1 GABINETE DO DIRECTOR GERAL REQUEST FOR PROPOSALS FOR CONSULTANCY SERVICES FOR THE ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR NAMPULA-CUAMBA ROAD PROJECT (ROADS ) RFP No 5/DG/07 Roads and Bridges Management and Maintenance Programme Financed by IDA January, 007

2 STANDARD REQUEST FOR PROPOSALS CONTENTS Request for Proposals... Section. Letter of Invitation... Section. Information to Consultants... Section. Technical Proposal - Standard Forms... Section 4. Financial Proposal - Standard Forms... Section 5. Terms of Reference... 7 Section 6. Standard Forms of Contract... Annexes: Annex I. Consultants Services: Complex Time-Based Assignments

3 Section 5. Terms of Reference INTRODUCTION The Government of Mozambique (GOM) is negotiating with Japan govt. for the purpose of improving the transport infrastructure in Mozambique and strengthening the institutional capacity of the road sub-sector, and intends, through the Administração Nacional de Estradas (ANE), to apply part of the credit proceeds to eligible payment under the contract for which this request for proposals is issued. As a continuation of the Government s initiatives to improve the quality of the country s road network, the GOM, through the Administração Nacional de Estradas (ANE) and the Road Fund, has begun implementation of a major 0-year roads program, Roads and Bridges Management and Maintenance Project (RBMMP or Roads ). This ten-year program is jointly financed by the GOM and a variety of donors, including JICA which plays its role among financers for the sector. Now the GOM and ANE are preparing the second phase of Roads, which will be a three-year program to begin early 007. ANE requires consultancy services in order to prepare the Environmental and Social Impact Assessment for the Nampula Cuamba Road Project. (ROADS ). The consultant shall carry out required surveys and relevant activities based on the legislation and guidelines such as Mozambique s, Japan International Cooperation Agency, Japan Bank for International Cooperation and African Development Bank (hereinafter referred as the guidelines ). The consultant is required to read and grasp the guidelines before conducting the study. The environmental and social consideration activities should also consider and follow the Environmental Guidelines for Road Works in Mozambique (997), the Directive for Road Sector and other Safeguards and documentation, if required. OBJECTIVES The main objective of the Consultancy is to carry out the Environmental and Social Impact Assessment for the Nampula Cuamba Road Project (ROADS ). The Consultant is deemed to identify projected Impacts and establish appropriate mitigation measures. Additionally, the Consultant will develop a monitoring program that will be followed during the project implementation. Specific Objectives

4 To collect required information and data regarding upstream plans, natural environment, socio-economic environment and relevant data; Description of current environmental and social situation and the expected trends in the presence of the road project; Examination of the legal and administrative framework regarding environmental and social management; Analyze the environmental and social impacts utilizing the detailed information and data gathered in both environmental and social screening stage and initial environmental and social examination stage on specific substantive parameters covering the natural, human and social environments, and the activities involved in road construction, operation and maintenance; The preparation of an Environmental and Social Management Plan; The preparation of an Resettlement Plan; The development of a Monitoring Program to be followed during the project implementation SCOPE OF WORKS The Consultant will carry out a combination of desktop and field studies in order to fully describe the environmental and social baseline of the affected area. Based on the knowledge of the affected environment the consultant will identify and describe impacts and associated mitigation measures for the design, construction and operation phases. During the study the Consultant take into account issues and concerns raised through the Public Consultation Process (PCP). These issues and concerns will be incorporated into the environmental and social analysis... Desktop Studies a) The Consultant will review the national environmental policy, legislation and directives relevant to the roads sector programme as well as Japanese, AfDB, World Bank and other relevant Safeguards; b) The Consultant will analyse :50,000 and :50,000 vegetation cover, forestry, topographical and geological maps and soils maps of appropriate scale relevant to the alignment. Where possible aerial photographs should be analysed. This analysis will serve the following purposes: Topography and landforms (with emphasis on slope gradients in relation to erosion and sedimentation risk), Geology and geomorphology;

5 Soils (with emphasis on the distribution of soil types, their aptitude and erosion sensitivity); Land cover and vegetation; Vegetation cover and use (with emphasis for the floodplain vegetation communities grasslands on floodplains, dune communities, mangroves, etc.) Evaluate existing reports and documents to determine the possible occurrence of plant species of conservation concern and wildlife. Describe the salient hydrological features to determine the impact on the hydrology; Make a district-level analysis of the socio economic environment (demography, land use, commercial and social development). b) overview of biophysical and socio-economic aspects including areas of high priority for conservation of natural habitats, formally protected areas such as national parks, fragile ecosystems, demographics, ethnicity, gender aspects, HIV/AIDS etc. The Consultant will identify distinct biophysical/socio-economic zones within the project area of influence, that would be impacted on. c) assess ANE capacity and responsibility to implement the EMP, the Resettlement Plan and its relation with other government institutions and the private sector to implement, monitor and enforce the relevant guidelines to undertake Environmental and Social studies... Field Work From the desktop study, the consultant should be able to define with high degree of certainty the area of influence of the road. The second stage will involve fieldwork in the area of impact of the project where a visual scoping exercise will be conducted. The approach adopted will be to first identify the types of environmental and social impacts that can occur with the project implementation. The following environmental and social issues will need to be investigated:.. Human Environment

6 ... Social Environment. Migration and resettlement. Local economy, employment and livelihood (including quality of life, fuel price increase). Land use and local resources utilization 4. Existing social infrastructures and services (including access to them) 5. Local communities/ Ethnic group 6. Benefit and damage misdistribution and Local conflicts of interests 7. Gender (Division of labor (paid and unpaid work), Income generating activities (money and kind), Access to land control over productive factors, Involvement in societal organization) 8. Children s rights 9. Cultural heritage (sanctuary, local heritage) 0. Public sanitation. Infectious diseases/communicable diseases such as HIV/AIDS, Noncommunicable diseases (including Malnutrition and Psychosocial disorders and well-being). Water usage and rights. Traffic accidents 4. Information, education and communication 5. Democratic trend 6. Participation (Consultations, Civil Society strengthening) 7. Social instability... Pollution 8. Air pollution

