Village of Mamaroneck Flood Mitigation Status Report

Similar documents
Mamaroneck & Sheldrake Rivers Basin Village of Mamaroneck Flood Risk Management Study

Exploring the Possibilities At Prado Dam

Passaic River Main Stem and Tributaries, New Jersey, Flood Risk Management Project

ICELANDIC RIVER / WASHOW BAY CREEK INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT

MUD CREEK WATERSHED STUDY PUBLIC MEETING NOVEMBER 7, 2013

Briefing to Elected Officials

Sea Level Rise and Recurrent Flooding Update

Reservoir Drought Operations

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING December 5, 2018 ROUTINE STATUS REPORTS ITEM 1

Chabot Dam Seismic Upgrade Spec Board of Directors March 8, 2016

Warm Springs Hydro LLC 5203 South 11 th East Idaho Falls, ID

STORMWATER 101 May 2012

Rainwater Harvesting

Engineering Report Preliminary Floodplain Study. Executive Summary

Dry Creek Flood Control Improvement Project

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

Forecast Informed Reservoir Operations for Groundwater Recharge Prado Dam

Lower Columbia River Pile Dike Assessment

Wapato Access Feasibility Study

Flood Mitigation Plan

Roland Ottolini, P.E. Director, Natural Resources Division. Lee County Board of County Commissioners March 15, 2016

ND Detention Project Development Update

PUBLIC INFORMATION MEETING Rahway River Basin Flood Risk Management Feasibility Study

Hydrology and Flooding

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

Cokato Lake (86-263) Wright County. Hydrologic Investigation

Current Water Management Practices for Kerr Reservoir

Mill Creek/Peaks Branch/ State Thomas Drainage Relief Tunnel. Parkdale / Lawnview Avenue Neighborhood April 26, 2016

FISHER RIVER INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT

List of Appendices APPENDIX A: WY 2000 LAKE MICHIGAN DIVERSION ACCOUNTING REPORT APPENDIX B: WY 2001 LAKE MICHIGAN DIVERSION ACCOUNTING REPORT

Restoring Wreck Pond Inlet Jenna Krug, Habitat Restoration Coordinator

Water Supply Board Briefing. Water Operations Department March 22, 2016

SOURCE WATER MONITORING

4. Present Activities and Roles

An Investigation into the 2012 drought on Apalachicola River. Steve Leitman, Bill Pine and Greg Kiker

Spring Forecast Based Operations, Folsom Dam, California

Capturing Storm Water in Semi-arid Climate

Watersheds, Hydrology and Flooding

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models...

Assessment of Agricultural Flood Damages Along the James River in South Dakota

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

The Impacts of Climate Change on Portland s Water Supply

Wood Canyon Emergent Wetland Project. City of Aliso Viejo 12 Journey, Suite 100 Aliso Viejo, CA 92656

Appendix G Preliminary Hydrology Study

Green Infrastructure. Jesse Schomberg University of Minnesota Sea Grant Program

CALCASIEU PARISH ENGLISH BAYOU BASIN STORMWATER MASTER PLAN. NTB Associates, Inc. Solving Tomorrow's Problems Today...

Northampton s New Stormwater and Flood Control Utility

Project Summary: - Hydrologic Models. - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

SEWRPC Staff Memorandum

LOXAHATCHEE RIVER WATER QUALITY EVENT SAMPLING TASK 2: FINAL REPORT ASSESSMENT OF LOXAHATCHEE RIVER WATER QUALITY

LOWER INTERLAKE BASIN - HYDROLOGY

Little Bear Brook Flood Hazard Assessment and Redevelopment Area Regional Stormwater Management Analysis. Progress Meeting

fcgov.com/water-quality Water Quality Update Fall 2017 Monitoring and Protecting Our Water Sources

Calculating System Development Charges for Stormwater Facilities

Sea Level Rise Impacts on Municipal Stormwater Systems in Hampton Roads

MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK

Presentation Overview

CENTRAL ASSINIBOINE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT

Village of Gurnee, Illinois Flood Mitigation Plan. Executive Summary. November 15, Flood Mitigation Planning Committee

Climate Change/Variability and Reservoir Operations

2003 Water Quality Monitoring Report

2002 Water Quality Monitoring Report

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

Local Flood Hazard Mitigation Program. A framework for hazard mitigation in the NYC West of Hudson Water Supply Watersheds

