Bill of Quantity (BOQ)

Similar documents
Bill of Quantity (BOQ)

Bill of Quantity (BOQ)

Bill of Quantity (BOQ)

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

Bill of Quantity (BOQ)

Bill of Quantity (BOQ)

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

Rehabilitation of Omar Bin El Khattab, Al Karama, and Saeed Dakka Roads in Jabalia by Using Crushed Material

Bill No.1: Preliminaries

SPECIAL SPECIFICATION 6666 Charter Communications System

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION

SPECIAL SPECIFICATION 6664 Level (3) Communications System

SPECIAL SPECIFICATION 6658 Time Warner Communications System

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

REHABILITATION OF DRIVEWAY AND GROUND FLOOR OF THE SECOND BUILDING AT MIDDLE STREET OFFICE

July Bill No.1: Preliminaries

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

CITY OF FARGO SPECIFICATIONS ASPHALT LEVELING COURSE

Construction Specification for General Excavation

CITY OF ELIZABETHTON Building Department Excavations and Cuts Permit Application

Jericho Agro Industrial Park

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

CW 3235 RENEWAL OF EXISTING MISCELLANEOUS CONCRETE SLABS TABLE OF CONTENTS

SECTION MAINTENANCE OF EXISTING CONDITIONS

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS

SECTION MEASUREMENT AND PAYMENT

SECTION 39 - MANHOLES TABLE OF CONTENTS

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS

SECTION EXCAVATION AND FILL

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

PROPOSED COMPLETION OF ROAD INFRASTRUCTURE AND MAINTENANCE WORKS AT EXPORT PROCESSING ZONES AUTHORITY - ATHI RIVER. ITEM NO.

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

BILL OF QUANTITIES FOR KIPUNGANI SEA WALL

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS

TOWN OF HOLLIS, NEW HAMPSHIRE

SECTION ASPHALT CONCRETE

SECTION ASPHALT PAVING AND SURFACING

FORM OF TENDER RITHET RESERVOIR DRAIN PROJECT ( TITLE OF CONTRACT ) T 34/16 ( OWNER S CONTRACT REFERENCE NO. )

BID FORM (LUMP SUM CONTRACT)

CITY OF FARGO SPECIFICATIONS REMOVALS

THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR RESTORATION

REGIONAL CONSTRUCTION STANDARDS

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR 2014 WATER MAIN AND SEWER MAIN REPLACEMENT IN EASEMENTS

SECTION A1 EXCAVATION AND BACKFILL GENERAL

CITY OF FARGO SPECIFICATIONS REMOVALS

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

CERAMIC FLOORING TRADE SPECIFICATION

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING

DOCUMENT ADDENDA AND MODIFICATIONS

CHAPTER 6 - SANITARY SEWER

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

Job Order Sewer Repair Services

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

PUBLIC WORKS DEPARTMENT GENERAL NOTES

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS

ITEM 706 PIPE SLOPE DRAIN

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations.

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

SECTION TRENCHING & BACKFILLING

SECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench

STATEMENT OF OFFICIAL ACTION

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form

Community Services Dept., City of Mississauga Subdivision Requirements Manual Page 1 of 5 Specifications Revised: September 26, 2005

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

Addendum No. 1 Page 1 of 2

GENERAL REQUIREMENTS

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

Special Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

Installation Guidelines

SCHEDULE OF QUANTITIES CPUT BELLVILLE JOB NO: SECTION 1 : PRELIMINARY AND GENERAL ITEM PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT

DIVISION 4.3 CITY OF SARNIA CONCRETE SIDEWALKS, CURBS AND DRIVEWAYS STANDARDS 2018

THE CORPORATION OF THE CITY OF WINDSOR OFFICE OF THE CITY SOLICITOR. Shelby Askin Hager Manager of Purchasing & Risk Management

SECTION 16: GROUND ASSETS CONTENTS

Maps are enclosed of the larger areas to be included in the projects. The area in yellow are the proposed areas.

