STATE AID GUIDE FOR: Updated: December 16, 2005

Similar documents
Annual CSAH Needs Update for 2017

Annual CSAH Needs Update for 2018

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17

Exhibit A Scope of Work. 0.0 Separation of work Types and Cost Estimate

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

Texas Department of Transportation Book 2 Technical Provisions. Grand Parkway Project. Attachment 2-2. Work Breakdown Structure Requirements

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

2008 Interim Standard Sheet List For Use with the 2008 Imperial Road and Bridge Standards July, 2015

CITY OF TACOMA Department of Public Utilities Tacoma Power

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

Kansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max:

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR

Constructability Guidelines


SECTION PAYMENT PROCEDURES

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP &

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????

Review of Plans and Specs from a Constructability Perspective

SECTION MEASUREMENT AND PAYMENT

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

12/21/2018 WHAT S NEW SINCE What's New Since SPEC BOOK 2018 SPEC BOOK 2018 SPEC BOOK WHAT S NEW SINCE 2014

IM 0291(108)0 UNION COUNTY INDEX OF SHEETS. Index of Sheets. Estimate of Quantities. Table of Fence Quantities. Details for Right-of-Way Fence

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment

Table of Contents for Guide Specifications

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25

OHIO DEPARTMENT OF TRANSPORTATION JERRY WRAY, DIRECTOR DATE : 02/14/97 PAGE : TABULATION OF BIDS

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

Addendum No. 1 Page 1 of 2

2008 Interim Standard Sheet List For Use With The 2008 Imperial Road and Bridge Standards October, 2014

General Symbols, Ducts and Cables

ENGINEERS ESTIMATE MARYLAND STATE HIGHWAY ADMINISTRATION

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

St. Tammany Parish Government Department of Procurement P. O. Box 628 Covington, LA Phone: (985) Fax: (985)

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

VANDERBILT UNIVERSITY

SECTION MAINTENANCE OF EXISTING CONDITIONS

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

ADDENDUM 1 FOR SUMITOMO RUBBER USA RAILROAD TRACK IMPROVEMENT PROJECT NYSDOT PIN

General Symbols, Ducts and Cables

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

Thank you for your response to our Request for Bid submissions. The following is a summary of the submitted bids for this project.

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS

1/5/2018 WHAT S NEW SINCE B & B QUALIFICATION OF WORKERS. What's New Since SPEC BOOK 2018 SPEC BOOK 2018 SPEC BOOK

Chapter 3: Permit Procedures and Requirements

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

PRIMARY LINE EXTENSION

SCHEDULE OF QUANTITIES AND PRICES

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

NOTICE TO BIDDERS ADDENDUM NO. 3. Dated: March 25, 2019 SAP

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX

DOCUMENT ADDENDA AND MODIFICATIONS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 01/22/02 PAGE : 1 TABULATION OF BIDS

PUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ)

TOWN OF HOLLIS, NEW HAMPSHIRE

PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56

HALIFAX REGIONAL MUNICIPALITY MUNICIPAL DESIGN GUIDELINES

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

Water Pollution Control for Work in Sensitive Areas

Plan Unit Description

Maine Turnpike Authority

Table Related Arlington County Standards, Specification and Policies

CITY OF TACOMA Tacoma Rail

Maine Turnpike Authority

000I-291 UNION COUNTY INDEX OF SHEETS

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Welcome to Douglas County PUD

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

SECTION MEASUREMENT AND PAYMENT

CONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION

Index to Technical Specifications

General Symbols, Ducts and Cables

Forsyth County Procurement

CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS

CHAPTER 2: QUANTITIES

Bruce Powers, Park Analyst / Project Manager Parks & Recreation Department

CHAPTER 10: PAVING. Refer to page 548 of the 2016 Spec book or page 573 of the 2018 Spec book for material specifications under G.