7 9. Water pollution 0. Soil contamination. Waste. Noise and vibration. Ground subsidence 4. Offensive odors 5. Bottom sediment in sea and rivers 6. Hazard management.. Physical and Natural Environment 7. Global warming 8. Biota (Flora, Fauna), ecosystems and natural heritage 9. Geographical features 0. Soil erosion and stability of slopes. Underground water. Hydrological situation. Coastal zone (mangroves, coral reefs, tidal flats, etc.) 4. Climate 5. Landscape 6. Natural disasters Note-) Regard to resettlement survey, ANE may provide aerial photograph in 007 through the Nampula-Cuamba Road Feasibility Study by ANE in cooperation with JICA. The consultant shall adopt methodologies based on Resettlement Policy Framework for the Road Sector, Sep. 006 World Bank/ANE(hereinafter referred as RFP. Note-) above items are adopted from the guidelines

8 .. Analysis of Impacts The impacts during design, construction and operational phases must be identified and evaluated. The predicted environmental and social impacts should be categorized into primary and secondary effects. The description and quantification of the environmental and social impact will, where possible, be based on scientific methods as follow: An indication of the magnitude of the impacts; Extent, nature and duration; The provision of criteria by which impacts have been assessed; The consideration of cumulative impacts within the area; Significance in terms of national, regional and local impacts; Presentation and justification of criteria used..4. Public Consultation Public consultation is an integral part of the EIA process. Initial public consultation will be undertaken with local communities, national and international NGOs, scientific experts, relevant government agencies (at national, provincial and district level) and the private sector. The draft recommendations of the study will be discussed with key stakeholders at workshops to be held. Feed-back from the workshops will be incorporated in the Final Report..4 Environmental and Social Management Plan The overall mitigation plan will recommend feasible and cost effective measures to prevent or reduce significant negative impacts to acceptable levels. The Consultant will estimate the impacts and costs of these measures. The Consultant should prepare a short and concise management plan including proposed work programs, budget estimates, schedules, staffing and training requirements, and other necessary support services to implement the mitigating measures..5 The Resettlement Plan The Consultant will analyze issues regarding resettlement. A Census survey of the expected size of the displaced persons, their socio-economic status including the value of their assets and other sources of livelihood should be carried out. The displaced people and the host population should be consulted about acceptable project alternatives and should be informed about potential impacts on them. Description of compensation options to be offered and other resettlement assistance to be provided should be documented and discussed with resettles including their preferred choice. It would be preferable to use local NGOs in this process. Institutional responsibilities for implementation of the resettlement plan

9 including involvement of NGOs in monitoring the plan should be established including the Schedules and budget for RO implementation.

10 .6. Environmental Monitoring Plan Additionally to the Environmental and Social Impact Assessment, the Consultant is required to prepare a Monitoring Plan. The Monitoring Plan will be an appropriate tool followed by ANE staff or ANE s representative to confirm the implementation of mitigation measures recommended in the study. The environmental Monitoring Plan should include guidelines for monitoring environmental and social aspects of road construction, rehabilitation and maintenance and this should be since the pre-construction to post-construction phase. In addition the guidelines will also include the main tasks such as the items/parameters to be monitored, the checklist for mitigating potential environmental impacts, and the method to present the report and the results of monitoring..6 Reporting.6.. The Consultant will be required to provide the following outputs: a) Documents regarding Mozambique s EIA Procedures: EDPA (Scoping report), TdR (ESIA plan report) and relevant required documents (to be submitted to MICOA) - ( weeks after commencement) b) Baseline survey report: This report shall include General information (.), Present Condition (.) ( months after commencement). c) Environmental and Social Impact Assessment Draft Report: This report shall be included above Baseline survey report, and Impact prediction by the project, evaluation, environmental and social management plan, the monitoring plan and the Resettlement Action Plan: ( months after commencement). d) Environmental and Social Impact Assessment Draft Final Report: The Consultant shall submit for review of the National Director of ANE, or his designated representative, a draft final ESIA report including the Environmental and Social Impact Assessment, the Environmental and Social Management Plan, the Monitoring Plan and the Resettlement Action Plan. (4 months after commencement)

11 After any required modifications or additions suggested by ANE and MICOA, the completed documents shall be present for ANE and MICOA final approvals. The Final EIA Report shall include the following: - The results of the environmental and social scoping exercise including: overview of relevant policy and legislation; definition of typical ecosystems in the area of impact of the road; - The full comprehensive ESIA clearly outlining comprehensive formulation of required mitigation measures, cost impacts and assessments with related recommendations; - Assessment of environmental and social impacts likely to arise from the road project; - Environmental and Social Management Plan, Monitoring Plan and the Resettlement Action Plan. The Environmental and Social Management Plan will be issued to the Contractor during the implementation Phase; *** The consultant shall prepare Resettlement Action Plan (hereinafter referred as RAP ) Report based on Resettlement Policy Framework for the Road Sector, Sep. 006 World Bank/ANE..6.. Coordination and Preparation Documents for Required Meetings a) Public Consultation regarding ESIA The consultant shall hold prescript public consultation based on the guidelines in each district/municipality. Frequency and timing: The consultant shall get in trim for effective meetings with ANE in cooperation with JICA Study Team. (Maximum twice in each district/municipality) b) Stakeholder Meeting regarding RAP The consultant shall hold meetings with the project affected population, especially with the owners of the displaced structures. The Consultant is also deemed to coordinate with ANE regarding the compensation of such affected persons.