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

Transcription:

United Nation Development Programme Construction Salah El Deen Road Median From Al Zawaida entrance to Al Maghazi Northern entrance PAL 10-00071488 Bill of Quantity (BOQ)

PREAMBLE TO BILL OF QUANTITY (BOQ) 1. GENERAL The nature of this contract is re-measured unit price contract and the Bill of Quantity (BOQ) shall reflect this fact. BOQ shall be read and construed in conjunction with other Contract Documents. General directions and description of work and material given in the Technical Specification are not necessarily repeated in the Bill of Quantity. The Technical Specification forms an integral part of the Bill of Quantity. The Tenderer is obliged to check the number of the pages of the Bill of Quantity and should any be found missing or duplicated or the figures of writing indistinct, the Tenderer must notify the Employer/Engineer at once and have the matter rectified before the Tender is submitted. No liability whatsoever will be accepted in respect of any claim for errors in the Tenderer s offer resulting from failure to comply with the fore-going. The Tenderer is deemed to have visited the site/s and fully acquainted himself as to the location of each of the items and works to be carried out and to all conditions which may affect the performance of the works, including but not limited to: Access for the storing dump site and UNDP crushing site as well as access to required services Restrictions applicable to working in GAZA Strip area. All safety regulations and employer site safety procedures. All Palestinian regulations. The Tenderer is also deemed to have surveyed the actual condition of the site and buildings and made his own assessment of the type and extent of the works prior to submitting his offer. 2. QUANTITIES Although practical care was exercised in preparing the BOQ, all quantities given herein shall be deemed to be estimated quantities of the work to be done. They are not to be taken as actual and correct quantities of the work to be executed and they do not absolve the contractor of his obligations under the Contract. At any time, the actual quantities increase or decrease, hence, it is understood that the actual quantities increase or decrease is expected risk and no claim whatsoever will be taken into consideration for extra cost in that respect by employer. Any claim whatsoever submitted for cost or extra expenses incurred from such increase or decrease will not be accepted by Employer/Engineer except where else stipulated in the Contract. 3. MATERIALS All materials used are to be of the best new available, subject to the Employer/Engineer approval, durable nature, guaranteed, not liable to any base exchange and manufactured Contractor s signature and stamp Page 2

according to applicable BS, ASTM or DIN Standards. Execution also is subject to approval of Employer/Engineer and shall be in conformance of the best available common practice in engineering codes at the time of execution. Items that contain materials or products of special make with names of manufacturers are to be taken as samples of what will be required. Subject to the Employer/Engineer approval, the Contractor may, at his discretion, offer similar products of other make if the equivalent quality of the specified materials is obtained. In this case, the Contractor shall submit a description and/or drawings showing all technical conditions, characteristics, make, type and address of Manufacturer, etc., of the materials offered as alternatives. 4. PRICES AND CURRENCY The prices given, by the Contract, hereunder in the BOQ shall be in United States Dollars or ILS. Furthermore inflation and escalation or changes whatsoever shall not be subject of claim later on. The Unit Prices entered against the various items in the following Bill of Quantities include all operation costs for execution, completion and maintenance of the various items of the works finished completely in every respect till the final acceptance as specified or described in the Tender Documents, with or without modifications, either by way of additions or deductions, or alterations as may be offered in writing during the progress of the works, and include, without being limited to, all what is deemed necessary particularly referred to in the Tender Documents. The Unit Price shall cover all costs of every kind whatsoever including, without being limited to, all charges for additional site installations, relocation, supervision, labor, transportation and supply of materials; the provision, maintenance, use and efficient repair of all plant, equipment and appliance of every kind, the construction and maintenance of all temporary works, the performance of all services and the fulfillment of all obligations and responsibilities herein defined. The Tenderer shall be deemed to have fully considered all the conditions, obligations, and requirements of the Tender Documents before entering the respective unit price against the various items of the Bill of Quantities. The Unit Prices given hereunder the BOQ shall also include erection, installation, fixing, and re-fixing of all elements. These prices shall also include taxes, visa for labor, gate passes, accommodations for the Contractor s staff and labors, all required insurance and work permits, guarantees, bonds, traffic plan requirements, safety procedures, etc. and all requirements necessary to have the work maintained until its final handing over. The Unit Prices given hereunder in the Bill of Quantity for this work shall also include overheads, risks, profit etc. and all other financial matters to have all these civil works completed. Contractor s signature and stamp Page 3