SECTION IV WATERSHED TECHNICAL ANALYSIS

Informational Meeting- July 21, Boxelder B-2/B-3 Watershed Planning Study

Surface Water Improvement and Management (SWIM) Plan Development

Assessing Real Time - Drainage Water Management

Adaptation to Change with No

Section 6: Stormwater Improvements

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Water Supply Reallocation Workshop

Stormwater design considerations

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

SECTION III: WATERSHED TECHNICAL ANALYSIS

OCSD Urban Runoff Program SCAP Collection Systems in Motion

Impacts of Permit-Exempt Wells

Stafford Capitol Region Natural Hazards Mitigation Plan Update - Page 384

Freight Street Development Strategy

Hydrologic Analysis of a Watershed-Scale Rainwater Harvesting Program. Thomas Walsh, MS, PhD Candidate University of Utah

Cedar River Watershed Habitat Conservation Plan

Surface Water Improvement and Management (SWIM) Plan Development

St. Lucie Estuary/ Southern Indian River Lagoon Water Resource Summary

2003 ANNUAL REPORT on INTERBASIN TRANSFERS For RTP South and the Towns of Cary, Apex, and Morrisville

REGIONAL PUBLIC MEETING February 22, 2018, East Haven, CT. South Central Regional Multi-Jurisdiction Hazard Mitigation Plan Update

TOWN LINE BROOK URBAN WATERSHED STUDY MODELING INCREMENTAL IMPROVEMENTS

Water Infrastructure Needs in the Columbia River Basin Legislative Council on River Governance

Background Information on the. Peace River Basin

Public Works and Engineering

ANNUAL PLATTE RIVER SURFACE WATER FLOW SUMMARY

Song Lake Water Budget

Climate Change Impacts on Water in NW Washington

New Castle County, DE. Floodplain Regulations

Gilleland Creek Intensive Bacteria Survey Addendum. March 18, 2010

City of Madison: 2017 Capital Budget Capital Improvement Plan

OVERLAND RESERVOIR. Prepared for: Overland Ditch and Reservoir Company Redlands Mesa Road Hotchkiss, CO 81419

Modeling the Middle and Lower Cape Fear River using the Soil and Water Assessment Tool Sam Sarkar Civil Engineer

Reservoir on the Rio Boba

Transcription:

Village of Mamaroneck Flood Mitigation Status Report

Introduction Flooding is a regional problem that must be addressed with regional solutions; There are no quick-fix answers; This is an ongoing process; Geography, History and Technical Explanations; Response to flooding since April 2007; and Where We are Today

Geography What is a Watershed? An extent of land where water from rain or snow melt drains downhill into a body of water, such as a river, lake, dam, estuary, wetland, sea or ocean. The watershed includes both the streams and rivers that convey the water as well as the land surfaces from which water drains into those channels; and Watersheds can contain multiple Drainage Basins or Sub-Basins.

Geography Typical Watershed

Mamaroneck Watersheds Approximately 32 Square Miles (20,480 Acres) 5 Drainage Subbasins (Mamaroneck River, Sheldrake River, Mamaroneck Harbor, Beaver Swamp Brook and Beaver Swamp Brook West)

Mamaroneck Watersheds Mamaroneck River Mamaroneck, Sheldrake and Lower Mamaroneck Harbor Sub-Basins 24 Square Miles (15 above the Confluence of the Mamaroneck and Sheldrake Rivers) Guion Creek Beaver Swamp Brook, Beaver Swamp Brook West and Upper Mamaroneck Harbor Sub Basins 8 Square Miles

Mamaroneck Watersheds Storm flows in the Mamaroneck River from the Watershed based on storm size Storm Statistical Chance of Occurrence Runoff in Cubic Feet per Second (cfs) Runoff in Gallons per Minute (gpm) 2-yr 50% 1,360 610,410 10-yr 10% 2,900 1,301,610 50-yr 2% 4,200 1,885,091 100-yr 1% 4,800 2,154,390

Floodplain Floodplain Flat or nearly flat land adjacent to a stream or river that experiences occasional or periodic flooding. Includes: Floodway Consists of the stream channel and adjacent areas that carry flood flows Flood Fringe Areas covered by the flood, but which do not experience a strong current.