EXHIBIT A SCOPE OF SERVICES FOR. FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title

B STEEL BEAM GUIDE RAIL - OPSS 721

CITY OF ASHLAND REDEVELOPMENT PLAN FOR THE ASHLAND INVESTMENT CO., LLC HOUSING DEVELOPMENT

NAME STREET ADDRESS CITY, STATE & ZIP CODE. GAS ELECTRIC TELEVISION TELECOMMUNICATION OTHER (check one) UNDERGROUND OVERHEAD BOTH (check one)

CW 3240 RENEWAL OF EXISTING CURBS TABLE OF CONTENTS

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

CHAPTER 3: DETAILS and ADA

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

ADDENDUM NO. 1. BVCAP Laurel Hill Residential Site Improvements Pawtucket, RI. March 18, 2016 PREPARED BY:

Maps are enclosed of the larger areas to be included in the projects. The area in yellow are the proposed areas.

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

Transcription:

STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk, Wetland Mitigation, Railroad Crossing Surfacing and Concrete Surfacing 3. AFTER THE FACT BRIDGE DECK REHAB 4. CREDIT FOR LOCAL EFFORT The following pages were compiled to act as a guide to aid you in your preparation for the submittal of After the Fact right of way, lighting, signals, wetland mitigation, Bridge Deck Rehab and Credit for Local Effort. Each sheet lists items that are included and items that are not included for each. This is NOT an all inclusive list and is only to be used as a guide. Please note that it would be very helpful to the State Aid Office if your submittals were separated from each other according to the following: 1. After the Fact Right of Way 2. Miscellaneous After the Fact Traffic Signal, Lighting, Retaining Walls, Sidewalk, Wetland Mitigation, RR Crossing Surfacing and Concrete Paving. 3. After the fact Bridge Deck Rehab 4. Credit for Local Effort Send an abstract of bids with the spec items highlighted for each of the four listed categories. If a single project qualifies for more than one of the four listed categories, separate copies of the abstracts for each, is required. This is needed because each category is processed separately. All submittals must be received by the DSAE by July 1 to be included in the following year s apportionment determination.

TABLE OF CONTENTS PAGE County Screening Board Resolutions 3-4 After the Fact Right of Way 5 Miscellaneous After the Fact : Traffic Signals 6 Lighting 7 Retaining Walls 8 Sidewalk 9 Wetland Mitigation 10 Railroad Crossing Surfacing 11 Concrete Paving 12 After the Fact Bridge Deck Rehab 13 Credit for Local Effort 14 2

COUNTY SCREENING BOARD RESOLUTIONS Right of Way - June 1984 (Latest Rev. June 2000) That needs for Right-of-Way on County State Aid Highways shall be earned for a period of 25 years after the purchase has been made and the documentation has been submitted and shall be comprised of actual monies paid to property owners with Local or State Aid Funds. Only those Right of Way costs actually incurred by the county will be eligible. It shall be the County Engineer's responsibility to submit justification to the District State Aid Engineer. His approval must be received in the Office of State Aid by July 1 to be included in the following year s apportionment determination. Traffic Signals, Lighting, Retaining Walls, Sidewalk, Railroad Crossing Surfacing, Wetland Mitigation, and Concrete Paving - June 1984 (Latest Rev. June 2004) That needs for Traffic Signals, Lighting, Retaining Walls, Sidewalk, Railroad Crossing Surfacing, Wetland Mitigation, and Concrete Paving (as eligible for State Aid participation) on County State Aid Highways shall be earned for a period of 25 years after the construction has been completed and the documentation has been submitted and shall consist of only those construction costs actually incurred by the county. It shall be the County Engineer's responsibility to justify any costs incurred and to report said costs to the District State Aid Engineer. His approval must be received in the Office of State Aid by July 1 to be included in the following year s apportionment determination. Bridge Deck Rehabilitation - Dec. 1982 (Latest Rev. Oct. 1992) That needs for bridge deck rehabilitation shall be earned for a period of 15 years after the construction has been completed and the documentation has been submitted and shall consist of only those construction costs actually incurred by the county. It shall be the County Engineer's responsibility to justify any costs incurred and to report said costs to the District State Aid Engineer. His approval must be received in the Office of State Aid by July 1 to be included in the following year s apportionment determination. Mn/DOT Bridges - June 2000 That, needs for bridge improvements to trunk highway bridges carrying CSAH routes shall be earned for a period of 35 years after the bridge construction has been completed and the documentation has been submitted and shall be comprised of actual monies paid with local or State Aid funds. Only those bridge improvement costs actually incurred by the county will be eligible. It shall be the County Engineer s responsibility to submit justification to the District State Aid Engineer. His approval must be received in the Office of State Aid by July 1 to be included in the following year s apportionment determination. (Only one bridge project has been submitted, therefore, each bridge will be handled on an individual basis.) 3