The works, materials or activities listed in the following shall always be considered as supportive works to be included in the Unit Prices bid for any item in the Bill of Quantities: Any measurement for execution and payment of the works, including the provision of measuring instruments, gauges, setting out marks, marking paint and relevant tools, labor, etc., the maintenance and preservation of gauges and setting-out marks during the execution of the works. Provision of small tackle tools or any other equipment required for the execution of the works. Supply of consumable materials for the Contractor s equipment. Removal of all contamination (refuse, debris, building rubbish and the like) arising from or in connection with the Contractor s work to locations approved by the engineers Protection of the executed works and of the items made available for execution of the works from damage, fire, inclement weather, vandalism and theft etc., until the time of final acceptance. Transportation of all materials and structural components from the storage places on site to the points of use and return transportation, if required. Submitting and transporting any samples required. Carrying out tests on materials and works, etc., that is required by the Engineer. Fuel and lubricants for operation of Contractor s equipment. All safety precautions and measures for safeguarding labor as well as securing surrounding areas. Lighting of the work site. Maintenance, repair or reconstruct damaged infrastructure resulted by contractor s activities 5. RIGHTS OF EMPLOYER The following rights are reserved to the Employer: To omit individual items mentioned in the Schedule of Prices if not required in the opinion of the Employer and/or to replace them should it be more advantageous to execute them in another way. To order execution of alternative or provisional items as if they were main items. To order execution of additional works as well as alternatives of works, always in conformity with the conditions outlined in the Contract. Any order and/or delivery of material or equipment by the Contractor for performance of the works may only be based on instructions and/or approved execution drawings by the Employer/Engineer. All equipment and materials for installation and finishing works to be incorporated in this contract shall prior to ordering and/or delivery by the Contractor, be approved by the Employer/Engineer both in respect of quality and type as well as of quantity. Contractor s signature and stamp Page 4

6. SITE ACCESS AND STORAGE The Tenderer shall visit all sites and ascertain the location of required access onto these sites and the location of allowance for complying with the requirements and for the reinstatement to original condition of all roads and areas used or disturbed by the Contractor to the satisfaction of the Engineer. 7. SITE INSTALLATION All costs of labor, works, provisions, materials and equipment for Site Installations required by the Contractor and stipulated in the Tender Documents shall be included in the various unit prices of the Bill of Quantities. No extra payment will be allowed by the Employer for any of these activities. 8. DURATION The total duration of the contract is Four (4) calendar months including weekends, holidays and official holidays. Official weekends are Fridays and Saturdays. 9. OTHER CONTRACTOR S OBLIGATIONS The Contractor has to submit Detailed Shop Drawings to be approved by the Engineer before commencement of the work, and all required materials should be supplied as specified and subject to the Engineer approval. The Contractor has to fix the underground services that may be damaged during his work. The Contractor has to maintain the Existing Open Channels flow during construction. All works has to be done according to the Engineer's instructions, Drawings and specification. The Contractor has to repair any damages of any services at full satisfaction of relevant Service Authority The contractor has to test on his own expenses, the sub-grade CBR before commencement of work, In case the CBR value less than 15%, then soil replacement should be applied. The contractor has to check the upper 30 cm below the top of the sub-grade to verify that they are uniform, and any rubbish material or saturated /wet soil shall be removed and replaced with suitable material approved by the Engineer, NO EXTRA COST SHALL BE PAID FOR SUCH REPLACEMENT The contractor has to Execute any required side slope according to specifications, drawings, and Engineer s instructions Price will include costs of removing and/or relocating of all obstacles such as debris, garbage, trees and existing services in addition to the required materials necessary for work completion according to engineer's instructions and specifications. The contractor has to coordinate with Municipalities regarding garbage containers location. The contractor should include in his price the costs of cut and removal of trees roots, backfilling, watering, and compaction in layers with clean sand as specified and Contractor s signature and stamp Page 5

according to the Engineer instructions, the price will also include relocation of Power, Telephone poles and networks to sidewalk. Price will include costs of adjusting the levels of existing manholes (in any diameter) to suit the new situation. Replacing covers, frames, rings if defected and all materials and work required to complete the task. The contractor has to remove the existing base coarse during preparation works and transport it wherever directed by the engineer to the related Municipality. The price will include costs of cutting and removing of the existing asphalt pavement layer and transporting the removed material to a site approved by the Engineer Prices for excavation item shall include the removal of any buried structure not to be part of the proposed roads, including transport of excavated, surplus material and buried structure (not to be part of the proposed roads) to a location approved by the engineer or his representative outside the site, workmanship and anywhere else, needed, all according to drawings, specifications, conditions and directed instructions by the Engineer or his representative. Quantities of excavation shall be measured according to the dimensions mentioned in the drawings(engineering measurements in m 2 ) Back-filling item should be in layers (25cm max. each & compaction test 97%). Prices shall includes material supply, watering, compacting, transporting, testing and anywhere else, needed, all according to drawings, specifications, conditions and direct instructions by the Engineer or his representative. Suitable clean sand should be used for back-filling in layers (25cm max. each & compaction test 97%), selected from the approval excavated soil or imported. Prices shall includes supply, watering, compacting, transporting, testing and anywhere else, needed, all according to drawings, specifications, conditions and directed instructions by the Engineer or his representative. The contractor shall check and ascertain that the Benchmark used by him and its elevation is accurate and correct in all respects. The contractor shall check the surveying work. If correction is needed, the contractor has to redo the surveying work on his own. Contractor s signature and stamp Page 6