12 .7. EIA Presentation A program of formal presentation of the ESIA procedures and findings must be made to ANE staff. This must be presented at ANE s offices and must be programmed and planned in conjunction with the ANE Project Engineer. This forms part of the ANE Studies approval procedures. The report must be presented to all the key Design staff. Presentations must be made to coincide with the Draft Final Report. In addition, all study investigations and findings will be documented and available to interested individuals and organizations. The consultant should display the study for public at various stages including the ESIA Final Report All intermediate reports shall be submitted both in English and Portuguese, and presented in 0 copies of each language. The Final Report shall be produced both in Portuguese and English, in 0 copies each. All reports are to be submitted electronically in PDF format (the entire report, including all tables, graphics, and text), with tables provided also in Excel format. All documents and reports developed by the Consultant and paid for under these services shall become the property of ANE upon completion of the services. The draft ESIA report should focus on findings of the environmental and social scoping exercise and preliminary conclusions and recommendations. The final reporting should also include alternative recommendations for the environmental management system for presentation to the stakeholders. 4 Level of Effort and Duration It is estimated that four months will be required for this consultancy service. It is envisaged that traveling will be required to collect baseline social and environmental data in the different ecological zones within the area of influence. The key personnel expected for this assignment include: Environmental Specialist Ecologist Socio-economist Hydro geologist Institutional, legal and policy

13 5 STUDY BACKGROUND INFORMATION For the preparation of the Environmental and Social Impact Assessment the following publications, among others, are deemed necessary and relevant to the envisaged scope of work. Environmental Impact Assessment of the Next Road Sector Programme in Moçambique, February 00 Road and Environment: A Handbook. World Bank 994 Road Maintenance and Environment. World Bank 994 Regulations on the Procedure for environmental impact assessment (Decreto No 46/04, 9 September 004) Directiva Ambiental para o Sector de Estradas. Janeiro 00. Environmental and Social Consideration Guidelines, 00 JICA JBIC guidelines JBIC Environmental Guidelines, 00 JBIC AfDB guidelines Environmental and Social Assessment Procedures for African Development Bank s Public Sector Operations, 00 AfDB Integrated Environmental and Social Impact Assessment Guidelines, 00 AfDB Involuntary Resettlement Policy, 00 AfDB African Development Bank Group s Policy on the Environment, 004 AfDB The Consultant will be expected to maintain contacts with the following, along with any other relevant contacts developed during the course of the Study: ANE Social and Environmental Unit I coordination with JICA Study Team; ANE delegates; Local authorities. MICOA (Central and provincial delegations) N.B. The following methodology should also be applied: Methodology As explained in introduction, for this project four guidelines will need to be followed. The consultant shall adopt appropriate method for quantitative data.. Collection of General Information and Analysis (Literature Survey) Following information shall be summarized in the report, a half to one page each item at least.

14 AREA Upstream Plans and Position of the project Site (5 districts and Nampula Municipality) Environmental Legislation and relevant guidelines Natural Environment information (by district) Socio-Economic information (by district) Main Items National Development Plan, Poverty Reduction Strategy Paper, Environmental Pan and Policy, Forestry Plan, Agricultural Plan, Tourism Plan, Mining Plan, Education Plan/Welfare Plan, Industry/Energy Plan National Environmental Protection Law, National EIA Law, EIA Guidelines (Comprehensive and sector), Land law, Road Ordinance, Resettlement law, Resettlement Framework Policy Vegetation map, land use map, fauna, flora, covered soil map, rainfall data and temperature by district, Population by district, Local economy, fatal by causes, main industry by area, disease and number, record of traffic accidents by causes, education system and number of student by district, hazard management The consultant shall summarize (literature survey) all 6 items which showed in the issues to be considered. Survey Items (Human Environment, Physical and Natural Environment) by above collected data and information. The consultant shall define present s, issues and present activities by relevant organizations based on above literature survey and present physical survey in the next article (. Present Survey Methodology).

15 . Present Condition Survey regarding Environmental Impact Assessment Methodology for present surveys is as follows. The consultant shall describe each present quantitatively based on baseline physical and literature survey. - Human Environment Social Environment Table I-- Present Survey Methodology N o Item Physical Site Survey Methodology Migration and resettlement Local economy, employment and livelihood (including quality of life, fuel price increase) Land use and local resources utilization Existing social infrastructures and services (accesses to Local communities/ Ethnic group and aborigine Benefit and damage misdistribution and Local conflicts of interests 7 Gender 8 Children s rights 9 Cultural heritage (sanctuary, local heritage) Count all structures in affected area by re-alignment of the road, and survey resettlement costs based on RFP by WB /ANE. The consultant may use aerial photo, if ANE provide it in 007. Explain resettlement and compensation procedures based on relevant laws and guidelines such as Land Act and RFP by WB/ANE. Interview survey by district, and rough site survey Interview survey by district, and rough site survey Survey all social infrastructures location by GPS and Mapping in the site survey (school, public buildings, hospitals, meeting place and so on) Survey all communities / tribe / language group (area, population and present issues) in site survey and interview by district office. Survey present local conflicts in interview by district office Survey in interview with relevant governmental section, key women s group, NGO s and district office (Define present issue and present activities) Survey in interview with relevant governmental section, NGO s and district office (Define present issue and present activities) Survey all cultural heritage s location by GPS and Mapping in the site survey (religious place, preying tree, preying mountain, preying forest, sanctuary, historical monument and so on) References M J I JB AF

16 Pollution Communicable diseases and Non-communicable diseases Public sanitation Water usage and rights Traffic accidents Information, education and communication Democratic trend Participation (Consultations, Civil Society strengthening) Social instability Air pollution Water pollution Survey in interview with relevant governmental section, NGO s and district office (Define present issue and present activities) Survey in interview with relevant governmental section, NGO s and district office (Define present issue and present activities) Survey major wells for drinking water and used river as water resources. Record all location by GPS and Mapping in the site survey And confirm existence of water usage rights in interview with relevant governmental section and district office (Define present issue and present activities) Survey in interview with police station and relevant governmental section (Define present issue and present activities) Survey in interview with relevant governmental section, NGO s and district office (Define present issue and present activities) Survey in interview with relevant governmental section, NGO s and district office (Define present issue and present activities) Survey in interview with relevant governmental section, NGO s and district office (Define present issue and present activities) Survey in interview with relevant governmental section, NGO s and district office (Define present issue and present activities) Measure dust volume along the road and not along the road for confirmation of impacts. (Measure weight dust per day, m) Measure turbidity in rivers which residents are using for dinking, laundry and bathing (rainy season/dry season)

17 Physical and Natural Environment Soil contamination Waste Noise and vibration Ground subsidence Odors Bottom sediment in sea and rivers Hazard management Survey histories of land use along the road in interview with relevant governmental section and district office. (Biochemical factory, leather factory and hazardous material existence) Survey solid and liquid waste management and system in interview with relevant governmental section and district office Measure ambient noise level and traffic noise by sound level meter (equivalent noise db (A)) Survey such phenomenon in interview with relevant governmental section and district office Survey such phenomenon in interview with relevant governmental section and district office Survey such phenomenon in interview with relevant governmental section and district office Survey in interview with relevant governmental section and district office (define existence of management) Global warming No need physical site survey Biota (Flora, Fauna), ecosystems and natural heritage Geographical features Soil erosion and stability of slopes Underground water Flora - Preparation vegetation map by physical site survey (define all vegetation communities along the road) Flora and Fauna - Check considerable species along the road and new alignment based on IUCN list, CITES list and other relevant list by physical site survey and interview with residents and relevant organizations (Mapping by GPS is required) - Define major route of elephant migration (Mapping by GPS is required) - Define major ecosystem by vegetation type Survey precious geographical site in rough site survey Survey soil erosion places and destabilizing slopes in rough site survey and mapping by GPS Survey major wells for drinking water and spring places. Record all location by GPS and Mapping in the site survey.

