SST-II HYDRAULIC BI-FOLD SPECIFICATIONS

Similar documents
BI-Fold HYDRAU-LIFT SPECIFICATIONS

Featuring the SST-II Hydraulic Bi-Fold System

Custom Hydraulic Doors and Windows Architectural / Commercial / Residential

FF200, FOUR-FOLD DOORS CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems

F-SERIES: FF XT SPECIFICATIONS Exterior Swinging Four-Fold Door Systems

N-SERIES: NTH2700 SPECIFICATIONS Tubular Composite Top Hung Sliding Door System

L-SERIES: LTH3900 SPECIFICATIONS Stainless Steel Hollow Metal Sliding Fire Door System

N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System

GLASSWALL SPECIFICATIONS

OPTIONS ARE LISTED IN RED, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.

SECTION ELECTRIC FOUR FOLD DOORS MODEL 46 FLAT SHEETED

GLASSWALL SPECIFICATIONS

SECTION MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

LTH3700, HOLLOW METAL SLIDING FIRE DOOR

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR

The motor shall be high-starting torque, ball bearing, rated at 460 V, 3 phase

GLASS WALL SPECIFICATIONS

GLASS WALL SPECIFICATIONS

AUTOMATIC VERTICALLY RETRACTABLE Skyfold Mirage ACOUSTIC INTERIOR GLASS WALL Section Page 1 October 2017

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

SECTION SOUND CONTROL DOORS

FIRST RESPONDER 4 FOUR FOLD DOORS Model# FF400-FR-DSI

SECTION Motor Operated Horizontal Sliding Sound Control Door

SECTION SECTIONAL OVERHEAD DOORS

SECTION ROLLER GATES

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

SECTION HARDWARE

1. Supply, delivery, engineering and installation of new storage equipment.

Specifications for FL-100 Soffit Panel

SECTION The specification section is organized by placing information in three standard parts:

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336)

1. High bay shelving units, fabrication and installation including leveling.

Series 3000 Pocket Doors

SECTION DETAILS (MECHANICALLY ASSEMBLY)

SECTION SECTIONAL OVERHEAD DOORS

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL

COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY)

SECTION STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTIONAL ALUMINUM DOORS

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM

SECTION FIBERGLASS REINFORCED POLYESTER (FRP) DOORS AND ALUMINUM FRAMES

The fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general specifications:

SECTION ACCORDION FOLDING PARTITIONS

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

CEILING MOUNTED ARTICULATING JIB CRANE

.1 Blast-resistant non-fire rated pressed steel frames. .4 Factory supplied [and installed] glass and glazing.

RAOUL WALLENBERG HIGH SCHOOL SECURITY COILING GRILLE SFUSD PROJECT NO SAN FRANCISCO UNIFIED SCHOOL DISTRICT SECTION 08330

ADDENDUM NO. 4 Oct. 18, 2016 NEW SIMPSONVILLE FIRE STATION NO. 5 SIMPSONVILLE, SOUTH CAROLINA SCNA PROJECT NO. 1512

SECTION / STC 52 METAL SOUND CONTROL DOORS

WALL MOUNTED ARTICULATING JIB CRANE

SECTION SECTIONAL OVERHEAD DOORS

(HURRICANE) FOUR FOLD DOORS

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION ORCHESTRA PIT FILLER

SECTION DECORATIVE METAL RAILINGS

SECTION MISCELLANEOUS METALS

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

This guide can be used to prepare a specification for incorporating wall bracket jib cranes into a competitively bid construction project.