Construction Salah El Deen Road Median From Al Zawaida entrance to Al Maghazi Northern entrance Item No. Bill of Quantity Description Unit Qty. - The Contractor has to submit Detailed Shop Drawings to be approved by the Engineer before commencement of the work, and all required materials should be supplied as specified and subject to the Engineer approval. - The Contractor has to fix the underground services that may be damaged during his work. - The Contractor should include in his price the costs of sampling and testing as required and according to technical specifications and work requirement. - Price will include costs of removing and/or relocating of all obstacles such as debris, garbage, trees and existing services in addition to the required materials necessary for work completion according to engineer's instructions and specifications. - The Contractor should include in his price the costs of cut and removal of trees roots, backfilling, watering, and compaction in layers with clean sand as specified and according to the Engineer instructions, the price will also include relocation of Power, Telephone poles and networks to sidewalk. - Price will include costs of adjusting the levels of existing manholes (in any diameter) to suit the new situation. Replacing covers, frames, rings if defected and all materials and work required to complete the task. - The price will include costs of cutting and removing of the Existing Asphalt pavement layer and transporting the removed material to a site approved by the Engineer. Unit Price (US$) Total (US$) 1.1 Clean, excavate, cut the Existing Asphalt, base coarse and any sub-base material layers from existing asphalt level to the bottom of the sub-base layer design level including watering and compaction of the sub-grade not less than 98%.The price will include costs of removing and transporting of the cutting Asphalt pavement layer, base coarse and any sub-base material to a site approved by the Engineer and store base coarse quantity to be used as sub- base layer under curb stone and interlock tiles, all according to drawing and technical specifications. m 2 2100 Contractor s signature and stamp Page 7

Item No. 1.2 1.3 1.4 1.5 1.6 Description Unit Qty. Supply,fill and lay approved sub-base material ( Kurkar) in two layers, each 15 cm thickness from the sub-grade to the level under the base coarse layer of median with CBR.> 30%, watering and compaction up to 98% maximum dry density according to modified proctor test. Supply & lay pre-cast concrete curbstones for median (15x30x100 cm) including compaction of the sub-grade to 95% of MDD. Price include laying approved selected crushed stone materials from the removed quantities with dimension 30x12 cm under the Curbstone plain concrete with CBR > 80%, watering & compaction to reach 100 % of maximum dry density, Price also include B250 plain concrete foundation (27x12cm) under the curb and (12x21cm) behind it,spreading 2 cm mortar under the curb, filling joints between curbs with cement mortar and painting with one prime coat and two finishing coats of approved brand name painting material, expansion joint every 12 mr and filling 3cm with sekaflex, all according to drawing and technical specifications.. Supply & lay approved colored interlock tiles 6 cm thick.price also include laying approved selected crushed stone materials from the removed quantities 10 cm thickness layer with CBR > 80%, watering & compaction to reach 100 % of maximum dry density and spreading 5 cm clean sand bed under interlock tiles, and tiles testing. All according to drawings, specifications and instructions by the Engineer. Supply and cast concrete B200 for poles base Dimension (100x100x100 cm) the work include excavation, shuttering, supplying and installing hot galvanized steel pole base for 12 m poles, the work include supplying and fixing a 3" sharshori conduits with a rope inside it in the base, nuts, wishers and all required accessories required to complete the job, all according to drawings, specifications and engineer instructions. Supply and install 3" sharshori conduit with a rope inside it, the work includes Excavation, backfilling on layers 20 cm thick of dune sand with compacting to 98 % MDD. The price including for any depth excavation, laying and re-back filling with suitable Materials. Total of Works(US$) m 2 2100 L.m 2100 m 2 2100 Unit 40 L.m 1200 Unit Price (US$) Total (US$) Contractor s signature and stamp Page 8

Construction Salah El Deen Road Median From Al Zawaida entrance to Al Maghazi Northern entrance PAL 10-00071488 Summary: Description Total (US$) Construction Salah El Deen Road Median from Al Zawaeda Entrance to Al Magaze north Entrance Total (US$) Vat (0%) 0.00 Grand Total (US$) Grand Total (in letters):------------------------------------------------------------- Contractor s Name:------------------------------------------------------------------ Signature and Stamp:---------------------------------------------------------------- Date:------------------------------------------------------------------------------------- Contractor s signature and stamp Page 9