Conceptual Design of CO 2 Transportation System for CCS

Similar documents
Noriyuki Kokubun a, Kiyohiko Ko b and Masahiko Ozaki c *

Ship transport of CO 2 An Overview

Adriatic LNG Terminal (ALT) Roger D. Leick ALT Topsides Manager

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

THE TRANSFER OF LNG IN OFFSHORE CONDITIONS. SAME SONG NEW SOUND

Marine Facilities for LNG Carrier Transfer Alternatives

1) 2) 3) 4) 5) The oil and gas cycle. Life cycle of oil and gas (time) Potential requirement on ground

Available online at Energy Procedia 37 (2013 ) GHGT-11

Available online at Energy Procedia 4 (2011) Energy Procedia 00 (2010) GHGT-10

Innovative Zero-emission Coal Gasification Power Generation Project

Design Concept and Features of the Mitsubishi LNG-FPSO (Floating Production, Storage and Offloading Unit)

Feasibility study of CO2 free hydrogen chain utilizing Australian brown coal linked with CCS

The general design of a LNG-terminal. Background

Enabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions

LNG Plant Overview. Seminar with Supplier Association Murmanshelf Murmansk, 15 May 2012 Jostein Pettersen

Under the Scenes of our Lives High-pressure Pump

SAMSUNG Energy Plant: All-in-One Solution for Floating Power Plants with Gas-fired Combined Cycle Gas Turbines

Comparison of Spherical and Membrane Large LNG Carriers in Terms of Cargo Handling

Optimisation economics for CO 2 Capture and Storage in Central Queensland (Australia)

Available online at ScienceDirect. Energy Procedia 63 (2014 ) GHGT-12

North American LNG 2006

RISKS ASSOCIATED WITH THE MARINE ASPECTS OF LNG FPSOs (FLOATING PRODUCTION, STORAGE AND OFFLOAD) UNITS. Braemar Engineering

The Low Motion Floater (LMF)

Development of Efficient, Environmentally Friendly and Flexible Shipboard Regasification Vessel

HANDBOOK OF PORT AND HARBOR ENGINEERING

2012 International Symposium on Safety Science and Technology Safety aspects of the use of LNG for marine propulsion

LNG Systems for Marine Application. LNG Reliquefaction & LNG Regasification. Oil & Gas Systems

Towards a Low-Carbon Society - Climate Change Policy in Japan -

Hydrogen Energy Supply Chain based on Victorian brown coal linked with CCS

Liquefied Hydrogen Supply Chain and Carrier Ship to Realize Hydrogen Economy

Available online at ScienceDirect. Energy Procedia 114 (2017 )

CO2-Free Hydrogen Supply Chain

Green FSRU for the future

When bigger is better Prelude FLNG, the world s biggest floating structure

American Institute of Marine Underwriters

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

Appendix A: Project Characteristics

Design Theories of Ship and Offshore Plant

Integrated Utilization of Offshore Oilfield Associated Gas

ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

Inland Technologies Inc

Available online at Energy Procedia 100 (2009) (2008) GHGT-9. Allan Hart and Nimalan Gnanendran*

A Leader In Maritime Technology

A new re-liquefaction system of MRS-F (Methane Refrigeration System Full re-liquefaction) for LNG Carriers

Why LNG? LNG is mainly produced for transportation purposes. More economical to transport gas as LNG compared to pipelines over long distances

Petronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations

Evaluation of durability of concrete for applying slipforming to construction of prestressed concrete outer tank for LNG storage

WHAT IS LIQUEFIED NATURAL GAS?