Floodplain A River is the entire floodplain not just the dry weather channel 100-YR FLOOD PLAIN FLOODWAY DRY WEATHER CHANNEL

Floodplain VIllage of Scarsdale Town of Mamaroneck Mamaroneck Reservoir Sheldrake River Mamaroneck River West Basin East Basin Town/Village of Harrison Village of Mamaroneck Guion Creek Otter Creek Beaver Swamp Brook Town of Rye City of Rye Much of the Village is in the 100-Year Floodplain Of those areas, many structures predate the current FEMA Construction Guidelines Many areas and structures actually in the Floodway 500-YR Floodplain Village of Larchmont 100-YR Floodplain Floodway 100-YR Floodplain 500-YR Floodplain

History Flooding is not new to Mamaroneck Records prior to Federal Government Tracking From October 1877 to May 1968 informal records indicate 81 Flood events in the Village Federal Records since 1971 Records indicate Significant Floods in 1971, 1972, 1974, 1975, 1978, 1980, 1982, 1984, 1989, 1992, 1996, 1998, 2006, and 2007 Of these, six were serious enough to warrant Presidential Disaster Declarations, including the most recent in 2006 and 2007.

History Flood Control Projects 1933 Village Project channelized portions of the Mamaroneck and Sheldrake River floodplains 1937 WPA Project improved the Mamaroneck River Channel for 2,300 feet below the North Barry Avenue Bridge to a 30-ft wide rock lined channel Flood Control Studies 1942 US Department of War New York District Engineer s Office (predecessor of the Army Corps of Engineers) Flood Control Survey

History Flood Control Studies (cont) 1945 Westchester County Harding Report Studied Three Alternative Approaches on the Mamaroneck River Channel Improvement alone Relief Tunnel (from North Barry to Tompkins Avenue) combined with Channel Improvement Flood Control Reservoir combined with Channel Improvement Also Studied Alternative Approaches on the Sheldrake River Included Storage at Larchmont Reservoir and various channel improvements and or diversion tunnels.

History Flood Control Studies (cont) The Army Corps of Engineers (USACE) 1977 USACE Started the Mamaroneck & Sheldrake Rivers Flood Mitigation Studies 1987 USACE presented findings and preliminary design for a $60 Million Flood Control Project to widen and deepen the Mamaroneck River and reroute the Sheldrake River under Fenimore Road (project never built because cost benefit ratio did not meet federal criteria) Currently completed with Reconnaissance Phase of a Re- Evaluation Study to update this Project. Next Phase (Preliminary Design) slated to be completed in two (2) years.

History Flood Control Studies (cont) Leonard Jackson Associates 1982 Study with recommendations for improvements to the Lower Mamaroneck River (was abandoned as a condition of the continuation of the USACE Study) 2007 Study to evaluate potential structural flood mitigation measures approved by the Board of Trustees in August of 2007 Simultaneous LJA Study of the Beaver Swamp Brook for Harrison also has potential benefits for Mamaroneck

History Spring 2007 Flood Events March 2, 2007 4-inches of rain in about 4 hours equated to between a 25-yr and a 50-yr rainfall event Addition of frozen ground (no infiltration) and snowmelt from previous weeks snow storms made the actual flood event frequency closer to a 100-yr to 150-yr flood event April 16, 2007 Actual measured rainfall of 8.05 Inches in 24-hours equated to a 200-yr rainfall event Flood events were close to the long duration rainfall magnitudes

Village Response 2006 2007 2008 Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar FEMA Hazard Mitigation G rant The Parkway Drainage Project NIM S Federal Mandate for Disaster Preparedness LISWIC formation of Regional Stormwater District GIS Project Flood Eve nts (3/2-4/16) Storm Cle anup Efforts Post-March Village Flood Meetings (Command Center Creatred) Me eting with ACE, DEC, SEMO and Others (3/29) Activated Command Center (4/13) Coordination of Recovery Efforts with Utilitie s, etc. FEMA Data Gathering by Village Staff Waiving of Buildign Permit Fees fro Flood Vic tims (4/24) ACE Tours Vill age (5/2) Federal Disaster Declared (5/3) Community Meetings (5/7-5/21) Harrison enlists LJA to study Flood issues in Harrison Town and Village Committee awar ds donated relief funds Village enlists LJA to study potential structural solutions County Summi t to explore r egional solutions and funding Citizens F lood Committee Village Flood Control Legislation Congresswoman Lowey secures $30 Million in Federal Funds Village be gins replacement of capi tal purchases lost to floods Village FEMA G rant Applications ACE Mamaroneck Re valuation Study Building Department reorganized, strict FEMA enforcement New Mayor begins to coordiante Regional Efforts Village Attorney Code revie w and updates (priority on Fl ood related matters) County $10 Million F lood Mitigation grant Program Begins Beaver Swamp Brook Stu dy BOT Authorizes Study BOT ap proved LISWIC SWM District Mamaroneck/Harrison Findings Meeting Committee R eorga nized Draft Findings Phase I Completed Coordinating for Local Sponsor for ACE Projectd Application for Joint Mamaroneck Harrison Beaver Swamp Brook Project Disaste r Preparedness Storm Water Management Village Recovery Efforts Village Public Assitance Flood M itigation Efforts Grant/ Funding Efforts Regional Solution Efforts