1. Include construction details, materials, individual components and profiles, and finishes.

SECTION OVERHEAD COILING DOORS

SECTION Coiling Doors and Grilles Model 4320

SECTION ALUMINUM WINDOWS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

SECTION OVERHEAD COILING SHUTTERS

NOTE TO SPECIFYING ARCHITECT REGARDING SECTION CONTOUR CURTAIN AND MOTOR

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION FOLDING DOORS AMSTEL AS900CC DIVIDER SOUND

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

HOTEL SPECIFICATION SECTION 08100

SECTION MOTOR CONTROL CENTER

SECTION SECTIONAL OVERHEAD DOORS

SECTION AWNINGS

FABRICOIL BASIC January 10, 2006

RENLITA. Customized Opening Solutions SECTION SECTIONAL OVERHEAD DOORS

SECTION SECURITY GRILLES RAPIDGRILLE TM AP MODEL 676 UPWARD COILING GRILLE

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION MISCELLANEOUS METALS THIS SECTION TO BE INCLUDED IN SUB BID FOR SECTION MISCELLANEOUS AND ORNAMENTAL IRON

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651

SECTION SECURITY GRILLES 670 SERIES UPCOILING SECURITY GRILLE

SECTION SECURITY GRILLES 679 SERIES SUPERGARD SIDE FOLDING GRILLE

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

SECTION SOLID PHENOLIC PLASTIC TOILET PARTITIONS

Trex Commercial Products page Metal Railing

SECTION DOOR HARDWARE

GLASS WALL SPECIFICATIONS

Aluminum Perforated Rolling Door

1. Bullet resistant hollow metal door and frame assemblies tested in accordance with UL 7 52 and in compliance with the following:

SECTION / / BULLET RESISTANT SOUND CONTROL WINDOWS

SECTION METAL WALL PANEL SYSTEM

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION HANDRAILS AND RAILINGS. Display hidden notes to specifier. (Don't know how? Click Here)

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

DIVISION 16. Electrical Specifications

SECTIONAL OVERHEAD DOORS SECTION SECTIONAL OVERHEAD DOORS PART 1 GENERAL

Transcription:

PART 1 GENERAL 1.01 DESCRIPTION A. General 1. Furnish SST-II Hydraulic Bi-Fold System complete from one manufacturer. Provide all labor, materials, tools and equipment to furnish the SST-II Bi-Fold System complete as herein specified. 1.02 RELATED WORK BY OTHERS A. Preparation of opening including jambs and header will be by General Contractor. Any deviation of site conditions contrary to approved shop drawings must be called to the attention of the architect. B. All header, blocking, support structures and jambs as required. C. Paint or otherwise finishing all trim and other materials adjoining door. D. Provide hydraulic fluid in quantity necessary for proper system operation. 1.03 SUBMITTALS A. Product Data 1. Submit manufacturer s product data and roughingin diagrams. 2. Complete shop drawings are to be provided prior to fabrication indicating construction and installation details. 1.04 QUALITY ASSURANCE A. Provide each Bi-Fold System as a complete unit by one manufacturer, including frames, panels, brackets, guides, hardware, operators and installation accessories to suit opening. B. Wind Loading: Design and reinforce Bi-Fold system to withstand a wind loading pressure to comply with state and federal code requirements. C. Preparation of the opening shall conform to the criteria set forth by UBC, 2000 International Building Code & 1999 Standard Building Code (ASCE 7-98). 1.05 PRODUCT DELIVERY, STORAGE AND HANDLING A. Proper storage of the system before installation and continued protection during and after installation will be the responsibility of the general contractor. 1.06 WARRANTY A. Frame/Panels, hydraulic cylinders and controls shall be guaranteed for one year against defects in material and workmanship from date of shipment to the job site. B. Optional factory-supplied, manufacturers-standard glass retainer system and glass inserts shall be guaranteed for one year against defects in material and workmanship from date of shipment to the job site. C. Glass retainer, glass and/or other cladding/covering by others is not included in this warranty. PART 2 PRODUCTS 2.01 ACCEPTABLE MANUFACTURERS A. Subject to compliance with requirements, manufacturers offering products which may be incorporated into the work, include, but are not limited to, the following: Crown Incorporated 135 McLeod Avenue South Plato, MN. 55370 (320) 238-2616 www.crowndoors.com info@crowdoors.com B. Upon compliance with all of the criteria specified in this section, manufacturers wishing to bid products similar to the product specified must submit to the architect - 10 days prior to bidding - complete data in support of compliance. The submitting manufacturer guarantees the proposed substituted product complies with the product specified and as detailed on the drawings. 2.02 MATERIALS A. Product to be SST-II Hydraulic Bi-Fold System as furnished by Crown Incorporated 1. Construct panel/frame sections with structural steel tube (of ASTM-A500 grade minimum) framing to comply with applied wind code. a. Optional: 304 stainless steel tube framing for highly corrosive environments. 2. Frames shall be constructed of structural steel tubing and other structural steel shapes, and designed to the same loading requirements for live, dead and wind loads as the surrounding construction, with a maximum CTC between vertical and horizontal members measuring 60 and 48, respectively. 3. Panel frame shall be designed so that no center cane bolt is required in the floor. 1