MEMO CONCERNS. DISTRIBUTION For general information ELECTRONIC FILE CODE AUTHOR(S) DATE. 14F013 9

Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant

Large Floating Concrete LNG/LPG Offshore Platforms

Estimation of Emissions from CO 2 Capture and Storage: the 2006 IPCC Guidelines for National Greenhouse Gas Inventories

Supply of natural gas to island economies

A Study on Re-liquefaction Process of Boil-off Gas of LCO 2 Transfer Ship

PERP Program LNG Receiving Terminals New Report Alert

Available online at Energy Procedia 4 (2011) Energy Procedia 00 (2010) GHGT-10

LNG Houston, February 6-7 th, The case for developing a Floating LNG Receiving Terminal on the US East Coast

Domestic seaborne distribution systems in Asia

OFF-THE-SHELF MID-SMALL-MINI-SCALE LNG PLANT CASE STUDYFOR APPLICATION

Available online at Energy Procedia 1 (2009) (2008) GHGT-9. Sandra Heimel a *, Cliff Lowe a

New energy for Italy

LNG RECEPTION TERMINAL: OPERATING ASPECT OF RE- GASIFICATION SYSTEM INCLUDING LNG COLD UTILIZATION

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

ezng Solutions LLC for Maritime Fuel and Transport Nested Liquefied Natural Gas Tank Concept

OFFSHORE TARIFF Valid as per June 1, 2018

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

International Journal of Offshore and Coastal Engineering Vol.1 No. 1 pp. 1 7 August 2017 e-issn: Department of Ocean Engineering ITS

Finite Element Analysis for Structural Performance of Offshore Platforms

Floating LNG Business A breakthrough in offshore gas monetization

Multiple screw pumps on FPSO vessels

LNG Business In India

Ship Transportation of Natural Gas

Challenges of Offshore Geotechnical Engineering

The Technical & Practical challenges of FLNG

Available online at ScienceDirect. Energy Procedia 63 (2014 ) GHGT-12

LNG R E F E R E N C E P R O J E C T S. Phone: +49(0) GOC Engineering GmbH Bachovenstr. 8; Sinzig, Germany

Introduction. FLNG: Costs and Cost Drivers. What is FLNG (and what isn t) FLNG Project Costs

Scalable FLNG for Moderate Metocean Environments. R M Shivers LoneStar FLNG

Lars Odeskaug - TORP CEO

CHAPTER 3: GENERAL DESCRIPTION OF THE PROPOSED COEGA INTEGRATED POWER PROJECT

LNG Terminal in Świnoujście. Mutual Joint Visit Workshop for Seveso Inspections 26 September 2017, Nicosia, Cyprus

KHI Activity for Hydrogen Supply Chain

Utilisation of LNG Cold Energy at Maptaput LNG Receiving Terminal

Carbon Capture and Storage

Available online at GHGT-9

LNG BUNKERING VESSELS AND CNG CARRIERS -Innovative solutions to improve sustainability- LNG/SHORE POWER Workshop TRIESTE 10 th of March 2016

Steel Industries in Japan Achieve Most Efficient Energy Cutoff Chemical Absorption Process for Carbon Dioxide Capture from Blast Furnace Gas

6th Annual LNG Transport Handling & Storage 2016 Forum. FSRU as The Pivotal Point for Effective LNG Distribution

Elastopor Sustainable solution for cryogenic insulation

Floating offshore gas units

Development of Filler for Underground Cavities SMART GROUTTM Using Granulated Blast Furnace Slag

Energy Procedia

Clean LNG fuel for Black Sea-Danube-Rhine corridor

OUTLINE OF MIZUSHIMA LNG RECEIVING TERMINAL AND MAIN CHARACTERISTIC OF EQUIPMENT COST REDUCTION

Hydrogen Energy Supply Chain from Overseas

Offshore Liquid FPSO Measurement Systems Class 2450

Seismic Analysis of an SPB Tank Installed in the Offshore GBS LNG Terminal

The following sub-systems are provided and the integration of these is described below:

Liquefied Natural Gas Terminals Services and solutions

INTRODUCING THE LIQUID LOGISTIC SHIPPING CONCEPT

Transcription:

Available online at www.sciencedirect.com Energy Procedia 37 (2013 ) 2989 2996 GHGT-11 Conceptual Design of CO 2 Transportation System for CCS Abstract Takakazu Suzuki a *, Makoto Toriumi b, Takuya Sakemi c, Naoki Masui d, Shuho Yano e, Hideo Fujita f, Hironori Furukawa g a Engineering Advancement Association of Japan, 3-18-19 Toranomon, Minato-ku, Tokyo, 105-0001, Japan b Universal Shipbuilding Corporation, 5-36- 7 Shiba, Minato-ku, Tokyo, 108-0014, Japan c Taisei Corporation, 1-25-1 Nishi-shinjuku, Shinjuku-ku, Tokyo, 163-0606 Japan d Obayashi Corporation, Shinagawa Int.city B, 2-15-2 Konan Minato-ku, Tokyo, 108-8502, Japan e Mitsubishi Heavy Industrials, Ltd., 2-16- 5 Konan, Minato-ku, Tokyo 108-8215, Japan f Mitsui Engineering & Shipbuilding Co. Ltd., 5-6- 4 Tsukiji. Chuo-ku, Tokyo 104-8439, Japan g JFE Engineering Corporation, 2-1 Suehiro-cho, Tsurumi-ku, Yokohama 230-8611, Japan Reducing carbon dioxide (CO 2 ) emission is strongly requested in relation to the global warming issue. The development of innovative technology including Carbon dioxide Capture and Storage (CCS) is required to achieve the CO 2 reduction targets. Because of the geological structure of the domestic complex in Japan, reservoirs near sources of emissions have not enough storage capacity of CO 2. Therefore, transportation to suitable sites will be necessary for large amount of CO 2 storage. Three methods of transporting CO 2 from coalcoastline were studied. One with transporting liquefied CO 2 by ship, another with transporting CO 2 hydrate by ship, and the third by a pipeline. Transportation distance is approximately 700-1,000km for the former two cases, and 120km for pipeline. The case study on a demonstration scale and a commercial use was executed. The CO 2 transport volume set for each case is 240,000 ton-co 2/year and 1,540,000 ton- CO 2 /year respectively. This research was executed as a contract study from New Energy and Industrial Technology Development Organization (NEDO). 2013 The Authors. Published by by Elsevier Ltd. Ltd. Selection and/or peer-review under responsibility of of GHGT GHGT Keywords: CCS, liquefied CO 2, CO 2 hydrate, pipeline, CO 2 transportation system * Corresponding author. Tel.:+81-3-5405-7204; fax: +81-3-5405-8201. E-mail address: suzuki@enaa.or.jp. 1876-6102 2013 The Authors. Published by Elsevier Ltd. Selection and/or peer-review under responsibility of GHGT doi:10.1016/j.egypro.2013.06.185

2990 Takakazu Suzuki et al. / Energy Procedia 37 ( 2013 ) 2989 2996 1. Outline of CO 2 transportation system CO 2 transportation system image is shown in Fig.1. This study examined both demonstration scale (about 240,000ton-CO 2 /year) and commercial use (about 1,540,000ton-CO 2 /year), in the following technologies and concept design, except for the CO 2 hydrate transportation, which was only demonstration scale study. Each technology and concept design are as shown in following chapters. Liquefied CO 2 storage tank (Chapter 2), Ship transportation of liquefied CO 2 (Chapter 3), Offshore gravity- based terminal (Chapter 4), Floating Offshore terminal (Chapter 5), CO 2 hydrate transportation (Chapter 6), Pipeline transportation (Chapter 7) Fig.1 Image of CO 2 transportation system 2. Liquefied CO 2 storage tank (Onshore terminal, Offshore terminal) In the shipping and offloading terminals where liquefied CO 2 will be transported for shipping, it is required to keep the buffer function inclusive of the stormy weather standby of the CO 2 carrier in order to prevent transportation and storage from stagnation. Here, under the design condition, the specification for Temporary storage tank and its incidental equipment of terminal was determined. Drawing was made and investigation for the lot area required for terminal construction was executed. 2.1. Design condition The state of CO 2 handled at the terminal is Liquefied with low temperature and high pressure. Design is executed subject to "High Pressure Gas Safety Act." [1]. The following was thought as a design condition. It is prevented that liquefied CO 2, at offloading and shipping, from solidification (piping blockage due to CO 2 hydrate) effected by temperature and pressure change during transportation process. Also, heat insertion treatment, so to speak, a methodology to control and collect the volume of boil off gas (B.O.G.) was executed. That is, the necessary storage of liquefied CO 2 in each terminal for the demonstration scale plant and for the commercial use plant respectively was assumed to be 6,000ton and 24,000ton. The designed pressure value is basically set at 0.8MPaG. The temperature was designed within the range of -46 to -50 degree Celsius in consideration of triple point and to meet the pre-condition as mentioned as above. 2.2. Specification of the CO 2 Onshore terminal and Offshore terminal (includes tanks) For both Onshore and Offshore terminal for liquefied CO 2 in the demonstration scale plant, two numbers of 3,000ton spherical tanks (18m inner diameter) were considered. They were made of alumina

