ENVIRONMENTAL MANUAL

Similar documents
To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities.

PTM PLANT ISO 9001 Quality Manual Certification No

ENVIRONMENTAL POLICY DOCUMENT

Waste Management Policy

POLICY ON ENVIRONMENTAL MANAGEMENT

ISO14001 Training. ALPS Electric (Ireland) Ltd.. Rev 08 Updated August Consent of copyright owner required for any other use.

Environmental & Sustainability Policy

Lowering our Environmental Impact. Lowering Impact, Raising Expectations

Green Stamp Certification Criteria for Printing Businesses

Environmental Roles and Responsibilities

Mastip Environmental Policy Statement: Protect the Environment on a daily basis

MANAGEMENT OF THE INSTALLATION. Attachment C. Cadbury Ireland Limited, Rathmore Installation Rathmore Installation IPPC Licence Application

Phoenix Energy Holdings Gas Ltd Health & Safety Policy

Swift Crafted Limited. Environmental & Sustainability Policy

MANAGEMENT OF THE INSTALLATION

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation

Garth Hill College WASTE MANAGEMENT POLICY

ENVIRONMENTAL STATEMENT

Quality Assurance Policy

Samsung Requirements for WEEE Managing

Environmental Instruction

SUPPLIER QUALITY REQUIREMENTS

Environmental Policy

Customer Packaging Returns Information

Derbyshire Constabulary ENVIRONMENTAL MANAGEMENT PLAN NOVEMBER POLICY REFERENCE 07/190. This plan is suitable for Public Disclosure

Environmental Management System Manual (EM-01) Revision No. : 2 Date : 1/6/2017. Revision History Sections Affected

Band Systems Ltd. Construction Phase Plan CDM POLICY STATEMENT

2.0 Management of the Commission s Environmental Responsibilities

RILTA ENVIRONMENTAL Ltd. ENVIRONMENTAL MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL ISO 14001:2004

Business Continuity Policy

ENVIRONMENTAL MANUAL. Page 1 of 26 Uncontrolled when printed NCH Env Manual Vers 11.0 date 01/02/18

BS EN ISO 9001 QUALITY ASSURANCE MANUAL

Quality and Environmental Business Process Manual

Register of Legal and Other Requirements United Kingdom

National Beverage Company Gaza Plant

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008

Albion Water Limited. Environmental Management System Manual

Avenir Digital Limited

version 1 / 96 R Green Stars Hotel Environmental Management System

Integrated System Procedures Legionella Control Association Statement of Compliance

Lucas UK Group Limited Quality Management System

UK Environmental Impact

Head of HSE. Group Services, Risk

ISO 14001:2015. EMS Manual.

Health and Safety Policy Statement

Environmental Aspects & Impacts Procedure EMS 01 Internal Procedures Issue 1, Revision 1

Humantech Environmental Management System Manual

BUILDING PRODUCTS DIVISION

National Beverage Company Gaza Plant

APS Cleaning. Environmental Management System. Scope of Certification

COUNCIL REGULATION (EU)

The content in this APC Annual Report is hereby endorsed by the Chief Executive Officer, or equivalent officer of the organisation.

Tersus Consultancy Limited. Environmental & Sustainability Policy

Gold Coast Airport Tenant Environment Management Guideline

External Providers Quality Requirements.

NS Green Procurement Guidelines NIPPON SEIKI CO., LTD.

CAPITA PLC POLICY. Environmental [PUBLIC] Classification Version 2.0

Integrated System Procedures Legionella Control Association Statement of Compliance Procedure No: IP-028 Rev No: 18 Rev Date : 02/07/2018 Page 1 of 7

CHAS Assessment Standards

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008

ISO 14001: 2004 Standard Review. Review of the ISO 14001:2004 Standard

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

NORTHERN IRELAND AMBULANCE SERVICE ENVIRONMENTAL MANAGEMENT POLICY

J&P OMAN COMPANY ORGANISATION P.110 PROCEDURE. Page: 1 of 16. Document Title: Issue Date: 13/04/2014. Revision Date: 06/06/2016 Revision No.

