP -4, E3RA TP -2, E3RA B -6, Terracon HA -2 HA -3 HA -1 TP -1, E3RA Legend HA-1 Approximate Hand Excavation Location by SSGC Approximate Exploration Location by others Scale: NTS South Sound

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Rodgers Chapel Expansion 502 James B. Hunt Drive Mount Olive, North Carolina August 26, 2016 Project No. 72165063 Prepared for: University of Mount Olive Mount Olive, North

More information

Soil Survey Summary Report

Soil Survey Summary Report Soil Survey Summary Report Benton Boulevard Extension Pooler, Chatham County, Georgia February, 206 Terracon Project No. ES5553 Prepared for: McGee Partners, Inc. Atlanta, Georgia Prepared by: Terracon

More information

Proposed Family Dollar Store Watford City, North Dakota. 7B Building & Development Lubbock, Texas January 26, Terracon Project No.

Proposed Family Dollar Store Watford City, North Dakota. 7B Building & Development Lubbock, Texas January 26, Terracon Project No. Proposed Family Dollar Store Watford City, North Dakota Terracon Project No. M5165122 Prepared for: 7B Building & Development Lubbock, Texas January 26, 2017 January 26, 2017 7B Building & Development

More information

Attachment B: Field Forms and Notes

Attachment B: Field Forms and Notes Attachment B: Field Forms and Notes Field forms Dalton, Olmsted & Fuglevand, Inc. Environmental Consultants T117 Early Action Area, Port

More information

Geotechnical Engineering Report South Shore Carter Lake Campground Expansion Northwest of CR 31 and Cougar Run Lane Larimer County, Colorado

Geotechnical Engineering Report South Shore Carter Lake Campground Expansion Northwest of CR 31 and Cougar Run Lane Larimer County, Colorado Geotechnical Engineering Report South Shore Carter Lake Campground Expansion Northwest of CR 31 and Cougar Run Lane Larimer County, Colorado July 15, 2016 Terracon Project No. 20165057 Prepared for: Larimer

More information

GEOTECHNICAL EXPLORATION FOR PROPOSED PAVEMENT IMPROVEMENTS, SIERRA MIDDLE SCHOOL, 4950 CENTRAL AVENUE, CITY OF RIVERSIDE, CALIFORNIA.

GEOTECHNICAL EXPLORATION FOR PROPOSED PAVEMENT IMPROVEMENTS, SIERRA MIDDLE SCHOOL, 4950 CENTRAL AVENUE, CITY OF RIVERSIDE, CALIFORNIA. GEOTECHNICAL EXPLORATION FOR PROPOSED PAVEMENT IMPROVEMENTS, SIERRA MIDDLE SCHOOL, 4950 CENTRAL AVENUE, CITY OF RIVERSIDE, CALIFORNIA Prepared for: RIVERSIDE UNIFIED SCHOOL DISTRICT 3070 Washington Street

More information

LTISD PURCHASING DEPARTMENT HWY 71, BLDG B AUSTIN, TX 78738

LTISD PURCHASING DEPARTMENT HWY 71, BLDG B AUSTIN, TX 78738 LTISD PURCHASING DEPARTMENT 16101 HWY 71, BLDG B AUSTIN, TX 78738 March 23, 2018 NOTICE TO VENDORS This notice serves as ADDENDUM #3 for Request for Competitive Sealed Proposal (RFCSP), Number 18-03-012,

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Proposed State Road 52 HDD Cores E2-D and E2-E Washtenaw County, Michigan May 29, 2015 Terracon Project No. N4149328 Prepared for: Project Consulting Services, Inc. Prepared by:

More information

BID: CTC Dirt Road Paving Durango Lane, Dakota Circle, and Angler Lane BID DUE: Tuesday, December 11, 11:00am

BID: CTC Dirt Road Paving Durango Lane, Dakota Circle, and Angler Lane BID DUE: Tuesday, December 11, 11:00am Capital Projects & Purchasing Department 113 Mable T. Willis Blvd. Walterboro, SC 29488 843.539.1968 BID: CTC-13 2018 Dirt Road Paving Durango Lane, Dakota Circle, and Angler Lane BID DUE: Tuesday, December

