Ironton Russell Bridge Project

Similar documents
Ironton Russell Bridge Project

Ironton Russell Bridge Project

Ironton Russell Bridge Project

Ironton Russell Bridge Project

Ironton Russell Bridge Project

Ironton Russell Bridge Project

Ironton Russell Bridge Project

Bonner Bridge Replacement Update:

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

2016 ACEC/PA ANNUAL MEETING

Tilikum Crossing Transit Bridge. Portland, OR

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

LRFD Bridge Design Manual Changes

STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

I-94/I-69 Interchange Bridge Construction

St. Anthony Falls I-35W Bridge Replacement. ASHE National Conference June 13, Dustin Thomas, P.E. I-35W Bridge Construction Engineer

Lesner Bridge Replacement

I2-0 LIST OF ACTIVE SSDs

Economical Design / Case Studies

Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc.

Dan Carrier Parsons Brinckerhoff Project Manager Cooper River Bridge Charleston, South Carolina

LIST OF ACTIVE STRUCTURAL STANDARD DRAWINGS (SSDs)

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring

MILTON-MADISON BRIDGE REPLACEMENT

Red Wing Bridge Alternates

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

Results you can rely on

Final Estimates Level 2

Strengthened Bascule Piers for the Newly Rehabilitated Bridge of Lions

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS

SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal

PHASING CONSIDERATIONS FOR BRIDGES

7 Bridges in 74 Days. NC 12 Detour

John James Audubon Bridge. Introduction

ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead

Pueblo's New 4th street

Inventory Inspection and Load Rating of a Complex Segmental Concrete Bridge. Presented by Matthew J. Lengyel, PE, SE

Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By:

Lesner Bridge Replacement

Specification Changes and Their Effect on Plans. Bridge Construction Issues. BRG VTC April, 2010

RESILIENT INFRASTRUCTURE June 1 4, 2016

Dulles Corridor Metrorail Project

DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE

MIDAS Civil 2016 v2.1 Release Webinar. PSC Composite Design Check / Load rating

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE

H3-2 LIST OF ACTIVE ONTARIO PROVINCIAL STANDARD DRAWINGS Division 900 Fencing and Guide Rails

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

Presented by: Taya Retterer BRG Webinar July 30, 2012

Get In, Get Out, Stay Out!

ABRAHAM LINCOLN BRIDGE

Replacing the Aging US 52 Mississippi River Bridge

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD

Spliced Segmental Prestressed Concrete 1-Beams for Shelby Creek Bridge

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 6 - RICE COUNTY

IMUA ANNUAL PRESENTATION 2013

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

Accelerated Bridge Construction in USA

Modjeski and Masters, Inc. Consulting Engineers 04/18/06 St. Croix River Bridge 3D Analysis Report Introduction

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts...

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

The bridge over the Georges River at Alfords Point has been duplicated with a new incrementally launched bridge.

John James Audubon Bridge

MIDAS Training Series

KEYWORDS: Barge Stability, Steel Truss Erection, Horizontal Sliding of Steel Trusses

I-70 over SR 121 Bridge Slide Construction and Engineering

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/01/2017 to 10/07/2017

APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES

Jane Addams Memorial Tollway (I 90) Fox River Bridge Traffic Needs Drive Innovative Solutions

High Bridge Re-Deck Project

Maritime Work Plan for the High Rise Bridge Construction

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

OHIO S CONCRETE BRIDGES

Short Span Steel Bridges

Progressive Erection Applied to Box Girder with Strutted Wing Slab

Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey

Construction of Long Key Bridge

Provincial Highways Management. Ministry of Transportation PRODUCTION RATES. Contract Management Office Estimating Section

EXODERMIC DEXKS AND STEEL BRIDGES

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

DEVELOPMENT OF GUIDE FOR SELECTION OF SUBSTRUCTURE FOR ABC PROJECTS

Accelerated Bridge Construction Award

Fort Street M-85 Bascule Bridge Looking to the Past to Build Bridge for the Future

Creating Solutions Together The Construction Of The Waiwera Viaduct

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

A New At the port columbus

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa

IN THE EYE OF THE STORM: UTILIZING PRECAST SOLUTIONS TO ACCELERATE BRIDGE CONSTRUCTION

Construction and design features of the Bridge over the Danube River. Bulgaria

Dundas Street Crossing of Sixteen Mile Creek A Field Spliced, Post-tensioned Precast Concrete Girder Bridge

SUNSHINE SKYWAY BRIDGE

STRUCTURES INSPECTION SELF STUDY TRAINING COURSE PART ONE

EGCE 406: Bridge Design

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Transcription:

Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E.

Ironton Russell Bridge Project Project Summary: October 1, 2014 Project Overview The Ironton Russell Bridge Project entails the construction of a cast in place concrete cable stayed bridge over the Ohio River with structural steel approaches connecting the towns of Ironton, Ohio and Russell, Kentucky. The bridge will provide two 12-ft driving lanes and two 4 ft shoulders; a driving lane and shoulder in each direction. Span lengths for the approaches vary widely as they cross numerous (6) rail lines, the Ohio River levee and city streets. On the Kentucky side the spans are 140-ft and 235-ft; in Ohio the spans are 110-ft, 144-ft, 186-ft and 144-ft. The approach bridges are founded on small diameter drilled shafts (Kentucky) or steel pile (Ohio). The main span unit consists of three spans; two flanking spans at 370-ft and the center span of 900-ft. The main span unit is supported by two CIP, 316-ft tall, diamond shaped towers, founded on large diameter drilled shafts with rock sockets. When completed, the 900-ft main span will be the longest span the Ohio DOT has built. The contract value for construction of the new structure and removal of the existing is $81,266,742.05, with Brayman Construction Corporation the low bidder. Recent Construction Highlights - Main Span Tower 4 (OH): Segments 3 and 4 of Tower 4 (OH) were cast in one lift on September 3, 2014. Each side of the placement is 35-4 tall, concrete was placed at both locations by alternating the pump boom from right leg to left leg. Page 1 of 8