Needs Credit for Local Effort - Oct. 1989 (Latest Rev.Oct., 1997) That annually a needs adjustment for local effort for construction items which reduce State Aid needs shall be made to the CSAH 25 year construction needs. The adjustment (credit for local effort) shall be the local (not State Aid or Federal Aid) dollars spent on State Aid Construction Projects for items eligible for State Aid participation. This adjustment shall be annually added to the 25 year County State Aid Highway construction needs of the county involved for a period of twenty years beginning with the first apportionment year after the documentation has been submitted. It shall be the County Engineer's responsibility to submit this data to their District State Aid Engineer. His submittal and approval must be received in the Office of State Aid by July 1 to be included in the following year s apportionment determination. 4

STATE AID AFTER THE FACT RIGHT OF WAY COSTS INFORMATION The following items qualify for both reimbursement with state aid funds and for "After the Fact" R/W needs. Payment for land and improvements taken or damaged. (Slope Easments) Owner s appraisal fees. Owners/occupants relocation costs. Payment to utility companies for utility movement required by construction. Costs necessary to bring an abstract up to date by reason of the taking but not costs necessary for the property owner to clear title to make the property merchantable. Filing fees (recording of deed, satisfaction of mortgage). Demolition Expenses Trial Expenses State Deed tax. Title searches. Condemnation costs. Appraisal costs to the local road authority. Labor additive - fringe benefits such as sick leave, vacation leave, holiday pay, worker and unemployment compensation. (Must be State Aid or Local Money) - Federal Project, also if on a State Aid Route The following items are not reimbursable and do not qualify for "after the fact" needs as they are considered administrative costs or local options: Taxes. Work done by local forces as a compromise to the negotiations. After the Fact needs on Trunk Highway Turnback projects Administrative overhead costs - such as building expenses and administration and supervision staff not directly charged. Permit fees. The following items qualify for reimbursement as preliminary engineering costs (but not as After the Fact needs): Staking of right-of-way. Archaeological dig costs (Federal Projects). Contaminated Site Investigation. 5

STATE AID MISCELLANEOUS AFTER THE FACT TRAFFIC SIGNAL COST INFORMATION The following items qualify for After the Fact Misc. Traffic Signal needs: Loop Detector Revise or Replace Signal System Salvage Signal System Conduit Hand Holes Full Traffic Actuated Signal System Traffic Control Interconnect Emergency Vehicle Pre-emption System Safety Related, S/B included, State Law for Wiring, 12/16/03 Mast Arm Substitution County Supplied Controller Cabinet (Shall consist of only those construction costs actually incurred by the county) The following items do not qualify for After the Fact Misc. Traffic Signal needs: Sign Panels Temporary Signals Engineering 6

STATE AID MISCELLANEOUS AFTER THE FACT LIGHTING INFORMATION The following items qualify for After the Fact Misc. Lighting needs: Lighting Unit Light Base Design Conduit Wire Hand Hole Equipment Pad Service Cabinet Service Equipment Photocell Meter Socket Safety Switch Inspection Fee Pull Box Salvage Lighting Unit Relocate Lighting Unit Revised Lighting Unit Junction Box Electrical System (Maybe lump sum package cost) Emergency Vehicle Preemption System The following items do not qualify for After the Fact Misc. Lighting Needs: Flashing Beacon Lights Traffic Control Interconnection 7

