Original Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 75% Three Story Academic Addition with CTE Gymnasium Addition: Multi-court gym 3 courts Expandable to future fieldhouse/lower level lockers & support spaces PE Fields/Competition Soccer (Turf) /Competition Softball (Sod) $87.1M SUMMER 2016 Champaign Unit 4 School District
Revised Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Addition with CTE Gymnasium Addition: Multi-court gym 3 courts Expandable to future fieldhouse/lower level lockers & support spaces PE Fields/Competition Soccer (Turf) /Competition Softball (Sod) $96.0M
Revised Central Scheme 1A Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Addition with CTE Gymnasium Addition: Multi-court gym 3 courts Main level lockers & support spaces PE Fields/Competition Soccer (Turf)/Competition Softball (Sod) $96.0M
Original Central Scheme 2 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Addition with CTE Full Fieldhouse Addition with lower level lockers & support spaces PE Fields/Competition Soccer (Turf) /Competition Softball (Sod) $102.0M
Central Schemes Summary
Revised Spalding Park/Franklin-Central Fields Competition Baseball (Sod) Practice Baseball (Sod) Additional Tennis Courts Dugouts/Concessions/Restrooms/ Bleachers $3.6M
Revised South Side-Central Fields $6.2M Competition Track & Field/JV Football (Turf) Practice Football (Sod) Support Building: Restrooms Lockers Concessions Storage Additional Parking
Central Fields Summary
Original Centennial Scheme 1 $60.6M Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 50% Two Story Academic Addition Single Story Cafeteria/Administration Addition CTE spaces Gymnasium Addition: Multi-court gym 2 courts Expandable to future fieldhouse Football Field (Turf)
Revised Centennial Scheme 1 $66.0M Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Two Story Academic Addition Single Story Cafeteria/Administratio n Addition CTE spaces Gymnasium Addition: Multi-court gym 2 courts Expandable to future fieldhouse Football Field (Turf)
Original Centennial Scheme 2 $71.2M Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Two Story Academic Addition Single Story Cafeteria/ Administration Addition CTE spaces Full Fieldhouse Addition Football Field (Turf)
Centennial Schemes Summary
Revised Edison Scheme Existing Building Exterior Upgrades: Window Replacement Roof Work Tuckpointing Accessibility Enclosures HLS upgrades: Limited accessibility upgrades Power, security & lighting upgrades Classroom Renovations: General material & finish upgrades No reconfiguration of existing classrooms $7.5M
Revised Edison Scheme 2 Existing Building Exterior Upgrades: Window Replacement Roof Work Tuckpointing Accessibility Enclosures HLS upgrades Accessibility upgrades Power, security & lighting upgrades Classroom Renovations General material & finish upgrades No reconfiguration of existing classrooms Cafeteria and Gymnasium replacement HVAC System Upgrades Higher efficiency systems $15.0M
Original Edison Scheme Existing Building Exterior Upgrades: Window Replacement Roof Work Tuckpointing Accessibility Enclosures Completely Renovate Existing Original Building Demolish Additions to the North Side of original building Building Additions: Cafeteria Gym Three Story Classroom Building $33.3M
Edison Schemes Summary
Original International Prep Academy Renovation of Existing Building: 50% Building Additions: Gym/Stage/Support Cafeteria Expansion Relocate/Expand Library Added Classroom Wing: First Floor: 3 rd -5 th grades Second Floor: 6 th -8 th grades $17.6M
Original Dr. Howard Elementary Three Story Replacement School Facility Demolish Existing School $16.1M
Original South Side Elementary Existing Building Exterior Upgrades: Window Replacement Roof Work Tuckpointing Renovation of Existing Building: 100% HLS upgrades Accessibility upgrades Power, security & lighting upgrades Building Additions: Admin areas Gym/Stage areas Remove portable classroom building $11.1M
Elementary School Schemes Summary