Where are We Now? Flood Control Studies Leonard Jackson Associates 2007 Study Findings Summary Mamaroneck Reservoir as a Retainage Basin ineffective Eliminate Bends in the River ineffective Stream Maintenance good for low flow situations but negligible effect on flood events Widening of Mamaroneck River from Halstead to Ward Avenue significant effects (up to 3 ft reductions) for flood events Needs to be put on Hold as a condition of continuation of the USACE Re-Evaluation Study Can proceed with work on Beaver Swamp Book without affecting the USACE Study

Where are We Now? Flood Control Studies (cont) US Army Corps of Engineers 2007 Re-Evaluation Study Reconnaissance Phase Completed Needs Local Sponsor (NYS DEC) to continue with process Preliminary Design scheduled for completion in two (2) years Update will not include underground re-routing of Fenimore Road, will need to find alternative method to address these flows. Cannot proceed with any projects that will change the flow profiles or hydraulics of either the Mamaroneck and/or Sheldrake Rivers without risking loss of Federal Funding for Project

Where are We Now? Flood Mitigation Advisory Committee Formed subsequent to the Spring 2007 flooding Consists of individuals from throughout the Village, reflecting both residential and commercial interests Coordinates efforts with the Village to address flood mitigation and reduce flood impact both short and long term : Meet on a monthly basis Advocate for the maintenance of the local infrastructure and propose revisions to the Local Village Ordinances Attend meetings held by neighboring communities to obtain updates on flood mitigation efforts Continue close coordination with the Village with ideas about flood mitigation efforts, the recent flood study conducted by LJA, and the pursuit of all applicable grants

Where are We Now? Common Misconceptions Use the Mamaroneck Reservoir as a Detention Basin For the 100-yr storm the Flow Rate is 2,154,390 gpm, so to retain the storm for one (1) hour you need 129,263,400 gallons of storage, which is 17,281,203 cubic feet of storage. At approximately 7 Acres in size, the Reservoir would need to be about 57 feet deep to provide 1-hour of retention for the 100-yr storm. Similarly it would require a full 16 ft of depth to retain the 2- yr storm for a single hour.

Where are We Now? Common Misconceptions (cont) 235' Dredge the Rivers Dredging alone does not significantly change the Floodplain Elevation, River Channels must be widened and deepened to have any significant impact on the size and depth of the Floodplain

Where are We Now? Common Misconceptions (cont) Raising Bridges Has no effect whatsoever on the floodplain, bridges need to have their open spans (abutment to abutment) widened as part of overall channel improvements Re-route the Sheldrake River Under Fenimore Road Part of the original 1986 USACE Project would not pass today s environmental review standards

Where are We Now? Stormwater Infrastructure Maintenance Stormdrains Dam Debris at Bridges

Where are We Now? Next Steps Flood Mitigation Plan USACE Reevaluation Study Securing Local Sponsorship No further action on Mamaroneck or Sheldrake Rivers or Risk loosing Funding Village Codes Review and Updating Other Considerations Incentives to bring properties into FEMA/NFIP Compliance Incentives to manage Stormwater onsite for new or existing sites

Summary There is no Quick Fix to the Flooding Issue About a third of the Village is in the Floodplain, flooding has historically hit the Village hard Village has been active in Recovery and Planning for future since the floods of last year Village is actively seeking to be part of Regional Stormwater Solutions including the USACE Reevaluation Study Will continue to pursue other available (and approved) incremental flood mitigation projects while the Re-Evaluation Study Progresses