Takakazu Suzuki et al. / Energy Procedia 37 ( 2013 ) 2989 2996 2991 killed steel (SLA360), a -60 degree Celsius cryogenic steel material (steel plate thickness is 31mm at the max., while minimum site area became approximately 7,000m 2 (80m 80m). In addition, the tanks and equipment are stored in the offshore gravity base caisson terminal. In case of the onshore commercial use plant, due to the size, the adoption of 9% nickel steel (SL9N) that had cryogenic performance of -196 degree Celsius was required as a material unnecessary to execute in situ annealing process. As a result, two numbers of 12,000ton spherical tanks (28m inner diameter) were required (plate thickness become 50mm at the max., and the minimum site area is 10,000m 2 (150m 66m). In the onshore commercial use plant, the tank adopted 3,000ton cylindrical type in consideration of its well-fitting dimension inside of the caisson. Therefore, the total number of tanks counted eight. In this case, economical alumina killed steel (SLA360) was able to be adopted for the tank material. Additionally, in order to reduce the B.O.G. at each plant, it has been found effective to shorten as much as possible the total length of piping from the liquefaction facility to the tank. Fig. 2 to Fig. 4 shows liquefied CO 2 storage tank and the outline chart of the commercial use Onshore terminal. Fig. 2 Commercial use CO 2 Storage Tank (onshore) Fig. 3 Commercial use CO 2 Storage Tank (offshore) 12,000ton (0.8MPaG) 2 set 3,000ton (1.0MPaG) 8 12,000ton CO2 Storage tank 2set 150m 66 10,000m 2 21,000ton class CO2 Carrier Fig. 4 Commercial use Onshore terminal layout 10,000m 2 (not include pier, loading arm and planting area) 2.3. Obtained results and issues in the future In the demonstration scale tank facility, comparatively economical alumina killed steel (SLA360) can be obtained as a material in accordance with the size of tank. However, operation of the facility requires maintenance and control of appropriate temperature and pressure. The temperature room (surplus) of the steel material is -10 degree Celsius towards operational temperature of liquefied CO 2. The 12,000ton tank in the commercial plant requires adoption of 9% nickel steel (Cryogenic performance: - 196 degree Celsius) subject to legal limitation of steel material thickness, annealing condition and others. In this case, from now on, permission to use economic materials and relaxation of