4. Panel frames shall be factory-welded at all joints and connections, with smooth welds not to exceed 1/4 [6] thickness. 5. Panel frames shall be primed with rust-resistant red oxide to provide corrosion resistance, and be prepared for field finishing, if required. 6. Factory-Supplied neoprene seals/weather stripping will be shipped loose for field-install to protect against damage during transport. B. Bi-fold doors/windows shall be operated by hydraulic cylinders that are mechanically fastened to the panel frame. 1. Cylinders are to be located on the top half of the door, only. Cylinders will be designed to carry the required loads during operation, open position and closed position. Internal stops will be installed so as not to allow over-extension of the cylinders, therefore restricting the system from opening or closing beyond its limit. 2. Lift straps or cables, horizontal top and bottom drive shafts, pulleys and strap or cable kick outs are unacceptable. 3. System shall be locked closed by means of the hydraulic cylinders providing a minimum of 1000 lbs. of closing force. C. Power Operator - Standard voltage is 208-230v single phase. 1. Up-Down" push-button or key-switch controls for separate mounting. 2. Power unit to power (2) hydraulic cylinders which open and close the door/window. Power unit to be pre-wired, factory-tested and provided with supply cables for final hook-up (by others). 3. Open-Close control units will be wired for constant-hold operation. 4. Incoming electrical source to hydraulic power unit to be supplied by others (manufacturer s standard). 5. Each door operator shall have thermal overload protection for the motor. 2.03 OPERATION A. The Bi-Fold System shall be extended/retracted in the opening using a constant-contact push-button or key switch, operating hydraulic cylinders mounted to the door/window frame. PART 3 EXECUTION 3.01 SAFETY A. Hydraulic power unit to have a manual emergency let -down valve for closing the system in case of a power outage. B. SST-II Bi-Fold System to incorporate pressure compensated orifice valves C. Photo eyes or lead-edge sensor optional. 3.02 INSTALLATION A. Installation of the Bi-Fold System shall be by a contractor familiar with this type of installation, and be in strict accordance with the approved build drawings and manufacturers standard printed specifications, instructions and recommendations. All moving parts will be left in good operating condition. B. Permanent or temporary electric wiring shall be brought to the power unit location before installation. After the Bi-Fold System is installed, the general contractor assumes the responsibility of any damage to the system or system components during construction until the building is turned over to the owner. C. Fill reservoir with hydraulic fluid (provided by others). Use ATF for cold weather applications or #32 hydraulic fluid for all other applications. 3.03 CLEANING A. All surfaces shall be wiped clean and free of handprints, grease and oil. 3.04 TRAINING A. Installer shall demonstrate proper operation and maintenance procedures to owner's representative. B. Operating keys and owner s manual shall be provided to owner's representative. D. Finishes 1. Entire system frame and panels shall be cleaned and primed with rust-resistant red-oxide primer, prepared for field finish (by others). a. Optional Finishes i. Manufacturers standard RAL powdercoated E. Available Accessories/Options 1. Photo eyes or lead-edge sensor that stops (or stops and reverses) the downward movement of the door/window. 2. Warning horn/strobe light assembly 3. Remote receiver w/transmitter a. Additional transmitters available 4. 24v DC battery back-up system 5. 3-Phase option 6. External, weather-resistant, open-close control wired for constant-hold 7. Inside-sash or front-set glass retainer system and glass inserts 2

ELEVATIONS 3

SECTION VIEWS 4

ATTACHMENT DETAILS FRAME DETAILS For more information, please contact us at info@crowndoors.com or visit our website: 5