INSPIRE each student to develop a strong

Similar documents
NALLE ELEMENTARY SCHOOL

POWELL ELEMENTARY SCHOOL

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

SHEPHERD ELEMENTARY SCHOOL

RAYMOND EDUCATION CAMPUS

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

Collins Middle School

LASALLE - BACKUS EDUCATION CAMPUS

Corsicana High School

MCKINLEY INSTITUTE OF TECHNOLOGY BRAILSFORD & DUNLAVEY RGM AND ASSOCIATES MEASURE T BOND

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

MAURY ELEMENTARY SCHOOL

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Darlington Area Schools - Building Evaluations

SEATON ELEMENTARY SCHOOL

MCER Study for Little Powder K-8

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

WATKINS ELEMENTARY SCHOOL

CESAR CHAVEZ LANGUAGE ACADEMY

Darlington Area Schools - Building Evaluations

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School

SYLVAN. inspire MIDDLE SCHOOL. which is to. instruction and programs. in a safe, caring, and. collaborative learning community.

Cupertino Union School District

DAVIS ELEMENTARY SCHOOL

BALLOU SENIOR HIGH SCHOOL

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621

HIDDEN VALLEY ELEMENTARY SCHOOL

PRESENTATION JANUARY 24, 2017

Facility Improvements

Charles H Wacker Elementary School 9746 S Morgan St Chicago, IL 60643

ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015

FACILITY COMPONENTS - MIDDLE SCHOOL

STUART-HOBSON MIDDLE SCHOOL

Appendix J - Custom Uniformat for EDU Migration

LECKIE ELEMENTARY SCHOOL

Facility Condition Assessment Dr. Harry L. Halliwell Memorial School

Considering Modular Buildings for Your Space Needs?

PATTERSON ELEMENTARY SCHOOL

WILKINSON ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL

James E McDade Elementary Classical School 8801 S Indiana Ave Chicago, IL 60619

Completed projects. Projects in progress. Program developments

Priority 1 Maintenance Projects Total Investment Needed: $54,875,317. Elementary Schools

James Lick High School

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Independence Adult Center

Measure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014

Crockett Elementary School Renovations

School Assessment Report

Santa Teresa High School

NOYES EDUCATION CAMPUS

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

Timberglen Recreation Center Summary

BUILDING CONDITION: INTERIOR

Lake Highlands North Recreation Center Summary

Project Scope & Budget Breakdown. Mandatory Scope Recommended Additional Scope Wish List Scope

Architectural Inspection Site Structures

Sgt. Alvin C. York Historic School

Williams Scotsman: The Mobile Space Solution

Franklin Elementary School

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Stephen Decatur Classical Elementary School 7030 N Sacramento Ave Chicago, IL 60645

REFLEC TIONS I & II AT CIRCLEPORT

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016

Al Behrman Elementary School

Charles H Wacker Elementary School

REFLEC TIONS I & II AT CIRCLEPOR T

LEWIS ELEMENTARY SCHOOL

Velma F Thomas Early Childhood Center

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923

FREMONT UNIFIED. Thornton Middle School Conversion S C H O O L D I S T R I C T. Quattrocchi Kwok Architects. Sept 26, 2018

Darlington Area Schools - Building Evaluations

Edmonton Public School District No. 7

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

County of Santa Barbara, California Facility Condition Assessment 2014

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

Biddeford School Department

Reilly Elementary School Site Summary

Bronx Community College. Five-Year Capital Plan FY through FY

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet

Pigeon Lake Regional High School Falun, Alberta

CATAMARAN TOWER - 1 Seef Area Plot 19, 20

The Report: Priority 1 thru 5 $ 2,124,417 Lifecycle Years 1 thru 3 ½ $ 384,097 New Construction $ 2,451,568 Less Redlined Items $ 43,534

BARNARD ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Thurgood Marshall Recreation Center Summary

Thomas J Higgins Elementary Community Academy S Morgan St Chicago, IL 60643

Health Life Safety Survey and Master Facilities Plan

CITY OF NOVI. Police Department

K.B. Polk Recreation Center Summary

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

GARFIELD ELEMENTARY SCHOOL

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

Administrative Offices

MVSD FACILITY PRIORITY NEEDS

John D Shoop Math-Science Technical Academy ES S Bishop St Chicago, IL 60643

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1

Transcription:

DEL PASO MANOR ELEMENTARY SCHOOL Valuing a culturally and academically DIVERSE COMMUNITY, Del Paso Manor Elementary School s Mission is to EDUCATE and INSPIRE each student to develop a strong A C A D E M I C FOUNDATION that supports life-long learning and RESPONSIBLE citizenship BY PROVIDING INTELLECTUALLY CHALLENGING INSTRUCTION while promoting integrity and critical thinking.