STATE AID MISCELLANEOUS AFTER THE FACT RETAINING WALL INFORMATION The following items qualify for After the Fact Misc. Retaining Walls Including: Concrete Retaining Wall Stone Retaining Wall Modular Block Retaining Wall Concrete Block Retaining Wall Wood/Timber Retaining Wall Keystone Retaining Wall Block/Brick Retaining Wall Stone Retaining Wall NOT included: Temporary Retaining Wall 8

STATE AID MISCELLANEOUS AFTER THE FACT SIDEWALK INFORMATION The following items qualify for After the Fact Misc. Sidewalk needs: Pedestrian curb ramps Remove sidewalk Remove Pavement Concrete Sidewalk pavement Bituminous Sidewalk Pavement 9

STATE AID MISCELLANEOUS AFTER THE FACT WETLAND MITIGATION INFORMATION The following items qualify for After the Fact Misc. Wetland Mitigation needs: Wetland Mitigation at a cost/acre Common Excavation Seeding Seed, Mixture Mulch Material Fertilizer Equipment Rental Labor Cost Clearing Grubbing Trees Mobilization (Pro-rated) 10

STATE AID MISCELLANEOUS AFTER THE FACT RAILROAD CROSSING SURFACING INFORMATION The following items qualify for After the Fact Misc. Railroad crossing surfacing needs: Ballast (Class 5) Track Spikes Plates Rail Anchors Switch Ties Freight for Ties Freight for Delivery Ballast DO NOT include sales tax. 11

STATE AID MISCELLANEOUS AFTER THE FACT CONCRETE PAVING INFORMATION The following items qualify for After the Fact Misc. Concrete Paving needs: Concrete paving Structural Concrete Expansion joints Reinforcement bars Dowel Bars Headers - Permanent/Temporary 12

STATE AID AFTER THE FACT BRIDGE DECK REHAB INFORMATION After the Fact Bridge Deck Rehab is allowed only on Adequate Bridges. Bridges with full needs are not eligible. Deficient bridges are already drawing needs. The following items qualify for After the Fact Bridge Deck Rehab needs: Mobilization (Prorated) Scarify Bridge Deck Structural Steele Reinforcement Bars Structure Concrete Concrete Pavement Wear Course Expansion Joints Surfacing Removals Sandblast Anchorages NOT included: Approach Work Shoulders Sidewalks Lighting Railing Special Surface Finishes Traffic Control Sign Salvage Curb and Gutter Any After the Fact items 13

STATE AID CREDIT FOR LOCAL EFFORT INFORMATION ALWAYS CHECK 1. Check Data Collector first to: a. Make sure that the construction will reduce the needs. (Overlays do not reduce needs.) b. Make sure the Type of Construction Funds reflect Local Construction 2. Construction items which reduce State Aid needs means bridge construction, grading, base, initial surfacing or complete shoulders. The basis for these items will be the Abstract of Bids. (Not the Final) (The segment must be deficient in the needs). 3. State Aid Construction Project means project constructed based on an approved S.A.P. plan. 4. Must be local dollars spent (Not State Aid or Federal Aid dollars). 5. From Abstract of Bids This list is only some of the possible items eligible for inclusion in Credit for Local Effort: All grading items Clearing/Grubbing Common Excavation Removal Bit. Material (no overlays) Turf establishment Bale check Temporary Erosion Control Guide Posts Permanent Traffic barriers All Base items Curb & Gutter Seeding Storm sewer City local dollars spent on CSAH roads are eligible if NOT paid with SA Dollars Some Items not included: Engineering Bond Funds Traffic control Turn lanes Overlays Wages Paved Medians Storm Sewer Ponds Retaining Walls Sidewalk/Driveway Pavement Fencing Lighting Maintenance Overhead Buildings Copies of local dollars spent, an abstract of bids and a breakdown of State Aid eligible items, and corresponding needs sheets must be submitted. CSAH Needs will verify: Split Regular/Municipal (Cities under 5,000) N:\CSAH\Word\AFTER THE FACT AND CREDIT FOR LOCAL EFFORT.doc 14

Credit For Local effort

After the fact Right of way

After the fact Miscellaneous