Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Similar documents
Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Category Environmental Item Main Check Items Confirmation of Environmental Considerations

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country?

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR

4. Agency (or Institution) Responsible for Implementing the Project

JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS

JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process

SUMMARY 2013 EDITION

ENVIRONMENTAL SCOPING PLAN

Agency (or Institution) Responsible for Implementing the Project

Summary of Preliminary Study

Summary of Preparatory Study

COMPLIANCE REPORT ASSESSING APPLICATION OF ARTICLE 11 b (6) OF EMISSIONS TRADING DIRECTIVE TO HYDROELECTRIC PROJECT ACTIVITIES EXCEEDING 20 MW

Summary of Preparatory Study

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

JICA s Position Paper on SDGs: Goal 14. Goal 14: Conserve and sustainably use the oceans, seas and marine resources for sustainable development

Comparative Analysis of Cambodia Legal Framework and ADB Safeguard Policy Statement: ENVIRONMENT

FOR DISCUSSION ONLY. (A) ADB Safeguard Policy Statement. (C) Extent of Equivalence 2

Summary of Preliminary Study Result for Technical Cooperation Project

Project for Elaboration of the National Strategy for Treatment of Household and Similar Waste for the Kingdom of Morocco

Summary Report on the Preparatory Study for Environmental and Social Considerations

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

Questions. New Project Executing Project (with Claim) Executing Project (without Claim) Others Please specify

Summary of the Preliminary Study for Grant Aid Project

SUSTAINABLE HYDROPOWER DEVELOPMENT A NORWEGIAN-GEORGIAN COOPERATION PROGRAM. A Citizen s Guide. Communication and Hydropower EIA

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS

Annex F Scoping Checklist

The Niger: a lifeline. Effective Water Management in the Upper Niger River

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Aquanova Nyzhniy Bystryi small hydropower plant project non-technical summary

Climate Change & Small Island Developing States

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project

UNRAVELING THE MYRAID OF STANDARDS AND TOOLS

Review of EIAR for the Ilisu Dam and HEPP. Summary

Summary of Preparatory Study for Development Study (M/P)

Summary of Preparatory Study for Development Study

Project/Program Concept Paper

Chapter 6: Executing the EIA Process

REQUEST FOR PROPOSALS FOR CONSULTANCY SERVICES FOR THE ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR NAMPULA-CUAMBA ROAD PROJECT (ROADS 3)

REPORT ON ENVIRONMENTAL ASPECTS COMPREHENSIVE STUDY ON DISASTER MANAGEMENT IN SRI LANKA

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

Notes for NEPA for Generic Terms of Reference

HOUSE BILL lr0052

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

Summary of Preparatory Study. The Development Study on Water Resources Development and Management for Lake Kyoga Basin in the Republic of Uganda

KYNSHI-I HEP (270 MW), MEGHALAYA

Linking the FDES and Climate Change Statistics

(1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options)

Environmental Impact Assessment of Hydroelectric Power Plant LEEZA MALIK (2013CEP2080) TUSHAR SINGLA (2011MT50623)

Nam Theun 2. TNC workshop April 2014

List of Monitoring Indicators

AP Environmental Science

Basic Policy for Nature Restoration

Technical Review of Pak Beng Hydropower Project Water Quality, Aquatic Ecology and Fisheries

Large Dams in the Americas: Is the Cure Worse than the Disease?

Revised mapping of the CITES Strategic Vision: objectives and the Aichi Targets in the Strategic Plan for Biodiversity

ATTACHMENT 1 GEPA CHECKLIST & Historical Archeological & Natural Heritage Preservation Documents

Global Environmental Issues

5.4 Initial Environmental Examination

Open Working Group, February 2014: Australia, the Netherlands, United Kingdom Constituency Statement. Oceans and Seas, Forests and Biodiversity

Transboundary Cooperation Workshop # January 2010, Vientiane. Sharing of Benefits in Transboundary Water Resources Management

DRAFT FOR CONSULTATION OCTOBER 7, 2014

Principles for environmental and social responsibility

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

13 Land Use Activities and Indigenous Biological Diversity

Ocklawaha River Restoration as Mitigation

APPENDIX M CEQA Initial Study Checklist

Fisheries and Aquaculture in a Changing Climate

Environmental and Social Review Summary. Hoi Xuan Hydropower Project

(1) Coastal Protection (Adaptation Project) (2) Coastal Protection (BAU Development with Adaptation Options)

WASA Quiz Review. Chapter 2

Natura 2000 and Hydropower. Hydropower and Fish Workshop Brussels 29 May, 2017

Guidelines for a Mangrove Management Plan Cayman Islands, BWI. M. L. Anderson

GEORGIA URBAN ENERGY LTD

11th International Riversymposium,

COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS

CAO Audit of IFC Investment in Coastal Gujarat Power Limited, India August 22, 2013 (Published on October 23, 2013)

APPENDIX E SECTION 404 (B) (1) EVALUATION OF DREDGE AND FILL MATERIAL

Mohawk River Basin Research Initiative

Deforestation in India: Causes and Consequences of Deforestation in India

REGIONAL RIVER BASIN CONSULTATIONS 2 ND AG MEETING FRIDAY, 13 TH JANUARY, 2017 DR. LWIN LWIN WAI

Environmental and Social Impact Assessment for Rogun Hydro Power Plant

Hydroelectricity. How immaculate is it?