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS FIGURE 3 Geotechnical Report (2) REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS RIVER TOWER RESTORATION RIVER TOWER PARK TAMPA, FLORIDA AREHNA PROJECT NO. B-13-002 February 22, 2013 Prepared

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report County Bridge SH-15 Stillwell Road over Tributary to Stanger Creek Leavenworth County, KS January 13, 2014 Terracon Project No. 02135230 Prepared for: Leavenworth County

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 5-06 Template Version: C40606 - RW APPENDIX A GEOTECHNICAL REPORT AECOM 99 Commerce Drive 04 477 538 tel Winnipeg, MB, Canada R3P 0Y7 04 84 040 fax www.aecom.com

More information

ADDENDUM No. 2 BID NO THOMPSON CREEK SUBSTATION DRIVEWAY IMPROVEMENTS PROJECT

ADDENDUM No. 2 BID NO THOMPSON CREEK SUBSTATION DRIVEWAY IMPROVEMENTS PROJECT 205 E. 28 th St. P.O. Box 1000 Bryan, TX 77805 Phone: 979-821-5860 FAX: 979-821-5747 http://www.btutilities.com November 2, 2015 ADDENDUM No. 2 BID NO. 007-01-16 THOMPSON CREEK SUBSTATION DRIVEWAY

More information

GEOTECHNICAL REPORT US 93 WILDLIFE UNDERCROSSINGS North of Wells, Nevada E.A July 2009

GEOTECHNICAL REPORT US 93 WILDLIFE UNDERCROSSINGS North of Wells, Nevada E.A July 2009 GEOTECHNICAL REPORT US 93 WILDLIFE UNDERCROSSINGS North of Wells, Nevada E.A. 73523 July 2009 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL

More information

Kalavista Drive Watermain Replacement Reference No E

Kalavista Drive Watermain Replacement Reference No E Replacement Reference No. 07-E7.7. September 0, 07 ADDENDUM NO. This Addendum forms part of the Contract Documents and is to be read, interpreted and coordinated with all other parts. The cost of all work

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS PROPOSED WEIRS AT STATIONS 130+00 AND 16+00 DRAINAGE IMPROVEMENTS TO THE FOUR CORNERS MSBU HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical,

More information

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5 TABLE OF CONTENTS Page No. PROJECT INFORMATION... 1 Project Authorization... 1 Project Description... 1 Purpose and Scope of Services... 1 SITE AND SUBSURFACE CONDITIONS... 2 Site Location and Description...

More information

GEOTECHNICAL REPORT US 95 WIDENING ANN ROAD

GEOTECHNICAL REPORT US 95 WIDENING ANN ROAD GEOTECHNICAL REPORT US 95 WIDENING ANN ROAD to KYLE CANYON ROAD Package 2 E.A. 73627 January 212 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION

More information

PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT

PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT Converse Project No. 15-81-177-01 Prepared For: David Evans and Associates, Inc. 17782 17th Street, Suite 200 Tustin, California 92780 Prepared By: 10391

More information

Florida s Leading Engineering Source

Florida s Leading Engineering Source Since 1988 Florida s Leading Engineering Source Environmental Geotechnical Construction Materials Testing Threshold and Special Inspections Plan Review & Code Compliance Mr. Ron Ridenour Hanson Professional

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,

More information

Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No G

Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No G Geotechnical Investigation Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No. 40-3264G Laboratory CBR Tests Laboratory CBR tests were performed on samples

More information

BID: CTC-14 Honor Lane Improvements BID DUE: Tuesday, December 11, 11:30am ADDENDUM 1 DATED: DECEMBER 4, 2018

BID: CTC-14 Honor Lane Improvements BID DUE: Tuesday, December 11, 11:30am ADDENDUM 1 DATED: DECEMBER 4, 2018 Capital Projects & Purchasing Department 113 Mable T. Willis Blvd. Walterboro, SC 29488 843.539.1968 BID: CTC-14 Honor Lane Improvements BID DUE: Tuesday, December 11, 2018 @ 11:30am ADDENDUM 1 DATED:

More information

September 3, 2013 Via

September 3, 2013 Via September 3, 2013 Via email: sadler@adeq.state.ar.us Mr. Bill Sadler, PG Geology Supervisor Solid Waste Management Division Arkansas Department of Environmental Quality 5301 Northshore Drive North Little