Ironton Russell Bridge Project Project Summary: October 1, 2014 Recent Construction Highlights Kentucky Approach Kentucky Approach: Barrier wall and light pole stands were cast this month on the Kentucky Approach. Removal of the deck overhang formwork can now begin. Page 2 of 8

Ironton Russell Bridge Project Project Summary: October 1, 2014 Recent Construction Highlights Ohio Approach Ohio Approach Deck: Reinforcing steel installation for all 4 sections of cast-in-place deck is complete. Due to the deck pour sequencing all reinforcing steel will be in place prior to the first of four deck placements. The first placement is scheduled to take place this week (above). Page 3 of 8

Scheduled Actual Select Milestone Events (Schedule Update 24) Date Date Notice to Proceed 3Feb12 Open Bridge to Traffic 21Jul16 End Project 24Apr17 Ohio Approach Set Structural Steel Ohio Approach 18Apr14 18Mar14 Complete Deck Concrete Ohio Approach 07Oct14 Main Span Cast KY Tower Footing 10May13 10May13 Cast OH Tower Footing 21Jan14 21Feb14 Cast First KY Tower Section 27June13 14June13 Cast Last KY Tower Section 10Dec14 Cast First OH Tower Section 05Mar14 27Mar14** Cast Last OH Tower Section 13Jul15 Complete KY Back span 06Aug14 15Aug14 Complete OH Back span 05Feb15 Set form traveler KY Tower 13Feb5 Set form traveler OH Tower 05Oct15 Main span Closure Pour 15Apr16 Kentucky Approach Set Structural Steel Kentucky Approach 13Sept13 6Sept13 Complete Deck Concrete KY Approach 10Dec13 20Nov13 % Complete ($) Paid $46.5M/Total $82.8M 56.1% % Complete (Time) Day 940 of 1803 52.1% **Non critical path activity. Bridge and Roadway Summary All of the 12 Kentucky Back Span Segments have been cast on the false work. The final back span deck placement was cast on August 19, 2014. All of the 24 floor beam post-tensioning tendons have been stressed and grouted. The Manitowoc 888 crane and parts were moved and set on the back span on August 27, 2014. It was fully assembled and functional on September 2, 2014. At Tower 3 (KY), Segment 11 left (downstream) was cast on June 10, 2014. Segment 11 right was cast on June 17, 2014. At Tower 4(OH), Segment 3 and 4 were cast on September 3, 2014. Work began setting false work and formwork for the Tower 4 strut began on September 8, 2014. All Ohio approach substructure elements are complete. Steel girder erection for the Ohio approach was completed in March and sub-contractor Boone-Coleman has completed the approach embankment. Sub-contractor Oglesby has partially completed work placing concrete pavement on the approach and surface streets. Brayman continues forming the Ohio approach deck sections. Brayman s reinforcing steel subcontractor, J&B Steel, has completed installing rebar for the deck sections and the first of four deck sections is scheduled to be cast in the month of October. Page 4 of 8

Tower 3 (KY) Progress thru 10/1/14 Page 5 of 8

Tower 4 (OH) Progress thru 10/1/14 Page 6 of 8

Substructure Progress Chart thru 10/1/14 Kentucky Approach Ohio Approach Rear (KY) Abutment % complete Pier 6 % complete Drilled shafts 12 of 12 100 Pile Installed 24 of 24 100 Footing 7 of 7 100 Footing 100 Backwall 2 of 2 100 Stem 100 Wing walls 6 of 6 100 Cap 100 Pier 1 Pier 7 Drilled shafts 3 of 3 100 Pile Installed 24 of 24 100 Footing 100 Footing 100 Stem 100 Stem 100 Cap 100 Cap 100 Main Span Pier 2 Pier 8 Drilled shafts 6 of 6 100 Pile Installed 27 of 27 100 Footing 100 Footing 100 Pier Segment 3 of 3 100 Stem 100 Diaphragm Segment 4 of 4 100 Cap 100 Pier 3 (Ky Tower) Forward (OH) Abutment Drilled shafts 6 of 6 100 Pile Installed 22 of 22 100 Footing 100 Footing 100 Tower Segments 11 of 18 61 Backwall 2 of 2 100 Wingwalls 2 of 2 100 Pier 4 (OH Tower) Drilled shafts 6 of 6 100 Footing 100 Tower Segments 4 of 18 22 Pier 5 Drilled shafts 4 of 4 100 Footing 100 Pier Segments 2 of 2 100 Diaphragm Segment 3 of 3 100 Page 7 of 8

Superstructure Progress Chart thru 10/1/14 Precast Floorbeams # cast % cast 52 pieces total 52 of 52 100 Precast Anchorblocks # cast % cast 108 pieces total 48 of 108 44 Main Span Unit % complete Kentucky Back span Segments 12 of 12 100 Ohio Back span Segments 0 of 12 0 Kentucky Cantilever Segments 0 of 15 0 Ohio Cantilever Segments 0 of 15 0 Kentucky Approach % complete Girders Fabricated 24 of 24 100 Girders Erected 24 of 24 100 Deck Castings 3 of 3 100 Ohio Approach % complete Girders Fabricated 35 of 35 100 Girders Erected 35 of 35 100 Deck Castings 0 of 4 0 Page 8 of 8