Environment & Sustainability Policy

Contractor safety for schools and services. Guidance

A PUBLIC COMMITMENT. Product Stewardship. Plastics and Chemicals Industries Association CODE OF PRACTICE

EMAS environmental statement Growing our green initiatives

Procurement Policies & Procedures

Environmental Statement

/ 1 2 ANNUAL REPORT BALANCE RECRUITMENT E N V I R O N M E N T A L

Self Assessment Checklist

TITLE: SQR-001 Supplier Quality Requirements

Local Annual Environmental Report For HMP & YOI Parc. January December 2010

The following is a description of the type of work that our Company undertakes:

HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY

DALAIR LIMITED QUALITY MANUAL

ENVIRONMENTAL MANAGEMENT MANUAL

Supplier Quality Assurance Requirements

Quality Manual Revision: C Effective: 03/01/10

Tersus Consultancy Limited. Environmental & Sustainability Policy

Waste Management Plan. Pine Dale Coal Mine (Including the Yarraboldy Extension)

Attachment C Management of the Installation

Quality Manual ISO 9001:2000

PBL Environmental Management System. Staff Awareness Training. This package has been developed by the Parsons Brinckerhoff Ltd, Environment Group

QUALITY ASSURANCE MANUAL

Fuji Electric. (Edition 5.0) Green Procurement Guideline. April Fuji Electric Co., Ltd.

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

Site Waste management Plan (SWMP)

Quality Assurance Manual Sample Company

ABENGOA INABENSA ABENGOA INABENSA. General Operating Procedure POG Page 2 of 9. Translation control table. Revision: 02

Introduction to ISO 14001

2013 UPS Corporate Sustainability Report: Supplemental Data

CONDUCTING CRITICAL CONTROL AUDITS CS-OHS-60

QM Food Safety Quality Management System

Quality Manual Template ISO 9001:2015 Quality Management System

Quality, Health Safety & Environment Code: 2013

Jumeirah Carlton Tower Environmental Policy

Transcription:

ENVIRONMENTAL MANUAL Issue: 4 Dated: 19.01.12 CONTROLLED STATUS The content of this document is transmitted electronically in read only form to the personnel listed below and available on our website www.metroneledyne.co.uk CIRCULATION OF CONTROLLED DOCUMENT: TO THE ENVIRONMENT TEAM: comprising: David Carter MEng.CEng.MIET - Managing Director Dean Chilvers - Sales Manager Wayne Richardson - Engineering Manager Martin Freestone - Operations Manager Martyn Fovargue Quality Manager Issued & controlled by Martyn Fovargue Doc ref: ev-1

ENVIRONMENTAL ASPECTS (4.3.1) ASPECTS & IMPACTS are evaluated by use of numeric risk assessments as part of the internal auditing procedure DEMAND ON RESOURCES: This is minimised by the following controls: - Steel - The industry currently operates a system which recycles all scrap materials collected from companies like us, using registered contractors, which is estimated to contribute to between 10-25% of raw material for new steel. - Other Metals - Copper (including cable), and Aluminium, are collected by a registered contractor for recycling. - Wood - Packing material is obtained, as far as possible, from renewable/sustainable sources. This is specified to our suppliers with a request for verification. Surplus pallets are taken back by the metalwork supplier. - Cardboard/Paper - This is obtained, as far as possible, from renewable/sustainable sources. This is specified to our suppliers with request for verification. Suitable cardboard boxes we receive from suppliers are re-used for despatch of our goods. Office paper is shredded and also used as packing, or recycled. Waste cardboard is taken for recycling by a registered contractor. - Toner Cartridges - collected by a registered contractor. - Chemicals household-type chemicals are the only ones used within the operation. - Vehicles - company owns/uses vehicles that are less than three years old and fitted with catalytic convertors and engine management systems to maximise fuel usage. They are regularly serviced. This includes hired vehicles. - Energy - The factory unit is involved in light engineering using only relatively small amounts of oil and electricity. Gas is not available (the building is leased and therefore this limits our control of these issues.) - Water - not used in processes. - - - - - - - - - - - - - - - - - - - - - - - - - Any changes affecting the above, including legislation, customer requirements, tenancy agreement or processes will be reviewed at the management meeting and a revision to this procedure will be issued. THE PLANT HAS NO PROCESSES WHICH CAUSE SIGNIFICANT IMPACT ON THE ENVIRONMENT envp-ea