2992 Takakazu Suzuki et al. / Energy Procedia 37 ( 2013 ) 2989 2996 legal binding such as introduction of 5% nickel steel and pre-stressed concrete material will be expected since there is enough room for liquefied CO 2 (-50 degree Celsius). Since there is no experience in constructing and using a tank in this huge scale for liquefied CO 2 storage both in demonstration and commercial purpose, experiment of the state change during operation and analysis verification are required prior to practical use. As for pre-stressed concrete tank, technology will allow designing at the maximum of 50,000ton size. 3. Ship transportation of liquefied CO 2 The conceptual design of liquefied CO 2 carrier is carried out for several types of ship on the basis of the experience of LPG and LNG. 3.1 Preliminary investigation (1) Building record of liquefied CO 2 carrier. Several liquefied CO 2 carriers are constructed, but they are small ship having capacity up to 1,400m 3. (2) The applicable ship rules. 1) The liquefied CO 2 carrier is designed according to Ships carrying liquefied gases in bulk of Rules for the survey and construction of steel ship published by Classification society. 2) The liquefied CO 2 carrier is categorized as Ship type 3G and independent tanks type C. (3) The applicable design temperature and pressure of liquefied CO 2. The design temperature for tank is -50 degree Celsius and the design pressure for tank is 1.0MPaG based on the investigation of properties of liquefied CO 2. (4) The applicable steel material of CO 2 tank. 1) The applicable materials of tank are decided by the design temperature and plate thickness of tank is decided by the design pressure. 2) The applicable materials for tank are steel for low temperature use or nickel steel. 3) The applicable plate thickness is up to 40mm and 50mm in case of special approval. (5) The applicable CO 2 tank configuration. The applicable tank structure is pressure vessel and tank configuration is 3 types as shown below. Cylindrical tank Bi-lobe tank Spherical tank 3.2 Conceptual design The conceptual design is carried out for the demonstration scale ship with Carbon dioxide discharge of 240,000ton-CO 2 /year and for the commercial use ship with 1,540,000ton-CO 2 /year. The 4 types of ship are designed with the different tank type and capacity. The principal dimensions are shown on table 1. Table1 rincipal dimensions of Liquefied CO 2 Carrier item unit 3,000ton type 20,000ton type 50,000ton type demonstrational ship commercial ship commercial ship Tank type cylindrical bi-lobe spherical bi-lobe Length(L) m 95.0 161.0 226.0 240.0 Breadth(B) m 18.4 27.5 41.0 35.4 Depth(D) m 7.4 17.2 19.0 21.5 Draft(d) m 4.8 9.4 10.5 11.5

Takakazu Suzuki et al. / Energy Procedia 37 ( 2013 ) 2989 2996 2993 Fig. 5 20,000ton type commercial ship 4. Offshore gravity-based terminal 4.1 Summary The Offshore terminal installed close to the storage site has the facilities to accommodate berthing and offloading operation for CO 2 carrier, to receive temporary storage, and to support pressure risers for the injection of CO 2. The conceptual design has demonstrated that the proposed Offshore terminal is able to provide the above services, safety against environmental attacks such as earthquake and storm, and cost merit. The construction method based on the existing technology is also proposed. The gravity-based Offshore terminals are suitable for shallow waters. 4.2 Structural configuration and type of foundation The structural configuration of the terminal has been determined by the survey on the existing technology which covers port structures, offshore LNG terminals and gravity-based platforms for oil and gas development in the North Sea. The terminal of reinforced concrete has the following dimensions to accommodate CO 2 containers and to berth CO 2 carriers. Commercial use Length 250m Width 42m Height 25m The environmental conditions at the open sea and the geotechnical condition of the sea bottom show that the skirt suction foundation, proven technology in offshore concrete platforms, is applicable to the terminal. The arrival of CO 2 carrier at the terminal for commercial use is shown in Fig.6. The study also demonstrates that delayed the arrival of CO 2 carriers during heavy weather could be minimized by the wave blocking effect of the gravity- based terminal and a down time is negligible even at the open sea. 4.3 Proposed construction method The terminal of large offshore concrete structure will be constructed at a dry dock, a quay wall and so on. The terminal will be fully loaded with topside facilities there and it will be towed to the installation site. Fig.6 Schematic view of offshore gravity-based terminal for commercial use 5. Floating Offshore terminal The functions of the floating Offshore terminal are to receive the liquefied CO 2 from the liquefied CO 2 carrier, which is liquefied at Onshore terminal, to store them at CO 2 tanks onboard, to inject them into sea bottom. 5.1 Design condition The water depth at site, the size of the floating structure, and wave/wind condition are shown as follows,