18 Hydrological situation Coastal zone (mangroves, coral reefs, tidal flats, etc.) Survey major river basin in rough site survey, and show these basins diagrammatically in map. Survey major ecotone and precious habitats through fauna-flora survey. And record all location by GPS and mapping them. 4 Climate No need physical site survey 5 Landscape Take pictures aesthetic landscape and record all locations by GPS. Survey major disasters (flood, 6 Natural disasters earthquake, typhoon) and show them diagrammatically in map. References: M: Mozambique EIA Guidelines, JI: JICA, JB: JBIC, AF: AfDB. Impact Assessment The consultant shall predict direct / indirect, during/after construction negative and positive impacts as possible as putatively. And if these negative impacts are serious and irreversible, concrete mitigation measures including cost estimation should be proposed. Additionally this impact assessment includes activities regarding borrow pit and quarry.

19 - Human Environment Social Environment Table I-- Prediction Methodology N o Item Prediction Items/Methodology Migration and resettlement Local economy, employment and livelihood (including quality of life, fuel price increase) Land use and local resources utilization Existing social infrastructures and services Local communities/ Ethnic group and aborigine Benefit and damage misdistribution and Local conflicts of interests 7 Gender 8 Children s rights Cultural heritage (sanctuary, local heritage) Communicable diseases and Non-communicable diseases Public sanitation Water usage and rights Traffic accidents Information, education and communication Democratic trend - Number of resettlement (displaced to other community) and setting back structures - Cost estimation (Forest area, agricultural area and urban area) (Accesses to infrastructures, and change of services) (change of women s activities) (change of children s works) -Number of cultural site and location in the new alignment -Cost estimation of displacement (Disease name) -Number of cultural site and location in the new alignment References M J I JB AF

20 Pollution Physical and Natural Environment Participation (Consultations, Civil Society strengthening) Social instability Air pollution Water pollution Soil contamination Waste Noise and vibration Ground subsidence Offensive odors Bottom sediment in sea and rivers Hazard management Global warming Biota (Flora, Fauna), ecosystems and natural heritage Calculate density of air quality in 0 years after construction of the road (NO, SO, CO, dust) Calculate density of dust during operation borrow pit and quarry Calculate or estimate density of turbid water during construction and operation of borrow pits and quarries No need (generally such contamination will not be expected for road project) After Construction -Calculate density of air quality in 0 years after construction of the road (use planned traffic volume after 0years) During Construction Calculate noise from construction machines (no need to calculate green gases volume) - Calculate loss-vegetation area by types in new alignment, and show them in the map - Number of loss-considerable species, and their location - Predicted ecosystem after construction of the road Geographical features - Number of loss precious sites Soil erosion and stability of slopes Underground water (pick up predicted areas for occurring erosion) - Number of loss wells and spring water in new alignment - Estimation of affected area and number of residents

21 4 5 6 Hydrological situation Coastal zone (mangroves, coral reefs, tidal flats, etc.) Climate Landscape Natural disasters (impacts by cutting land or mountain) (Loss of aesthetic landscapes and their location) (Weakness by disasters) 7. General The services shall be carried out in accordance with generally accepted principles and standards of professional practices. The Consultant s Scope of Work is understood to cover all activities necessary to accomplish the stated objectives of these services, while adhering to the aforementioned principles and practices, whether or not a specific activity is cited in this TOR. The Consultant shall work under the direction of the Office of the Director General of ANE and shall work in close collaboration with ANE appointed Coordinator. 8 Logistical Support ANE will appoint a liaison officer through whom all requests for information, guidance and assistance should be addressed. All reasonable assistance will be provided, including liaison with other Government agencies and access to any relevant data that is not classified as restricted. ANE shall provide the Consultant, without charge, such support facilities as may reasonably be needed for the expeditious performance of the required services, including reasonable access to pertinent files, documents and working papers. 9 Consultant s Obligations Transport Requirements: The Consultant will be responsible for providing national/international transportation and local land transport for the supplied personnel for the duration of the contract period.

22 Staff Housing and Accommodation: The Consultant shall be responsible for providing suitable furnished accommodation for personnel assigned to the services to be provided under the contract. Communications, Office, and Documentation Costs: The Consultant shall be responsible for meeting all costs of office operation, supplies, communications, secretarial services, document translation, and logistical services. 0 Local Taxes Consistent with the provision of the Terms of Agreement, clause.0, the consulting firm and its expatriated personnel providing services under the contract for which these TOR are written shall be required to pay local taxes on the income and profits derived from these services, unless otherwise provided in the respective contract. Should the contract require payment of such taxes, it shall also include provision for reimbursement to said firm and its expatriate personnel exclusively of any amounts actually paid. These taxes must be separately identified and detailed in the contract derived from these services.

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 1. Full title of the Project The Study on Integrated Development Strategy for Danang City and Its Neighboring

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning) Page: 1 Date: May 27, 2014 Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full Title of the Project 2. Type of the study (e.g. Master

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d) Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) Date: March 16, 2015 Environmental and Social onsiderations in Detailed Planning Survey (Technical ooperation for Development Planning) 1. Full title of the Project THE PROJET ON THE ORRIDOR DEVELOPMENT

More information

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR Overview of Presentation 1. Objectives of the Consultancy 2. Hydropower in Myanmar 3. Draft Table of Contents 4.