LEGAL REQUIREMENTS (4.3.2) A legal requirements register is held within the company s quality system, Q-Pulse, and maintained by the groups Quality and Environmental Manager of actual environmental legislation that the Company is subject to and other legal requirements to which it subscribes. The information required is drawn from:- - Standards, the HSE, Netregs / business link websites and other useful / reliable sources. - Contact with the Environmental Authority, B2B, Biffpack, industry associations, insurers, other Hubbell sites, and corporate requirements, surveillance and advice. The legal requirements register outlines the key features of each requirement. Management system changes are made as necessary. Internal policy IWI 01 covers environmental requirements that apply to Hubbell Ltd as a whole that require inter-site co-operation. Annual evaluations of compliance are conducted, which are documented as audits within Q- Pulse and reference the requirements looked at. envp-lr

COMMUNICATION (4.4.3) ORIGIN - Any new information or changes may originate from any of the following: National press or web bulletins/newsletters Subscription to environmental publications Management review meetings/process BSI standards auto updating service Initiatives/guidance from waste disposal contractors Advice from in-house environmental consultant HOW? - The Environment Policy is part issued as part of the new employee induction. This details the Company commitment and the employee s responsibilities in this respect. Any new issues or changes are reviewed at the management review meetings and conveyed to relevant employees by means of their supervisor, a procedure/memo or specific specialist training. Where environmental issues are relevant to our customers, external authorities, or suppliers, specific conditions will be added to quotations, orders etc. CHECKING - The effectiveness of the methods of communication will be verified as part of the auditing program. THE COMPANY ENVIRONMENTAL POLICY IS AVAILABLE ON OUR WEBSITE envp-c

CONTROL OF DOCUMENTS (4.4.5) All documents that are critical to the effective operation of the environmental management system are controlled by the Quality Manager. Documents will be computer generated by the Quality Manager using protected access which verifies approval. They can be made available as read only to managers and supervisors. If it is necessary to produce hard copies it is the responsibility of the Quality Manager to ensure that these are either destroyed immediately after reference or, if retained, replaced when a later revision is created. All documents will carry a unique reference, date and revision level. All documents will be controlled on the same basis as ISO 9001quality standard MSDS data sheets are retained at the point where hazardous chemicals are stored. These will be replaced when the data is updated by suppliers. International standards are controlled by subscription to BSI Plus Update system. envp-cod

EMERGENCY PREPAREDNESS (4.4.7) There are limited environmental hazards identified for this site that would need emergency planning. Following a site review, it has been identified that an oil spill from the external oil storage tank, and potential fuel spills from delivery vehicles, are the only potential hazards. Full Risk Assessments have been completed for these and appropriate emergency spill procedures put into place. These Risk Assessments and Spill procedures are reviewed on a regular basis and amended as necessary. In the event of unexpected hazard or dangerous situation full location and contact details are available at the entrance to the main offices. In the severest situation resulting in total loss of facility, environmental issues would be dealt with by our Managing Director and appropriate agencies locally, and the appropriate individual within Hubbell Ltd. There are no significant emissions to air other than heating boiler. There are no emissions to water. There are no emissions to land other than as declared for landfill. THIS SITUATION IS REVIEWED ON A REGULAR BASIS envp-ep