2994 Takakazu Suzuki et al. / Energy Procedia 37 ( 2013 ) 2989 2996 Water depth at site : 120 m Storage tank capacity for liquefied CO 2 : Demonstration scale terminal : 6,000 ton Commercial use terminal: 24,000 ton Max. wave height (significant) : 10 m 5.2 Conceptual design (1) Demonstrational terminal (shown in Fig.7 As to the facilities onboard, there are two (2) sets of the liquefied CO 2 tanks having 3,000 ton capacity each, loading arms, CO 2 injection system, power plants and accommodation quarter, etc. The principal dimension of the floating barge is, Loa = 100 m, Bm = 35 m, Dm = 8 m. The multi-anchor chain system was selected because that the design external force by wind and wave has not been so big than expected. (2) Commercial use terminal (shown in Fig.8) As to the facilities onboard, there are eight (8) sets of the liquefied CO 2 tanks having 3,000 ton capacity each, loading arms, CO 2 injection system, power plants and accommodation quarter, etc. The floating terminal is of octagon mono-column type and the principal dimension is, Loa = 86 m, Boa = 86 m, Dm = 46 m. The mooring system is the multi-anchor chain system. The functions of the floating Offshore terminal are to receive the liquefied CO 2 from the liquefied CO 2 carrier, which is liquefied at Onshore terminal, to store them at CO 2 tanks onboard, to inject them into sea bottom. There are many kinds of structural configuration for the floating Offshore terminal, such as, barge type, ship type, semi-submersible type, TLP type, SPAR type, etc. There are also many kinds of mooring system such as, multi-anchor chain mooring, turret mooring, dolphin mooring, etc. The optimal structural configuration and mooring system shall be determined in accordance with the design conditions at site such as, water depth, wave, wind, soil condition of sea bottom, etc. Fig.7 The illustration of the demonstrational floating Offshore terminal Fig.8 The illustration of the commercial floating Offshore terminal 6. CO 2 hydrate transportation CO 2 transportation as hydrate pellets will be presumed feasible comparing with liquefied CO 2, since natural gas transportation as hydrate will be feasible under certain condition than LNG. The most important characteristic of hydrates is so- - means those can exist relatively stable in the atmospheric pressure at well above the equilibrium decomposition temperature as covered with ice membrane. The feature will be utilized for storage and/or transportation in the form of pellets (solid), which phenomenon and effectiveness was observed in the study of Natural Gas Hydrate (NGH) pellets [2]. The self-preservation phenomenon of CO 2 gas hydrate (CGH) pellets and validity of conditions were confirmed by laboratory test,and the storage condition in tanks and/or in CO 2 carriers was decided at -15 degree Celsius under the atmospheric pressure. 6.1 System configuration of CGH transportation