Del Paso Manor Elementary School Description: Year Built: 1951 Total Square Feet of Floor Space: 37,374 Acres: 13.4 Address: 2700 Maryal Drive Sacramento, CA 95821 Generated on: 5/30/13 Building stages: Building trades: - Physical Assessment Report - A-SHELL - B-INTERIORS - C-SERVICES - E-OTHER BUILDING CONSTRUCTION - F-BUILDING SITE WORK Stakeholder: Drawings: - Del Paso Manor 2013 (Physical Assessment Report) - Del Paso Manor (Physical Assessment Report)

Site Plan

F-BUILDING SITE WORK Observation #2 SITE DEVELOPMENT - No fence separating adjacent park and school property. Child safety could be compromised without the ability to lockdown and secure the campus. Recommend adding a 4' min. fence and gates along east side of campus separating school property and park to secure school perimeter.

Floor Plan

A-SHELL Observation #1 OPENINGS - Windows frames showing signs of termite damage and dry rot. Recommend replacing windows including frames. Observation #4 STRUCTURE - Metal Ramp missing skirt on perimeter AND flexes and bend when occupied which is distraction to students. Recommend replacing with compliant ramp with skirt. Observation #14 OPENINGS - Drapes are typical throughout school and are not working for most staff. Some rooms are missing drapes altogether. (Kindergarten) Recommend upgrading window treatment to mini blinds.

Observation #15 OPENINGS - Drapes missing in some windows of Kindergarten? Recommend upgrading window treatment to mini blinds. Observation #16 OPENINGS - Windows are single pane glazing. Non-efficient, typical throughout facility. Recommend replacing with double pane windows.

Observation #22 STRUCTURE - Signs of dry rot, termites and age showing in exterior wood. Recommend replacing damaged wood elements. Observation #24 OPENINGS - Glazing in door was broken out during break-in. Temporarily replaced with wood panel. Recommend replacing panel with clear fire glass to allow for light and security viewing.

B-INTERIORS Observation #5 WALL FINISHES - Back of stage area not usable as it is currently. Abandoned showers and restroom could be reconfigured for ideal storage area which is a huge need for faculty. Recommend reconfiguring back area, demolishing walls and finishes to clear out for storage area. Observation #23 CEILING FINISHES - Chipping paint detected. Recommend prepping and repainting after testing existing paint for lead. Observation #26 FLOOR FINISHES - Flooring is original terrazzo slabs that is difficult to keep clean. Recommend replacing flooring with cleanable hard surface.

C-SERVICES Observation #3 DOMESTIC PLUMBING - All portable classrooms (5 total) lack running water (sinks). 2 of them are occupied by special needs children. Highly recommend adding sinks and plumbing to all 5 portable classrooms. Observation #13 HVAC SYSTEM - HVAC System in Portables do not keep rooms cool in the warmer months. Recommend mechanical diagnostic assessment of systems. Observation #17 DOMESTIC PLUMBING - All classroom SINKS are original and in need of replacement as are the classroom counters typ. Recommend replacing counters and sinks in all classrooms and staff rooms.

Observation #18 TECHNOLOGY - Wireless Internet in music room is not working. Recommend service tech to assess outage. Observation #19 HVAC SYSTEM - Heating and AC is not functioning correctly in Music room. Recommend Mechanical Service to diagnose climate control issues.

E-OTHER BUILDING CONSTRUCTION Observation #6 ADA COMPLIANCE - Back of stage steps are not ADA compliant and decaying. Recommend replacing with ADA ramp. Observation #7 LIFE SAFETY - Asbestos 9x9 Tiles in working kitchen exposed. Recommend proper abatement removal or adding flooring over potentially hazardous materials.

Observation #8 ADA COMPLIANCE - Kitchen Staff restrooms are not compliant. Not enough room to meet proper code. Recommend reconfiguring back kitchen area for compliant restroom. Observation #9 LIFE SAEFTY - Open and exposed machinery in in heavily used area in kitchen. Recommend removing if not functional or building enclosure to secure it away from staff. Observation #10 ADA COMPLIANCE -Staff restrooms are non-compliant. Recommend reconfiguration or area to accommodate accessible restrooms.

Observation #11 ADA COMPLIANCE -Staff restrooms are non-compliant. Recommend reconfiguration or area to accommodate accessible restrooms. Observation #12 OPENINGS - Existing windows have security steel mesh placed on outside. No longer able to open windows. This is typical throughout the campus. Recommend replacing dual pane sliding sash window type. Also, potential life safety issue if security screen do not allow for exiting.

Observation #20 ADA COMPLIANCE - Multiple ADA non-compliant drinking fountains throughout campus. Also, faculty need more drinking fountains. Recommend replacing all drinking fountains with ADA compliant fountains and strategically adding more fountains within campus. Observation #21 LIFE SAFETY - Asbestos found throughout campus both in signage and in flooring. Recommend proper abatement or encapsulating areas exposed.

Observation #25 SUSTAINABILITY - Lighting in school entry is insufficient and inefficient. Recommend replacement of lighting to efficient 1x4 or 2x4 surface mounted lighting. Observation #27 LIFE SAFETY - Hazardous materials known in old boiler room.