More information

CHANGE ORDER NO. 3 CITY OF BRYAN CEMETERY EXPANSION PROJECT CITY JOB NO. 572-D April 5, 2016

CHANGE ORDER NO. 3 CITY OF BRYAN CEMETERY EXPANSION PROJECT CITY JOB NO. 572-D April 5, 2016 CLM Energy Services, LLC 7607 Eastmark, Suite 240 College Station, TX 77840 CHANGE ORDER NO. 3 CITY OF BRYAN CEMETERY EXPANSION PROJECT CITY JOB NO. 572-D5-1303 April 5, 2016 We are submitting Change Order

More information

Results of Onsite Percolation Testing Ellis Commons Senior Housing Development APN City of Perris, California

Results of Onsite Percolation Testing Ellis Commons Senior Housing Development APN City of Perris, California Lansing Companies 12671 High Bluff Drive, Suite 150 San Diego, California 92130 April 18, 2017 Project No. 11607.001 Attention: Subject: References: Mr. Casey Malone Results of Onsite Percolation Testing

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report O Reilly Auto Parts Store 1311 E. Nine Mile Road Highland Springs, Virginia August 8, 2012 Project No. 70125105 Prepared for: Oglesby Partners, Inc. Chattanooga, Tennessee

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT Project: NW Bucklin Hill at Silverdale Way NW Project Number: 12023 Prepared for: Barber Development P.O. Box 473 Redmond, WA 98073 Prepared by: South Sound Geotechnical

More information

Appendix C Geotechnical Soil Testing Data

Appendix C Geotechnical Soil Testing Data Appendix C Geotechnical Soil Testing Data rjmmmrorr Table C-1 Laboratory Soil Testing Results Groundwater Assessment Report UMore Mining Area Dakota County, Minnesota Sample Particle Size Particle Size

More information

LEGEND ODOT CLASS. A-1-b GRAVEL AND/OR STONE FRAGS. WITH SAND A-3. A-3a COARSE AND FINE SAND. A-4a. A-4b. A-6a. A-6b TOTAL VISUAL VISUAL

LEGEND ODOT CLASS. A-1-b GRAVEL AND/OR STONE FRAGS. WITH SAND A-3. A-3a COARSE AND FINE SAND. A-4a. A-4b. A-6a. A-6b TOTAL VISUAL VISUAL PROJECT THE PROJECT CONSISTS OF CONSTRUCTING TWIN STRUCTURES FOR PROPOSED SR OVER SLOCUM AVENUE (TR-). THE TWO STRUCTURES ARE THREE-SPAN STRUCTURES USING SPI-THROUGH SLOPES AT THE ABUTMENTS. AN MSE WA

More information

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062.

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062. GEOTECHNICAL ENGINEERING REPORT KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas April 1, 2016 Prepared for: University of Kansas Bartlett & West Prepared by: GeoSource, LLC April 1, 2016

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Coquina Beach Drainage Improvements Bradenton Beach, Florida July 16, 2018 Dunkelberger Project No. HC1032 Prepared for: Manatee County Construction Services Division Bradenton,

More information

CCR Groundwater Monitoring System

CCR Groundwater Monitoring System CCR Groundwater Monitoring System Omaha Public Power District North Omaha Station North Omaha Ash Landfill Omaha, Nebraska June 2016 This page intentionally left blank. OPPD North Omaha Ash Landfill CCR

More information

Addendum # 1 Public Safety Complex Wetland Date of Addendum: 2/23/17

Addendum # 1 Public Safety Complex Wetland Date of Addendum: 2/23/17 Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 1 Public Safety Complex Wetland Date of Addendum:

More information

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199 REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO. 3-6187-A CLIENT ID: 0199 Prepared for: JEA 1 West Church Street Jacksonville, Florida

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

GEOTECHNICAL REPORT B-1942

GEOTECHNICAL REPORT B-1942 GEOTECHNICAL REPORT TUSCARORA BRIDGE REPLACEMENT B-1942 E.A. 73561 March 2011 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT

More information

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE Geotechnical Exploration Report Minto Westlake Retail & Sales Center 00 Seminole Pratt Whitney Road, Loxahatchee, Florida September 1, 01 GFA Project