Takakazu Suzuki et al. / Energy Procedia 37 ( 2013 ) 2989 2996 2995 The scope of CGH transportation system covers after receiving CO 2 gas from the Separation & Capture System at the coal-fired power plant and before delivering to the underground Sequestration System. The components of the CGH transportation system i.e. CGH production facilities and storage tanks at Onshore terminal /CGH carriers /the re-gasification units at Offshore or Onshore terminal were fixed. And the basic conditions of the system such as; the properties of CO 2 delivered from upstream, transport volume, transport distance, storage volume and condition after re-gasification were determined. 6.2 Case study of CGH transportation (for demonstration scale) Considering the cruising time from power plant as the source of CO 2 to reservoirs as the candidate offshore storage sites, loading/unloading time and wait-on-weather time with the pier restriction, the size and number of CGH transportation fleet were decided as follows; Treating volume 3,156 ton /day (CGH) CGH transport fleet Deadweight 7,400 ton x 3 ships Ship dimension (m) L=125, B=19.4, D=10, d=4.8 (Fig.9) Considering the results of economic evaluation of the demonstration scale system, further study for Commercial use unit (about 6.5 time treating size larger) was not performed. Fig.9 Image view of the CGH carrier at pier 6.3 Features of CGH transportation The advantages and disadvantages of the CGH transportation system are summarized as follows; (1) Safer transportation by ships under the atmospheric pressure at -15 degree Celsius in spite of increasing transportation volume than liquid phase transportation. (2) Possibility to improve energy balance by NGH-CGH round trip transportation by the same ship. (3) Possibility to improve energy balance by gas hydrate separation concept (hydrate method). 6.4 Challenging tasks For further study of the CGH transportation system toward full scale commercialization in the future, following challenging tasks should be studied. (1) Applicable laws or regulations to the CGH carriers in view of safety for carrying CGH pellets in bulk. (2) Improvement on the energy required for manufacturing CGH pellets, by means of cold energy utilization, round trip transportation of CGH-NGH by the same ship, and the separation and recovery of CO 2 by hydrate method. (3) Optimum shapes and sizes combination of CGH pellets for improving filling rate in tanks and/or holds. (4) Loading and unloading system in the cargo holds and/or storage tanks for effective handling of solid CGH pellets, including measures against adherence of pellets. 7. Pipeline transportation 7.1 Transport conditions In Japan CO 2 pipelines must be designed according to High Pressure Gas Safety Act. Based on the same transport volumes of CO 2 as the ship transport case (1,540,000 ton- CO 2 /y), the case study for the

2996 Takakazu Suzuki et al. / Energy Procedia 37 ( 2013 ) 2989 2996 pipeline was carried out. The length of the pipeline on land is 17km, and the length of the offshore portion is 108km. The maximum depth of the offshore pipeline is 100m. The pressure at the wellhead of the storage formation is specified at 10.5MPaG. Since there is a gasliquid equilibrium curve around 4~6MPaG for CO 2 at the normal temperature, it is determined that the operation pressure to be out of this range to make the flow single phase. 7.2 Pipe Material and Corrosion Protection Pipe material was also determined to be usual carbon-manganese steel pipe (API material) in this study. CO 2 emitted from the power plant contains approximately 8% of water, but there is no other corrosive elements in the gas. Therefore, the major corrosion protection method for internal surface of the pipe will be removal of water, and water contents in the gas is limited to 100ppm. 7.3 Pipeline System Configuration In Case-1 (Fig.10) CO 2 is transported as gas phase throughout the pipeline at a lower pressure (design pressure at 3.5MPaG), and it is pressurized again at the compressor near the storage site. In this case, the external pipe diameter is 610.0mm. In Case-2 (Fig.11) CO 2 is transported as liquid phase (dense phase) throughout the pipeline at a higher pressure (design pressure at15mpag), and it is injected into the formation without compression at the end of the pipeline. In this case, the external pipe diameter is 323.9mm. 7.4 Construction method The in-land pipeline will be buried under roads similar to natural gas transmission pipelines. Offshore pipelines will be laid by a special construction ship called pipe lay-barge. Gas 0.10 MPaG, 61 degree Celsius CO2 91.5% H2O 8.1% H2 0.4% Capture Compression Gas Transport Compression Liquid (super critical phase) Pressure r at seabed well head 10.5 MPaG Power plant Fig. 10 Dehydrator and compressor Onshore pipeline Offshore pipeline Onshore platform Compressor and pump System configuration of Case-1 (gas phase/low pressure transport) Storage Gas Liquid 0.10 MPaG, 61 degree Celsius CO2 91.5% H2O 8.1% H2 0.4% Pressure at seabed well head 10.5 MPaG Capture Compression Transport Onshore pipeline Power plant Fig. 11 Dehydrator and compressor Offshore pipeline Seabed well head Storage System configuration of Case-2 (liquid phase/high pressure transport) References [1] High Pressure Gas Safety Act (Act No. 204 of June 7, 1951. Revisions of Act No. 50 of June 2, 2006 [2] T. Iwasaki, et al., Research on Self-preservation of Natural Gas Hydrate Pellets, Mitsui Zosen Technical Review, No.187, 2006; p.15-21.