More information

Notes for NEPA for Generic Terms of Reference

Notes for NEPA for Generic Terms of Reference TERMS OF REFERENCE IIRRIIGATIION AND WATER MANAGEMENT Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to the construction and/or the development of Irrigation

More information

Appendix 3 The World Bank s New Operational Manual

Appendix 3 The World Bank s New Operational Manual Appendix 3 The World Bank s New Operational Manual Appendix 4 Environmental Consideration in JICA Outline of Environmental Consideration in JICA 1Introduction Various studies

More information

JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS

JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS APRIL 2002 JAPAN BANK FOR INTERNATIONAL COOPERATION Preface Japan Bank for International

More information

JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS

JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS January 2015 JAPAN BANK FOR INTERNATIONAL COOPERATION 1 Preface Japan Bank for International

More information

ENVIRONMENTAL SCOPING PLAN

ENVIRONMENTAL SCOPING PLAN APPENDIX F ENVIRONMENTAL SCOPING PLAN F.1 DATA OF EXAMINATION Table F.1.1 Data of Examination No. Items Description 1 Full title of the Project and relevant report 2 Type of the study Development Study

More information

Summary of the Preliminary Study for Grant Aid Project

Summary of the Preliminary Study for Grant Aid Project Summary of the Preliminary Study for Grant Aid Project 1. Title of the Cooperation Project The Project for Extension of Selabam Hydropower Plant in Lao People's Democratic Republic 2. Categorization and

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study Date: February, 2011 1. Title of the Cooperation Project, Relevant Project Report Project for the Rehabilitation of the Trunk Road, Phase IV (Dejen Debre Markos Section) 2.

More information

SUMMARY 2013 EDITION

SUMMARY 2013 EDITION SUMMARY 2013 EDITION RSAT Joint Initiative on Rapid Basin-wide Hydropower Sustainability Assessment Tool PART 1: OVERVIEW OF THE RSAT The RSAT is designed as an integrative tool to assess hydropower development

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 1. Project Title: The Feasibility Study on Development of Toamasina Port in the Republic of Madagascar 2. Type

More information

EAST AFRICAN COMMUNITY DEVELOPING EAC FORESTRY POLICY AND STRATEGY TERMS OF REFERENCE

EAST AFRICAN COMMUNITY DEVELOPING EAC FORESTRY POLICY AND STRATEGY TERMS OF REFERENCE EAST AFRICAN COMMUNITY DEVELOPING EAC FORESTRY POLICY AND STRATEGY TERMS OF REFERENCE EAC SECRETARIAT ARUSHA FEBRUARY, 2018 1 1. INTRODUCTION The East African Community (EAC) is an inter-governmental organization

More information

A Partnership for Saving West Africa s Coastal Assets

A Partnership for Saving West Africa s Coastal Assets A Partnership for Saving West Africa s Coastal Assets 2015 West Africa Coastal Areas Management Program (WACA) 1 Africa s development and climate agendas are inextricably linked: If unaddressed, climate

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Haor Flood Management and Livelihood Improvement Project Loan Agreement: June 16, 2014 Loan

More information

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles Operational Manual - Table A1 - Environmental and Social Safeguard Policies Policy and Staff Connections- World Bank Intranet WB External Site WBG Directory Help Site Map Feedback Home News & Events Countries

More information

REPORT ON ENVIRONMENTAL ASPECTS COMPREHENSIVE STUDY ON DISASTER MANAGEMENT IN SRI LANKA

REPORT ON ENVIRONMENTAL ASPECTS COMPREHENSIVE STUDY ON DISASTER MANAGEMENT IN SRI LANKA REPORT ON ENVIRONMENTAL ASPETS OMPREHENSIVE STUDY ON DISASTER MANAGEMENT IN SRI LANKA 1. TITLE OF THE OOPERATION PROJET AND NAME OF THE PROJET PROPONENT 1.1 Project Title omprehensive study on Disaster

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1. Name of the Project Country: Republic of Costa Rica Project: Las Pailas II Geothermal Project (Guanacaste Geothermal Development Sector Loan) Loan Agreement: August

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Land Accounting for SDG Monitoring and Reporting

Land Accounting for SDG Monitoring and Reporting Regional Expert Workshop on Land Accounting for SDG Monitoring and Reporting Bangkok - Thailand 25-27 September 2017 Mrs. Niroshinie De Silva Assistant Director Ministry of Mahaweli development & Environment

More information

b. Projects Without PED Agreements. Credit for PED Coordination Team activities will be provided under the following criteria:

b. Projects Without PED Agreements. Credit for PED Coordination Team activities will be provided under the following criteria: CHAPTER 9 PRECONSTRUCTION ENGINEERING AND DESIGN AND ENGINEERING DURING CONSTRUCTION 9-1. Preconstruction Engineering and Design Studies (PED). This phase of project development encompasses all planning

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify) PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:

More information

PREPARATORY STUDY FOR DEVELOPMENT STUDY. 1. Project Title The study on improvement of planning capability in sewerage sector in Malaysia

PREPARATORY STUDY FOR DEVELOPMENT STUDY. 1. Project Title The study on improvement of planning capability in sewerage sector in Malaysia PREPARATORY STUDY FOR DEVELOPMENT STUDY 1. Project Title The study on improvement of planning capability in sewerage sector in Malaysia 2. Type of the Study Study on improvement of planning capability

More information

Environmental and Social Considerations

Environmental and Social Considerations Chapter 5 Environmental and Social Considerations 5.1 Environmental Legislation 5.1.1 Environmental Impact Assessment Law and relevant guidelines in Mozambique 1) Environmental Organization In Mozambique,

More information

INLAND WATERWAYS AUTHORITY OF INDIA (Ministry of Shipping, Government of India) Head Office : A-13, Sector 1, Noida

INLAND WATERWAYS AUTHORITY OF INDIA (Ministry of Shipping, Government of India) Head Office : A-13, Sector 1, Noida Project Management Unit (World Bank Assisted Development Project for NW-1) INLAND WATERWAYS AUTHORITY OF INDIA (Ministry of Shipping, Government of India) Head Office : A-13, Sector 1, Noida - 201301 Phone

More information

Appendix 1: Scoping Techniques

Appendix 1: Scoping Techniques Appendix 1: Scoping Techniques 1 Scoping Techniques Checklist technique Checklist technique is used for identifying the project impacts. Such lists usually cover all possible impacts of the project. In