More information

Geotechnical Investigation for Navajo Gallup Water Supply Project Reach 26.3

Geotechnical Investigation for Navajo Gallup Water Supply Project Reach 26.3 Geotechnical Investigation for Navajo Gallup Water Supply Project Reach 26.3 Geo-Test Geotechnical Engineering Services Report No. 1-718 for Reach 26.3 Tank Site Geo-Test Job No. 1-718, Addendum No. 1

More information

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Skiatook City Substation Skiatook, Oklahoma October 05, 2017 Terracon Project No. 04175204 Prepared for: GRDA Tulsa, Oklahoma Prepared by: Terracon Consultants, Inc. Tulsa,

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT PROJECT MINECRAFT ACCESS ROAD BOYDTON PLANK ROAD DINWIDDIE COUNTY, VIRGINIA JOB NUMBER: 37775.003 PREPARED FOR: DINWIDDIE COUNTY PO BOX 70 DINWIDDIE COUNTY, STATE 23841

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Foothills Drive Widening Holmes Drive to Lakewood Street Farmington, New Mexico April 9, 2014 Terracon Project No. 69135010 Prepared for: Souder Miller & Associates Farmington,

More information

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES Elizabeth City, North Carolina G E T Project No: EC14-188G May 30, 2014 PREPARED FOR: 106 Capital Trace, Unit E Elizabeth City,

More information

Drainage Repairs (A-Side) Western Missouri Correctional Center Cameron, MO Project No: C

Drainage Repairs (A-Side) Western Missouri Correctional Center Cameron, MO Project No: C Addendum No. 1 TO: PLANS AND SPECIFICATIONS FOR: Drainage Repairs (A-Side) Western Missouri Correctional Center Cameron, MO Project No: C1702-01 BIDDERS ARE HEREBY INFORMED THAT THE CONSTRUCTION PLANS

More information

February 6, TO: Hector J. Bordas Design Division. Attention Nicole Mi. FROM: Greg Kelley 6^-1 i Geotechnical and Materials Engineering Division

February 6, TO: Hector J. Bordas Design Division. Attention Nicole Mi. FROM: Greg Kelley 6^-1 i Geotechnical and Materials Engineering Division February 6, 2018 TO: Hector J. Bordas Design Division Attention Nicole Mi FROM: Greg Kelley 6^-1 i Geotechnical and Materials Engineering Division GEOTECHNICAL INVESTIGATION GATES CANYON PARK REGIONAL

More information

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE Report of Geotechnical Exploration Addie s Corner Entry Bridge and Lake Areas 8799 Immokalee Road Naples, Collier County, Florida October 26, 2016

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Mt. Pisgah Road Slide Paradise, Utah January 15, 2013 Terracon Project No. 61115029 Prepared for: J-U-B Engineers, Inc. 1047 S 100 W, Suite 180 Logan, UT 84321 Prepared

More information

Table of Contents. Description

Table of Contents. Description Table of Contents Description Page A. Introduction...1 A.1. Project Description...1 A.2. Purpose...1 A.3. Background Information and Reference Documents...1 A.4. Site Conditions...1 A.5. Scope of Services...2

More information

SUBSURFACE INVESTIGATION

SUBSURFACE INVESTIGATION ARKANSAS DEPARTMENT OF TRANSPORTATION SUBSURFACE INVESTIGATION STATE JOB NO. CA03 FEDERAL AID PROJECT NO. 9991 HWY. 67 HWY. 141 (WIDENING) (S) STATE HIGHWAY 412 SECTION 7 & 8 IN LAWRENCE & GREENE COUNTY

More information

AECOM tel 558 North Main Street fax Oshkosh, Wisconsin 54901

AECOM tel 558 North Main Street fax Oshkosh, Wisconsin 54901 920.2.0270 tel 8 North Main Street 920.2.021 fax Oshkosh, Wisconsin 4901 May 8, 2012 Mr. James Rabe P.E., CPESC Civil Engineer II City of Oshkosh 21 Church Avenue Oshkosh, WI 490 Subject: Subsurface Exploration

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Fax GEOTEK EGIEERIG & TESTIG SERVICES, IC. 909 East 0 th Street orth Sioux Falls, South Dakota 0 0-- Fax 0--0 South Dakota State University Facilities and Services Admistration 0, PO Box 0 Brookgs, South Dakota

More information

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133 GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project

More information

WILLMER ENGINEERING INC. Willmer Project No Prepared for. Clark Patterson Lee Suwanee, Georgia. Prepared by

WILLMER ENGINEERING INC. Willmer Project No Prepared for. Clark Patterson Lee Suwanee, Georgia. Prepared by SOIL SURVEY REPORT (Revised March 6, 2013) New Hospital Connector Road GDOT Project No. CSSTP-0006-00(276), PI No. 0006276 Duluth, Gwinnett County, Georgia WILLMER ENGINEERING INC. Willmer Project No.