Resolution XI.3. Adjustments to the Strategic Plan for the triennium

Appendix M. Criteria, Measures and Indicators for Effects Assessment

INTEGRATING COASTAL ISSUES INTO NATIONAL ADAPTATION PLANS: LESSONS FROM WEST AFRICA

Guidance for addressing the implications for wetlands of policies, plans and activities in the energy sector

The Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014.

JICA efforts in supporting adaptation to climate change

Transcription:

Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been already prepared in official process? Have EIA reports been approved by authorities of the host country's government? Have EIA reports been unconditionally approved? If conditions are imposed on the approval of EIA reports, are the conditions satisfied? In addition to the above approvals, have other required environmental permits been obtained from the appropriate regulatory authorities of the host country's government? Have contents of the project and the potential impacts been adequately explained to the Local stakeholders based on appropriate procedures, including information disclosure? Is understanding obtained from the Local stakeholders? Have the comment from the stakeholders (such as local residents) been reflected to the project design? (3) Examination Have alternative plans of the project been examined with social and of Alternatives environmental considerations? Does the water quality of dam pond/reservoir comply with the country s ambient water quality standards? Is there a possibility that proliferation of phytoplankton and zooplankton will occur? Does the quality of water discharged from the dam pond/reservoir comply with the country s ambient water quality standards? Are adequate measures, such as clearance of woody vegetation ti from the inundation zone prior to flooding planned to prevent water quality (1) Water Quality degradation in the dam pond/reservoir? Is there a possibility that reduced the river flow downstream will cause water quality degradation resulting in areas that do not comply with the country s ambient water quality standards? Is the discharge of water from the lower portion of the dam pond/reservoir (the water temperature of the lower portion is generally lower than the water temperature of the upper portion) planned by considering the impacts to downstream areas? Are earth and sand generated by excavation properly treated and (2) Wastes disposed of in accordance with the country s regulations? Confirmation of Considerations

Checklist: 3. Hydropower Stations, Dams and Reservoirs (2) Main Check s Confirmation of Considerations (1) Protected Areas Is the project site located in protected areas designated by the country s laws or international treaties and conventions? Is there a possibility that the project will affect the protected areas? 3 Natural (2) Ecosystem (3) Hydrology Does the project site encompass primeval forests, tropical rain forests, ecologically valuable habitats (e.g., coral reefs, mangroves, or tidal flats)? Does the project site encompass the protected habitats of endangered species designated by the country s laws or international treaties and conventions? Is there a possibility that the project will adversely affect downstream aquatic organisms, animals, plants, and ecosystems? Are adequate protection measures taken to reduce the impacts on the ecosystem? Is there a possibility that installation of structures, such as dams will block the movement of the migratory fish species (such as salmon, trout and eel those move between rivers and sea for spawning)? Are adequate measures taken to reduce the impacts on these species? Is there a possibility that hydrologic changes due to the installation of structures, such as weirs will adversely affect the surface and groundwater flows (especially in "run of the river generation" projects)? (4) Topography and Geology Is there a possibility that reductions in sediment loads downstream due to settling of suspended particles in the reservoir will cause impacts, such as scouring of the downstream riverbeds and soil erosion? Is there a possibility that sedimentation of the reservoir will cause loss of the storage capacity, water logging upstream, and formation of sediment deposits at the reservoir entrance? Are the possibilities of the impacts studied, and adequate prevention measures taken? Is there a possibility that the project will cause a large-scale alteration of the topographic features and geologic structures in the surrounding areas (especially in run of the river generation projects and geothermal power generation projects)?