More information

Appendix 1: Scoping Techniques

Appendix 1: Scoping Techniques Appendix 1: Scoping Techniques 1 Scoping Techniques Checklist technique Checklist technique is used for identifying the project impacts. Such lists usually cover all possible impacts of the project. In

More information

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 (No. JPBN. 1509/27 Vol. II CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 In exercise of the powers conferred by section 5 of the Conservation

More information

FRAMEWORK CONVENTION ON THE PROTECTION AND SUSTAINABLE DEVELOPMENT OF THE CARPATHIANS

FRAMEWORK CONVENTION ON THE PROTECTION AND SUSTAINABLE DEVELOPMENT OF THE CARPATHIANS FRAMEWORK CONVENTION ON THE PROTECTION AND SUSTAINABLE DEVELOPMENT OF THE CARPATHIANS 2 The Parties, ACKNOWLEDGING that the Carpathians are a unique natural treasure of great beauty and ecological value,

More information

Technical Guidance Document for Strategic Environmental Assessment (SEA)

Technical Guidance Document for Strategic Environmental Assessment (SEA) Technical Guidance Document for Strategic Environmental Assessment (SEA) EAD-EQ-PCE-TG-03 Signature on Original Environment Quality Sector * Corporate Management Representative Secretary General Originated

More information

IMPLEMENTATION PROTOCOL FOR DETERMINATION AND NOTIFICATION OF CRITICAL WILDLIFE HABITATS IN NATIONAL PARKS AND WILDLIFE SANCTUARIES

IMPLEMENTATION PROTOCOL FOR DETERMINATION AND NOTIFICATION OF CRITICAL WILDLIFE HABITATS IN NATIONAL PARKS AND WILDLIFE SANCTUARIES IMPLEMENTATION PROTOCOL FOR DETERMINATION AND NOTIFICATION OF CRITICAL WILDLIFE HABITATS IN NATIONAL PARKS AND WILDLIFE SANCTUARIES PREAMBLE: The purpose of this Implementation Protocol is to detail the

More information

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1 AMDAL Procedure (This is only indicative and for reference purposes. This is not exhaustive and therefore, the Consultants are requested to familiarize themselves with all the laws, rules, regulations,

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan 1.Name of the Project Country: The Republic of Indonesia Project: Upper Citarum Basin Flood Management Sector Loan Loan Agreement: March 28,

More information

18 Cumulative Impacts and Interaction of Effects

18 Cumulative Impacts and Interaction of Effects 18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly

More information

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

Fourth Meeting of the Conference of the Parties to the Framework Convention on the Protection and Sustainable Development of the Carpathians

Fourth Meeting of the Conference of the Parties to the Framework Convention on the Protection and Sustainable Development of the Carpathians Fourth Meeting of the Conference of the Parties to the Framework Convention on the Protection and Sustainable Development of the Carpathians UNEP/CC/COP4/DOC11/REV1 Original: English STRATEGIC ACTION PLAN

More information

Environmental and Social Policy

Environmental and Social Policy Environmental and Social Policy Contents Foreword 2 Purpose 2 Commitments 2 Environmental and Social Assessment 3 Operations financed directly 4 Operations financed through Financial Intermediaries 4 Environmental

More information

Chapter 13 of Agenda 21

Chapter 13 of Agenda 21 Chapter 13 of Agenda 21 What is Agenda 21? Agenda 21 is the global plan of action that was adopted at the United Nations Conference on Environment and Development (UNCED) held in Rio de Janeiro, Brazil,

More information

Background Information on Inter-American Development Bank Environmental and Social Safeguards Policies and Procedures 3 June 2011

Background Information on Inter-American Development Bank Environmental and Social Safeguards Policies and Procedures 3 June 2011 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment A. ENVIRONMENTAL ASSESSMENT OP-703 Environment and Safeguards Compliance Policy; Guidelines; Safeguard Screening Form World Bank Policies & Procedures

More information

EIA implementation and Follow-up

EIA implementation and Follow-up EIA implementation and follow up: a case study of Koga irrigation and watershed management project- Ethiopia By: W.B. Abebe, W.J.A.M. Douven, M.McCartney, J. Leentvaar This research was done for the partial

More information

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives Ex-ante Evaluation 1. Name of the Project Country: India Project: Swan River Integrated Watershed Management Project (Loan Agreement: 03/31/2006; Loan Amount: 3,493 million yen; Borrower: The President

More information

Building from the ground up in West Africa. The Hatch approach to projects in a developing country

Building from the ground up in West Africa. The Hatch approach to projects in a developing country Building from the ground up in West Africa The Hatch approach to projects in a developing country 2 Agenda 1. Hatch Contribution to West Africa Development 2. Three Recent Projects on Which We Worked 3.

More information

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway in association with Design 151.66 Km (Existing Road Apr. 180 km) 2 OBJECTIVE: The Government of Timor Lestewishes to Engage Consultant to carry out the Preliminary, Detailed Engineering Design and Environment

More information

1. Introduction to the Project

1. Introduction to the Project 1 TABLE OF CONTENTS 1. Introduction to the Project...3 2. Project justication...3 3. Project location...3 4. Project description...6 5. Planning approval process...8 6. Public participation process (PPP)...9

More information

Summary of Preparatory Study Report for Technical Cooperation Project (draft) Dated 2007/04/16

Summary of Preparatory Study Report for Technical Cooperation Project (draft) Dated 2007/04/16 Summary of Preparatory Study Report for Technical Cooperation Project (draft) Dated 2007/04/16 1. Title of the Cooperation Project, and Names of Project Proponent and Consultants 1.1 Title of the Cooperation

More information

Draft. Environmental Assessment Guidelines (including the Scope of the Environmental Assessment)

Draft. Environmental Assessment Guidelines (including the Scope of the Environmental Assessment) Draft the Scope of the Environmental Assessment) March 2012 Page left intentionally blank I II Page left intentionally blank III TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 PROJECT BACKGROUND... 1 1.2 APPLICATION

More information

Summary of the Preliminary Study for Grant Aid Project

Summary of the Preliminary Study for Grant Aid Project Summary of the Preliminary Study for Grant Aid Project 1. Title of the Cooperation Project The Project for Water Supply Development in Itay El-Barud Markaz, Beheira Governorate in the Arab Republic of