More information

Report of Exploratory Test Pits

Report of Exploratory Test Pits Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001

More information

Report of Geotechnical Exploration For. University of North Florida Kernan Shuttle Stop Jacksonville, Florida

Report of Geotechnical Exploration For. University of North Florida Kernan Shuttle Stop Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Kernan Shuttle Stop Jacksonville, Florida MAE Project No. 0016-0023 March 18, 2015 Prepared for: Prepared by: Jacksonville, Florida 32256

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richardson Subdivision Apartments 37th Street and Grand Avenue Artesia, New Mexico September 13, 2011 Terracon Project No. 68110 Prepared for: Development Design & Engineering,

More information

Mark D. Suennen, Vanasse Hangen Brustlin, Inc. Nicholas Williams, EIT, Christopher Snow, PE, Andrew R. Blaisdell, PE

Mark D. Suennen, Vanasse Hangen Brustlin, Inc. Nicholas Williams, EIT, Christopher Snow, PE, Andrew R. Blaisdell, PE M E M O R A N D U M TO: FROM: Mark D. Suennen, Nicholas Williams, EIT, Christopher Snow, PE, Andrew R. Blaisdell, PE DATE: August 25, 17 FILE NO.: 09.0025945.00 SUBJECT: Preliminary Geotechnical Design

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Mobile Offices and Future Service Center Range Road Eglin Air Force Base, Florida November 2, 2016 Project No. EA165075 Prepared for: American States Utility Services, Inc. Prepared by: Terracon Consultants,

More information

Dig that Creek or Tunnel that Creek? Case Study of Crossing San Tomas Aquino Creek with an Inverted Sewer Siphon in Santa Clara, California

Dig that Creek or Tunnel that Creek? Case Study of Crossing San Tomas Aquino Creek with an Inverted Sewer Siphon in Santa Clara, California Northern California Pipe Users Group Twenty-First Annual Sharing Technologies Seminar Berkeley, California February 21, 2013 Dig that Creek or Tunnel that Creek? Case Study of Crossing San Tomas Aquino

More information

MAY 13, Copyright 2015 Kleinfelder All Rights Reserved

MAY 13, Copyright 2015 Kleinfelder All Rights Reserved GEOTECHNICAL ENGINEERING REPORT CAST-IN-PLACE RETAINING WALL WEST 2 RD STREET SOUTH OVER I-244 STATE J/P NO. 28861(04) TULSA, OKLAHOMA PROJECT NO. 20160176-2 MAY 1, 2015 Copyright 2015 Kleinfelder All

More information

Prepared for: HDR Engineering, Inc. 200 West Forsyth Street, Suite 800 Jacksonville, Florida Prepared by:

Prepared for: HDR Engineering, Inc. 200 West Forsyth Street, Suite 800 Jacksonville, Florida Prepared by: REPORT OF GEOTECHNICAL EXPLORATION REHABILITATE WHARF STRUCTURE AT BERTHS 6 AND ½ OF BERTH 5 TALLEYRAND MARINE TERMINAL, JACKSONVILLE, FLORIDA E&A PROJECT NO. 0756-0081 Prepared for: HDR Engineering, Inc.

More information

Geotechnical Testing Laboratory, Inc. Engineering and Construction Materials Testing Services

Geotechnical Testing Laboratory, Inc. Engineering and Construction Materials Testing Services Engineering and Construction Materials Testing Services February 27, 15 Central Louisiana Economic and Development Alliance P.O. Box 465 Alexandria, Louisiana 719 Attention: Mr. Rick Ranson Vice President

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report 700 West Pavement SR-0 to 00 South West Valley City, Utah October, 009 Terracon Project No. 6090 Prepared for: Horrocks Engineers 6 West Grove Parkway, Suite 00 Pleasant

More information