Checklist: 3. Hydropower Stations, Dams and Reservoirs (3) 4 Social (1) Resettlement (2) Living and Livelihood Main Check s Is involuntary resettlement caused by project implementation? If involuntary resettlement is caused, are efforts made to minimize the impacts caused by the resettlement? Is adequate explanation on compensation and resettlement assistance given to affected people prior to resettlement? Is the resettlement plan, including compensation with full replacement costs, restoration of livelihoods and living standards developed based on socioeconomic studies on resettlement? Are the compensations going to be paid prior to the resettlement? Are the compensation policies prepared in document? (f) Does the resettlement plan pay particular attention to vulnerable groups or people, including women, children, the elderly, people below the poverty line, ethnic minorities, and indigenous peoples? (g) Are agreements with the affected people obtained prior to resettlement? (h) Is the organizational framework established to properly implement resettlement? Are the capacity and budget secured to implement the plan? (i) Are any plans developed to monitor the impacts of resettlement? (j) Is the grievance redress mechanism established? Is there any possibility that the project will adversely affect the living conditions of inhabitants? Are adequate measures considered to reduce the impacts, if necessary? Is there any possibility that the project causes the change of land uses in the neighboring areas to affect adversely livelihood of local people? Is there any possibility that the project facilities adversely affect the (f) (f) traffic systems? (g) (g) Is there any possibility that diseases, including infectious diseases, (h) (h) such as HIV, will be brought due to the immigration of workers associated with the project? Are adequate considerations given to public health, if necessary? Is the minimum flow required for maintaining downstream water uses secured? (f) Is there any possibility that reductions in water flow downstream or seawater intrusion will have impacts on downstream water and land uses? (g) Is there any possibility that water-borne or water-related diseases (e.g., schistosomiasis, malaria, filariasis) will be introduced? (h) Is there any possibility that fishery rights, water usage rights, and common usage rights, etc. would be restricted? (f) (g) (h) (i) (j) (f) (g) (h) (i) (j) Confirmation of Considerations

Checklist: 3. Hydropower Stations, Dams and Reservoirs (4) Main Check s Confirmation of Considerations (3) Heritage Is there a possibility that the project will damage the local archeological, historical, cultural, and religious heritage? Are adequate measures considered to protect these sites in accordance with the country s laws? 4 Social 5 Others (4) Landscape (5) Ethnic Minorities and Indigenous Peoples (6) Working Conditions (1) Impacts during Construction (2) Accident Prevention Measures Is there a possibility that the project will adversely affect the local landscape? Are necessary measures taken? Are considerations given to reduce impacts on the culture and lifestyle of ethnic minorities and indigenous peoples? Are all of the rights of ethnic minorities and indigenous peoples in relation to land and resources to be respected? Is the project proponent not violating any laws and ordinances associated with the working conditions of the country which the project proponent should observe in the project? Are tangible safety considerations in place for individuals involved in the project, such as the installation of safety equipment which prevents industrial accidents, and management of hazardous materials? Are intangible measures being planned and implemented for individuals involved in the project, such as the establishment of a safety and health program, and safety training (including traffic safety and public health) for workers etc.? Are appropriate p measures taken to ensure that security guards involved in the project not to violate safety of other individuals involved, or local residents? Are adequate measures considered to reduce impacts during construction (e.g., noise, vibrations, turbid water, dust, exhaust gases, and wastes)? If construction activities adversely affect the natural environment (ecosystem), are adequate measures considered to reduce the impacts? If construction activities adversely affect the social environment, are adequate measures considered to reduce the impacts? Is a warning system established to alert the inhabitants to water discharge from the dam?

Checklist: 3. Hydropower Stations, Dams and Reservoirs (5) Main Check s Confirmation of Considerations 5 Others (3) Monitoring 6 Note Reference to Checklist of Other Sectors Does the proponent develop and implement monitoring program for the environmental items that are considered to have potential impacts? What are the items, methods and frequencies of the monitoring program? Does the proponent establish an adequate monitoring framework (organization, personnel, equipment, and adequate budget to sustain the monitoring framework)? Are any regulatory requirements pertaining to the monitoring report system identified, such as the format and frequency of reports from the proponent to the regulatory authorities? Where necessary, pertinent items described in the Forestry Projects checklist should also be checked (e.g., projects in the mountains including large areas of deforestation). In the case of dams and reservoirs, such as irrigation, water supply, and industrial water purposes, where necessary, pertinent items described in the Agriculture and Water Supply checklists should also be checked. Where necessary, pertinent items described in the Power Transmission and Distribution Lines checklist should also be checked (e.g., projects including installation of electric transmission lines and/or electric distribution facilities). Note on Using Checklist If necessary, the impacts to transboundary or global l issues should be confirmed (e.g., the project includes factors that may cause problems, such as transboundary waste treatment, acid rain, destruction of the ozone layer, or global warming). 1) Regarding the term Country s Standards mentioned in the above table, in the event that environmental standards in the country where the project is located diverge significantly from international standards, appropriate environmental considerations are requested to be made. In cases where local environmental regulations are yet to be established in some areas, considerations should be made based on comparisons with appropriate standards of other countries (including Japan's experience). 2) checklist provides general environmental items to be checked. It may be necessary to add or delete an item taking into account the characteristics of the project and the particular circumstances of the country and locality in which it is located.