MONITORING & MEASUREMENT (4.5.1) All environmental activity and performance relevant to the company s operations/processes are monitored at the regular management review meetings. AIMS & TARGETS - The company will strive to comply with and, wherever possible, exceed the requirements of BS EN ISO 14001 to minimise the effect on the environment by monitoring and controlling the use of: non-sustainable resources, generation of waste for disposal and pollutants to atmosphere or land. Any on-going projects that have been identified as an environmental objective or improvement will be itemised on the minutes of the review meetings and dates/responsibilities for activities set. HEATING. The heating boiler is now controlled by Vickers V16 Electronic programmer which has recognised fuel saving technology with estimated reductions in emissions and cost of between 20-40% LIGHTING. This is generally fluorescent with limited sodium discharge types. It is not considered viable to invest in other forms of lighting. GENERALLY we are a low user of energy and emitter of pollutants to the environment and as such there be no benefit in producing graphed data/statistics. We will however periodically record and evaluate our usage of all forms of energy consumption within the factory unit, with a view to achieve minimal levels. Similarly, waste material for re-cycling will be monitored. It will be the responsibility of the Quality Manager to collate all such information in conjunction with the Accounts Dept. This data will be presented at monthly review meetings. envp-mm

EVALUATION OF COMPLIANCE (4.5.2) Compliance is verified by activities established following input of any changes in legal, and other, requirements, being reviewed and completed as part of the management review and the subsequent internal auditing as part of an annual program. Minutes of management reviews and audit reports are kept for a minimum of five years envp-eoc

NON-CONFORMITY, CORRECTIVE & PREVENTIVE ACTION (4.5.3) Any non-conformances originating as a result of activities or processes being at variance with the established environmental policy or objectives of the company will be treated in the same way as quality and quality auditing non-conformances on the Q Pulse software. These will then be dealt with in the normal way by establishing corrective and preventive measures and closure when the effectiveness is proven. Each instance will then be available for presentation to the management review meetings on a regular basis. The resulting review will then, where applicable, be transmitted on to relevant personnel by normal communication methods and procedures amended were necessary. envp-capa

CONTROL OF RECORDS (4.5.4) The following documents are maintained for retrieval, inspection in support of the environmental controls operated by the company: Document Format NON-CONFORMANCES MINUTES MEMOS/PROCEDURES STANDARDS COLLECTION/TRANSFER NOTES, ETC ELECTRONIC ELECTRONIC ELECTRONIC HARDCOPY HARDCOPY & ELECTRONIC Records are securely stored. Hardcopies are kept in files in the short term and then archived periodically off-site. Electronic data is backed up daily on tape and taken off-site. Records are stored for a minimum of five years envp-cr

MANAGEMENT RESPONSIBILITIES (4.4.1) The Environmental management team is essentially the same as for Quality and Health & Safety and reviews of all matters are covered at the same review meetings. SCOPE: The environment management team are responsible for the operational control of all aspects that could affect the degradation of the environment generated by the manufacturing facility and also having regard to minimising the usage of natural resources ALL MANAGERS are responsible for identifying and implementation of activities relating to the environment and conveying the company s objectives to the supervisors, including reporting on EMS performance for review and recommendations for improvement. SUPERVISORS will be advised of any specific issues relating to their processes and may be consulted during reviews when required. They will be responsible for conveying any specific instructions/procedures to their operators. MANAGING DIRECTOR. The Managing Director is ultimately responsible for all matters relating to the environment and to ensure that adequate resources are available to support any identified objectives. QUALITY MANAGER. The Quality Manager is responsible for day-to-day co-ordination of the environmental management system. IN HOUSE CONSULTANT. The Company uses the in house consultant to advise on all current, and any changes in, legislation. He also carries out the internal audits program. envp-mr

REFERENCE DOCUMENTS