More information

Environmental Screening Form and EMMP Template USAID West Africa Regional Regulation 216 Workshop: Ghana USAID/GEMS JANUARY, 2017

Environmental Screening Form and EMMP Template USAID West Africa Regional Regulation 216 Workshop: Ghana USAID/GEMS JANUARY, 2017 Environmental Screening Form and EMMP Template USAID West Africa Regional Regulation 216 Workshop: Ghana USAID/GEMS JANUARY, 2017 This document contains two tools to be used for an exercise in which workshop

More information

Environmental Impact Assessment of Hydroelectric Power Plant LEEZA MALIK (2013CEP2080) TUSHAR SINGLA (2011MT50623)

Environmental Impact Assessment of Hydroelectric Power Plant LEEZA MALIK (2013CEP2080) TUSHAR SINGLA (2011MT50623) Environmental Impact Assessment of Hydroelectric Power Plant LEEZA MALIK (2013CEP2080) TUSHAR SINGLA (2011MT50623) 1 Contents Background Objective EIA of Hydroelectric plants Tools and Techniques used

More information

Outline for. Protected Areas Management Planning

Outline for. Protected Areas Management Planning Outline for Protected Areas Management Planning Level One: Community-based protected area management organizations and Level Two: Conservation organizations / Non-governmental organizations Outline for

More information

Chapter 13 Management and Implementation

Chapter 13 Management and Implementation Chapter 13 Management and Implementation TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Overview of AGT Region Operating Management System... 13-1 13.3 Construction

More information

CMPDI. 4.6 Mine Closure Plan

CMPDI. 4.6 Mine Closure Plan 4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.

More information

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP)

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Executive Summary Sri Lanka Strategic Cities Development Project (SCDP) Executive Summary

More information

Struma Lot 3.2 EIA Development, Working Document

Struma Lot 3.2 EIA Development, Working Document Struma Lot 3.2 EIA Development, Working Document Revision 1, 03 February 2016 1 Introduction 1.1 Background Struma Motorway is one of the most challenging road projects in Bulgaria. The motorway is about

More information

Terms of Reference for a Gender Analysis

Terms of Reference for a Gender Analysis Terms of Reference for a Gender Analysis 1. BACKGROUND The European Commission defines a gender analysis as the study of differences in the conditions, needs, participation rates, access to resources and

More information

Environmental Impact Assessment (EIA) Owen Struthers Development Management Branch Welsh Government

Environmental Impact Assessment (EIA) Owen Struthers Development Management Branch Welsh Government Environmental Impact Assessment (EIA) Owen Struthers Development Management Branch Welsh Government Environmental Impact Assessment Introduction New Directive: Directive 2014/52/EU of the European Parliament

More information

(1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options)

(1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options) Sub-sector Guideline: (1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options) Basic Concept A. General Concept Climate change will increase

More information

() TECSULT Tecsult International Limilee. Social and Environmental Assessment Of the Transport Sector. Executive Summary TRANSPORTS ET DE L'HABITAT

() TECSULT Tecsult International Limilee. Social and Environmental Assessment Of the Transport Sector. Executive Summary TRANSPORTS ET DE L'HABITAT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTERE DES INFRASTRUCTURES, DES BURKINA FASO TRANSPORTS ET DE L'HABITAT Unite - Progres

More information

6 Risk assessment methodology

6 Risk assessment methodology Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management

More information

Mining & Communities

Mining & Communities Mining & Communities Supporting human rights-based development in the context of industrial mining in Guinea Abridged version of the Practical guide for civil society organizations and local authorities

More information

Republic of Bulgaria Ministry of Regional Development DG Territorial Cooperation Management EX-ANTE EVALUATION AND SEA OF THE BULGARIA THE FORMER

Republic of Bulgaria Ministry of Regional Development DG Territorial Cooperation Management EX-ANTE EVALUATION AND SEA OF THE BULGARIA THE FORMER Republic of Bulgaria Ministry of Regional Development DG Territorial Cooperation Management EX-ANTE EVALUATION AND SEA OF THE BULGARIA THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA IPA CBC PROGRAMME 2014-2020

More information

IGF Geneva 2016 MPF-SDG Comparative Analysis. Perrine Toledano CCSI, Head: Extractive Industries

IGF Geneva 2016 MPF-SDG Comparative Analysis. Perrine Toledano CCSI, Head: Extractive Industries IGF Geneva 2016 MPF-SDG Comparative Analysis Perrine Toledano CCSI, Head: Extractive Industries SDG and MPF: Can they connect? The Sustainable Development Goals (SDGs) form the post-2015 global development

More information

Final Environmental Impact Assessment Report

Final Environmental Impact Assessment Report NON-TECHNICAL SUMMARY... I 1 INTRODUCTION... 1 1.1 BACKGROUND... 1 1.2 PROJECT IMPLEMENTATION SCHEDULE... 2 1.3 COST ESTIMATE... 2 1.4 KEY LEGISLATIVE, REGULATORY AND INSTITUTIONAL FRAMEWORK... 2 1.4.1

More information

Assessment of the national capacities for child rights monitoring

Assessment of the national capacities for child rights monitoring UNICEF Moldova TERMS OF REFERENCE Assessment of the national capacities for child rights monitoring Type: individual consultancy (national/ international) Duration: June November 2017 Location: Republic

More information

Annex 1: Project Tropicalia Sustainable Tourism, Dominican Republic

Annex 1: Project Tropicalia Sustainable Tourism, Dominican Republic Annex 1: Project Tropicalia Sustainable Tourism, Dominican Republic and Social Action Plan (ESAP) Item PS 1: Assessment and Management of and Social Risks and Impacts 1.1 and Social Management System (ESMS)

More information

Hongsa Health Surveillance Start-up and Approaches

Hongsa Health Surveillance Start-up and Approaches Hongsa Health Surveillance Start-up and Approaches Suranee Phusuwan Introduction Lao People's Democratic Republic is committed to graduate from the list of Least Developed Countries by 2020 and to be the

More information

ESIA for the proposed Baynes Hydropower Project:

ESIA for the proposed Baynes Hydropower Project: ESIA for the proposed Baynes Hydropower Project: Public Scoping Meeting: Windhoek Special Arrangements Visitors from Kunene Region Liaison Officer will translate for them. Meeting filmed. Microphones to

More information

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Final Scoping Report - Non-Technical Summary Presentation Structure of the Presentation Introduction to the Tema LNG Project

More information

Identification and evaluation of environmental aspects

Identification and evaluation of environmental aspects 1.0 Purpose This procedure defines the mechanism for the identification and evaluation of environmental aspects of the operations of KSPH&IDCL in order to determine those aspects that have actual or potential

More information

PUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME. 2 Objective of the Phase II Environmental and Social Programme

PUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME. 2 Objective of the Phase II Environmental and Social Programme PUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME 1 Introduction and Background To meet its environmental and social obligations and commitments, the Lesotho Highlands Development

More information

Final Design Guideline

Final Design Guideline Final Design Guideline May, 2016 July, 2011 Check the Capital Project Delivery website to ensure this is the current version Table of Contents Purpose... 1 Introduction... 1 FD Support... 1 Roadway and

More information

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories: 5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the

More information

Guiding Principles on Sustainable Hydropower Development in the Danube River Basin

Guiding Principles on Sustainable Hydropower Development in the Danube River Basin Guiding Principles on Sustainable Hydropower Development in the Danube River Basin Lead Countries : Austria, Romania, Slovenia in the frame of the International Commission for the Danube River Protection

More information

Executive Summary 1. 1 Project Background 6

Executive Summary 1. 1 Project Background 6 Contents Executive Summary 1 1 Project Background 6 Page 1.1 Project Overview 6 1.2 Hotel Concept 6 1.3 Justification of the Project 8 1.3.1 Foreign Currency Earnings 8 1.3.2 Tourism Developments in Mauritius

More information

LESEDI ENVIRONMENTAL MANAGEMENT FRAMEWORK (EMF) PUBLIC MEETING 25 JANUARY 2006

LESEDI ENVIRONMENTAL MANAGEMENT FRAMEWORK (EMF) PUBLIC MEETING 25 JANUARY 2006 LESEDI ENVIRONMENTAL MANAGEMENT FRAMEWORK (EMF) PUBLIC MEETING 25 JANUARY 2006 AGENDA Opening and Welcome Introduction of Consultants Profile of Izwelisha Consortium Explanation of the EMF process Environmental

More information

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India Review: Definition of EIA Environmental Impact Assessment

More information

Dying fisheries in a changing environment: A study on livelihood strategies of fishery communities in Mumbai, India.

Dying fisheries in a changing environment: A study on livelihood strategies of fishery communities in Mumbai, India. Dying fisheries in a changing environment: A study on livelihood strategies of fishery communities in Mumbai, India. Sibananda Senapati and Vijaya Gupta National Institute of Industrial Engineering (NITIE)

More information

LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT

LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT APPENDIX

More information

TERMS OF REFERENCE Individual Contractor. Phnom Penh Cambodia and Home Based Expected Place of Travel:

TERMS OF REFERENCE Individual Contractor. Phnom Penh Cambodia and Home Based Expected Place of Travel: TERMS OF REFERENCE Individual Contractor 1. Assignment Information Assignment Title: International Senior Forest Economist Cluster/Project: Policy and Advocacy Unit Post Level: Senior Specialist Contract

More information

Office of Climate Change Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE

Office of Climate Change Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE Office of Climate Change Guyana September, 2017 TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE HOUSEHOD BASELINE SURVEY FOR BARTICA TOWN 1. INTRODUCTION AND

More information

Office of Climate Change Guyana September TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE

Office of Climate Change Guyana September TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE Office of Climate Change Guyana September 2017 TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE TRANSPORTATION SECTOR ENERGYAUDIT IN BARTICA 1. INTRODUCTION AND

More information

COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS

COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS Chapter Description Page EXECUTIVE SUMMARY 1 INTRODUCTION 1-1 1.1

More information

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES EMIOLA ABASS June 13, 2017 COURSE OBJECTIVE This course has been designed to provide guidance to

More information

Community Benefits of Land Restoration

Community Benefits of Land Restoration Community Benefits of Land Restoration Introducing Green Infrastructure for Coastal Resilience Matt Fulda, Acting Director Monroe May 23 rd, 2017 Avery Point Campus, University of Connecticut Easton Trumbull

More information

REQUEST FOR EXPRESSIONS OF INTEREST

REQUEST FOR EXPRESSIONS OF INTEREST REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK 13 Rue de Ghana, B.P. 323-1002 Tunis-Belvédère, Tunisia Office of the Special Envoy on Gender E-mail: L.miriti@afdb.org - Tel: + (216) 7110

More information

REPUBLIC OF SUDAN MINISTRY OF HUMANITARIAN AFFAIRS

REPUBLIC OF SUDAN MINISTRY OF HUMANITARIAN AFFAIRS REPUBLIC OF SUDAN MINISTRY OF HUMANITARIAN AFFAIRS COUNTRY AGREEMENT Between Government of Sudan (GOS) And International Non- Governmental Organizations Operating in Sudan Preamble: Voluntary and humanitarian

More information

REDD+ Safeguards and Safeguard Information Systems

REDD+ Safeguards and Safeguard Information Systems REDD+ Safeguards and Safeguard Information Systems Expected Learning Outcomes This module will provide an overview of REDD+ safeguards and safeguard information systems. In particular, we will discuss:

More information

PROTOCOL ON INTEGRATED COASTAL ZONE MANAGEMENT IN THE MEDITERRANEAN

PROTOCOL ON INTEGRATED COASTAL ZONE MANAGEMENT IN THE MEDITERRANEAN PROTOCOL ON INTEGRATED COASTAL ZONE MANAGEMENT IN THE MEDITERRANEAN The Contracting Parties to the present Protocol, Being Parties to the Convention for the Protection of the Marine Environment and the

More information

Ex-ante Project Evaluation

Ex-ante Project Evaluation Ex-ante Project Evaluation 1. Name of project Country: Socialist Republic of Vietnam Name of project: Hai Phong City Environmental Improvement Project (II) L/A signing date: March 31, 2009 Loan amount:

More information